11.07.2015 Views

Improved Life for Longitudinal Joints in Asphalt Pavement - WisDOT ...

Improved Life for Longitudinal Joints in Asphalt Pavement - WisDOT ...

Improved Life for Longitudinal Joints in Asphalt Pavement - WisDOT ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Quality ControlThe follow<strong>in</strong>g research focuses on the use of field permeameters <strong>for</strong> quality-control monitor<strong>in</strong>g of longitud<strong>in</strong>aljo<strong>in</strong>ts.New England Transportation ConsortiumProject 03-5, Evaluation of a Field Permeameter as a <strong>Longitud<strong>in</strong>al</strong> Jo<strong>in</strong>t Quality Indicator, Jo Sias Daniel, RajibMallick and Walaa Mogawer, University of New Hampshire, April 2007.http://www.netc.umassd.edu/netc03_5_f<strong>in</strong>al_report.pdfThis study sought to evaluate the use of field permeameters <strong>for</strong> evaluat<strong>in</strong>g the quality of constructed longitud<strong>in</strong>aljo<strong>in</strong>ts. Various construction methods were used, <strong>in</strong>clud<strong>in</strong>g the use of <strong>in</strong>frared heaters and jo<strong>in</strong>t sealants. Based ondensity, air void content and strength from cores, conclusions <strong>in</strong>cluded:• Permeameter use is promis<strong>in</strong>g but requires ref<strong>in</strong>ement to reduce variability.• Jo<strong>in</strong>t sealants and jo<strong>in</strong>t heaters improve short-term jo<strong>in</strong>t per<strong>for</strong>mance.See also “Development and Evaluation of a Field Permeameter as a <strong>Longitud<strong>in</strong>al</strong> Jo<strong>in</strong>t Quality Indicator,” R.B.Mallick and J. Daniel, International Journal of <strong>Pavement</strong> Eng<strong>in</strong>eer<strong>in</strong>g, Vol. 7 (1), March 2006: 11-21. View theabstract at http://www.<strong>in</strong><strong>for</strong>maworld.com/smpp/content~content=a741577671~db=all~order=page.Research <strong>in</strong> ProgressFive ongo<strong>in</strong>g projects perta<strong>in</strong> to longitud<strong>in</strong>al jo<strong>in</strong>t characteristics and construction.Arkansas“HMA <strong>Longitud<strong>in</strong>al</strong> Jo<strong>in</strong>t Evaluation and Construction,” expected completion date June 2009.http://rip.trb.org/browse/dproject.asp?n=13587Arkansas is evaluat<strong>in</strong>g the use of a density specification <strong>for</strong> quality control.Contacts: Mark Greenwood, Project Manager, (501) 569-2552, mark.greenwood@arkansashighways.com. StacyWilliams, Pr<strong>in</strong>cipal Investigator, (479) 575-2220, sgwill@engr.uark.edu.Colorado“Evaluation of <strong>Longitud<strong>in</strong>al</strong> Jo<strong>in</strong>t Density,” expected completion date December 2010.http://rip.trb.org/browse/dproject.asp?n=9807Investigators are compar<strong>in</strong>g the longitud<strong>in</strong>al jo<strong>in</strong>t density of seven asphalt pavement projects constructed <strong>in</strong> 2004under a density specification to seven projects constructed <strong>in</strong> 2000 without such a specification.Contacts: Roberto de Dios, Project Manager, (303) 757-9975, roberto.dedios@dot.state.co.us. David Weld,Pr<strong>in</strong>cipal Investigator, (425) 284-3820, david@<strong>in</strong>rix.com.Ill<strong>in</strong>ois“Experimental Feature: Evaluat<strong>in</strong>g <strong>Longitud<strong>in</strong>al</strong> Jo<strong>in</strong>t Compaction Techniques,” no expected completion date given.http://rip.trb.org/browse/dproject.asp?n=5482This project is evaluat<strong>in</strong>g longitud<strong>in</strong>al jo<strong>in</strong>t construction techniques, specifications and elim<strong>in</strong>ation of pneumaticrollers.Contact: Tessa Volle, Pr<strong>in</strong>cipal Investigator, (217) 782-3547, volleth@nt.dot.state.il.us.Oklahoma“<strong>Longitud<strong>in</strong>al</strong> Jo<strong>in</strong>t Density and Permeability <strong>in</strong> <strong>Asphalt</strong> Concrete,” expected completion date 2008.http://rip.trb.org/browse/dproject.asp?n=12547Oklahoma does not have a density specification; this study will use field and laboratory methods to develop a testmethod and a specification <strong>for</strong> ensur<strong>in</strong>g optimal density and permeability of longitud<strong>in</strong>al jo<strong>in</strong>ts. Also see the FFY07Problem Statement at http://www.okladot.state.ok.us/hqdiv/p-r-div/spr-statements/pdfs/statements.pdf (page 5 of thePDF).Contact: Stephen Cross, Pr<strong>in</strong>cipal Investigator, (785) 864-4290, sac@kuhub.ccukans.edu.6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!