26.11.2012 Views

Download - Puerto Angamos

Download - Puerto Angamos

Download - Puerto Angamos

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Puerto</strong> <strong>Angamos</strong> & TGN<br />

Mejillones – Chile.<br />

May, 2012


Ultramar Group – Who we are.<br />

03/05/2012 www.puertoangamos.cl<br />

2


Ultramar Group – Corporate Structure<br />

03/05/2012 www.puertoangamos.cl<br />

3


Ultramar Group – Corporate Structure<br />

03/05/2012 www.puertoangamos.cl<br />

4


Agenda<br />

Terminal Location & Particulars<br />

Benefits of <strong>Puerto</strong> <strong>Angamos</strong><br />

<strong>Puerto</strong> <strong>Angamos</strong> & the Community<br />

03/05/2012 www.puertoangamos.cl<br />

5


Terminal Location & Particulars<br />

www.puertoangamos.cl<br />

03/05/2012 6


Strategic Location<br />

∙ Pacific gateway for Zicosur countries.<br />

∙ Perfectly linked by road and rail to the Chilean hinterland.<br />

∙ Rail and Road Connectivity to the North of Chile & Zicosur.<br />

23º 03,30`S<br />

70º 23,51' W<br />

20/02/212 03/05/2012 www.puertoangamos.cl<br />

7


Mejillones Agenda Bay – Complejo Portuario Mejillones<br />

<strong>Puerto</strong> <strong>Angamos</strong> & TGN under Concession to:<br />

� Ultramar<br />

� Belfi<br />

� CMB<br />

03/05/2012 www.puertoangamos.cl<br />

8


Agenda<br />

Mejillones 2012<br />

• Terminal under Concession to<br />

Ultramar / Belfi / CMB (30 years) since 2003.<br />

• 13.5 hectares at <strong>Puerto</strong> <strong>Angamos</strong>.<br />

• 1,500 m 2 warehouse capacity.<br />

4<br />

3<br />

Berth Length<br />

(m)<br />

Draft (m) Max Depht (m)<br />

1 225 12.84 14.6<br />

2 220 12.84 14.6<br />

3 200 11.16 12.5<br />

4 180 10.7 12.5<br />

BERTH<br />

SITE<br />

Length(m) Draft (m)<br />

Max Depht<br />

(m)<br />

265 12.84<br />

2<br />

12.5<br />

20/02/2012 www.puertoangamos.cl<br />

300 11.16<br />

9<br />

1<br />

2


Agenda<br />

4<br />

3<br />

Mejillones 2012<br />

• Berth 1-2-3-4:<br />

Multipurpose Vessel Operation<br />

www.puertoangamos.cl<br />

20/02/2012 10<br />

1<br />

• Berth Site 2:<br />

Full Container Vessel Operation<br />

2


Largest Terminal in the North of Chile<br />

<strong>Puerto</strong> <strong>Angamos</strong>,<br />

Connecting the world with Antofagasta & ZICOSUR<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

11


Terminal´s cargo Throughput WCSA<br />

COUNTRY/PORT<br />

2011 WCSA<br />

Participation<br />

11/10 % TEUS 2011 TEUS 2010<br />

Colombia 10% 13% 748,305 662,821<br />

Buenaventura 100% 13% 748,305 662,821<br />

Ecuador 20% 22% 1,526,469 1,247,055<br />

Esmeraldas 4% 8% 66,764 62,017<br />

Guayaquil 92% 25% 1,405,762 1,123,098<br />

<strong>Puerto</strong> Bolivar 4% -13% 53,943 61,940<br />

Perú 24% 19% 1,804,515 1,522,234<br />

Paita 9% 21% 153,653 126,520<br />

Callao 90% 20% 1,616,165 1,346,186<br />

Matarani 1% 17% 21,453 18,278<br />

Ilo 1% -58% 13,244 31,250<br />

Chile 45% 9% 3,392,916 3,112,926<br />

Arica 5% 30% 170,110 130,984<br />

Iquique 7% -10% 237,758 264,974<br />

<strong>Puerto</strong> <strong>Angamos</strong> 5% 23% 158,323 129,000<br />

Antofagasta 3% -15% 88,213 103,795<br />

Valparaíso 29% 11% 973,012 878,787<br />

San Antonio 25% -2% 853,806 870,719<br />

Lirquen 9% 36% 314,956 231,636<br />

San Vicente (SVTI) 13% 17% 425,967 363,557<br />

Coronel 5% 22% 170,771 139,474<br />

Total WCSA 100% 14% 7,472,205 6,545,036<br />

Source Cepal 2011<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

12


II Region<br />

Terminal Market Share II Region<br />

(Tonnes)<br />

2010<br />

2011<br />

ATI<br />

48%<br />

ATI<br />

43%<br />

*Figures does not include Bulk Cargo<br />

PANG<br />

52%<br />

PANG<br />

57%<br />

Highway<br />

Railroad<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

13


PUERTO ANGAMOS TRANSFERED CARGO 2011<br />

Th tonnes<br />

Th tonnes<br />

3.000<br />

2.500<br />

2.000<br />

1.500<br />

1.000<br />

500<br />

0<br />

700<br />

600<br />

500<br />

400<br />

300<br />

200<br />

100<br />

0<br />

1469<br />

184<br />

Tonnage Troughput x 1000<br />

1816<br />

195<br />

2221<br />

248<br />

2170<br />

265<br />

2238<br />

284<br />

2590<br />

344<br />

2006 2007 2008 2009 2010 2011<br />

600<br />

500<br />

400<br />

300<br />

200<br />

100<br />

Gral. Proj.<br />

Copper Cobre CTR`s C.<br />

Cargo<br />

Gral<br />

Cargo<br />

C. Proy Naves Vessels<br />

Teus Troughput x 1000<br />

2006 2007 2008 2009 2010 2011<br />

0<br />

180<br />

160<br />

140<br />

120<br />

100<br />

M Ton M TEUS M Box<br />

80<br />

60<br />

40<br />

20<br />

0<br />

Vessels<br />

Th TEUS<br />

2011 Distribution<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

14<br />

18%<br />

26%<br />

55%<br />

Copper General Cargo Containers


PUERTO ANGAMOS SERVICE<br />

Vessel waiting time (hour/vessel)<br />

Container moves (vessel/hour)<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

15


SERVICES AND SHIPPING LINES AT PUERTO ANGAMOS (VESSEL/MONTH)<br />

ASIA (8 V/M)<br />

ASPA I / CEX (4 v/m)<br />

ASPA II / NAX – ALW (4 v/m)<br />

EUR 7 (V/M)<br />

STRING I SAWC (4 v/m)<br />

CCNI CONDOR (2 v/m)<br />

MEDITERRANEO (1 v/m)<br />

ECNA & CA (8 V/M)<br />

SERVICIO ANDINO (5 v/m)<br />

WCSA STRING II<br />

MIAMI WCSA (3 v/m)<br />

www.puertoangamos.cl<br />

20/02/2012 16


Equipment<br />

Quay Cranes<br />

� Gottwald HMK 280 – Capacity 100<br />

ton for Panamax Vessel<br />

� Liebherr LMH500 – Capacity 104 ton<br />

for Panamax Vessel<br />

� Gottwald HMK 8410 – Capacity 100<br />

ton for Super Post Panamax Vessel<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

17


Equipment<br />

Quay Cranes Yard Equipment<br />

� Gottwald HMK 280 – Capacity 100<br />

ton for Panamax Vessel<br />

� Liebherr LMH500 – Capacity 104 ton<br />

for Panamax Vessel<br />

� Gottwald HMK 8410 – Capacity 100<br />

ton for Super Post Panamax Vessel<br />

3 Quay Cranes of 104 lifting tonnes<br />

∙ 7 Reach stackers<br />

∙ 2 Empty Containers Stackers<br />

∙ 6 Container Trailers<br />

∙ 16 Trucks<br />

∙ 33 Roll trailers<br />

Park teams with an average age of 4 years.<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

18


Equipment<br />

Quay Cranes Yard Equipment<br />

• Gottwald HMK 280 – Capacity 100<br />

ton for Panamax Vessel<br />

• Liebherr LMH500 – Capacity 104 ton<br />

for Panamax Vessel<br />

• Gottwald HMK 8410 – Capacity 100<br />

ton for Super Post Panamax Vessel<br />

3 Quay Cranes of 104 lifting tonnes<br />

• 7 Reach stackers<br />

• 2 Empty Containers Stackers<br />

• 6 Container Trailers<br />

• 16 Trucks<br />

• 33 Roll trailers<br />

Park teams with an average age of 4 years.<br />

IT Integration<br />

• On–Line traceability for clients.<br />

• File transfer by secure protocol.<br />

• Monitoring of copper in each process<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

19


TGN<br />

03/05/2012 www.puertoangamos.cl<br />

20


TGN Berth Facilities<br />

Highest Construction Standards:<br />

• January 2011 Start Up of Operations.<br />

• 4 million Tonnes Capacity.<br />

• USD 80 million Investment.<br />

Berth Nº1<br />

Operation | Unloading<br />

Cargo |Coal, Limestone<br />

LOA | 250 meters<br />

Beam |32,2 meters<br />

Draft |14,4 meters<br />

DWT | 95,000 tonnes<br />

Two Liebherr CBG 35/32 cranes, 1.500 tph, Pipe<br />

Conveyor Belt<br />

03/05/2012 www.puertoangamos.cl<br />

21


TGN Pipe Conveyor System<br />

• The Pipe Conveyor was designed to transport the material<br />

about 3 charging stations, which are loaded from 2 ship<br />

cranes from the ship to countryside.<br />

• Highest standards of environmental protection.<br />

• Dust Control System in the hopper.<br />

material loading<br />

closed pipe<br />

return belt can also<br />

conveyor material<br />

material discharge<br />

03/05/2012 www.puertoangamos.cl<br />

22


TGN Expansion Plan<br />

• New Berth to load Ore Concentrates<br />

• Approved by environmental authorities.<br />

• 3.5 millions Tonnes of Capacity.<br />

Future Warehouse<br />

Facilities<br />

24 Ha<br />

It’s possible in the future a shiploader will also be<br />

installed capable of handling mineral concentrates.<br />

03/05/2012 www.puertoangamos.cl<br />

23


Stockpile plus Containers…<br />

Storage and reception<br />

• 30,000 Stockpile<br />

• Truck reception<br />

• Fix Tariff (10, 15 or 20 years..)<br />

• Variable Tariff<br />

Loading and Transport to <strong>Puerto</strong> <strong>Angamos</strong><br />

• Investments: Containers and Rotainer Spreader.<br />

• 3 years Contract.<br />

• Use 1 or 2 Port mobile cranes to load vessels.<br />

03/05/2012 www.puertoangamos.cl<br />

24 24


Loading a Container…<br />

03/05/2012 www.puertoangamos.cl<br />

25


And more reasons that benefit your Service…<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

26


ADVANTAGES OF OUR PORTS<br />

1.- Protected Bay of Mejillones<br />

TGN<br />

<strong>Puerto</strong> <strong>Angamos</strong><br />

Unbeatable Natural Sheltered Bay:<br />

- 95 % of swells coming from S-SW.<br />

- Absence of currents.<br />

“Less than 1% of down time due to weather<br />

conditions”<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

27


ADVANTAGES OF OUR PORTS<br />

2.-<strong>Puerto</strong> <strong>Angamos</strong> Relationship with Unions<br />

• One of <strong>Puerto</strong> <strong>Angamos</strong> main assets is our close relationship with Unions.<br />

• Port workers at Mejillones see customers as their customers.<br />

• <strong>Puerto</strong> <strong>Angamos</strong> has managed to avoid Labour Conflict and Strikes/lock outs in the last 5 years of concession.<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

28


ADVANTAGES OF PUERTO ANGAMOS<br />

3.- OVERSIZED CARGOES<br />

� Direct access to major highways, provide expeditiously connectivity with Chile without<br />

passing through cities.<br />

� Support areas allow to provide security to the cargo, at all times while waiting for escorts.<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

29


ADVANTAGES OF PUERTO ANGAMOS<br />

4.- STORAGE AREAS<br />

� 134 thousand M2 uncovered and 1,500 M2 covered of storage area.<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

30


ADVANTAGES OF PUERTO ANGAMOS<br />

5.- DEDICATED STORAGE AREAS<br />

4ha Zone next to the port of exclusive use for project cargoes.<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

31


ADVANTAGES OF PUERTO ANGAMOS<br />

6.-SAFETY & SECURITY<br />

• Safety measures above standards<br />

• Certified to ISPS, OHSAS 18001, ISO 9001 & 14001<br />

<strong>Puerto</strong> <strong>Angamos</strong> is the Safest and more Secure Port in the Region<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

32


<strong>Puerto</strong> <strong>Angamos</strong> & the Community<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

33


PUERTO ANGAMOS & THE COMMUNITY: Education, sports and culture<br />

“Creciendo Juntos” Program<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

34


PUERTO ANGAMOS & THE COMMUNITY: Education, sports and culture<br />

Sports Activities<br />

Sports Activities<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

35


PUERTO ANGAMOS & THE COMMUNITY: Education, sports and culture<br />

Cultural &<br />

community<br />

events<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

36


Thank You!<br />

Join a Winning Team!<br />

20/02/2012 03/05/2012 www.puertoangamos.cl<br />

37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!