11.07.2015 Views

Tender Invited for 630 KVA Diesel Generator set by Director FRI ...

Tender Invited for 630 KVA Diesel Generator set by Director FRI ...

Tender Invited for 630 KVA Diesel Generator set by Director FRI ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.2.4 All the expenses included on above tests including provision of testingapparatus required to carryout above mentioned test shall be borne <strong>by</strong>the contractor without any extra cost to Government. If the results of testare not found satisfactory, the contractor shall at his own expensesreplace the defective equipment/materials or any part there of as directed<strong>by</strong> the Engineer-in-charge. The decision of the Head Engineering Cellshall be final, conclusive and binding in this respect.5.2.5 The test as described above under clause 5.2.1 to 5.2.3 shall be carriedout in presence of electrical Engineer.5.3 COMPLETIONAfter test, the installation will be approved and accepted <strong>by</strong> HeadEngineering Cell. The installation will taken over provisionally <strong>for</strong> onemonth and if no defect noticed during one month period, the finalcompletion certificate will be issued. If any defect is found during onemonth period, the contractor will repair it and installation will again betaken provisionally <strong>for</strong> one month. Maintenance period <strong>for</strong> one year willstart from the date of final completion certificate which is issued afterone month of his satisfactory working from the date of provisional takeover.5.4 TRAINING OF STAFFThe contractor will give training to operator /staff as detailed <strong>by</strong>Engineer-in-charge <strong>for</strong> 15 days period regarding operating and runningmaintenance of generating <strong>set</strong>.6. GUARANTEEThe contractor shall ensure that the generating <strong>set</strong>, panels, electricalFittings/accessories etc under this contract, shall be of best quality andshall be strictly n accordance with specifications and particularscontained/ mentioned in the clause there of and the contractor shallguarantee that the said generating <strong>set</strong> will continue to confirm thedescription and quality a<strong>for</strong>esaid <strong>for</strong> a period of 12 Months. Head

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!