Minimum tillage or direct drilling
Minimum tillage or direct drilling
Minimum tillage or direct drilling
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
• TRACTORTRACTOR COST“ COST OF USING SPECIALIST DRILLS ”(AIM : 35€/ha)>> CRITERIA FOR CALCULATING THE COST OF USENumber of hours per year Depreciation period (years) Interest on financeTract<strong>or</strong> > 140 hp 400 hr 8 5.5%Tract<strong>or</strong> < 140 hp 600 hr 8 5.5%• DRILLDRILL COSTS• Depreciation over a 10 year period.• 5.5% interest on finance.• Shelter.• Repairs and spares (2.30€/ha f<strong>or</strong> the SD and 3€/ha f<strong>or</strong> the Fastliner).>> MINIMUM TILLAGE DRILLSOperating cost (€/ha)Area (ha)T = TrailedP = Mounted>> DIRECT DRILLSOperating cost (€/ha)Area (ha)35