11.07.2015 Views

TSH powerpoint.ppt - cogen 3

TSH powerpoint.ppt - cogen 3

TSH powerpoint.ppt - cogen 3

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Proven, Clean & Efficient Biomass, Coal, Gas CogenerationEC-ASEAN COGEN Programme Phase III14 MWe <strong>cogen</strong>eration plant using oil palm EFBsas fuels in MalaysiaCLIENT: <strong>TSH</strong> Bio-Energy Sdn. Bhd.LOCATION: Kunak, Sabah, MalaysiaSUPPLIERS: Babcock & Wilcox Volundand ENCO<strong>TSH</strong> Bio-Energy Sdn. Bhd. <strong>cogen</strong>eration plant1 The EC-ASEAN Business Facilitator


Proven, Clean & Efficient Biomass, Coal, Gas CogenerationEC-ASEAN COGEN Programme Phase IIITECHNOLOGY• Fuel conveying system• Water-cooled inclined vibrating membrane grate• Water-tube steam boiler, capacity of 80 T/H, 66.5 bar (g)• Automatic de-ashing system• High efficiency water-resistant cast iron multi-cyclones (2 sets)• Multi valve steam turbine, with inlet pressure at 50 bar (g)• Turbo alternator with rated output of 17,500 KVAECONOMICS• Investment Euro 9 million, excluding civil works and buildingfoundations• Pay back period is 4 years after commissioning2 The EC-ASEAN Business Facilitator


Proven, Clean & Efficient Biomass, Coal, Gas CogenerationEC-ASEAN COGEN Programme Phase IIIFuel used –palm oil waste3 The EC-ASEAN Business Facilitator


Proven, Clean & Efficient Biomass, Coal, Gas CogenerationEC-ASEAN COGEN Programme Phase IIIBabcock & Wilcox Volund boiler4 The EC-ASEAN Business Facilitator


Proven, Clean & Efficient Biomass, Coal, Gas CogenerationEC-ASEAN COGEN Programme Phase IIIBoiler and Gas Cleaning5 The EC-ASEAN Business Facilitator


Proven, Clean & Efficient Biomass, Coal, Gas CogenerationFLOW DIAGRAMEC-ASEAN COGEN Programme Phase III6 The EC-ASEAN Business Facilitator


Proven, Clean & Efficient Biomass, Coal, Gas CogenerationEC-ASEAN COGEN Programme Phase IIICUSTOMER VIEWPOINT• The Group’s expansion into power plants would cushion its corebusiness in oil palm plantations, palm oil milling and wood-basedoperations.• Palm oil production amounted to 100,000 tonnes in 2003 and isexpected to rise to 120,000 tonnes in 2004.• Expects its 14 MWe renewable energy biomass power plant inSabah to be commissioned in Dec 2004 to generate an annualprofit in 8-10 mil RM (Euro 1.75 - 2.2 mil) through sales ofpower to the Sabah Electricity Sdn Bhd (SESB).Datuk Kelvin Tan AikPen, Group MD,<strong>TSH</strong> Resources Bhd.• <strong>TSH</strong>RB is the first local company to sell renewable energy: from oil palm waste - toSESB• Selling up to 10MWe at 21.25 sen (Euro cents 4.66) per KWh through a 21-yearrenewable energy purchase agreement to SESB• Independent power producers using diesel sell electricity to SESB at 36 sen (Eurocents 7.89) per KWh.• Awarded the 1.8 mil RM (approx Euro 400,000) grant by COGEN 3 Programme.7 The EC-ASEAN Business Facilitator

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!