PDF - 9Mo - Grande Dixence SA
PDF - 9Mo - Grande Dixence SA
PDF - 9Mo - Grande Dixence SA
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
GD. P.111951: Construction works start at <strong>Grande</strong> <strong>Dixence</strong>to collect water from the Viège (Matter Valley) andthe Borgne (Hérens Valley) rivers. The first <strong>Dixence</strong>dam, built barely 15 years before, is to be submergedin the new lake, engulfed by a constructionsite on an absolutely record scale.1965: The <strong>Grande</strong> <strong>Dixence</strong> scheme is operational.It has taken around 15 years of unremitting workand 3000 men labouring tirelessly in shifts to realisethis dream of modern times… an invertedpyramid, an inexhaustible source of energy.Stafel, construction of the afterbay reservoir