11.07.2015 Views

Statement of Work and Specifications for the Optical Design ... - ATST

Statement of Work and Specifications for the Optical Design ... - ATST

Statement of Work and Specifications for the Optical Design ... - ATST

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Document: SOW <strong>for</strong> <strong>Design</strong> <strong>and</strong> Analysis <strong>for</strong> HOWFSRevision: ADate: 14 June, 20131. GENERAL WORK DESCRIPTION1.1 DESIGN OPTIMIZATION STUDYThis <strong>Statement</strong> <strong>of</strong> <strong>Work</strong> (SOW) defines <strong>the</strong> tasks <strong>and</strong> deliverables that shall be per<strong>for</strong>med <strong>and</strong> providedby <strong>the</strong> Contractor. This ef<strong>for</strong>t shall be hereinafter referred to as <strong>the</strong> <strong>Work</strong>.The <strong>Work</strong> shall consist <strong>of</strong> <strong>the</strong> Contractor reviewing <strong>and</strong> analyzing <strong>the</strong> provided Wavefront Correction(WFC) High-Order Wavefront Sensor (HOWFS) conceptual design (see Appendix A),makerecommendations <strong>for</strong> optimizing <strong>the</strong> design with respect to: manufacturing feasibility; cost-effectiveness;<strong>and</strong> likelihood <strong>of</strong> achieving per<strong>for</strong>mance requirements, <strong>and</strong> develop a final toleranced design based uponthose recommendations <strong>and</strong> feedback/review by AURA.1.2 MEETINGSContractor shall organize <strong>and</strong> conduct, at a minimum, <strong>the</strong> following meetings:1.2.1 Meeting ScheduleTimeT0T0 + 1 weekT0 + 2 weeksT0 + 4 weeksT0 + 6 weeksEvent*AwardKick Off1 st Progress Review Meeting2 nd Progress Review MeetingFinal <strong>Design</strong> Review MeetingT0 + 8 weeks Final Report MeetingT0 + 9 weeks AURA Report Review periodT0 + 10 weeks Revised Final report due*See Section 1.2.2 <strong>for</strong> specific meeting content <strong>and</strong> objectives1.2.2 Meeting ContentKick-<strong>of</strong>f meeting - to discuss <strong>the</strong> objectives <strong>of</strong> <strong>the</strong> <strong>Work</strong> <strong>and</strong> to ensure that <strong>the</strong> requirements are clear <strong>and</strong>sufficient <strong>for</strong> <strong>the</strong> <strong>Work</strong> to proceed. Contractor shall propose a schedule with a goal <strong>of</strong> submitting <strong>the</strong> FinalReport within 8 (eight) weeks from contract award, followed by a one week AURA review period <strong>and</strong> aone week Contractor response period. The proposed schedule shall include major milestones <strong>of</strong> <strong>the</strong>optical design <strong>and</strong> tolerance analysis.1 st Progress review meeting - to review <strong>the</strong> feasibility, status <strong>and</strong> progress <strong>of</strong> <strong>the</strong> optical design.Contractor shall provide preliminary results, identify any remaining issues, a summary <strong>of</strong> <strong>the</strong>outcomes, a preliminary Zemax model <strong>for</strong> review. <strong>and</strong> any action items resulting from this meeting.2 nd Progress review meeting - to review <strong>the</strong> final optical design <strong>and</strong> review <strong>the</strong> steps <strong>of</strong> <strong>the</strong>tolerancing ef<strong>for</strong>t. Contractor shall provide preliminary results, identify any remaining issues, asummary <strong>of</strong> <strong>the</strong> outcomes, <strong>the</strong> final Zemax model <strong>for</strong> review, <strong>and</strong> any action items resulting from thismeeting.Page 4 <strong>of</strong> 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!