11.07.2015 Views

Statement of Work and Specifications for the Optical Design ... - ATST

Statement of Work and Specifications for the Optical Design ... - ATST

Statement of Work and Specifications for the Optical Design ... - ATST

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Document: SOW <strong>for</strong> <strong>Design</strong> <strong>and</strong> Analysis <strong>for</strong> HOWFSRevision: ADate: 14 June, 2013Final design review meeting - to review <strong>the</strong> tolerance <strong>and</strong> sensitivity analysis <strong>of</strong> <strong>the</strong> final design.Contractor shall provide results, identify any remaining issues, <strong>and</strong> shall summarize <strong>the</strong> outcomes <strong>and</strong>any action items resulting from <strong>the</strong> meeting. The intent <strong>of</strong> <strong>the</strong> final design review meeting is toidentify any remaining issues or areas requiring fur<strong>the</strong>r work be<strong>for</strong>e <strong>the</strong> final report can be submittedFinal report meeting - to review <strong>the</strong> final report. Contractor shall provide a preliminary final report toAURA <strong>for</strong> review <strong>and</strong> comment not later than 1 week be<strong>for</strong>e <strong>the</strong> final review meeting. Should AURAfind deficiencies in ei<strong>the</strong>r <strong>the</strong> preliminary report or <strong>the</strong> meeting contents, AURA will return <strong>the</strong>preliminary report with comments not later than 1 week following final meeting so as to allow <strong>the</strong>Contractor to take any corrective actions.1.3 COMPLETIONThe Contractor shall complete <strong>the</strong> <strong>Work</strong> within <strong>the</strong> 8 week schedule. Weeks 9 <strong>and</strong> 10 are reserved <strong>for</strong>AURA review/comment <strong>of</strong> <strong>the</strong> Final Report <strong>and</strong> <strong>the</strong> Contractor’s responses, respectively.2. DELIVERABLESThe Contractor shall deliver <strong>the</strong> following:2.1 REPORTSA preliminary <strong>and</strong> after revisions, a final report, in electronic <strong>for</strong>mat ( i.e. .PDF <strong>and</strong>/or MS Word) thatshall contain:- A description <strong>of</strong> <strong>the</strong> work per<strong>for</strong>med.- <strong>Optical</strong> design description including a requirements compliance matrix.- Notable analysis features.- Monte Carlo tolerance analysis description, including error distribution assumptions.- Monte Carlo tolerance results indicating <strong>the</strong> statistical distribution <strong>of</strong> top level per<strong>for</strong>mance <strong>and</strong> asensitivity analysis in tabular <strong>for</strong>m. This shall include fabrication, mounting, <strong>and</strong> alignmenttolerances.- Table <strong>of</strong> compensator ranges.- Conclusion <strong>of</strong> results <strong>and</strong> identification <strong>of</strong> tolerances that significantly increase fabricationrisk,cost, <strong>and</strong> mounting/alignment complexity- List <strong>of</strong> contents included in <strong>the</strong> data package.2.2 CONTENTS OF THE DATA PACKAGE; DIRECTORY OR FILE:- The Zemax optical design file <strong>for</strong> <strong>the</strong> final design including a lookup table <strong>for</strong> <strong>the</strong> position <strong>of</strong><strong>the</strong> triplet lenses as a function <strong>of</strong> zoom.- A lookup table <strong>of</strong> <strong>the</strong> position <strong>of</strong> <strong>the</strong> Cooke elements <strong>and</strong> o<strong>the</strong>r components as a function <strong>of</strong>zoom.- Drawings directory: contains <strong>the</strong> optical element drawings in ISO 10110 PDF <strong>for</strong>mat.- WFC tolerance models: <strong>the</strong> Zemax models used to generate <strong>the</strong> tolerance RMS wavefronterror sensitivities <strong>and</strong> to run <strong>the</strong> Monte Carlo analysis. This contains <strong>the</strong> Zemax ToleranceData Editor table <strong>of</strong> values.- WFC element drawings: <strong>the</strong> Zemax models that contains <strong>the</strong> ISO 10110 element drawings.Page 5 <strong>of</strong> 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!