11.07.2015 Views

MAStER PlAN - Somerville House

MAStER PlAN - Somerville House

MAStER PlAN - Somerville House

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Commencement of D Block and MallRefurbishment Update>> Scheduled for commencement in late 2013.>> Temporary, fully fitted and air-conditioned, classroom facilities will bepositioned on the Oval towards the completion of Term 4, 2013 inpreparation for Term 1, 2014 as refurbishments to the Mary <strong>Somerville</strong>Science Centre continue.Student pick-up timesPrep: 2.30 pmYear 1: 2.35 pmYear 2: 2.40 pmYear 3: 2.45 pmYear 4 to Year 6: 2.50 pmMiddle and Senior School students: 3:10 pmIf you have more than one daughter, please collect your daughters at thelater pick-up time.Raymond Terrace Remains One-Way>> Raymond Terrace remains one-way between Hancock and GrahamStreets, with no access to Graham Street from Raymond Terrace.>> Vehicles can enter Raymond Terrace from Graham Street, however,Raymond Terrace will be closed to west-bound traffic betweenHancock Street and Graham Street.Traffic managementPlease help us create a safe and efficient pick-upenvironment for your daughter.>> Adhere to the 40km school zone speed limit on local streets>> Park and stop in allocated areas eg Graham Street Set-Down Loop,Graham Street Pick-Up/Drop-Off zone, Stephens Road Drop-Off/Pick-Upzones>> Do not enter the School grounds for drop-off or pick-up>> Do not obstruct driveways or stop on yellow lines to pick-up your daughter>> Arrive as close to your designated pick-up time as possible (and notbeforehand)>> Drive slowly and be conscious of workers, pedestrians and vehicles aroundthe School.>> Raymond Terrace is also closed to pedestrian traffic with access viathe footpath at the top of Graham Street, directly behind the QCHEPand A&RF sites, and in front of the Hancock Street car park.>> The map below indicates vehicle and pedestrian traffic in the Precinct.>> The School continues to request a return to two-way lanes onRaymond Terrace to try and ease traffic congestion, despite approvalsgiven by the Brisbane City Council.Enquiries and Issues LineSchool construction enquiries can be made to the <strong>Somerville</strong> <strong>House</strong>Enquiries and Issues Line on (07) 3033 9275. Should the phone beunattended, please leave a message and your call will be returned assoon as possible.Enquiries and issues associated with the construction of the QueenslandChildren’s Hospital and traffic management on Graham Street are to belogged via the QCH project hotline on 1800 285 839.Open footpathsClosed footpathsStage 1 Program of works23/09/13 – 23/10/13Work SiteWorkAreaPedestrian access aroundQCH worksite

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!