11.07.2015 Views

UPDATE SHEET No 5 (DRAFT) - Qualicoat

UPDATE SHEET No 5 (DRAFT) - Qualicoat

UPDATE SHEET No 5 (DRAFT) - Qualicoat

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

QUALICOAT SPECIFICATIONS <strong>UPDATE</strong> <strong>SHEET</strong> <strong>No</strong>. 513 th Edition 08.11.12Page 3/83. PRELIMINARY CONDITIONS (MINIMUM EQUIPMENT)The chemical manufacturer shall have the following minimum equipment available at atleast one location (main production site and/or technical service centre):• analytical instruments for testing the quality of the conversion coating;• cutting tools and instruments necessary for performing the adhesion test;• apparatus for testing adhesion and elasticity (cupping test);• impact tester (EN ISO 6272);• apparatus for testing resistance to cracking on bending;• apparatus to carry out the following corrosion tests:o constant climate condensation watero resistance to humid atmospheres containing sulphur dioxide 11o acetic acid salt spray resistanceo pressure cooker testo filiform corrosion test 111At all other locations (not being the main production site and/or technical service centre),the following requirements shall be met:• A method for testing the quality of the conversion coating shall be available.• Tests that cannot be carried out on‐site shall be performed by the laboratory at the mainproduction site and/or technical service centre or outsourced to any QUALICOATapproved laboratory.4. QUALICOAT TESTING LABORATORIESBefore an approval is granted for a new pretreatment system, the laboratory in charge shall carryout the testing programme specified in the following section. Corrosion tests shall also beperformed by a second laboratory under the responsibility of the laboratory in charge.For renewal of an approval, the full testing programme shall be carried out only by thelaboratory in charge.5. TESTING PROGRAMMEApproval is based on the following testing programme to ensure conformity with therequirements prescribed by QUALICOAT.a) PANEL PREPARATIONFor every corrosion test, six extruded samples shall be evaluated (three samples in each ofthe two laboratories involved).111 These tests may be outsourced and carried out by a QUALICOAT approved laboratory or another laboratory accredited forthese specific tests according to ISO 17025.H:\ac2\Q-COAT\BESTIMMU\Updatesheets\13th Edition\E\Update sheet 5_Revised Appendix A6.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!