11.07.2015 Views

Bulembu Vocational Training Centre - sahee foundation

Bulembu Vocational Training Centre - sahee foundation

Bulembu Vocational Training Centre - sahee foundation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

medical opinion is that there is no medical risk from the currently capped Chrysotilemine dump. Still it is our opinion that in the midst of inconclusive or conflictingreports, we will err on the side of safety and caution. To that end, we havecontracted Quantum-Murray, a leading environmental rehabilitation contractor inCanada to partner with us on the town’s mine-dump rehabilitation(www.murraydemolition.com). Quantum-Murray is scheduled to commence workNovember 2009 and should be completed December 2010. The rehabilitationprocess will further cap the mine dump with rock and gravel and then cover that witha deep layer of topsoil. The resulting hill will be seeded in order to naturally producegrass and trees. With the natural Chrysotile asbestos fully covered and seeded, anypotential harmful factors will be fully alleviated. These measures have been takeneven though Natural Resources Canada has stated that “chrysotile asbestos can beused without undue risk (i.e. safely) in building materials, friction products, pipes andother industrial applications, provided it is manufactured and handled with care.Experts in Canada and in other countries, as well as the International LabourOrganization, and the Organization for Economic Co-operation and Developmentconcluded that current knowledge and modern technology can successfully controlthe potential for health and environmental harm posed by chrysotile asbestos.”18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!