11.07.2015 Views

Catalog - Pratt & Whitney

Catalog - Pratt & Whitney

Catalog - Pratt & Whitney

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Post-Maintenance Test – All Models (5 Days)ATA Level: IV Class Size: 12Course Code: 4005 B747/767/PW40004105 A300/PW41004405 MD11/PW44004135 A330/PW4100-100 inch4035 B777/PW4000-112 inchDesigned for mechanics, technicians and propulsion engineersresponsible for engine testing and analysis. Students will developthe skills necessary to perform engine test procedures, monitorperformance and evaluate the engine’s condition. Practicalexperience will be gained using test logs and data to monitorperformance and troubleshoot engines.Heavy Maintenance (B1-B2) – All ModelsATA Level: V Class Size: 6to8Course Code: 4007 B747/767/PW4000 (10 Days)4107 A300/PW4100 (10 Days)4407 MD11/PW4400 (10 Days)4137 A330/PW4100-100 inch (10 Days)4037 B777/PW4000-112 inch (15 Days)Designed for personnel who are responsible for performing andsupervising limited and major engine assembly and disassembly.The course provides practical hands-on training on the assemblyand on the disassembly of major build groups, using specialtooling, equipment and appropriate technical manuals.Maximum Heavy Maintenance (B3) – All Models(See note for class duration.)ATA Level: V Class Size: 2to4Course Code: 4006 B747/767/PW40004106 A300/PW41004406 MD11/PW44004136 A330/PW4100-100 inch4036 B777/PW4000-112 inchDesigned for personnel who are responsible for performing andsupervising limited and major engine assembly and disassembly.The course provides practical hands-on training on the assemblyand on the disassembly of major build groups, using specialtooling, equipment and appropriate technical manuals.This course is offered only at the customer’s facility using thecustomer’s tooling and engine-build groups.Note: The number of build groups selected for training determines total course length.Training days = 3 to 35 days based on an eight-hour day.Engine Change – Bootstrap Method – All Models (2 Days)ATA Level: V Class Size: 4to6Course Code: 4111 A300/PW41004411 MD11/PW44004141 A330/PW4100-100 inch4041 B777/PW4000-112 inchGives engine-change team members the knowledge required toremove and install an engine using the bootstrap method. Enginebootstrap tooling installation and removal tasks will be performed.The course will cover the maintenance manual procedure forpreparing the engine for removal and installation.9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!