11.07.2015 Views

Guru Nanak Dev University, Amritsar

Guru Nanak Dev University, Amritsar

Guru Nanak Dev University, Amritsar

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

M/s. _______________________<strong>Guru</strong> <strong>Nanak</strong> <strong>Dev</strong> <strong>University</strong>, <strong>Amritsar</strong>(General Branch)(Established by the State Legislature Act No.21 of 1969)Ph : 0183-2258802-090183-2450601-14Ext. : 3018No.____________/GenDated________________________________________________________________Subject:Fabrication of Body on TATA Chassis from Manufactures for two Bus Chassis of TATALP1512/TC and one Bus Chassis Tata LP912.Sir,Sealed tenders are invited through registered/courier post for fabrication of body on Tata Chassis asper standard material to be used/specifications of Pun Bus type Bus Bodies, addressed in the name ofDr. Inderjit Singh, REGISTRAR, GURU NANAK DEV UNIVERSITY, AMRITSAR, so as to reach thisoffice on or before 25/06/2011.Sr.No.1.Description of Tata ChassisTATA LP 1512/ TCWheel Base 5200mmEuro IIIwith Cowlandwithout CowlSeatingcapacity52seaterQty2Nos.Cost of Fabrication PerChassisTo be quoted by thetenderer.2.TATA LP 912Wheel Base 4920 mmEuro IIIwithout Cowl42seater1 No.To be quoted by thetenderer.Terms & Conditions:1) The tender shall be sent under REGISTERED SEALED COVER and Addressed to Dr. InderjitSingh, Registrar, <strong>Guru</strong> <strong>Nanak</strong> <strong>Dev</strong> <strong>University</strong>, <strong>Amritsar</strong>, so as to reach his office on or before25/06/201 duly superscribed on the Envelop “Tender for fabrication of bus bodies on TATAChassis due on 25/06/2011 .”2) The tender shall contain full details of Pun Bus specifications indicating material to be usedalongwith its pamphlets.3) The firm shall have experience of fabrication of District type body of Pun Bus type and it shouldhave to furnish copies of latest fabrication orders received from State Govt./State Roadways andSemi-Govt. Organisations during the last 4 years.


4) In case there is a reduction in Government Levies or in cost of Raw Material the benefit of thesame will be passed on to the university.5) The price quoted should be inclusive of taxes.6) Firm should confirm and Guarantee that the rates quoted are lowest for respective quantity andthere are no other lower rates or discounts etc. quoted to any other Govt. Depts./Semi-Govt.Organistions etc.7) The firm shall have to furnish documents as regards Insurance of factory/workplace wherefabrication of bus body is to be carried out and have to give written undertaking regarding safetyof the Chassis provided to them for fabrication and in case of any loss or damage the firm shallhave to make it good.8) The firm shall intimate the university and get the bus/bus body inspected ;i. when the structure of body is complete.ii. Before painting of colour scheme.iii. when the fully built bus is finally ready.9) The firm shall intimate university about full readyness of Bus atleast one week in advance.10) Delivery: Supply of fully built bus shall have to be made within 30-40 days from the date ofissue of fabrication order, failing which delay charges Rs. 1000 may be charged per day per busor fabrication order may be cancelled. But, Registrar may condone delay in delivery of fullybuilt bus in case he is satisfied that reasons provided by the manufacturer are beyond theircontrol.11) After Fabrication Services, if any, shall also be mentioned.12) Colour Scheme: The firm shall have to strictly comply with the colour scheme as prescribed bythe university.13) The <strong>University</strong> reserves the right to reject all or any of the tenders without assigning any reason.No correspondence regarding acceptance or rejection of tenders will be entertained.14) The rates should be valid for 90 days from the date of tender.15) Payment Terms: Full payment after/on delivery of fully built bus.16) The decision of the Registrar in respect of selection of bus body builder will be final.17) In case of any dispute, the matter will be referred to the Registrar whose decision shall be finaland binding upon the firm.18) The Guarantee/Warranty period must be mentioned alongwith tender and it should not be lessthan the period as is provided to State Govt./Semi-Govt. Organisations/State Roadways. Thedocumentary evidence for the same should also be furnished alongwith.19) The firm will be responsible for any defect in Bus Bodies or equipments provided in these busbodies due to defective design, material or workmanship, for a period of Warranty from the dateof delivery of fully built Bus. The rectification/replacement of defective material/equipmentswill have to be undertaken by the firm free of charge at university, and shall collect the defectivematerial /equipments from university site.20) In case of any arbitration the area shall be confined to <strong>Amritsar</strong> jurisdiction only.Registrar

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!