11.07.2015 Views

SAMPLE Construction Storm Water Pollution Prevention Plan

SAMPLE Construction Storm Water Pollution Prevention Plan

SAMPLE Construction Storm Water Pollution Prevention Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.0 IDENTIFICATION OF POTENTIAL STORM WATER CONTAMINANTSThe purpose of this section is to identify pollutants that could impact storm water during construction ofthe facility.4.1 Significant Material InventoryPollutants that result from clearing, grading, excavation, and building materials and have the potential tobe present in storm water runoff are listed in Table 2. This table includes information regarding materialtype, chemical and physical description, and the specific regulated storm water pollutants associatedwith each material.4.2 Potential Areas for <strong>Storm</strong> <strong>Water</strong> ContaminationThe following potential source areas of storm water contamination were identified and evaluated:Cleared and graded areas;Asphalt loading dock construction and building construction;<strong>Construction</strong> site entrance and asphalt parking area construction;• Tree removal area; andAll undisturbed areas.Table 3 presents site specific information regarding storm water pollution potential from each of theseareas.4.3 A Summary of Available <strong>Storm</strong> <strong>Water</strong> Sampling DataNo storm water sampling data is available for the site.4-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!