11.07.2015 Views

PDF - 9Mo - Grande Dixence SA

PDF - 9Mo - Grande Dixence SA

PDF - 9Mo - Grande Dixence SA

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GD. P.52Fionnaypower plant800 metres with a 73% gradient!To bring the water from the <strong>Grande</strong> <strong>Dixence</strong> dam tothe first turbines at the Fionnay power plant, a ninekilometerunderground tunnel had to be built and fittedout. This pressure tunnel slopes steeply: the averagegradient is about 10%. When it was driven through,the labourers and engineers were faced with seriousproblems due in particular to water seepage.Completely underground, the Fionnay plant has 6generating units, each equipped with 2 Pelton turbines,total capacity 320 MW. The head varies between 680 mand 874 m, depending on the level of water in the<strong>Grande</strong> <strong>Dixence</strong> dam.The surge tank is at the end of the Louvie tunnel, inBagnes valley; the tunnel then becomes a steel-linedshaft which plunges more than 800 m down a 73% incline!The shaft ends at the Fionnay power plant distributor,an enormous cavern hewn out of the rock.Fionnay Village

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!