CONSTRUCTION INDUSTRY AUTHORITY OF THE PHILIPPINES (CIAP)PHILIPPINE DOMESTIC CONSTRUCTION BOARD (PDCB)3/F, Jupiter Bldg., #56 Jupiter St., Bel-Air Village, Makati CityTelephone Nos. 896-1801; 897-0791; Fax No. 897-0791CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> – <strong>Dec</strong>ember <strong>31</strong>, 2007BACKGROUND:This report is prepared in connection with the implementation ofConstruc<strong>to</strong>rs Performance Evaluation System (<strong>CPES</strong>) pursuant <strong>to</strong>Section 12, Annex E - Evaluation of Contrac<strong>to</strong>rs Performance ofthe Implementing Rules and Regulations (IRR) of RA No. 9184(Government Procurement Reform Act). Item 4 - Submission andDissemination of Evaluation Results of Section 12, specificallymandated PDCB <strong>to</strong> consolidate the <strong>CPES</strong> evaluation results of allongoing and completed projects and disseminate the same <strong>to</strong> alloffices/agencies/corporations concerned.USES OF <strong>CPES</strong> INFORMATION:The <strong>CPES</strong> rating and other information is designed <strong>to</strong> serve theinformation needs of the following: a) government agenciesundertaking infrastructure projects; b) industry planners anddecision makers, c) construc<strong>to</strong>rs, d) project owners, e) bankingand financing institutions, f) insurance companies, g) consultingfirms, h) professional associations, and i) embassies.Information on contrac<strong>to</strong>rs’ <strong>CPES</strong> ratings shall be used for thefollowing purposes: a) Pre-qualification/Eligibility Screening ofConstruc<strong>to</strong>rs; b) Awarding of Contracts; c) Project Moni<strong>to</strong>ring andControl; d) Issuance of Certificate of Completion; e) PolicyFormulation/Review; f) Industry Planning; and g) Granting ofIncentives/Awards, and (h) in adopting measure <strong>to</strong> furtherimprove performance of contrac<strong>to</strong>rs in the prosecution ofgovernment projects.REPORT COVERAGE:This report contains <strong>CPES</strong> rating and other project-relatedinformation of on-going and completed foreign assisted (FA)and locally funded (LF) infrastructure projects beingundertaken by either local, foreign or joint ventureconstruc<strong>to</strong>rs. The projects presented in these report covers:road, bridge, housing, building, ports and harbor, irrigationand flood control, and water supply projects.REPORT CONTENTS:Presented in this report are the names of construc<strong>to</strong>rsarranged alphabetically with the corresponding projectclassification. Information available in this report comprisesthree (3) parts, as follows: Part 1) Construc<strong>to</strong>r GeneralInformation; Part 2) Project Data; and Part 3) <strong>CPES</strong> Rating.Part 1 of the report includes the name of construc<strong>to</strong>r/s, andPCAB License Number.Information contained in Part 2 pertains <strong>to</strong> the project name,contract amount, implementing agency/region, number ofvisit, and status of project (on-going or completed).1


Part 3 includes data on <strong>CPES</strong> rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities, e) environmental, safetyand health, and f) resources deployment, and the <strong>CPES</strong> Rating/Final Rating and its Qualitative Description. Should there be need formore detailed information about the project such as PCAB/ARC category and type of contrac<strong>to</strong>r, project type, location, funding source,duration of project, date started and completed, status of project, slippage, and date of evaluation, please contact PDCB and/or otheragency concerned.(NOTE: Please refer <strong>to</strong> pages 3 an 4 for the meaning of other codes presented in this report)SOURCES OF INFORMATIONData contained in this report were culled from the <strong>CPES</strong> Summary <strong>Report</strong> submitted by the *Departments of Public Works and Highways(DPWH), National Irrigation Administration (NIA), National Housing Authority (NHA), Philippine Ports Authority (PPA), Pasig RiverRehabilitation Commission (PRRC), and Bases Conversion Development Authority (BCDA) covering the period <strong>Jan</strong>uary 1, <strong>2005</strong> –<strong>Dec</strong>ember <strong>31</strong>, 2007.* For DPWH projects, only the region is listed in the column “Implementing Agency/Region”.With regards <strong>to</strong> data on negative slippage, this matter may be brought about by any of the three (3) problems: a) Construc<strong>to</strong>r-RelatedProblems, b) Agency-Related Problems; and c) Other Related Problems. Please see the enumerated problems on each classification onpage 5 of this cover page. If you need particular information on the reason for the negative slippage of each concerned contrac<strong>to</strong>r, perproject, please contact the agency implementing the project.For particular information on the data of each of the <strong>CPES</strong> <strong>Report</strong>s, please contact the person-in-charge of the concerned implementingagencies listed below:Melrose Pailma (DPWH) Tess Pantalla (NIA) Ma. Otelia F. Eclavea (NHA) Amy Gamay (PRRC) Arnel Fortunado (BCDA)Tel. Nos. 304-3511 Tel. Nos. 927-0923 Tel. Nos. 928-4561 Tel. Nos. 433-3444 Tel. Nos. 816-6666For further information and queries, you may visit us at the Philippine Domestic Construction Board (PDCB), 3 rd Floor, Jupiter 1 Building,56 Jupiter Street, Bel-Air Village, Makati City; call us at 897-0791/896-1801; or e-mail us at pdcb_ciap@yahoo.com.You may access this report on this website http://www.gppb.gov.ph.2


UNIFORM CODING SCHEME FOR THE CONSTRUCTORS PERFORMANCEEVALUATION SYSTEM (<strong>CPES</strong>) – INFORMATION SYSTEMAGENCYREMARKSCODE DESCRIPTION CODE DESCRIPTIONBCDA Bases Conversion Development Authority AHD Project is Ahead of ScheduleDPWH Department of Public Works and Highways DEL Project is Delayed of ScheduleNIA National Irrigation Administration ONS Project is On ScheduleNHA National Housing Authority CWS Contract Works SuspendedPPA Philippine Ports Authority PSC Project Substantially CompletedPRRC Pasig River Rehabilitation Center TER TerminatedPCAB-ARC CATEGORY<strong>CPES</strong> RATING/QUALITATIVE DESCRIPTIONDESCRIPTION CODE DESCRIPTION <strong>CPES</strong> RATINGAgency Registration ClassificationSmall “A” SA Outstanding > 90%Small “B” SB Very Satisfac<strong>to</strong>ry > 80% but < 90%Medium “A” MA Satisfac<strong>to</strong>ry > 70% but < 80%Medium “B” MB Fair > 60% but < 70%Large “A” LA Poor < 60%Large “B” LB3


PCAB PROJECT CLASSIFICATIONCODE DESCRIPTIONGB-1 Building or Industrial PlantGB-2 Sewerage or Sewage Treatment/Disposal SystemGE-1 Road, Highway, Pavement, Railways, Airport Horizontal Structure & BridgesGE-2 Irrigation or Flood ControlGE-3 Dam, Reservoir or TunnelingGE-4 Water SupplyGE-5 Port, Harbor or OffshoreSP-EE Specialty – Electrical WorkSP-WD Specialty – Well-Drilling WorkSP Other Specialty Works Not Included in the Classification4


*CAUSES OF DELAYCONSTRUCTOR-RELATED PROBLEMS AGENCY-RELATED PROBLEMSC-W01 - Insufficient manpower deployed in project site A - VO1 - Delays in the approval of variation ordersC-EO1 - Breakdown of equipment/equipment not operational A - TO1 - Delays in the approval of contract timeC-EO2 - Lack/Insufficient/Inadequate equipment deployed in extensionproject siteC-MO1- Lack/Inadequate/Insufficient supply of construction A - SO1 - Delays in the approval of suspensionMaterials orderC-RO1- Lack of financial resources A - DO1 - Changes in construction designsA - FO1 - Delays in the releases of fundsA - RO1 - Right of Way (ROW) acquisition problem(squatter relocation problems, relocationof utilities, (i.e. PLDT, MERALCO postsand other similar cases)OTHER- RELATED PROBLEMS A - PO1 - Delays in acquisition of necessary permitsO-WO1- Unfavorable weather condition (Occurrence of naturalCalamities; occurrence of flooding/siltation on site;Unworkable ground condition)O-PO1- Insurgence or peace and order problems/civil disturbancesO-TO1- Third Party intervention*Can be a reason for the negative slippage of construc<strong>to</strong>r (please see the <strong>CPES</strong> reports of construc<strong>to</strong>r from the agencyconcerned.)5


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTION121 Construction 21686Const. of Cemented Footbridge,Sapang BayanFinal III 0.946 C 0.304 0.285 0.300 - - - 88.90121 Construction 21686Const. of MPB @ Bulacan StateUniversity Compound1st III 0.945 O 0.356 0.225 0.100 0.030 0.035 0.100 84.60 -2H2L Construction 16293 Conc. of Road @ Package 3-2 1st/Final XI 0.565 C 0.343 0.300 0.300 - - - 94.3091.06%Outstanding94.30%Oustanding2H2L Construction 16293Const. (Completion) of Sch. Bldg. @dela Paz E/S1st/Final IVA 0.791 C 0.366 0.200 0.300 - - - 86.6086.60%V.Satisfac<strong>to</strong>ry<strong>31</strong>0 ConstructionSpecialist Corporation4875Asphalt Overlay of Tigaon-Goa-Lagonoy RoadFinal V 47.945 C 0.450 - 0.500 - - - 95.0095.12%Outstanding<strong>31</strong>0 ConstructionSpecialist Corporation4875 Const. of Tumana Bridge (Phase III) 1st NCR 26.854 O 0.345 0.223 0.100 0.030 0.051 0.100 84.90 -<strong>31</strong>0 ConstructionSpecialist Corporation4875 Const. of Tumana Bridge (Phase III) Final NCR 26.854 C 0.221 0.190 0.300 - - - 71.1079.38%Satisfac<strong>to</strong>ry3E Construction 19588Completion of Multi-Purpose Bldg.,(Water District, Phase IV) Tankulan2nd X 2.365 O 0.268 0.300 0.050 0.030 0.044 0.067 75.90 -3E Construction 19588Completion of Multi-Purpose Bldg.,(Water District, Phase IV) Tankulan3rd X 2.365 O 0.394 0.300 0.050 0.020 0.047 0.067 87.80 -3E Construction 19588Completion of Multi-Purpose Bldg.,(Water District, Phase IV) Tankulan4th X 2.365 O 0.219 0.300 0.100 0.030 0.035 0.100 78.40 -3K Builders 27277 Const. of Curifang FMR 1st/Final II 0.277 C 0.386 0.300 0.300 - - - 98.603K Builders 27277 Const. of Multi-Purpose Building 1st/Final I 0.480 C 0.362 0.200 0.300 - - - 86.2098.60%Outstanding86.20%V.Satisfac<strong>to</strong>ry3K Rock Engineering 27908Completion of Multi-PurposeBuilding (Gymnasium)1st/Final II 1.194 C 0.327 0.200 0.300 - - - 82.7082.70%V.Satisfac<strong>to</strong>ry3K Rock Engineering 27908Completion of Multi-PurposeBuilding @ MIT1st/Final II 0.478 C 0.297 0.300 0.300 - - - 89.7089.70%V.Satisfac<strong>to</strong>ry3K Rock Engineering 27908Completion of One (1) CL,Secondary School Building1st/Final II 0.182 C 0.349 - 0.500 - - - 84.9084.90%V.Satisfac<strong>to</strong>ry3-L Construction 16745 Concreting of Barangay Road 1st V 0.550 O 0.344 0.300 0.100 0.010 0.028 0.100 88.20 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 1


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTION747 Builders & Trader 16892Impvt./Dredging/Rehab. of BaybaySapa (along Lopezville Subd.)1st IVA 4.797 O 0.213 0.200 0.100 0.030 0.028 0.200 77.10 -747 Builders & Trader 16892Impvt./Dredging/Rehab. of BaybaySapa (along Lopezville Subd.)Final IVA 4.797 C 0.250 0.300 0.300 - - - 85.0080.26%V.Satisfac<strong>to</strong>ry8 R's Construction 22997Barangay Hulo Linear Park Project(EPA - LPP - 19)2nd PRRC 22.542 O 0.<strong>31</strong>1 0.270 0.100 0.015 0.042 0.100 83.80 -811 Trading &Construction21215 Rehab. of Mansalay-Bulalacao Road 1st/Final IV-B 1.408 O 0.328 0.276 0.100 0.022 0.016 0.100 84.20 -A. Ballesta Construction 8446 Const. of One (1) Cl School Building Final VIII 0.360 C 0.442 - 0.500 - - - 94.2061.02%FairA. De Guia Construction 18228Const. of Balluyan Brgidge, Phase ISta. Maria1st CAR 3.626 O 0.158 0.120 0.100 0.015 0.035 0.100 52.80 -A. De Guia Construction 18228Const. of Balluyan Bridge, Phase ISta. Maria2nd CAR 3.626 O 0.326 0.240 0.070 0.015 0.049 0.067 76.70 -A. De Guia Construction 18228 Improvement of Buluan-Daga Road 1st CAR 7.519 O 0.110 0.018 0.050 0.008 0.033 0.033 25.20 -A. De Guia Construction 18228 Improvement of Buluan-Daga Road Final CAR 7.519 C 0.179 0.300 0.000 - - - 47.90A. De Guia Construction 18228 Widening of Ballacayu-Simanu Road Final II 2.751 C 0.270 0.200 0.300 - - - 77.00A. Munas IntegralsBuilders & Trading32003A. Seva Construction 20124Const./Rehab. of MPB @ Block 4,Kaingin 1Const. of Building at San FernandoH/S1st/Final NCR 3.803 C 0.347 0.300 0.300 - - - 94.7034.28%Poor75.71%Satisfac<strong>to</strong>ry94.70%Outstanding1st V 0.468 O 0.395 0.201 0.100 0.030 0.038 0.067 83.10 -A.A. De Vera Construction 6191 Const. of 1 CL School Bldg. Final VII 0.415 C 0.382 0.100 0.300 - - - 78.2085.69%V.Satisfac<strong>to</strong>ryA.C. Rivero Construction& Dev't. Corporation5122 Const. of Candaguit Bridge Final VI 9.922 C 0.347 0.200 0.300 - - - 84.7088.89%V.Satisfac<strong>to</strong>ryA.C. Rivero Construction& Dev't. Corporation5122Const./Replacement of CalibanBridge (Phase 2) along Bacolod-Murcia-D.S. Benedic<strong>to</strong>-San CarlosCity National Road1st VI 6.951 O 0.400 0.300 0.070 0.020 0.023 0.067 88.00 -A.C. Rivero Construction& Dev't. Corporation5122Const./Replacement of CalibanBridge (Phase 2) along Bacolod-Murcia-D.S. Benedic<strong>to</strong>-San CarlosCity National RoadFinal VI 7.289 C 0.379 0.300 0.300 - - - 97.9090.22%OutstandingA.D. Construction 6946 Const. of MPB 1st/Final IV-A 0.944 C 0.343 0.200 0.300 - - - 84.3084.30%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 3


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONA.D. Construction 6946 Rehab. of Panganiban Drainage Final V 4.212 C 0.288 0.300 0.300 - - - 88.80A.D. Gonzales Jr.Construction and TradingCompany Inc.A.D. Gonzales Jr.Construction and TradingCompany Inc.1001210012Const. of BGHMC Acute PsychiatricUnit Bldg.Impv't./Rehab. of San Ahustin-SanJoaquin Road77.82%Satisfac<strong>to</strong>ry2nd CAR 21.206 O 0.345 0.300 0.100 0.008 0.022 0.100 87.50 -1st III 4.752 O 0.307 0.195 0.100 0.022 0.032 0.100 75.60 -A.D.P. Const. & Supply 3466 Conc. of Bacolod South Road 1st VI 18.917 O 0.370 0.220 0.050 0.008 0.037 0.067 75.20 -A.D.P. Const. & Supply 3466 Const. of Magballo Bridge (Phase III) 1st VI 10.561 O 0.356 0.300 0.070 0.030 0.030 0.067 85.30 -A.D.P. Const. & Supply 3466A.D.P. Const. & Supply 3466Rehabilitation of Pis-anan-Bon<strong>to</strong>lFMRRehabilitation of Pis-anan-Bon<strong>to</strong>lFMR2nd VI 13.743 O 0.328 0.300 0.100 0.024 0.035 0.100 88.70 -3rd VI 13.922 O 0.325 0.240 0.070 0.023 0.032 0.067 75.70 -A.D.S. San JuanConstruction12853 Const. of St. Benedict MPB 1st/Final NCR 1.721 C 0.280 0.300 0.300 - - - 88.0088.00%V.Satisfac<strong>to</strong>ryA.E. Belleza Builders 22646 Const. of Day Care Center, Phase I Final V 0.379 C 0.415 - 0.500 - - - 91.5084.78%V.Satisfac<strong>to</strong>ryA.J. Taylan Const.Corp./BSP & Co., Inc.(J.V.)JV-020104A.L. Dare Construction 11932A.L. Salazar Construction,Inc.A.M. DoncerasConstruction389930528A.M. Robles Construction 28056Const. of Gasgas Bridge under JICABridge Projects along RuralImpv't. of Balaybay Farm-<strong>to</strong>-MarketRoad Brgy. BalaybayRehab./Const. of Port Bar<strong>to</strong>n-Kemdeng RoadConst. of Arteche-Lapinig Road,Sta.960-160-Sta.961-260 withexceptionsConst. of Multi-Purpose Bldg. @Brgy. Minuyan3rd I 63.299 O 0.343 0.275 0.050 0.030 0.055 0.067 82.00 -1st III 0.930 O 0.288 0.225 0.100 0.015 0.032 0.067 72.70 -1st IV-B 9.122 O 0.322 0.045 0.100 0.030 0.033 0.067 59.70 -Final VIII 8.008 C 0.247 - 0.000 - - - 24.701st III 2.850 O 0.356 0.248 0.100 0.030 0.035 0.100 86.90 -48.28%PoorA.M.P. Construction 16574Const. of 2 Cl Sch. Bldg. @ LomboyE/S1st/Final III 0.637 C 0.363 0.178 0.300 - - - 84.1084.10%V.Satisfac<strong>to</strong>ryA.M.P. Construction 16574Const. of 2 Cl Sch. Bldg. @ TalaveraCES1st/Final III 0.640 C 0.<strong>31</strong>6 0.255 0.300 - - - 87.1087.10%V.Satisfac<strong>to</strong>ryA.M.P. Construction 16574 Const. of 2-Cl S/B @ Tabacao H/S Final III 0.737 C 0.403 - 0.500 - - - 90.30A.M.P. Construction 16574Const. of Multi-Purpose Bldg. @Zaragosa Nat'l. H/SFinal III 2.807 C 0.295 0.217 0.300 - - - 81.2090.30%Outstanding66.71%Fair<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 4


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONA.M.P. Construction 16574Const. of Multi-Purpose Building atPoblacion Sison1st/Final I 1.349 C 0.297 0.235 0.300 - - - 83.2083.20%V.Satisfac<strong>to</strong>ryA.P. PalaciosConstruction29021Concreting of Provincial Road, Brgy.Matawe1st/Final III 3.239 C 0.286 0.300 0.300 - - - 88.6088.60%V.Satisfac<strong>to</strong>ryA.P. PalaciosConstructionA.P.O. GeneralConstruction29021 Concreting of Road 1st/Final III 0.935 C 0.425 - 0.500 - - - 92.507010Completion of School Bldg., HappyHollow E/S92.50%Outstanding1st CAR 0.638 O 0.373 0.240 0.100 0.023 0.018 0.100 85.40 -A.Q. DominguezConstruction & Supply19843Con. of Casanicolan-Sn. MarcelinoRoad1st I 0.964 O 0.<strong>31</strong>8 0.180 0.100 0.023 0.041 0.100 76.20 -A.R. Cruz Construction,Inc. (Formerly: AR CruzConst.)12157Concreting of Callaguip BarangayRoad1st/Final I 0.707 C 0.264 - 0.500 - - - 76.4076.40%Satisfac<strong>to</strong>ryA.R. Lustre Jr.Construction7680Completion of 2-S<strong>to</strong>rey Building @BSU Matungao Branch1st/Final III 1.403 C 0.329 0.300 0.300 - - - 92.9092.90%OutstandingA.R. Lustre Jr.Construction7680Concreting of Puer<strong>to</strong> PrincesaSabang Rd., (Underground River)1st IV-B 9.468 O 0.355 0.300 0.100 0.030 0.033 0.100 91.80 -A.R. Lustre Jr.Construction7680Concreting of Puer<strong>to</strong> PrincesaSabang Rd., (Underground River)Final IV-B 9.468 C 0.372 0.300 0.300 - - - 97.2093.96%OutstandingA.R. Lustre Jr.ConstructionA.R. Lustre Jr.Construction7680Const. of Bobosawen-ApurawanFMR1st IV-B 46.650 O 0.353 0.249 0.100 0.030 0.070 0.100 90.20 -7680 Const. of Culasian Bridge 1st/Final IV-B 10.076 C 0.333 0.300 0.300 - - - 93.3093.30%OutstandingA.R. Lustre Jr.Construction7680Const. of Culasian Bridge &Approaches (Completion) Phase II1st IV-B 5.828 O 0.360 0.300 0.100 0.030 0.035 0.100 92.50 -A.R. Lustre Jr.Construction7680Const. of Std. 2-Cl School Bldg. @San<strong>to</strong>r E/S & Rehab. of Sch. Bldg. @Mambog E/S1st/Final III 1.119 C 0.<strong>31</strong>8 0.300 0.300 - - - 91.8091.80%OutstandingA.R. Lustre Jr.Construction7680Const./Rehab. of Iwahig-TacduanDiversion Road National Highway1st IVB 11.430 O 0.238 0.096 0.100 0.030 0.040 0.100 60.40 -A.R.L. Construction 27645Repair/Rehabilitation of TatalonStreet, Brgy. Ugong1st/Final NCR 2.<strong>31</strong>2 C 0.389 - 0.500 - - - 88.9088.90%V.Satisfac<strong>to</strong>ryA.R.L. Construction 27645Upgrading of A.T. Santiago Brgy.Viente Reales1st/Final NCR 0.897 C 0.347 0.300 0.300 - - - 94.7094.70%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 5


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONA.R.L. Construction 27645Upgrading of Sapang Bakaw Road,Brgy. Lawang Ba<strong>to</strong>Final NCR 1.881 C 0.333 0.300 0.300 - - - 93.3088.80%V.Satisfac<strong>to</strong>ryA.V. Construction Supply 13202Const. of 4-Cl, 2-S<strong>to</strong>rey SchoolBuilding1st/Final IV-A 2.617 C 0.354 0.200 0.300 - - - 85.4085.40%V.Satisfac<strong>to</strong>ryA.Y.U. Engineering andConstruction25632Const. of 1 Cl 1 S<strong>to</strong>rey Sch. Bldg. @Gasco E/S1st/Final XI 0.434 C 0.375 0.157 0.300 - - - 83.2083.20%V.Satisfac<strong>to</strong>ryA.Y.U. Engineering andConstruction25632 Const. of Multi-Purpose Building Final XI 0.657 C 0.415 - 0.500 - - - 91.5087.51%V.Satisfac<strong>to</strong>ryA.Y.U. Engineering andConstruction25632Const. of Multi-Purpose Building @Purok RiveraFinal XI 0.472 C 0.325 - 0.500 - - - 82.5083.69%V.Satisfac<strong>to</strong>ryAAA Structures &Builders, Inc.30935Conc./Impv't. of Magsaysay Brgy.Road1st/Final II 0.878 C 0.270 - 0.500 - - - 77.0077.00%Satisfac<strong>to</strong>ryAB Vision EngineeringConstruction19845 Const. of MPB 1st/Final XI 1.607 C 0.393 0.300 0.300 - - - 99.3099.30%OutstandingAboitiz ConstructionGroup, Inc.Aboitiz ConstructionGroup, Inc/Kumagai GumiCo. Ltd. (J.V.)2608SLI-SN-003884C.P. PY-D Structural Overlay ofPatnongon-Nabas RoadCebu South Road ImprovementProject CP-1 (Talisay-Jct. ToledoSect.)Final ADB 166.347 C 0.323 0.200 0.000 - - - 54.8071.86%Satisfac<strong>to</strong>ry2nd VII 513.289 O 0.332 0.300 0.000 0.030 0.065 0.100 82.70 -Abulug Construction 5593Construction of Canal and CanalStructures (LMC-ARIP-10-06)FinalNIARegion II4.877 C 0.400 0.300 - - - - 70.0070.00%FairAbulug ConstructionCompany, Inc.Abulug ConstructionCompany, Inc.Abulug ConstructionCompany, Inc.Abulug ConstructionCompany, Inc.Abulug ConstructionCompany, Inc.Abulug ConstructionCompany, Inc.Abulug ConstructionCompany, Inc.5593 Const. of Dagupan MPB 1st/Final CAR 0.442 C 0.226 0.184 0.300 - - - 71.00559355935593559355935593Const./Completion of CabaruanBridgeRegravelling of Allsitan-Biduang-Nagattatan RoadRehab. of Drainage Canal Bangued-Pidigan SectionRehab. of Drainage Canal Bangued-Pidigan SectionRepair of Cristina H/S and Rehab. ofBucay C/SRepair/Impv't. of Calog-Luna-Pud<strong>to</strong>lRoad1st/Final II 0.383 C 0.178 0.271 0.300 - - - 74.9071.00%Satisfac<strong>to</strong>ry74.90%Satisfac<strong>to</strong>ry1st II 1.923 O 0.300 0.225 0.100 0.030 0.051 0.067 77.30 -1st CAR 2.385 O 0.225 0.000 0.100 0.008 0.022 0.200 55.50 -Final CAR 2.385 C 0.288 0.300 0.300 - - - 88.801st CAR 0.474 O 0.381 0.264 0.100 0.020 0.029 0.100 89.40 -1st II 1.180 O 0.369 0.200 0.100 0.010 0.033 0.100 81.20 -68.82%Fair<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 6


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONAbulug ConstructionCompany, Inc.5593Repair/Impv't. of Calog-Luna-Pud<strong>to</strong>lRoadFinal II 1.180 C 0.293 0.218 0.300 - - - 81.1081.16%V.Satisfac<strong>to</strong>ryAbulug ConstructionCompany, Inc.5593Res<strong>to</strong>ration of Damaged Roadwaysalong BAMR (Sinking Pavement @Logac Section)1st/Final II 1.392 C 0.<strong>31</strong>6 - 0.500 - - - 81.6081.60%V.Satisfac<strong>to</strong>ryACJ ConstructionResources10635Const. of Mayor Ricardo L. IpongMemorial National H/SFinal XII 4.634 C 0.355 0.300 0.300 - - - 95.5086.19%V.Satisfac<strong>to</strong>ryACJ ConstructionResources10635Const. of Saguing Bridge alongDavao-Cotaba<strong>to</strong> Rd., IncludingApproaches and Gap Section2nd XII 9.328 O 0.337 0.300 0.100 0.030 0.052 0.100 91.90 -ACJ ConstructionResources10635Const. of Saguing Bridge alongDavao-Cotaba<strong>to</strong> Rd., IncludingApproaches and Gap SectionFinal XII 9.328 C 0.283 0.297 0.300 - - - 88.0090.16%OutstandingACJ ConstructionResources10635ACO Construction 1<strong>31</strong>05Adelfa & CharlieEnterprisesAdelfa & CharlieEnterprisesAdelfa & CharlieEnterprisesAdelfa & CharlieEnterprises11569Const./Impvt of Jct. Meocad-Salasang-Katipunan RoadRepair of OB-Gyne Zamboanga CityMedical CenterConcrete Paving of Sambulawan-Calaguise Rd.Final XII 28.842 C 0.337 0.300 0.300 - - - 93.701st/Final IX 5.704 C 0.121 0.200 0.300 - - - 62.1094.18%Outstanding62.10%Fair1st VIII 4.477 O 0.359 0.247 0.100 0.030 0.037 0.100 87.30 -11569 Const. of Imbornal Bridge 1st/Final VIII 4.239 C 0.371 0.300 0.300 - - - 97.1011569 Const. of Palid Bridge 1st/Final VIII 5.281 C 0.348 0.300 0.300 - - - 94.8011569 Rehab. of Palompon-Villaba Road 1st VIII 9.490 O 0.352 0.214 0.100 0.030 0.056 0.100 85.20 -97.10%Outstanding94.80%OutstandingAdelfa & CharlieEnterprises11569Repair of Roads along Tabango-Villaba-Palompon Road & S<strong>to</strong>.Rosario-Villaba Road1st VIII 9.641 O 0.350 0.200 0.100 0.030 0.032 0.100 81.20 -Adfil Corporation 14437Conc. of Agusan-Surigao Road(Ampayon Section)1st XIII 4.691 O 0.383 0.300 0.100 0.030 0.025 0.100 93.80 -Adfil Corporation 14437Conc. of Agusan-Surigao Road(Ampayon Section)Final XIII 4.691 C 0.367 0.300 0.300 - - - 96.70Adfil Corporation 14437Const. of Tag-iho1 Bridge andApproaches (Completion)1st XIII 22.141 O 0.334 0.300 0.030 0.030 0.028 0.033 75.50 -Adfil Corporation 14437 Const. of Taguibo Flood Control 1st/Final XIII 14.413 C 0.360 0.300 0.300 - - - 96.00Adfil Corporation 14437 Const. of Waloe Bridge 1st XIII 9.199 O 0.372 0.300 0.100 0.030 0.054 0.100 95.60 -94.96%Outstanding96.00%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 7


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONAdfil Corporation 14437 Const. of Waloe Bridge Final XIII 9.199 C 0.339 0.200 0.300 - - - 83.90Adfil Corporation 14437Improvement of Masao River FloodControl, Phase IIIFinal XIII 4.590 C 0.500 0.567 - - - - 106.7090.92%Outstanding94.70%OutstandingAdfil Corporation 14437Impvt. of Agusan-Surigao Road(Ampayon Section)1st/Final XIII 9.290 C 0.354 0.200 0.300 - - - 85.4085.40%V.Satisfac<strong>to</strong>ryAdfil Corporation 14437Impvt. of Lake Mainit CircumferentialRoad, Brgy. Colorado Section1st/Final XIII 9.525 C 0.172 0.233 0.300 - - - 70.5070.50%Satisfac<strong>to</strong>ryAdfil Corporation 14437Adimre Construction 25534Advanced FoundationConstruction SystemsCorp.15449Rehab./Impvt. of Sagal-angManubiray FMRConst. of Std. 1-Cl School Bldg. @N. Clemena E/S, Bulihan &Bagbaguin E/SConst. of Subic-Cawag Bridge I,along Subic-Cawag-Balaybay RoadFinal X 13.894 C 0.358 0.278 0.300 - - - 93.60Final III 0.868 C 0.<strong>31</strong>8 0.300 0.300 - - - 91.8073.32%Satisfac<strong>to</strong>ry82.63%V.Satisfac<strong>to</strong>ry1st III 47.952 O 0.3<strong>31</strong> 0.300 0.100 0.030 0.040 0.100 90.10 -AG Construction 7921 Conc. of Wright Park Grounds 1st/Final CAR 0.936 C 0.286 0.300 0.300 - - - 88.6088.60%V.Satisfac<strong>to</strong>ryAgafer Construction 7912 Conc. of Centro 2 1st/Final II 0.963 C 0.284 0.204 0.300 - - - 78.80AJYSC Marketing 26924AJYSC Marketing 26924Const. of Ba<strong>to</strong>do Bridge andApproaches Ba<strong>to</strong>do ArcConst. of Ba<strong>to</strong>do Bridge andApproaches Ba<strong>to</strong>do Arc78.80%Satisfac<strong>to</strong>ry2nd XII 21.500 O 0.<strong>31</strong>4 0.159 0.100 0.030 0.042 0.100 74.50 -4th XII 22.822 O 0.320 0.300 0.100 0.030 0.045 0.100 89.50 -AJYSC Marketing 26924Const. of Ba<strong>to</strong>do Bridge andApproaches Ba<strong>to</strong>do ArcFinal XII 22.822 C 0.279 0.200 0.300 - - - 77.9081.22%V.Satisfac<strong>to</strong>ryAJYSC Marketing 26924Impvt. of Highway Jct. Malandag-Allae FMR, Malungon ARCFinal XII 18.364 C 0.330 0.300 0.300 - - - 93.0080.16%V.Satisfac<strong>to</strong>ryAkela Builders 26444AKH Construction andTrading CorporationConst./Rehab. of MPB @ NovalichesProper1st/Final NCR 1.335 C 0.386 0.291 0.300 - - - 97.7020759 Const. of MPB @ Brgy. 177 1st/Final NCR 4.745 C 0.399 0.300 0.300 - - - 99.9097.70%Outstanding99.90%OutstandingAKN Construction Corp.(Formerly: AKN Const.)11845Concreting of Quirino Avenue, Brgy.La Huerta San IsidroFinal NCR 4.766 O 0.339 0.300 0.300 - - - 93.90 -Al Chris Construction 12406 Conc. of Maribojoc-Antequera Road Final VII 9.142 C 0.337 0.100 0.300 - - - 73.70Al Chris Construction 12406Concreting of Maribojoc-AntequeraRoad71.24%Satisfac<strong>to</strong>ry1st VII 9.142 O 0.281 0.238 0.070 0.015 0.025 0.067 69.60 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 8


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONAl Chris Construction 12406Al Fahdel Construction &Engineering17953Const. of 1-Cl School Bldg., Ipo,Anda, BoholConcreting of Iligan-Bukidnon RoadBonbonan Digkilaan & RogongonSections,Final VII 0.435 C 0.439 - 0.000 - - - 43.9071.62%Satisfac<strong>to</strong>ry1st X 2.238 O 0.211 0.300 0.100 0.020 0.023 0.100 75.40 -Al Hussein Construction 18438Cluster III-Const. of Various Projectsin Salvador Inasagan & SudlonFinal X 4.242 C 0.297 0.300 0.300 - - - 89.7081.44%V.Satisfac<strong>to</strong>ryAl Hussein Construction 18438Completion of Malaapo Bridge &Approaches1st X 5.380 O 0.267 0.233 0.100 0.030 0.022 0.100 75.20 -Al Hussein Construction 18438Completion of Malaapo Bridge &ApproachesFinal X 5.380 C 0.325 0.300 0.300 - - - 92.5082.12%V.Satisfac<strong>to</strong>ryAl Hussein Construction 18438Const. of Cagascas Bridge andApproaches1st X 11.983 O 0.332 0.300 0.100 0.030 0.037 0.100 89.90 -Al Niño ConstructionSupplyAlajeño Construction andSupplies18378 Construction of Diversion Work 1st NIA 4.048 C 0.381 0.124 0.100 0.018 0.029 0.200 85.2028713 Const. of Spring Development 1st/Final IX 1.208 C 0.394 0.016 0.300 - - - 71.0085.20%V.Satisfac<strong>to</strong>ry71.00%Satisfac<strong>to</strong>ryAlber<strong>to</strong> Uy Construction& Development20924 Const. of 1 CL @ Labasan NHS 1st IV-B 0.437 O 0.344 0.267 0.100 0.008 0.025 0.050 79.40 -Alber<strong>to</strong> Uy Construction& Development20924 Const. of 1 CL @ Labasan NHS Final IV-B 0.437 C 0.348 0.143 0.300 - - - 79.1079.<strong>31</strong>%Satisfac<strong>to</strong>ryAlber<strong>to</strong> Uy Construction& Development20924 Const. of Bongabong River Front 1st IV-B 4.700 O 0.270 0.300 0.100 0.023 0.035 0.100 82.80 -Alber<strong>to</strong> Uy Construction& Development20924Const. of Bongabong River Front(Phase II)1st IV-B 1.871 O 0.350 0.275 0.100 0.023 0.021 0.100 86.90 -Albeva Konstrukt &Development Corporation25480Const. of NIA Central office CoveredCourt1st NIA 6.660 O 0.274 0.300 0.100 0.030 0.038 0.100 84.20 -Alcel Construction 15129Alcel Construction 15129Asphalt Overlay along Pangasinan-Zambales RoadAsphalt Overlay along Pangasinan-Zambales Road1st I 9.497 O 0.300 0.200 0.100 0.008 0.028 0.100 73.60 -Final I 9.497 C 0.215 0.300 0.300 - - - 81.5076.76%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 9


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONAlcel Construction andSupply15129Asphalt Overlay along Manila NorthRoad Km. 299+100 <strong>to</strong> Km. 299+300with exception and San Fernandoaccess road <strong>to</strong> Poro Pt. Km. 269+715Km. 270+0421st I 0.949 O 0.287 0.300 0.100 0.020 0.030 0.100 83.70 -Alcel Construction andSupply15129Asphalt Overlay along Manila NorthRoad Km. 299+100 <strong>to</strong> Km. 299+300with exception and San Fernandoaccess road <strong>to</strong> Poro Pt. Km. 269+715Km. 270+042Final I 0.947 C 0.304 0.200 0.300 - - - 80.4074.34%Satisfac<strong>to</strong>ryAlcel Construction andSupply15129Const. of Multi-Purpose Building @PoblacionFinal I 0.948 C 0.386 0.200 0.300 - - - 88.6087.62%V.Satisfac<strong>to</strong>ryAldana Construction 21736Const. of 1 Unit 3 CL SchoolBuilding at SEPNAS1st I 1.135 C 0.226 0.300 0.100 0.015 0.056 0.100 79.70 -Aldana Construction 21736Const. of 1 Unit 3 CL SchoolBuilding at SEPNASFinal I 1.135 C 0.357 0.300 0.300 - - - 95.7084.50%V.Satisfac<strong>to</strong>ryAldana Construction 21736Const. of 4-Cl Sta. Ana ElementarySchool Building1st/Final I 2.892 C 0.376 - 0.500 - - - 87.6087.60%V.Satisfac<strong>to</strong>ryALE BuildersConstruction andDevelopment Corp.Alebon GenuineMerchandisingAlebon GenuineMerchandising5180 Const. of MPB at Brgy. 34 & 35 1st NCR 4.666 O 0.349 0.240 0.100 0.030 0.056 0.067 84.20 -2630026300Conc. of By-Pass Road & LinedCanal w/ spillway along By PassRoadConc. of By-Pass Road & LinedCanal w/ spillway along By PassRoad1st X 4.089 O 0.376 0.300 0.000 0.023 0.040 0.067 80.60 -Final X 4.089 C 0.170 0.300 0.000 - - - 47.0067.16%FairAlex V. Pama<strong>to</strong>ng Trading& Construction13290Cagayan De Oro Convention CenterAccess Road Brgy. IndahagFinal X 7.434 C 0.274 0.284 0.300 - - - 85.8067.46%FairAlexa Trading &Construction22143Proposed Barangka Ibaba LinearPark2nd/Final PRRC 5.836 Suspended 0.350 0.300 0.300 - - - 90.10Al-Fahdel Construction &Engineering17953 Const. of Tugar Bridge 2nd X 4.678 O 0.337 0.300 0.100 0.023 0.051 0.100 91.10 -Alfalfa Construction 29712Repair/Rehab. of Poblacion-Boliwong Road1st/Final CAR 0.378 C 0.397 0.071 0.300 - - - 76.8076.80%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 10


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONAlfie's Const. & Const.Supply, Inc. (Formerly:Alfie's Construction &Const. Supply)17162Concreting of Bacolod-Murcia-D.S.Benedic<strong>to</strong> Road2nd VI 4.644 O 0.012 0.181 0.000 0.023 0.005 0.033 25.40 -Alfie's Const. & Const.Supply, Inc. (Formerly:Alfie's Construction &Const. Supply)17162Concreting of Bacolod-Murcia-D.S.Benedic<strong>to</strong> RoadFinal VI 4.644 C 0.300 0.289 0.300 - - - 88.9066.34%FairAlfie's Const. & Const.Supply, Inc. (Formerly:Alfie's Construction &Const. Supply)17162 Const. of Libas-Panaquiao Bridge 2nd VI 25.628 O 0.346 0.300 0.100 0.030 0.070 0.100 94.60 -Alfie's Const. & Const.Supply, Inc. (Formerly:Alfie's Construction &Const. Supply)17162 Const. of Libas-Panaquiao Bridge Final VI 25.628 C 0.<strong>31</strong>1 0.300 0.300 - - - 91.1090.47%OutstandingAlgimar Construction 15232 Concreting of Moyot Street Final V 4.624 C 0.362 - 0.500 - - - 86.20Algimar Construction 15232Const. of 1-Unit Classroom ModifiedSchool Building78.28%Satisfac<strong>to</strong>ry1st V 0.367 O 0.325 0.300 0.100 0.030 0.022 0.100 87.70 -Algimar Construction 15232 Const. of MPB at DECS Compound 1st/Final V 1.918 C 0.373 0.200 0.300 - - - 87.3086.08%V.Satisfac<strong>to</strong>ryAlgimar Construction 15232Algimar Construction 15232Algimar Construction 15232Algimar Construction 15232Algimar Construction 15232Const. of Multi-Purpose Building(Phase II)Const. of Multi-Purpose Building @DECS CompoundGravelling of San Fernando SouthRoadRehab. of Sitio Calumpang-MalintaRoadRehabilitation of San FernandoNorth Road2nd V 4.626 O 0.334 0.300 0.100 0.030 0.035 0.100 89.90 -1st V 4.790 O 0.396 0.225 0.100 0.030 0.041 0.100 89.20 -1st/Final V 1.841 C 0.220 0.200 0.300 - - - 72.001st/Final V 0.955 C 0.363 0.300 0.300 - - - 96.301st/Final V 1.859 C 0.442 - 0.500 - - - 94.2072.00%Satisfac<strong>to</strong>ry96.30%Outstanding94.20%OutstandingAlgimar Construction 15232 Repair of Calapi Bridge 1st V 1.898 O 0.341 0.240 0.100 0.010 0.019 0.100 81.00 -Algimar Construction 15232 Repair of Calapi Bridge Final V 1.898 C 0.381 0.100 0.300 - - - 78.1079.84%Satisfac<strong>to</strong>ryAlgon EngineeringConstruction Corporation270Const. of Hulid Bridge &Approaches along-Cateel-Compostela Secondary Nat'l Rd.1st XI 11.798 O 0.320 0.256 0.100 0.030 0.048 0.100 85.40 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 11


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONAllen Construction 12584Conc. of Agbanawag-CabucbucanRoad1st/Final III 1.885 C 0.290 0.300 0.300 - - - 89.0089.00%V.Satisfac<strong>to</strong>ryAllen Construction 12584Const. of School Building @ CLSU(Mini Amphi-Theatre)1st III 0.937 O 0.385 0.212 0.100 0.015 0.032 0.100 84.40 -Allencon DevelopmentCorporation12302Asphalt Overlay of <strong>Jan</strong>iuay-Lambunao Nat'l. Road1st VI 1.918 C 0.421 - 0.500 - - - 92.1092.10%OutstandingAllencon DevelopmentCorporation12302Asphalting of Magamay-NapandongRoad1st/Final VI 2.825 C 0.249 0.300 0.300 - - - 84.9084.90%V.Satisfac<strong>to</strong>ryAllencon DevelopmentCorporation12302Asphalting of Priority Road Section,San An<strong>to</strong>nio-Calaya Road1st/Final VI 3.547 C 0.<strong>31</strong>8 0.300 0.300 - - - 91.8091.80%OutstandingAlleyway Construction 15<strong>31</strong>0 Const. of MPB @ So. Cabading 1st/Final IV-A 1.437 C 0.346 0.213 0.300 - - - 85.9085.90%V.Satisfac<strong>to</strong>ryAlleyway Construction 15<strong>31</strong>0Const. of School Building in Tondo,Manila, Centex E/S1st NCR 1.850 O 0.336 0.300 0.100 0.030 0.042 0.100 90.80 -Alleyway Construction 15<strong>31</strong>0Const. of School Building in Tondo,Manila, Centex E/SFinal NCR 1.859 C 0.272 0.300 0.300 - - - 87.2089.72%V.Satisfac<strong>to</strong>ryAlleyway Construction 15<strong>31</strong>0Rehab./Impvt. of AntipoloCircumferential Road "A"1st/Final IV-A 9.994 C 0.<strong>31</strong>3 0.300 0.300 - - - 91.3091.30%OutstandingAlmakar Builders & MetalWorks21929Const. of 2 S<strong>to</strong>rey 4 ClassroomSchool Bldg., @ Jimenez E/S Wawa I1st/Final IV-A 2.891 C 0.166 0.229 0.300 - - - 69.5069.50%FairAlnor Construction &Const. SuppliesAlnor Construction &Const. SuppliesAlnor Construction &Const. SuppliesAlnor Construction &Const. SuppliesAlnor Construction &Const. SuppliesAlnor Construction &Construction Supplies26705 Completion of PNP Bldg. Final XIII 1.853 C 0.367 0.200 0.300 - - - 86.7026705 Const. of 2 Cl Magpayang NHS 1st XIII 0.801 O 0.382 0.240 0.100 0.030 0.039 0.100 89.10 -26705 Const. of 2 Cl Magpayang NHS 2nd XIII 0.801 O 0.347 0.286 0.100 0.015 0.013 0.100 86.10 -26705 Const. of MPB @ Brgy. Binocaran 1st XIII 0.926 O 0.373 0.240 0.100 0.030 0.030 0.100 87.30 -26705 Const. of MPB @ Brgy. Binocaran 2nd XIII 0.926 O 0.345 0.300 0.100 0.022 0.013 0.100 88.00 -26705 Completion of PNP Bldg. 1st XIII 1.852 O 0.<strong>31</strong>3 0.000 0.100 0.023 0.032 0.100 56.80 -75.25%Satisfac<strong>to</strong>ryAlnor Construction &Construction Supplies26705 Completion of PNP Bldg. 2nd XIII 1.852 O 0.354 0.240 0.100 0.030 0.015 0.100 83.90 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 12


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONAlnor Construction &Construction Supplies26705 Const. of School Building 1st XIII 0.458 O 0.350 0.250 0.030 0.022 0.027 0.100 77.90 -Alpha Ryder Construction& Supplies12197Concreting of Salvacion-CarjelaRoad1st/Final V 0.569 C 0.299 - 0.500 - - - 79.9079.90%Satisfac<strong>to</strong>ryAlpha Ryder Constructionand Supplies12197Const. of Dancalan Bridge &Approaches1st/Final V 1.170 O 0.338 0.240 0.100 0.023 0.043 0.100 84.40 -Alpha Tech Builders 26072 Conc. of Taloot RORO Road 1st/Final VII 4.628 C 0.364 0.300 0.300 - - - 96.40Alpha Tech Builders 26072Const. of Philippine Science HighSchool Dormi<strong>to</strong>ry Ph 196.40%Outstanding1st VII 4.625 O 0.308 0.240 0.100 0.030 0.040 0.100 81.80 -Alpha Tech Builders 26072Const. of Philippine Science HighSchool Dormi<strong>to</strong>ry Ph 1Final VII 4.625 C 0.<strong>31</strong>0 0.300 0.300 - - - 91.0084.56%V.Satisfac<strong>to</strong>ryAlphin Trading &ConstructionAlphin Trading &Construction26260 Const. of Ventinilla MPB 1st/Final I 1.034 C 0.357 0.300 0.300 - - - 95.7026260 Rehab. of Barangobong Bridge II 1st/Final I 1.068 O 0.275 0.300 0.100 0.015 0.047 0.100 83.70 -95.70%OutstandingAlphin Trading &Construction26260 Rehab. of Barangobong Bridge II Final I 1.068 C 0.295 0.300 0.300 - - - 89.5086.02%V.Satisfac<strong>to</strong>ryAlphin Trading andConstruction26260Const. of 1-Unit 1Cl Bldg. @Nagsaling E/S1st/Final I 0.385 C 0.385 0.200 0.300 - - - 88.5088.50%V.Satisfac<strong>to</strong>ryAlphin Trading andConstruction26260Const. of Multi-Purpose Bldg. @Tuliao E/S1st I 0.963 O 0.389 0.300 0.100 0.030 0.035 0.100 95.40 -Alphin Trading andConstruction26260Const. of Multi-Purpose Bldg. @Tuliao E/SFinal I 0.963 C 0.388 0.300 0.300 - - - 98.8096.42%OutstandingAlraf Construction &Enterprises17297Completion (Impvt./Conc. Paving) ofLicomo-Quiniput Road, Segment IIManguso-Mulawin Section1st IX 36.137 O 0.338 0.300 0.100 0.030 0.047 0.100 91.50 -Alraf Construction &Enterprises17297Impvt./Widening of Sangali Nat'lRoad1st/Final IX 6.592 C 0.243 0.300 0.300 - - - 84.3084.30%V.Satisfac<strong>to</strong>ryAlro Construction &Development Corp.18361Rehabilitation of Barangay Coguit-San Isidro Brgy. Road1st/Final V 3.706 C 0.406 - 0.500 - - - 90.6090.60%OutstandingAl's Enterprise andConstruction9721Const. of All Weather FMR alongCabay-Caisawan Road (Sta.3+000-Sta.1+600)1st/Final VIII 4.512 C 0.220 - 0.500 - - - 72.0072.00%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 13


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONAl's Enterprise andConstruction9721Const. of MPB @ Brgy. SabangSouth1st/Final VIII 1.4<strong>31</strong> C 0.276 0.300 0.300 - - - 87.6087.60%V.Satisfac<strong>to</strong>ryAl's Enterprise andConstruction9721Alzam Enterprises 19113Alzam Enterprises 19113Rehab./Impvt. of Asphalt Pav't.along San Julian-Borongan RoadSectionConst. of River Dike along TalomoRiver from Purok 9 goingdownstreamWidening/ Impvt. of Davao-AgusanRoad, Ilang Tibungco Section1st/Final VIII 9.530 C 0.233 0.200 0.300 - - - 73.3073.30%Satisfac<strong>to</strong>ry1st XI 4.704 O 0.390 0.160 0.100 0.020 0.043 0.200 91.30 -1st XI 9.419 O 0.376 0.300 0.100 0.030 0.040 0.100 94.60 -Alzam Enterprises 19113Widening/ Impvt. of Davao-AgusanRoad, Ilang Tibungco SectionFinal XI 9.420 C 0.347 0.300 0.300 - - - 94.7094.64%OutstandingAlzen Engineering &Construction Supplies13911Const. of Drainage Canal alongCotaba<strong>to</strong>-Davao Road OldFinal XII 2.412 C 0.375 - 0.500 - - - 87.5082.22%V.Satisfac<strong>to</strong>ryAlzen Engineering &Construction Supplies13911Const./Impvt. of Binoongan-Napaliko-Katipunan RoadFinal XII 24.050 C 0.322 0.300 0.300 - - - 92.2092.98%OutstandingAMJC Construction 21002AMJC Construction 21002Const. of 3-CL School Building @Ilocos Norte NHSConst. of 3-CL School Building @Ilocos Norte NHS1st I 1.290 O 0.350 0.157 0.100 0.020 0.023 0.100 75.00 -Final I 1.044 C 0.367 0.100 0.000 - - - 46.7066.51%FairAmopia Construction andSupplies27511 Conc. of FMR at Purok 4 1st/Final XII 0.457 C 0.392 0.200 0.300 - - - 89.2089.20%V.Satisfac<strong>to</strong>ryAngel & SamConstruction & GeneralMerchandise19968Cluster I-Const. of Various SchoolBuildings @ Cagayan de Oro CityNHS1st X 2.673 O 0.347 0.250 0.100 0.030 0.027 0.100 85.40 -Angel & SamConstruction & GeneralMerchandise19968Cluster I-Const. of Various SchoolBuildings @ Cagayan de Oro CityNHS2nd X 2.673 O 0.293 0.300 0.100 0.015 0.042 0.100 85.00 -Angel & SamConstruction & GeneralMerchandise19968Cluster I-Const. of Various SchoolBuildings @ Cagayan de Oro CityNHSFinal X 2.673 C 0.370 0.300 0.000 - - - 67.0079.74%Satisfac<strong>to</strong>ryAngel & SamConstruction & GeneralMerchandise19968Const. of 4 Cl School Bldg. @Kauswagan E/S1st X 1.682 O 0.234 0.300 0.100 0.030 0.029 0.100 79.30 -Angel & SamConstruction & GeneralMerchandise19968Const. of School Bldg. @Minadanao Polytechnic CollegeFinal X 0.929 C 0.362 0.200 0.300 - - - 86.2064.57%Fair<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 14


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONAngel & SamConstruction & GeneralMerchandise19968 Provision of Concrete Line Canal Final X 0.768 C 0.333 - 0.500 - - - 83.3086.69%V.Satisfac<strong>to</strong>ryAnilos Trading &Construction<strong>31</strong>557Const. of 3 units 3 CL Sch. Bldg. w/CR, Palawan Natl. H/S1st/Final IV-B 1.293 C 0.385 0.200 0.300 - - - 88.5088.50%V.Satisfac<strong>to</strong>ryAnilo's Trading andConstruction<strong>31</strong>557Const. of MPB (Phase II) Brgy.Inagawan1st/Final IV-B 0.934 C 0.<strong>31</strong>5 0.161 0.300 - - - 77.6077.60%Satisfac<strong>to</strong>ryAnilo's Trading andConstruction<strong>31</strong>557Const./Impvt. of Multi-PurposeBuidling, Phase 1, 2-CL1st/Final IV-B 1.897 C 0.373 0.200 0.300 - - - 87.3087.30%V.Satisfac<strong>to</strong>ryAnrol Construction 10136Const. of S<strong>to</strong>rey 2 CL SchoolBuilding @ Dulong Bayan E/S1st IV-A 6.014 O 0.361 0.227 0.100 0.030 0.011 0.100 82.90 -An<strong>to</strong>nio V. NideaConstruction6382Repair/Rehab. of Sala-CagbulacaoRoadFinal V 4.675 C 0.332 0.300 0.300 - - - 93.2087.44%V.Satisfac<strong>to</strong>ryAOG Construction 29758Conc. Paving of Dongon-LaboonRoad1st/Final VIII 14.176 C 0.244 0.300 0.300 - - - 84.4084.40%V.Satisfac<strong>to</strong>ryAOG Construction 29758 Const. of Amambahag Bridge Final VIII 7.596 C 0.363 0.300 0.300 - - - 96.30AOG Construction 29758 Const. of Basak II UK Bridge Final VIII 3.342 C 0.329 0.300 0.000 - - - 62.90AP Mercado Trading andConstructionAP Mercado Trading andConstruction2526925269Rehabilitation of Lateral D (Sta.0+000-4+666)Road Surfacing along Lat D (Sta.12+957-17+068)FinalFinalNIARegion INIARegion I78.06%Satisfac<strong>to</strong>ry65.36%Fair7.483 C 0.250 0.300 0.300 - - - 85.00 85.09%1.502 C 0.240 0.300 0.300 - - - 84.00 84.00%APB Construction 17055 Completion of MPB 1st CAR 1.908 O 0.398 0.300 0.100 0.023 0.032 0.100 95.30 -APD Construction 17467APD Construction 17467APD Construction 17467Conc. of Ilagan-Delfin-Albano-MalligNational Road, Villa Cacho SectionConcrete Reblocking alongCabatuan-Enrile Road (MBC) Km.406+00-Km. 407+500Concrete Reblocking alongCabatuan-Enrile Road (MBC) Km.406+00-Km. 407+5001st II 11.868 O 0.330 0.300 0.100 0.020 0.023 0.100 87.30 -1st II 1.288 O 0.<strong>31</strong>1 0.258 0.100 0.030 0.030 0.100 82.90 -Final II 1.566 C 0.284 0.300 0.300 - - - 88.4085.10%V.Satisfac<strong>to</strong>ryAPD Construction 17467Const. of Diversion Dam and AccessRoad for Cabaruan1st/FinalNIARegion 212.267 C 0.<strong>31</strong>5 0.240 0.300 - - - 85.5085.50%V.Satisfac<strong>to</strong>ryAPD Construction 17467Const. of Diversion Dam and AccessRoad for Dumalinono1st/FinalNIARegion 211.583 C 0.295 0.240 0.300 - - - 83.5083.50%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 15


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONAPD Construction 17467Const. of MPB at San Mateo (PhaseVI)1st/Final II 1.891 C 0.392 0.208 0.300 - - - 90.0090.00%V.Satisfac<strong>to</strong>ryAPD Construction 17467 Const. of Pigalo Bridge (Phase II) 1st II 2.820 O 0.400 0.240 0.100 0.030 0.023 0.067 86.00 -APD Construction 17467Const./Impvt. (Reblocking) alongSantiago City-BaluarteIsabela/Quirino Bdry.Final II 6.5<strong>31</strong> C 0.335 0.300 0.300 - - - 93.5093.86%OutstandingAPD ConstructionConstruction of Canal and Canal2006-0594Structures (LMC-ARIP-04-06)1st/FinalNIARegion II5.490 C 0.400 0.300 0.000 - - - 70.0070.00%FairAPD ConstructionConstruction of Canal and Canal2006-0594Structures (LMC-ARIP-06-06)FinalNIARegion II2.529 C 0.400 0.300 0.000 - - - 70.0070.00%FairAPO GeneralConstruction7010Completion of School Bldg., HappyHollow E/SFinal CAR 0.638 O 0.307 0.262 0.300 - - - 86.90 -Aqualine Construction 11555 Const. of Limopoca CIP FinalNIARegion VII3.232 C 0.321 0.300 0.300 - - - 92.1092.1%OutstandingAquino-Dela CruzEngineering &Construction16751Concreting/Improvement of SanCarlos-Calasiao Road(Manson-Balingit Section)1st I 9.444 O 0.332 0.291 0.100 0.030 0.038 0.100 89.10 -Aquino-Dela CruzEngineering &Construction16751Const. of 1 Cl Sch. Bldg. @ Matic-Matic E/S1st/Final I 0.386 C 0.384 0.300 0.300 - - - 98.4098.40%OutstandingAR Adlawan Construction 1<strong>31</strong>08Asphalting along Cebu ToledoWharf Road, Km.28+180-Km.28+4601st/Final VII 1.067 C 0.285 0.300 0.300 - - - 88.5088.50%V.Satisfac<strong>to</strong>ryArcinue Commercial 6746Const. of Modified ConventionalType Single S<strong>to</strong>rey S/BFinal I 0.703 C 0.356 0.300 0.300 - - - 95.6085.45%V.Satisfac<strong>to</strong>ryArcinue Commercial 6746Const. of Modified ConventionalType Single S<strong>to</strong>rey S/B at TagudtudNHS1st/Final I 0.827 C 0.292 0.300 0.300 - - - 89.20Arcinue Commercial 6746 Const. of Maypalic Bridge 1st I 12.048 O 0.295 0.265 0.050 0.030 0.035 0.067 74.20 -Arcinue Commercial 6746Const. of Modified ConventionalType Single S<strong>to</strong>rey Sch. Bldg. @ BailE/S1st/Final I 0.607 C 0.396 0.100 0.300 - - - 79.6089.20%V.Satisfac<strong>to</strong>ry79.60%Satisfac<strong>to</strong>ryArcinue Commercial 6746Const. of Various School Bldg.within 2nd District of La UnionFinal I 0.990 C 0.286 - 0.500 - - - 78.6085.88%V.Satisfac<strong>to</strong>ryArcinue Commercial 6746Const. of Various School Bldg.within 2nd District of La UnionFinal I 0.656 C 0.<strong>31</strong>0 - 0.500 - - - 81.0069.24%Fair<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 16


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONArcinue Commercial 6746Impvt./Conc. Paving of Lingayen-Binmaley By-Pass Road1st I 14.434 O 0.287 0.205 0.100 0.030 0.037 0.100 75.90 -Arellano GeneralConstructionARGEALIS Construction 16122<strong>31</strong>694 Const. of Multi-Purpose Building Final IV-A 2.120 C 0.356 0.300 0.300 - - - 95.60Construction of Fence for the SanFernando Runway Strip (WesternPortion)1st/Final BCDA 3.747 C 0.<strong>31</strong>0 0.300 0.300 - - - 91.0279.22%Satisfac<strong>to</strong>ry91.02%V.Satisfac<strong>to</strong>ryArmando U. KhongGeneral Contrac<strong>to</strong>r16163Proposed Completion of MalibayBridge along EDSA (Phase I)Final NCR 14.169 C 0.339 0.300 0.300 - - - 93.9083.46%V.Satisfac<strong>to</strong>ryARN Builders 18930 Const. of Banica Bridge 2nd VI 12.540 O 0.385 0.300 0.000 0.030 0.060 0.067 84.20 -ARN Builders 18930 Const. of Dumalag Bridge Final VI 16.494 C 0.341 0.114 0.300 - - - 75.5081.70%V.Satisfac<strong>to</strong>ryArrowhead Construction 22697Concreting of Road & Const. ofDrainage at LiyangFinal III 2.837 C 0.385 0.300 0.300 - - - 98.5085.12%V.Satisfac<strong>to</strong>ryArsvi Construction 23518 Const. of Multi-Purpose Bldg. 1st IV-A 4.821 O 0.349 0.240 0.100 0.030 0.045 0.100 86.40 -Art Star Construction andEnterprisesArt-Star Construction &EnterprisesArt-Star Construction &Enterprises1841618416Const. of Water System Project @Brgy. BungroConst. of Multi-Purpose Bldg.(Phase II)Final I 2.243 C 0.304 0.300 0.300 - - - 90.401st/Final I 6.109 C 0.278 - 0.500 - - - 77.8018416 Rehab. of Multi-Purpose Building 1st I 1.429 O 0.337 0.256 0.100 0.000 0.029 0.100 82.20 -78.94%Satisfac<strong>to</strong>ry77.80%Satisfac<strong>to</strong>ryArt-Star Construction &Enterprises18416 Rehab. of Multi-Purpose Building Final I 1.430 C 0.367 0.143 0.300 - - - 81.0081.84%V.Satisfac<strong>to</strong>ryAsanco GeneralMerchandising &Construction30517Const. of Multi-Purpose Building,PoblacionFinal IV-B 0.465 C 0.390 0.221 0.300 - - - 91.1083.61%V.Satisfac<strong>to</strong>ryASC Construction 26788Construction of Canal and CanalStructures (LMC-ARIP-08-06)FinalNIARegion II3.448 C 0.400 0.300 0.000 - - - 70.0070.00%FairASC Construction andConcrete Products26788Const. of (9) Nine Units AcademicSchool Building @ Libertad NHSFinal II 0.384 C 0.286 0.300 0.300 - - - 88.6088.18%V.Satisfac<strong>to</strong>ryASC Construction andConcrete Products26788Const. of Multi-Purpose Building @Enrile Vocational H/S1st II 1.445 O 0.355 0.300 0.100 0.015 0.019 0.067 85.60 -ASC Construction andConcrete Products26788Const. of Multi-Purpose Building @Enrile Vocational H/SFinal II 1.449 C 0.271 0.058 0.300 - - - 62.9070.01%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 17


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONASC Construction andConcrete Products26788Const. of Multi-Purpose Building @Lemu H/S1st II 0.963 O 0.337 0.000 0.100 0.000 0.027 0.067 53.10 -ASC Construction andConcrete Products26788Const. of Multi-Purpose Building @Lemu H/S2nd II 0.963 O 0.345 0.258 0.100 0.030 0.038 0.100 87.10 -ASC Construction andConcrete Products26788Const. of Multi-Purpose Building,Cagumitan E/SFinal II 0.943 C 0.444 - 0.500 - - - 94.4084.42%V.Satisfac<strong>to</strong>ryASC Construction andConcrete Products26788Const./Completion of SecondarySch. Bldg. @ Cagayan NHS1st II 0.784 O 0.388 0.135 0.100 0.020 0.011 0.100 75.40 -ASC Construction andConcrete Products26788Reha./Impvt. of National Road alongCagayan-Apayao Road, SolanaSection1st II 1.896 O 0.<strong>31</strong>5 0.212 0.100 0.030 0.028 0.100 78.50 -ASC Construction andConcrete Products26788 Rehab. of Manila North Road (MNR) 1st/Final II 4.821 C 0.350 0.200 0.300 - - - 85.0085.00%V.Satisfac<strong>to</strong>ryASC Construction andConcrete Products26788Repair/Rehab of CIS of Aglipay andMaddela1st/FinalNIARegion 22.511 C 0.289 0.240 0.300 - - - 82.9082.90%V.Satisfac<strong>to</strong>ryAsian Pearl Construction& Dev't. Corp.9059Const. of Gabaldon Bldg. & Grounds@ Ilocos Norte NHS1st I 7.594 O 0.349 0.300 0.100 0.020 0.060 0.100 92.90 -Asian Pearl Construction& Dev't. Corp.9059Impvt./Rehab. of Paoay FloodControl1st I 1.422 O 0.3<strong>31</strong> 0.200 0.100 0.008 0.019 0.133 79.10 -Asian Pearl Construction& Dev't. Corp.9059Impvt./Rehab. of Paoay FloodControlFinal I 1.422 C 0.238 0.300 0.300 - - - 83.8080.98%V.Satisfac<strong>to</strong>ryAsian Pearl Construction& Dev't. Corp. (Formerly:Asian Pearl Enterprises)9059Const. of Gabaldon Bldg. & Grounds@ Ilocos Norte NHSFinal I 7.594 C 0.322 0.300 0.300 - - - 92.2092.66%OutstandingAsian Pearl Enterprises 9059Concreting of Magnuang BarangayRoad1st/Final I 1.424 C 0.320 - 0.500 - - - 82.0082.00%V.Satisfac<strong>to</strong>ryAtlanta ConstructionCompany, Inc.<strong>31</strong>290Const./Rehab./Replacement/Completion/ and Repair of Elem.And Secondary Sch. Bldg.at SugodP/S1st X 5.214 O 0.364 0.200 0.100 0.030 0.032 0.100 82.60 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 18


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONAtlantic Erec<strong>to</strong>rs BuildersInc. / BrostanConstruction &DevelopmentAtlantic Erec<strong>to</strong>rs BuildersInc. / BrostanConstruction &DevelopmentAvatar ConstructionsCompanyJV-99-167/ 12360JV-99-167/ 12360<strong>31</strong>455Construction of Diversion Dam &Intake BarrelConstruction of Main Canal, Laterals& AppurtenantConc. of Dinagat-Lore<strong>to</strong> Road (SanJose-Mahayahay Section)Final1stNIARegion IINIARegion II232.105 C 0.381 0.300 0.000 - - - 68.1073.392 O 0.385 0.248 0.000 0.023 0.047 - 70.30 -1st XIII 10.411 O 0.300 0.000 0.100 0.030 0.050 0.100 58.00 -69.20%FairAvatar ConstructionsCompany<strong>31</strong>455 Conc. of Mahayahay-Glenville Road 1st/Final XIII 4.578 C 0.373 0.200 0.300 - - - 87.3087.30%V.Satisfac<strong>to</strong>ryAvatar ConstructionsCompany<strong>31</strong>455 Const. of Aurelio-Mahayhay Road Final XIII 3.153 C 0.369 0.247 0.300 - - - 91.6085.90%V.Satisfac<strong>to</strong>ryAvatar ConstructionsCompany<strong>31</strong>455Const./Conc. of Don Ruben-Sta.Cruz1st/Final XIII 1.087 C 0.379 0.244 0.300 - - - 92.3092.30%OutstandingAvatar ConstructionsCompany<strong>31</strong>455 Const./Conc. of San Juan Road 1st/Final XIII 2.596 C 0.283 0.300 0.300 - - - 88.3088.30%V.Satisfac<strong>to</strong>ryAzul Builders 21870Const. of Multi-Purpose Bldg.,Sapang Palay NHS (Phase II) SapangPalay City1st/Final III 3.035 C 0.353 0.300 0.300 - - - 95.3095.30%OutstandingAzul Builders 21870Package 4: Concreting of Road, G4Between Citrus & Lawang Pare1st/Final III 0.473 C 0.380 0.300 0.300 - - - 98.0098.00%OutstandingB. Bernardo Construction 6196Impvt./Rehab. of Sta. Maria-Norzagaray Road1st III 14.198 O 0.391 0.225 0.100 0.030 0.035 0.100 88.10 -B. Valencerina Trading &Construction22147Const. of Multi-Purpose Bldg., @Brgy. Tañong1st/Final NCR 1.4<strong>31</strong> C 0.386 0.300 0.300 - - - 98.6098.60%OutstandingB. Valencerina Trading &Construction22147Const. of Multi-Purpose bldg., @Tayabas West E/S1st IV-A 0.476 O 0.400 0.240 0.100 0.020 0.009 0.067 83.60 -B. Valencerina Trading &Construction22147 Rehab. of Road @ Brgy. Ampid I 1st/Final IVA 0.957 C 0.293 0.200 0.300 - - - 79.3079.30%Satisfac<strong>to</strong>ryB. Vicencio Construction 9687B. Vicencio Construction 9687Const. of Tagbilaran City-San JoseSt. Drainage Project (Outfall)Const./Opening of CalbayogDiversion Road, Monbon-Naga RoadSection1st VIII 14.174 O 0.333 0.179 0.100 0.030 0.051 0.200 89.30 -1st VIII 13.715 O 0.368 0.300 0.100 0.020 0.035 0.100 92.30 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 19


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONB. Vicencio Construction 9687Rehab.Impvt. of Calbayog-CatarmanRoad, Calbayog-Sinidman Sect.1st VIII 9.330 O 0.256 0.300 0.100 0.010 0.028 0.100 79.40 -B.A. Lagazo Builders 22056Concrete Paving of Belado St.(Phase II)Final II 0.951 C 0.263 0.300 0.300 - - - 86.3082.76%V.Satisfac<strong>to</strong>ryB.C.T. Trading andConstruction15199Conc. of PPNR (Sandoval-IraanSection)1st IV-B 28.841 O 0.<strong>31</strong>8 0.273 0.100 0.023 0.037 0.100 85.10 -B.C.T. Trading andConstruction15199Improvement/Concreting of Puer<strong>to</strong>Princesa South Road1st IV-B 4.729 O 0.2<strong>31</strong> 0.300 0.100 0.030 0.030 0.100 79.10 -B.C.T. Trading andConstruction15199Improvement/Concreting of Puer<strong>to</strong>Princesa South RoadFinal IV-B 4.729 C 0.338 0.200 0.300 - - - 83.8080.98%V.Satisfac<strong>to</strong>ryB.C.T. Trading andConstruction15199Replacement of Solomon Bridgealong Puer<strong>to</strong> Princesa South Road1st IV-B 12.533 O 0.400 0.156 0.100 0.030 0.030 0.100 81.60 -B.E. Construction 2730B.E. Construction 2730Conc. of Carles-Balasan Road,Barosbos-Guinticgan SectionConc. of Carles-Balasan Road,Barosbos-Guinticgan Section1st VI 8.819 O 0.303 0.245 0.000 0.030 0.035 0.067 68.00 -2nd VI 8.819 O 0.359 0.236 0.000 0.030 0.035 0.067 72.70 -B.E. Construction 2730 Conc. of Concepcion-Ajuy Road 1st VI 4.761 O 0.240 0.300 0.100 0.030 0.035 0.100 80.50 -B.E. Construction 2730 Conc. of Concepcion-Ajuy Road 2nd VI 4.761 O 0.371 0.218 0.070 0.008 0.028 0.067 76.20 -B.E. Construction 2730Const. of Iloilo City TechnicalVocational Colleges1st VI 4.821 O 0.373 0.240 0.100 0.015 0.032 0.100 86.00 -B.E. Construction 2730Const. of Iloilo City TechnicalVocational CollegesFinal VI 4.821 C 0.354 0.069 0.300 - - - 72.3081.89%V.Satisfac<strong>to</strong>ryB.E. Construction 2730 Const. of Lanag River Control 1st VI 14.450 O 0.288 0.160 0.100 0.030 0.040 0.200 81.80 -B.E. Construction 2730Const. of Leonora Salapandan NHSPhase II1st VI 0.948 O 0.<strong>31</strong>3 0.000 0.050 0.030 0.035 0.100 52.80 -B.E. Construction 2730Const. of MPB at UP Visayas GenderStudies Center Bldg.1st VI 11.446 O 0.342 0.240 0.100 0.030 0.027 0.100 83.90 -B.E. Construction 2730Const. of MPB Phase II @ LeganesE/S1st VI 0.950 O 0.291 0.109 0.050 0.030 0.035 0.067 58.20 -B.E. Construction 2730Const. of MPB Phase II @ Leganes68.37%Final VI 0.950 C 0.373 0.248 0.300 - - - 92.10E/SFairB.E. Construction 2730B.E. Construction 2730Const. of Multi-Purpose Building,Leon National H/SConst. of Multi-Purpose Workshop@ Balantang E/SFinal VI 1.901 C 0.<strong>31</strong>1 0.126 0.300 - - - 73.70Final VI 0.625 C 0.425 - 0.000 - - - 42.5075.10%Satisfac<strong>to</strong>ry64.20%Fair<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 20


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONB.E. Construction 2730Impv't. of Metro IloiloCircumferential Road, ZarragaSectionFinal VI 3.853 C 0.350 - 0.500 - - - 85.0080.02%V.Satisfac<strong>to</strong>ryB.F.T. Construction 14424 Const. of 2-Cl @ Magpapalayok H/S Final III 0.559 C 0.445 - 0.500 - - - 94.5084.00%V.Satisfac<strong>to</strong>ryB.G. Giron Construction& Supply15197 Const. of FMR @ Brgy. Malupa 1st III 1.421 O 0.293 0.223 0.100 0.010 0.019 0.100 74.50 -B.Q. Construction &Supply10217B.R.G. Construction 219<strong>31</strong>Const. of Urdaneta Flood ControlDrainage, Phase IConst. of Two (2) Units, S<strong>to</strong>rey Multi-Purpose Building with 12 stalls each(Phase I) @ NVAT1st I 11.772 O 0.375 0.160 0.100 0.023 0.030 0.200 88.80 -1st II 4.174 O 0.305 0.250 0.100 0.030 0.027 0.100 81.20 -B.S.U. Construction, Inc. 8457 Conc./Impvt. of Baywalk 1st XIII 1.916 O 0.290 0.300 0.100 0.022 0.025 0.100 83.70 -B.S.U. Construction, Inc. 8457Impvt. of Tandawan Road Sect.along Surigao-Davao Coastal Road1st XIII 9.550 O 0.<strong>31</strong>4 0.300 0.100 0.030 0.038 0.100 88.20 -B.S.U. Construction, Inc. 8457Impvt. of Tandawan Road Sect.along Surigao-Davao Coastal RoadFinal XIII 9.550 C 0.358 0.200 0.300 - - - 85.8087.24%V.Satisfac<strong>to</strong>ryB.S.U. Construction,Incorporated8457Conc./Reblocking along JNR-Barobo-Agusan sur Boundary1st XIII 9.594 O 0.364 0.300 0.100 0.030 0.061 0.100 95.50 -B.S.U. Construction,Incorporated8457Conc./Reblocking along JNR-Barobo-Agusan sur BoundaryFinal XIII 9.594 C 0.287 0.300 0.300 - - - 88.7092.78%OutstandingB-12 Construction andTrading Corporation<strong>31</strong>997Const. of Brgy. Road at Brgy.Pulong Maragul1st/Final III 0.941 C 0.375 0.200 0.300 - - - 87.5087.50%V.Satisfac<strong>to</strong>ryBaby SantiagoConstruction & Supply<strong>31</strong>662 Const. of Multi-Purpose Building Final IV-A 1.925 C 0.274 0.300 0.000 - - - 57.4042.42%PoorBadoc Builders <strong>31</strong>564Concreting of Badio Norte BarangayRoad1st/Final I 0.747 C 0.333 - 0.500 - - - 83.3083.30%V.Satisfac<strong>to</strong>ryBap Construction 16215Asphalt Overlay of Brgy. MabiniRoad (Intermittent Section)1st/Final IVA 1.927 C 0.360 0.200 0.300 - - - 86.0086.00%V.Satisfac<strong>to</strong>ryBaque Corporation 15235 Makati DES Linear Park 1st/Final PRRC 14.609awaitingapproval ofV.O. No.10.481 - 0.500 - - - 98.10Barillo Construction &Enterprises23836 Conc. of Lower Taway Road 1st/Final IX 0.951 C 0.279 0.221 0.300 - - - 80.0080.00%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 21


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.Barillo Construction &Enterprises23836PROJECT NAMERepair/Concreting of Roads atMalvar StreetNO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTION1st IX 0.706 O 0.394 0.300 0.100 0.030 0.035 0.100 95.90 -Barillo Construction &Enterprises23836 Repair/Rehab./Impvt. of Dagohoy St. 1st/Final IX 0.759 C 0.<strong>31</strong>2 0.230 0.300 - - - 84.2084.20%V.Satisfac<strong>to</strong>ryBarit Builders andConstruction30095Const./Completion of MPB @Isabela National H/SFinal II 0.936 C 0.<strong>31</strong>7 - 0.500 - - - 81.7082.05%V.Satisfac<strong>to</strong>ryBarman ConstructionCorp.Barman ConstructionCorp.7974Const. of Aba<strong>to</strong>n-Bridge andApproaches (Phase II) Brgy.Parang2nd IV-B 11.745 O 0.<strong>31</strong>4 0.300 0.100 0.030 0.037 0.100 88.10 -7974 Const. of Aba<strong>to</strong>n-Maidlang II Bridge 2nd IVB 9.615 O 0.<strong>31</strong>3 0.300 0.100 0.023 0.042 0.100 87.80 -Barman ConstructionCorp.7974Const./Rehab. of Mahabang ParangFMR, Mahabang Parang ARC1st IV-B 17.832 O 0.306 0.300 0.100 0.030 0.037 0.100 87.30 -Barman ConstructionCorp.7974Const./Rehab. of Mahabang ParangFMR, Mahabang Parang ARCFinal IV-B 17.832 C 0.<strong>31</strong>0 0.300 0.300 - - - 91.0088.78%V.Satisfac<strong>to</strong>ryBBC Construction(Formerly: BBC Sand &Gravel)BBC Construction(Formerly: BBC Sand &Gravel)BBC Construction(Formerly: BBC Sand &Gravel)BBC Construction(Formerly: BBC Sand &Gravel)BBC Construction(Formerly: BBC Sand &Gravel)BBC Construction(Formerly: BBC Sand &Gravel)16510 Completion of Matabao Bridge 1st XIII 9.243 O 0.383 0.240 0.100 0.023 0.027 0.100 87.30 -16510 Completion of Matabao Bridge Final XIII 9.243 C 0.394 0.200 0.300 - - - 89.401651016510Const. of Drainage Facilities alognAgusan-Misamis Oriental Road,Rehab. of Ngilan Bridge alongDaang Maharlika Highway (Agusan-Surigao Section)1st/Final XIII 3.628 C 0.372 - 0.500 - - - 87.2088.14%V.Satisfac<strong>to</strong>ry87.20%V.Satisfac<strong>to</strong>ry1st XIII 9.104 O 0.356 0.200 0.100 0.030 0.045 0.100 83.10 -16510 Replacement of Matabao Bridge 1st XIII 9.468 O 0.338 0.291 0.100 0.030 0.051 0.100 91.00 -16510 Replacement of Matabao Bridge 2nd XIII 9.468 O 0.387 0.272 0.000 0.030 0.030 0.067 78.60 -BCT Trading andConstruction15199Const./ Completion of San MiguelNHS 5 CL (Two s<strong>to</strong>rey 6 CL)Final IV-B 2.952 C 0.446 0.500 94.6083.54%V.Satisfac<strong>to</strong>ryBCT Trading andConstruction15199Improvement of Plaridel-Sitio ApisRoad, Plaridel-Jose Rizal ARCFinal IV-B 20.211 C 0.144 0.195 0.300 - - - 63.9078.42%Fair<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 22


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONBendimil Constructionand Development Corp.6135 Const. of Pedestrian Overpass 1st IX 4.253 O 0.393 0.240 0.100 0.030 0.043 0.100 90.60 -Bendimil Constructionand Development Corp.6135 Const. of Pedestrian Overpass Final IX 4.603 C 0.346 0.260 0.000 - - - 60.6078.60%Satisfac<strong>to</strong>ryBenny's Trading &Construction8762 Conc. of Irawan-Tagburos Road 1st IV-B 5.245 O 0.080 0.000 0.100 0.020 0.035 0.100 33.50 -Benny's Trading &ConstructionBenny's Trading &ConstructionBet Construction ofSupply8762 Const. of 2 CL Sta. Monica E/S Final IV-B 0.698 C 0.437 0.500 93.708762 Const. of Sidewalk Pavement 1st/Final IV-B 0.329 C 0.336 0.000 0.300 - - - 63.60<strong>31</strong>764 Concreting of Marcos Highway Road 1st/Final I 0.749 C 0.332 0.222 0.300 - - - 85.4083.06%V.Satisfac<strong>to</strong>ry63.60%Fair85.40%V.Satisfac<strong>to</strong>ryBeta Construction 9829 Conc. of Brgy. Road @ Balogo 1st/Final V 0.800 C 0.244 0.189 0.300 - - - 73.3073.30%Satisfac<strong>to</strong>ryBeta Construction 9829Conc. of Brgy. Road @ LRV SiteRoad1st/Final V 0.480 C 0.345 0.183 0.300 - - - 82.8082.80%V.Satisfac<strong>to</strong>ryBetter Work Construction 24432Bevel Construction 16423Bigfoot Construction andSupplyBill Hill Construction andSupplyBill Hill Construction andSupplyCompletion of Multi-Purpose Bldg.,DENR Regional office XII Brgy. ZoneIVImprovement/Concreting of CantaanBarangay RoadFinal XII 1.428 C 0.368 0.225 0.300 - - - 89.3092.24%Outstanding1st X 0.920 O 0.240 0.300 0.100 0.030 0.032 0.100 80.20 -24769 Conc. of Basak-Nasig-id FMR 1st/Final VII 0.903 C 0.190 0.300 0.300 - - - 79.0018046Completion of Roofing of MultiPurpose Hall @ Brgy. Mabini1st/Final XIII 0.182 C 0.400 0.240 0.300 - - - 94.0018046 Conc. of Magsaysay Road 1st XIII 0.916 O 0.367 0.255 0.100 0.030 0.039 0.100 89.10 -79.00%Satisfac<strong>to</strong>ry94.00%OutstandingBill Hill Construction andSupply18046 Conc. of Magsaysay Road Final XIII 0.916 C 0.290 0.170 0.300 - - - 76.0083.86%V.Satisfac<strong>to</strong>ryBillco Construction 18191Billco Construction 18191Bimbo Construction &Supply (Formerly: BimboConst.)Blimex Construction &Supply2502227259Const. of Don Ruben Seawall (PhaseIII)Const. of Don Ruben Seawall (PhaseIII)Repair/Improvement of MilaorRevetmentConst. of 4 Cl School Bldg. @Patalinhug E/S1st XIII 2.690 O 0.379 0.160 0.070 0.023 0.042 0.200 87.40 -Final XIII 2.690 C 0.370 0.300 0.000 - - - 67.001st/Final V 2.837 C 0.381 0.300 0.300 - - - 98.101st/Final XII 1.659 C 0.373 0.300 0.300 - - - 97.3079.24%Satisfac<strong>to</strong>ry98.10%Outstanding97.30%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 23


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONBlue Dragon Construction 11524Const. of Candon Flood Control,MNRFinal I 8.248 C 0.341 0.200 0.300 - - - 84.1082.78%V.Satisfac<strong>to</strong>ryBMJ Construction 14571Completion of S<strong>to</strong>. Tomas-CabaganOverflow Bridge (Phase V), Cansan-Bagutari Overflow Bridge1st II 14.394 O 0.400 0.300 0.100 0.020 0.028 0.100 94.80 -BMJ Construction 14571Completion of S<strong>to</strong>. Tomas-CabaganOverflow Bridge (Phase IV), Cansan-Bagutari Overflow Bridge1st II 9.092 O 0.359 0.240 0.100 0.020 0.042 0.100 86.10 -BMJ Construction 14571Completion of S<strong>to</strong>. Tomas-CabaganOverflow Bridge (Phase IV), Cansan-Bagutari Overflow BridgeFinal II 9.092 C 0.267 0.300 0.300 - - - 86.7086.34%V.Satisfac<strong>to</strong>ryBMJ Construction 14571Concreting of S<strong>to</strong>. Tomas-D. AlbanoRoad (Gap Section)Final II 9.649 C 0.261 - 0.500 - - - 76.1079.25%Satisfac<strong>to</strong>ryBMJ Construction 14571Const. of 2-CL School Building @Magassi High SchoolFinal II 0.632 C 0.291 0.300 0.300 - - - 89.1089.45%V.Satisfac<strong>to</strong>ryBMJ Construction 14571BMJ Construction 14571Rehab. of Pinacanauan Br. App. "A"& River Bank Protection worksRehab. of Pinacanauan Br. App. "A"& River Bank Protection works2nd II 11.699 O 0.267 0.200 0.100 0.030 0.040 0.200 83.70 -3rd II 11.699 O 0.395 0.200 0.070 0.020 0.023 0.133 84.10 -BMJ Construction 14571Road Concreting of Garita Brgy.Road (Phase II)Final II 0.472 C 0.321 0.300 0.300 - - - 92.1089.04%V.Satisfac<strong>to</strong>ryBMK Construction 8292Const. of Mitura Bridge alongUrdaneta-Manaoag Road1st I 24.737 O 0.300 0.300 0.000 0.020 0.025 0.067 71.20 -BMK Construction 8292Repair/Rehabilitation of DrainageSystem along old Judge de VeneciaSr. Ave., 3 Rows Cross Drainagealong Calasiao RoadFinal I 4.821 C 0.351 - 0.500 - - - 85.1085.19%V.Satisfac<strong>to</strong>ryBN Builders &Construction Supply28232Const. of Two (2) S<strong>to</strong>rey MPB(Completion)1st/Final XIII 0.948 C 0.353 - 0.500 - - - 85.3085.30%V.Satisfac<strong>to</strong>ryBNG Construction andGeneral Services18503Concreting of San Francisco-Malimono Road Phase XXIVFinal XIII 4.455 C 0.390 0.200 0.300 - - - 89.0083.48%V.Satisfac<strong>to</strong>ryBNG Construction andGeneral Services18503 Const. of MPB @ Brgy. 7 1st/Final XIII 0.939 C 0.276 0.000 0.300 - - - 57.6057.60%Poor<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 24


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONBNG Construction andGeneral Services26705Const. of Surigao Del Norte NationalHigh SchoolFinal XIII 0.371 C 0.369 0.116 0.300 - - - 78.5085.43%V.Satisfac<strong>to</strong>ryBNG Construction andGeneral Services18503Const. of Various MPB @ Brgy.Siana1st XIII 0.916 O 0.150 0.000 0.100 0.023 0.012 0.100 38.50 -BNG Construction andGeneral Services18503Const. of Various MPB @ Brgy.Siana2nd XIII 0.916 O 0.388 0.300 0.100 0.030 0.025 0.100 94.30 -BNG Construction andGeneral Services18503Const. of Various MPB @ Brgy.SianaFinal XIII 0.916 C 0.379 0.244 0.300 - - - 92.3074.17%Satisfac<strong>to</strong>ryBNR Construction &Development Corporation12903Completion of Putat Bridge I (PhaseIV) along Toledo-Tabuel SanRemigio Road Km.103.503(approach)1st/Final VII 3.092 C 0.350 0.290 0.300 - - - 94.0094.00%OutstandingBNR Construction &Development Corporation12903 Concreting of Farm-<strong>to</strong>-Market Road Final VII 0.949 C 0.372 - 0.500 - - - 87.2079.82%Satisfac<strong>to</strong>ryBNR Construction andDevelopment Corporation12903Const. of Drainage Facilities withCub and Gutter at Open-AirportRoad (Realigned <strong>to</strong> Const. ofDrainage Facilities at Open-AirportRoad)1st VII 1.845 O 0.389 0.240 0.100 0.010 0.038 0.100 87.70 -BNR Construction andDevelopment Corporation12903Const. of Drainage Facilities withCub and Gutter at Open-AirportRoad (Realigned <strong>to</strong> Const. ofDrainage Facilities at Open-AirportRoad)Final VII 1.845 C 0.386 0.300 0.300 - - - 98.6092.06%OutstandingBNR Construction andDevelopment Corporation12903Const. of Pedestrian Overpass atTalamban1st VII 4.295 O 0.353 0.300 0.100 0.030 0.060 0.100 94.30 -BNYU Enterprises &Construction27725Completion of Multi-PurposeBuilding1st VII 0.942 O 0.361 0.240 0.100 0.010 0.035 0.100 84.60 -BNYU Enterprises &Construction27725Completion of Multi-PurposeBuildingFinal VII 0.942 C 0.384 0.100 0.300 - - - 78.4082.74%V.Satisfac<strong>to</strong>ryBNYU Enterprises &Construction27725Completion of Multi-PurposeBuilding (Cultural Center)1st VII 0.927 O 0.207 0.240 0.100 0.010 0.047 0.100 70.40 -BNYU Enterprises &Construction27725Completion of Multi-PurposeBuilding (Cultural Center)Final VII 0.927 C 0.206 0.200 0.300 - - - 70.6070.46%Satisfac<strong>to</strong>ryBNYU Enterprises &Construction27725Concreting of Maribojoc-AntequeraRoad1st VII 4.770 O 0.346 0.034 0.100 0.023 0.025 0.100 62.80 -BNYU Enterprises &Construction27725Concreting of Maribojoc-AntequeraRoad2nd VII 4.770 O 0.307 0.191 0.100 0.023 0.025 0.100 74.60 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 25


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONBNYU Enterprises &Construction27725Repair/Improvement of Multi-Purpose Building1st/Final VII 0.933 C 0.285 0.300 0.300 - - - 88.5088.50%V.Satisfac<strong>to</strong>ryBonifacio M. CarlosConstruction3303Completion of Multi-Purpose Bldg.,Purok Matahimik Brgy. San PedroFinal IV-B 0.326 C 0.443 - 0.500 - - - 94.3094.30%OutstandingBonifacio M. CarlosConstruction3303Conc. of Puer<strong>to</strong> Princesa SouthRoadFinal IV-B 13.698 C 0.298 0.300 0.300 - - - 89.8091.60%OutstandingBonifacio M. CarlosConstruction3303Conc. of Puer<strong>to</strong> Princesa SouthRoad, Calategas Section1st IV-B 5.671 O 0.302 0.270 0.100 0.030 0.048 0.100 85.00 -Borderline Constructionand Supply24433Rehab./Impvt. of Bukidnon-Cotaba<strong>to</strong>Road, Poblacion Section1st/Final XII 4.653 C 0.329 0.200 0.300 - - - 82.9082.90%V.Satisfac<strong>to</strong>ryBrillantes Construction 26447Brillantes Construction 26447Brima Construction andEnterprises8746Const. of Multi-Purpose Building(Phase I)Provision of Line Canal atNabangunan Section along Jct.Dologan-Busco-Quezon RoadRehab./Impvt./Conc. of Tubod-Ganassi National RoadFinal X 0.940 C 0.400 0.209 0.690 - - - 129.90Final X 0.275 C 0.354 0.300 0.300 - - - 95.4097.63%Outstanding88.50%V.Satisfac<strong>to</strong>ry1st X 9.142 O 0.309 0.300 0.100 0.030 0.037 0.067 84.30 -Bros Construction andSupply10507Conc. of Surigao-Davao CoastalRoad (Bad-as SDN Section)1st XIII 6.509 O 0.384 0.238 0.070 0.008 0.019 0.100 81.90 -Bros Construction andSupply10507Concreting of NRJ Osmeña-Magkiangkan RoadFinal XIII 0.943 C 0.430 - 0.500 - - - 93.0090.78%OutstandingBros Construction andSupply10507Concreting of San Jose-Tren<strong>to</strong> RoadSectionFinal XIII 8.078 C 0.347 0.200 0.300 - - - 84.7083.89%V.Satisfac<strong>to</strong>ryBros Construction andSupplyBros Construction andSupplyBros Construction andSupply10507Const./Rehabilitation of SanFrancisco By-Pass Road1st XIII 0.886 O 0.400 0.173 0.100 0.018 0.023 0.100 81.40 -10507 Rehab. of Balingasag By-Pass Road 1st X 4.640 O 0.287 0.289 0.070 0.030 0.035 0.100 81.10 -10507Repair/Rehab. of del Monte PSCGBridge1st XIII 1.635 O 0.<strong>31</strong>2 0.300 0.000 0.030 0.035 0.033 71.00 -Brostan Consruction &Development12360Completion/Extension of Multi-Purpose Building1st/Final II 0.652 C 0.366 0.200 0.300 - - - 86.6086.60%V.Satisfac<strong>to</strong>ryBrostan Construction &Development12360Const. of MPB, Isabela StateUniversityFinal II 0.756 C 0.341 - 0.000 - - - 34.1048.45%PoorBrostan Construction &Development12360Const. of Multi-Purpose Bldg. @Vic<strong>to</strong>ria, Alicia, IsabelaFinal II 0.691 C 0.302 - 0.500 - - - 80.2088.78%V.Satisfac<strong>to</strong>ryBrostan Construction &Development12360Rehab. of Calapan South Road &East Coastal Road1st/Final IVB 0.952 C 0.360 0.300 0.300 - - - 96.0096.00%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 26


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONBrostan Construction &Development12360 Rehab. of Farm <strong>to</strong> Market Road 1st/Final II 0.469 C 0.286 0.225 0.300 - - - 81.1081.10%V.Satisfac<strong>to</strong>ryBrostan Construction &Development12360Rehab. of Nat'l Road along Jct.Oscariz-Ramon Putia Section1st/Final II 9.629 C 0.390 0.200 0.300 - - - 89.0089.00%V.Satisfac<strong>to</strong>ryBrostan Construction &Development12360Rehab./Impv't. of Sotero Nuesa-Simimbaan RoadFinal II 4.699 C 0.<strong>31</strong>2 - 0.500 - - - 81.2085.88%V.Satisfac<strong>to</strong>ryBrostan Construction &DevelopmentBusilac Builders,Incorporated123607701Rehab./Replacement of DamagedBridges along CDMA Road,Pinaripad BridgeConcreting of Various Roads(Sulquiano & Purungganan)3rd II 13.472 O 0.343 0.300 0.000 0.022 0.025 0.067 75.70 -1st I 0.939 O 0.360 0.246 0.100 0.030 0.035 0.100 87.10 -Busilac Builders,Incorporated7701Const. of Drainage along MNR, SanNicolas-Nangalisan Section1st I 6.641 O 0.328 0.200 0.100 0.008 0.019 0.133 78.80 -Busilac Builders,Incorporated7701Const. of Drainage along MNR, SanNicolas-Nangalisan SectionFinal I 6.641 C 0.239 0.300 0.300 - - - 83.9080.84%V.Satisfac<strong>to</strong>ryBYA Builders andConstruction Supply24158Const. of One (1) Cl Schl. Bldg. @Ipil NHS1st/Final VIII 0.442 C 0.363 0.297 0.300 - - - 96.0096.00%OutstandingBYA Builders andConstruction Supply24158Impvt./Rehab. of Nat'l Road alongTacloban-Baybay South Road1st/Final VIII 0.940 C 0.355 0.200 0.300 - - - 85.5085.50%V.Satisfac<strong>to</strong>ryC & F Construction &Development Corporation3509Rehab. of Sandiat Bridge &Approaches along Santiago-Tuguegarao Road1st/Final II 3.779 C 0.271 0.205 0.300 - - - 77.6077.60%Satisfac<strong>to</strong>ryC & F Construction &Development Corporation3509Widening/Rehab. of QuirinoHighway, Gumaoc-Tungkong-Mangga, San Jose Del Monte City.Final III 9.433 C 0.456 - 0.500 - - - 95.6087.62%V.Satisfac<strong>to</strong>ryC.B. TampengcoConstruction & Supply18505Const. of Multi-Purpose at Brgy. 80,Zone 71st NCR 2.136 O 0.366 0.250 0.100 0.023 0.041 0.100 88.00 -C.B. TampengcoConstruction and Supply18505Const. of 2 Cl Sch. Bldg. @ SanMateo H/S1st IV-A 0.962 O 0.286 0.267 0.100 0.030 0.032 0.100 81.50 -C.B. TampengcoConstruction and Supply18505Const. of MPB (Public Market) @Brgy 1862nd NCR 4.682 O 0.391 0.273 0.100 0.024 0.018 0.100 90.60 -C.B. TampengcoConstruction and Supply18505Const. of MPB (Public Market) @Brgy 186Final NCR 4.682 C 0.280 0.200 0.300 - - - 78.0088.29%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 27


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONC.B. TampengcoConstruction and Supply18505Const. of Multi-Purpose at Brgy.NBBS, Navotas, Metro ManilaFinal NCR 2.836 C 0.342 0.300 0.300 94.2090.70%OutstandingC.B. TampengcoConstruction and Supply18505Impvt. of V. Ilustre St., Brgy. DonManuel1st/Final NCR 1.878 C 0.375 0.300 0.300 - - - 97.5097.50%OutstandingC.C.M. Construction 11043C.C.M. Construction 11043C.D. ValbuenaConstruction26794Completion of Cogon Night HighSchool BuildingCompletion of Cogon Night SchoolBuildingConst. of Water Supply System atBrgy. Bagong Anyo2nd VII 1.112 O 0.343 0.221 0.100 0.010 0.029 0.100 80.30 -1st VII 1.112 O 0.378 0.240 0.100 0.010 0.029 0.100 85.70 -1st/Final IV-A 0.574 C 0.377 0.300 0.300 - - - 97.7097.70%OutstandingC.E. Padilla Construction 11278 PUP Linear Park Project 1st PRRC 19.989 O 0.370 0.290 0.100 0.030 0.070 0.100 96.00 -C.E. Padilla Construction 11278 PUP Linear Park Project Final PRRC 19.989 C 0.3<strong>31</strong> 0.300 0.300 - - - 93.10C.F. TrinidadConstruction9199Riprapping of Creek, besideFerretville SubdivisionFinal IV-A 3.840 C 0.218 0.300 0.300 - - - 81.80C.G.I. Construction 10606 Conc. of FMR @ Brgy. Daang Bago 1st/Final III 0.470 C 0.297 0.300 0.300 - - - 89.7095.13%Outstanding77.72%Satisfac<strong>to</strong>ry89.70%V.Satisfac<strong>to</strong>ryC.J. MaramatConstruction6007Completion of SLU-SVP Brgy.Bakakeng Multi-Purpose BuildingFinal CAR 1.427 C 0.368 0.300 0.300 - - - 96.8085.32%V.Satisfac<strong>to</strong>ryC.J. MaramatConstruction6007Const. of Multi-Purpose Building atBGH Compound Brgy.Final CAR 1.414 C 0.372 0.300 0.300 - - - 97.2091.88%OutstandingC.J. MaramatConstruction6007Const. of Two (2) S<strong>to</strong>rey ReinforceConcrete Municipal Bldg.3rd I 11.288 O 0.295 0.269 0.100 0.015 0.035 0.100 81.40 -C.L. CarandangEnterprises29494Concreting of Jct. Mandaon-Mandaon Road1st V 9.590 O 0.339 0.300 0.100 0.008 0.028 0.067 84.20 -C.L. CarandangEnterprises29494Const. of Flood Control Project @Tugbo1st/Final V 0.939 C 0.350 0.200 0.300 - - - 85.0085.00%V.Satisfac<strong>to</strong>ryC.L. CarandangEnterprisesC.L. CarandangEnterprises29494 Const. of MPB at DILG Compound 1st/Final V 0.379 C 0.369 0.200 0.300 - - - 86.9029494 Rehab. of Dayao-Bug<strong>to</strong>ng FTMR 1st/Final V 4.791 C 0.347 0.300 0.300 - - - 94.7086.90%V.Satisfac<strong>to</strong>ry94.70%OutstandingC.M. Dancel Const. &Supply / FRD Const. (JV)JV-03-106 Const. of Tulnagan Bridge Final I 19.981 C 0.326 0.300 0.300 - - - 92.6084.08%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 28


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONC.M. Dancel Construction& Supply12640Const. of Drainage along MNR,Nangalisan SectionFinal I 2.742 C 0.372 0.200 0.300 - - - 87.2084.62%V.Satisfac<strong>to</strong>ryC.M. Dancel Construction& Supply12640 ReConst. of River Control Protection 1st/Final I 4.725 C 0.200 0.300 0.300 - - - 80.0080.00%Satisfac<strong>to</strong>ryC.M. PanchoConstructionIncorporatedC.M. PanchoConstructionIncorporated18<strong>31</strong>83C.M. PanchoConstruction 183IncorporatedC.M. PanchoConstruction 183IncorporatedC.M. PanchoConstruction 183IncorporatedC.S. Garcia Construction 1901Bohol Circumferential RoadImprovement Project, CP-2, CandijayJagna-Valencia Sect.Sat. 169+240-Sta. 221+040Bohol Circumferential RoadImprovement Project, CP-2, CandijayJagna-Valencia Sect.Sat. 169+240-Sta. 221+040Bridge Replacement Sixth RoadProject Bridge Component CP-MConst. of Aloragat Bridge &ApproachesConst. of Daang Hari ExtensionAguinaldo-Highway-Coastal RoadConst./Rehab. of Sch. Bldg. F. DeMesa E/S4th PJHL 724.891 O 0.375 0.300 0.100 0.030 0.070 0.100 97.50 -6th PJHL 856.155 O 0.378 0.300 0.100 0.030 0.070 0.100 97.80 -Final I 86.581 C 0.341 0.200 0.300 - - - 84.1081.46%V.Satisfac<strong>to</strong>ry1st I 51.651 O 0.376 0.300 0.100 0.030 0.065 0.100 97.10 -1st/Final IVA 9.568 C 0.<strong>31</strong>4 0.300 0.300 - - - 91.401st/Final NCR 1.427 C 0.386 0.300 0.300 - - - 98.6091.40%Outstanding98.60%OutstandingC.S. Rayos Construction& General Services9790Completion of Ternate-NasugbuRoad, Calayo-Looc Section1st IV-A 23.966 O 0.362 0.240 0.000 0.030 0.030 0.033 69.50 -C.S. Rayos Construction& General Services9790Completion of Ternate-NasugbuRoad, Calayo-Looc SectionFinal IV-A 23.966 C 0.370 0.290 0.300 - - - 96.0085.56%V.Satisfac<strong>to</strong>ryC.V. Construction &Development8334Conc. of Road @ Sampaguita EastSt. Purok NHA 21st/Final XI 0.564 C 0.360 0.300 0.300 - - - 96.0096.00%OutstandingC.V. Construction &Development8334Const. of 1 Cl 1 S<strong>to</strong>rey Sch. Bldg. @Saloy H/S1st/Final XI 0.433 C 0.329 0.247 0.300 - - - 87.6087.60%V.Satisfac<strong>to</strong>ryCA Miguel Construction,Incorporated10221 Conc. of Brgy. Roads 1st/Final IVA 1.917 C 0.365 0.300 0.300 - - - 96.5096.50%OutstandingCager Construction &Supply21743Site Development Const. ofStandard Day Care Center KV1(Package 2)1st PRRC 1.776 O 0.388 0.297 0.100 0.015 0.055 0.100 95.50 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 29


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONCager Construction &Supply21743Site Development Const. ofStandard Day Care Center KV1(Package 8)1st PRRC 2.116 O 0.378 0.300 0.100 0.023 0.028 0.100 92.90 -Camia Construction 20506 Completion of Public Market 1st II 1.096 O 0.320 0.240 0.100 0.015 0.027 0.050 75.20 -Camia Construction 20506 Completion of Public Market Final II 1.096 C 0.328 0.239 0.300 - - - 86.7078.65%Satisfac<strong>to</strong>ryCamia Construction 20506Conc. of Dugo-San Vicente Roadwith Drainage1st II 5.630 O 0.352 0.264 0.030 0.020 0.023 0.033 72.20 -Camia Construction 20506 Const. of Balluyan Bridge, Phase II 1st CAR 2.830 O 0.346 0.300 0.100 0.030 0.035 0.100 91.10 -Camia Construction 20506Replacement/Const. of MalabangBridge1st CAR 15.218 O 0.309 0.300 0.100 0.030 0.045 0.100 88.40 -Candace Construction 12084Const. & Repair/Rehab. of VariousSchool Bldgs. (Clustered-1) 1stBatch CY 20041st/Final IX 0.359 C 0.450 - 0.500 - - - 95.0095.00%OutstandingCarlo JosephConstruction21017Const. of 1 unit 1Cl Sch. Bldg. @Lubao Vocational School1st/Final III 0.285 C 0.324 0.195 0.300 - - - 81.9081.90%V.Satisfac<strong>to</strong>ryCarlo JosephConstruction21017Const. of Lined Canal, San Vicente(Part of Package 17)1st/Final III 2.090 C 0.398 0.204 0.300 - - - 90.2090.20%V.Satisfac<strong>to</strong>ryCarlo JosephConstruction21017Improvement of Public Market(Porac Mall)1st/Final III 2.366 C 0.353 0.200 0.300 - - - 85.3085.30%V.Satisfac<strong>to</strong>ryCarrascal IntegratedEnterprises4764Completion of Madrid DistrictHospital (Phase III)1st XIII 3.629 O 0.352 0.211 0.100 0.030 0.048 0.100 84.10 -Carrascal IntegratedEnterprises4764Completion of Madrid DistrictHospital (Phase III)Final XIII 3.629 C 0.357 0.254 0.300 - - - 91.1086.20%V.Satisfac<strong>to</strong>ryCarrascal IntegratedEnterprisesCarrascal IntegratedEnterprisesCarrascal IntegratedEnterprises4764 Completion of MPB 1st XIII 3.635 O 0.373 0.300 0.100 0.030 0.056 0.100 95.90 -4764 Completion of MPB Final XIII 3.635 C 0.366 0.200 0.300 - - - 86.604764 Const. of Abacahan Bridge 1st XIII 10.236 O 0.321 0.300 0.050 0.030 0.051 0.100 85.20 -93.11%OutstandingCarrascal IntegratedEnterprises4764 Const. of Abacahan Bridge Final XIII 10.214 C 0.324 0.200 0.300 - - - 82.4084.08%V.Satisfac<strong>to</strong>ryCarrascal IntegratedEnterprises4764Improvement of Coastal RoadLanuzaFinal XIII 4.551 C 0.370 0.201 0.300 - - - 87.1085.96%V.Satisfac<strong>to</strong>ryCarry-on Construction 8014 Const. of MPB at Brgy. NBBS 1st/Final NCR 2.850 C 0.385 0.300 0.300 - - - 98.5098.50%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 30


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONCauayan UnitedEnterprises and Builders8816Construction of Canal and CanalStructures (LMC-ARIP-09-06)1stNIARegion II1.983 C 0.329 0.133 0.000 0.015 0.028 0.200 70.5070.51%Satisfac<strong>to</strong>ryCauayan UnitedEnterprises andConstruction Builders8816Const. of 1 Cl Sch. Bldg. @Daramuangan E/S1st/Final II 0.<strong>31</strong>9 C 0.366 0.174 0.300 - - - 84.0084.00%V.Satisfac<strong>to</strong>ryCauayan UnitedEnterprises andConstruction Builders8816Const. of 5-Units Deep Well (LightDuty Type), Minate I1st/Final II 0.184 C 0.260 0.200 0.300 - - - 76.0076.00%Satisfac<strong>to</strong>ryCauayan UnitedEnterprises andConstruction Builders8816Impvt./Rehab. Along Cabatuan-Enrile Road1st/Final II 6.717 C 0.286 0.262 0.300 - - - 84.8084.80%V.Satisfac<strong>to</strong>ryCauayan UnitedEnterprises andConstruction Builders8816Impvt./Rehab. of Cauayan-CabatuanRoad1st/Final II 0.947 C 0.400 0.200 0.300 - - - 90.0090.00%V.Satisfac<strong>to</strong>ryCauayan UnitedEnterprises andConstruction Builders8816Rehab. of FMR at Muñoz West-Sinamar Road1st/Final II 0.944 C 0.267 0.300 0.300 - - - 86.7086.70%V.Satisfac<strong>to</strong>ryCavacon Corporation(Formerly: CagayanValley Const. Corp.)2622Rehabilitation/ Widening(Concreting) of Paliparan Road2nd IV-A 21.226 O 0.226 0.250 0.100 0.022 0.059 0.100 75.70 -Cavite Ideal InternationalConst. & DevelopmentCorp.5599Contract Package I, Baguio-Pangawan, Kayapa Section underCordillera Road ImprovementProject (Baguio-Aritao RoadImprovement Project)2nd PJHL 1,562.663 O 0.386 0.240 0.100 0.030 0.061 0.100 91.70 -Cavite Ideal InternationalConst. & DevelopmentCorp.5599Contract Package I, Baguio-Pangawan, Kayapa Section underCordillera Road ImprovementProject (Baguio-Aritao RoadImprovement Project)3rd PJHL 1,562.663 O 0.<strong>31</strong>6 0.300 0.100 0.030 0.061 0.100 90.70 -Cavite Ideal InternationalConst. & DevelopmentCorp.5599CP II, Abuyog-Silago Road Sectionunder the Arterial Road LinksDevelopment Project, Phase IV(Himayangan-Silago Abuyog Roadand Liloan-San Ricardo RoadProjects)2nd PJHL 829.719 O 0.389 0.300 0.100 0.030 0.056 0.100 97.50 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page <strong>31</strong>


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONCavite Ideal InternationalConst. & DevelopmentCorp.5599CP II, Abuyog-Silago Sect. Under theArterial Road Links Dev't. Proj.,Phase IV (Himayangan-Silago-Abuyog Road and Liloan-SanRicardo Road Projects)3rd PJHL 904.189 O 0.321 0.300 0.100 0.030 0.042 0.100 89.30 -Cavite Ideal InternationalConst. & DevelopmentCorp.5599Naga-Toledo Road Project ARLDPPhase IV1st PJHL 805.321 O 0.365 0.300 0.100 0.030 0.070 0.100 96.50 -CBN Construction &Supply16851Replacement of DilapidatedConcrete/Concrete Paving of Jct.Dan Enriave-Pontevedra By PassRd.Final VI 4.542 C 0.371 0.300 0.300 - - - 97.1090.92%OutstandingCBN Construction andSupply16851Replacement of DilapidatedConcrete/Concrete Paving of Bago-Mailum-Mambucal-Canla-on RoadFinal VI 6.141 C 0.301 0.100 0.300 - - - 70.1080.42%V.Satisfac<strong>to</strong>ryCBN Construction andSupplyCDC Construction andSuppliesCDC Construction andSuppliesCDC Construction andSuppliesCDC Construction andSuppliesCDC Contruction andSupplies1685128275Replacement of DilapidatedConcrete/Concrete Paving of Jct.Dan Enriave-Pontevedra By PassRd.Const. of Multi-Purpose Bld., @RMTI, RMTI Compound1st VI 4.542 O 0.400 0.300 0.070 0.030 0.035 0.033 86.80 -Final III 4.658 C 0.241 0.300 0.300 - - - 84.1028275 Const. of Multi-Purpose Building 1st I 0.853 O 0.360 0.300 0.050 0.030 0.023 0.067 83.00 -28275 Const. of Multi-Purpose Building 2nd I 0.853 O 0.393 0.240 0.000 0.023 0.030 0.067 75.30 -2827528275Const. of Multi-Purpose Building(Phase I)Const. of Multi-Purpose Bldg.Ramon Magsaysay Tech. Inst.1st/Final I 0.948 C 0.333 0.300 0.300 - - - 93.3072.20%Satisfac<strong>to</strong>ry93.30%Outstanding1st III 4.658 O 0.193 0.180 0.100 0.030 0.020 0.100 62.30 -CDC Contruction andSupplies28275 Const. of Multi-Purpose Building 1st/Final I 0.949 C 0.352 - 0.500 - - - 85.2085.2%V.Satisfac<strong>to</strong>ryCebu 7H TechnochemIndustries, Inc.<strong>31</strong>578Rehab. of Loay Interior Road(Asphalt Overlay & Reflec<strong>to</strong>rizedTehrmoplastic Pav't Markings)1st/Final VII 4.750 C 0.355 0.300 0.300 - - - 95.5095.50%OutstandingCebu 7H TechnochemIndustries, Inc.<strong>31</strong>578Rehab. of Loay Interior Road/ Loboc-Bilar-Carmen SectionFinal VII 9.640 C 0.386 - 0.500 - - - 88.6089.74%V.Satisfac<strong>to</strong>ryCebu Young Construction <strong>31</strong>95Const. of Multi-Purpose Building @Inayawan E/S1st VII 0.956 O 0.400 0.240 0.100 0.020 0.041 0.100 90.10 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 32


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONCebu Young Construction <strong>31</strong>95Const. of Multi-Purpose Building @Inayawan E/SFinal VII 0.956 C 0.383 0.300 0.300 - - - 98.3092.56%OutstandingCedan Construction 10172Asphalt Overlay along Olongapo-Bugallon Road Iba Section, Iba1st/Final III 9.498 C 0.398 0.300 0.300 - - - 99.8099.80%OutstandingCedan Construction 10172 Const. of Magsaysay Bridge Final I 4.799 C 0.365 0.300 0.300 - - - 96.50Cedan Construction 10172Rehab. of La Paz Multi-PurposeBuilding1st/Final III 1.408 C 0.427 - 0.500 - - - 92.70Cedar Construction 24865 Const. of Multi-Purpose Building Final III 0.948 C 0.<strong>31</strong>7 0.300 0.300 - - - 91.7079.16%Satisfac<strong>to</strong>ry92.70%Outstanding85.40%V.Satisfac<strong>to</strong>ryCentral Mindanao Const.Multi-PurposeCooperativeCentral Mindanao Const.Multi-PurposeCooperativeCentral Mindanao Const.Multi-PurposeCooperativeCesar T. CarpioConstructionCesar T. CarpioConstruction23697 Completion of 1-Unit PWSP Final XII 1.862 C 0.440 - 0.500 - - - 94.0023697 Const. of Footbridge Final XII 0.2<strong>31</strong> C 0.394 - 0.500 - - - 89.40236972083320833Const. of Kisante CES Multi PurposeBldg.Const. of Two (2) CL SchoolBuilding @ Cawayan E/SReflec<strong>to</strong>rized Road PavementMarkings & Road Signs1st/Final XII 0.238 C 0.333 0.200 0.300 - - - 83.30Final VIII 0.861 C 0.349 0.200 0.300 - - - 84.901st/Final VIII 0.957 C 0.400 0.000 0.300 - - - 70.0087.10%V.Satisfac<strong>to</strong>ry86.64%V.Satisfac<strong>to</strong>ry83.30%V.Satisfac<strong>to</strong>ry77.97%Satisfac<strong>to</strong>ry70.00%FairCGGA Builders &Enterprises23762Completion of Multi-PurposeBuilding1st/Final VIII 0.232 C 0.283 0.300 0.300 - - - 88.3088.30%V.Satisfac<strong>to</strong>ryCGGA Builders &EnterprisesCGGA Builders &Enterprises23762Conc. of Shoulder at ManluripArthur Park Road1st/Final VIII 1.897 C 0.<strong>31</strong>9 0.300 0.300 - - - 91.9023762 Const. of Cabibihan Bridge Final VIII 4.960 C 0.245 0.200 0.300 - - - 74.5091.90%Outstanding72.10%Satisfac<strong>to</strong>ryCGGA Builders &Enterprises23762Rehab. of Layog Bridge Approachalong Maharlika Highway1st/Final VIII 4.603 C 0.334 0.223 0.300 - - - 85.7085.70%V.Satisfac<strong>to</strong>ryCGI Construction 11346Improvement of CICs in theMunicipality of Ocampo, CamarinesSur, namely; Gatibo, Hibago & SanAn<strong>to</strong>nio1st/FinalNIARegion V2.362 C 0.400 0.300 0.000 - - - 70.0070%FairCGI Construction 11346Improvement of CICs in theMunicipality of Ocampo, CamarinesSur, namely; Gatibo, Hibago & SanAn<strong>to</strong>nio1st/FinalNIARegion V2.362 C 0.400 0.300 0.000 - - - 70.0070%Fair<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 33


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONCha Construction andSupplyCha Construction andSupply28420 Const. of 2-CL School Bldg. Final V 0.923 C 0.444 - 0.500 - - - 94.4028420 Const. of 2-Rooms School Bldg. 1st/Final V 0.468 C 0.402 - 0.500 - - - 90.2078.34%Satisfac<strong>to</strong>ry90.20%OutstandingCha Construction andSupply28420Const. of Multi-Purpose Building atCamarines Sur H/S1st/Final V 2.080 C 0.396 0.120 0.300 - - - 81.6081.60%V.Satisfac<strong>to</strong>ryCharlz Construction 8709Charlz Construction 8709Const. of 2-Cl Building @ TaglimaoESConst. of 3 S<strong>to</strong>rey, 9 Cl SecondarySch. Bldg. @ Adlaon NHS1st X 0.849 O 0.400 0.300 0.100 0.030 0.026 0.100 95.60 -1st VII 5.711 O 0.385 0.180 0.100 0.030 0.054 0.100 84.90 -Charlz Construction 8709Const. of 3 S<strong>to</strong>rey, 9 Cl SecondarySch. Bldg. @ Adlaon NHSFinal VII 5.711 C 0.364 0.300 0.300 - - - 96.4088.35%V.Satisfac<strong>to</strong>ryCharlz Construction 8709Const. of MPB Manolo FortichMunicipal Hall Phase X, Calanawan2nd X 4.728 O 0.306 0.300 0.050 0.030 0.052 0.067 80.50 -Charlz Construction 8709Const. of MPB Manolo FortichMunicipal Hall Phase X, Calanawan3rd X 4.728 O 0.363 0.300 0.070 0.030 0.035 0.067 86.50 -Charlz Construction 8709Const. of MPB Manolo FortichMunicipal Hall Phase X, CalanawanFinal X 4.728 C 0.363 0.200 0.300 - - - 86.3083.13%V.Satisfac<strong>to</strong>ryCharlz Construction 8709Charlz Construction 8709Charlz Construction 8709Charlz Construction 8709Chiara Construction 8736Const. of Tertiary Sch. Bldg. (NBCCPhase II)Const. of Tinungtungan Bridge &Approaches, Mamaon-IndulangRoadConst. of Tinungtungan Bridge &Approaches, Mamaon-IndulangRoadRehab./ Impv't. of DPWH 3rd DEOBldg., DicklumRetrofitting of Kalibo Bridge PhaseIII1st X 2.360 O 0.220 0.259 0.100 0.030 0.032 0.100 74.10 -2nd X 22.146 O 0.291 0.151 0.100 0.023 0.045 0.100 71.00 -3rd X 22.155 O 0.308 0.056 0.100 0.030 0.065 0.100 65.90 -Final X 0.789 C 0.373 0.300 0.300 - - - 97.301st/Final VI 9.013 C 0.<strong>31</strong>3 0.300 0.300 - - - 91.3093.10%Outstanding91.30%OutstandingChina Geo-Engineering(Phil.) CorporationSL2-SN-00054Casecnan Multi-Purpose Irrigation &Power Project1st NIA 1,108.222 O 0.342 0.175 0.100 0.030 0.056 0.200 90.30 -China Geo-Engineering(Phil.) CorporationSL2-SN-00054Const. of Super Diversion Canal(Sta.19+200 <strong>to</strong> Sta. 26+600)2ndNIARegion III1215.409 O 0.343 0.200 0.100 0.024 0.042 0.200 90.90 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 34


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONChina Geo-Engineering(Phils.) Corp.FC-03-020Baguio-Aritao Road Impvt. ProjectCP II, Pangawan-Aritao-KayapaSection1st/Final PJHL 858.809 C 0.362 0.300 0.300 - - - 96.2096.20%OutstandingChina Geo-Engineering(Phils.) CorporationSL2-SN-000459MWCR-CP VI, Mamburao-Abra DeIlog Section3rd PJHL 857.228 O 0.380 0.300 0.100 0.030 0.061 0.100 97.10 -China Geo-Engineering(Phils.) CorporationSL2-SN-000459MWCR-CP VI, Mamburao-Abra DeIlog SectionFinal PJHL 858.783 C 0.<strong>31</strong>6 0.300 0.300 - - - 91.6095.38%OutstandingChina International Water& Electric Corp.China International Water& Electric Corp.China International Water& Electric Corp.China International Water& Electric Corp.China International Water& Electric Corp.China International Water& Electric Corp.China International Water& Electric Corp.China International Water& Electric Corp.China International Water& Electric Corp.FC-03-028FC-03-028FC-03-028FC-03-028FC-03-028FC-03-028/SL1-SN-004568SL1-SN-004568SL1-SN-004568FC-03-028IFCP Phase II, Package II, Impvt. ofJaro Mouth, Iloilo River & UpperIngore CreekLower Agusan Dev't. Proj. Stage IPhase II, Package I, Agusan RiverImpv't. (East Bank) & Cut-offChannelLower Agusan Dev't. Proj. Stage IPhase II, Package I, Agusan RiverImpv't. (East Bank) & Cut-offChannelLower Agusan Dev't. Proj. Stage IPhase II, Package I, Agusan RiverImpv't. (East Bank) & Cut-offChannelLower Agusan Dev't. Proj. Stage IPhase II, Package I, Agusan RiverImpv't. (East Bank) & Cut-offChannelMetro Manila Flood Control Proj.-West Mangahan Floodway, CP-2Rehab. of Malalag-Malita-Jose AbadSan<strong>to</strong>s RoadRehab. of Malalag-Malita-Jose AbadSan<strong>to</strong>s RoadRehab. of Malalag-Malita-Jose AbadSan<strong>to</strong>s Road2nd MFCP-I 507.803 O 0.383 0.200 0.100 0.030 0.060 0.200 97.30 -6th CARBDP 638.462 O 0.395 0.200 0.100 0.030 0.070 0.200 99.50 -7th CARBDP 759.724 O 0.398 0.200 0.100 0.030 0.070 0.200 99.80 -9th CARBDP 889.009 O 0.353 0.199 0.100 0.030 0.070 0.200 95.20 -FinalCARBDP-MFCDP II889.009 C 0.392 0.288 0.300 - - - 98.0098.63%Outstanding3rd NCR 182.915 O 0.333 0.200 0.100 0.030 0.056 0.133 FALSE -4th IBRD 485.779 O 0.367 0.300 0.100 0.030 0.065 0.100 96.20 -5th IBRD 485.779 O 0.380 0.300 0.100 0.030 0.056 0.100 96.60 -Final IBRD 533.694 C 0.393 0.300 0.300 - - - 99.3097.53%OutstandingChina International Waterand Electric CorporationSL1-SN-004851Bago River Irrigation SystemRehabilitation Project1st NIA 7.037 O 0.349 0.153 0.000 0.024 0.033 0.133 69.2069.20%Fair<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 35


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONChina NationalConstructional andAgricultural MachineryImport and ExportCorporation (CAMC)NOLICENSE Banaoang Pump Irrigation Project 1st NIA USD 38.475MO 0.387 0.059 0.070 0.024 0.028 0.133 70.10 -China NationalConstructional andAgricultural MachineryImport and ExportCorporation (CAMC)NOBanaoang Pump Irrigation Project 2nd NHA USD 34.475 O 0.375 0.176 0.100 0.018 0.037 0.133 83.90 -LICENSEChina Road & BridgeConstructionSL2-SN-000479CP 1, San Andres (Codon)-Virac-Jct.Ba<strong>to</strong>-Viga Road (CCRIP)1st PJHL 952.564 O 0.386 0.300 0.100 0.030 0.035 0.100 95.10 -China Road & BridgeCorporationSL2-SN-000479Const./Impv't. of CP VIII, Bayawan-Kalumboyan Road Project, Sta.0+000-Sta.17+369.88Final RRNDP 211.007 C 0.368 0.300 0.300 - - - 96.8094.22%OutstandingChina Road & BridgeCorporationSL-I-SN- Contract Package I, Himayangan004585/F Silago Sect., Arterial road linksC-03-029 Dev't. Project, Phase IV2nd PJHL 763.161 O 0.373 0.300 0.100 0.030 0.037 0.100 94.00 -China Road & BridgeCorporationSL-I-SN- Contract Package I, Himayangan004585/F Silago Sect., Arterial road linksC-03-029 Dev't. Project, Phase IV3rd PJHL 810.619 O 0.297 0.300 0.100 0.030 0.033 0.100 86.00 -China Road & BridgeCorporationSL-I-SN- Contract Package I, Himayangan004585/F Silago Sect., Arterial road linksC-03-029 Dev't. Project, Phase IV5th PJHL 810.619 O 0.327 0.300 0.100 0.030 0.042 0.100 89.90 -China Road & BridgeCorporationSL-2-SN-0006<strong>31</strong>Contract Package III, Calbayog-Gatanguit Road Sect., Arterial roadlinks Dev't. Project, Phase VI1st PJHL 1,397.424 O 0.393 0.300 0.100 0.030 0.065 0.100 98.80 -China Road & BridgeCorporationSL2-SN-000479CP1, San Andres (Codon)-Virac-Jct.Ba<strong>to</strong>-Viga Road (CCRIP)Km.175+423-Km.204+609/Km.0+000-Km.50+5373rd PJHL 952.564 O 0.373 0.300 0.100 0.030 0.057 0.100 96.00 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 36


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONChina Road & BridgeCorporationSL2-SN-000479CP1, San Andres (Codon)-Virac-Jct.Ba<strong>to</strong>-Viga Road (CCRIP)Km.175+423-Km.204+609/Km.0+000-Km.50+5374th PJHL 1,135.918 O 0.352 0.300 0.100 0.030 0.070 0.100 95.20 -China State (Phils.)Construction EngineeringCorp.China State (Phils.)Construction EngineeringCorp.China State (Phils.)Construction EngineeringCorp.FC-98-270SL1-SN-004<strong>31</strong>4/FC-02-072FC-02-072Const. of Package 6PY-1 Final ADB 706.209 C 0.466 - 0.500 - - - 96.60CP 2, Catarman-Calbayog via Lopede Vega Road under the ArterialRoad Links Development Project,Phase VCP 2, Catarman-Calbayog via Lopede Vega Road under the ArterialRoad Links Development Project,Phase V92.04%Outstanding2nd PJHL 621.279 O 0.388 0.300 0.100 0.030 0.047 0.100 96.50 -4th PJHL 643.720 O 0.300 0.300 0.100 0.030 0.033 0.100 86.30 -China State Const. Eng'g.Corp. /Ciriaco Corp. (JV)China State Const. Eng'g.Corp. /Ciriaco Corp. (JV)China State Const. Eng'g.Corp. /Ciriaco Corp. (JV)China State Const. Eng'g.Corp. /Ciriaco Corp. (JV)Metro Manila Urban TransportSL1-SN-Integration Project (MMURTRIP),004611/FPhase I, Package 3: Marikina BridgeC-03-045and Access RoadMetro Manila Urban TransportSL1-SN-Integration Project (MMURTRIP),004611/FPhase I, Package 3: Marikina BridgeC-03-045and Access RoadMetro Manila Urban TransportSL1-SN-Integration Project (MMURTRIP),004611/FPhase I, Package 3: Marikina BridgeC-03-045and Access RoadMetro Manila Urban TransportSL1-SN-Integration Project (MMURTRIP),004611/FPhase I, Package 3: Marikina BridgeC-03-045and Access Road1st URPO 991.913 O 0.351 0.300 0.100 0.030 0.070 0.100 95.10 -2nd URPO 991.913 O 0.236 0.295 0.100 0.030 0.047 0.100 80.80 -3rd URPO 1,087.276 O 0.360 0.300 0.100 0.030 0.065 0.100 95.50 -4th URPO 1,156.423 O 0.358 0.300 0.100 0.030 0.070 0.100 95.80 -China State ConstructionEngineering CorporationFC-02-039Casecnan Multi-Purpose Irrigation &Power Project1st NIA 608.637 O 0.330 0.154 0.100 0.021 0.033 0.200 84.00 -China State ConstructionEngineering CorporationFC-02-039CP 1, Alegria-Santiago Sect. Underthe PJHL, Mindanao Sect. Rehab.Project, Phase IIFinal PJHL 540.791 C 0.384 0.300 0.300 - - - 98.4096.56%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 37


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONChivas Construction 28<strong>31</strong>6Cholo Construction &Trading32138Chris-James Construction 11202Chris-James Construction 11202Chris-James Construction 11202Rehabilitation of Abra-Kalinga Road,Km.434+960-Km.435+260Const./Repair/Completion of SanVicente Brgy. RoadConc. Reblocking along FerryTerminal-San Juan Section, FerryTerminal-Caglanipao Rd.Conc. Reblocking along FerryTerminal-San Juan Section, FerryTerminal-Caglanipao Rd.Repair/Rehab. of Roadslip alongMaharlika HighwayFinal CAR 1.872 O 0.371 - 0.500 - - - 87.10 -1st/Final III 0.380 C 0.339 0.300 0.300 - - - 93.9093.90%Outstanding1st VIII 6.921 O 0.250 0.000 0.100 0.030 0.020 0.100 50.00 -Final VIII 6.921 C 0.165 0.300 0.300 - - - 76.501st VIII 4.678 O 0.267 0.145 0.100 0.015 0.013 0.100 64.00 -60.60%FairChristian IanConstruction Corporation8191Completion of Sports Complex @North Cental E/S1st III 52.383 O 0.399 0.300 0.100 0.030 0.040 0.100 96.90 -Cieli<strong>to</strong> A. Bay-agConstruction19032Concreting of Bambang-Kasibu-Malabing-Quezon-Solano Road,Tadji-Runruno Section, Km. <strong>31</strong>2+300-Km.<strong>31</strong>2+3801st II 0.953 O 0.347 0.240 0.100 0.010 0.023 0.100 82.00 -Cieli<strong>to</strong> A. Bay-agConstruction19032Concreting of Bambang-Kasibu-Malabing-Quezon-Solano Road,Tadji-Runruno Section, Km. <strong>31</strong>2+300-Km.<strong>31</strong>2+380Final II 0.954 C 0.339 0.300 0.300 - - - 93.9086.76%V.Satisfac<strong>to</strong>ryCieli<strong>to</strong> A. Bay-agConstruction19032 Const. of FMR @ Brgy. Yaway 1st/Final II 0.282 C 0.309 0.200 0.300 - - - 80.9080.90%V.Satisfac<strong>to</strong>ryCieli<strong>to</strong> A. Bay-agConstruction19032Const./Completion of Multi-PurposeBldg. at Kayapa H/S1st/Final II 0.909 C 0.400 0.200 0.300 - - - 90.0090.00%V.Satisfac<strong>to</strong>ryCiriaco Corporation 6932Const. of Delfin Albano Bridge alongTumauini-Delfina Albano Road1st II 198.304 O 0.380 0.000 0.100 0.030 0.033 0.100 64.30 -Ciriaco Corporation 6932Const. of Domalandan Bridge,Lingayen-Labrador Road (SA #4 &#5)Final I 216.544 C 0.383 0.300 0.300 - - - 98.3097.16%OutstandingCiriaco Corporation 6932Const. of Domalandan Bridge,Lingayen-Labrador Road (SA #4)1st I 92.778 O 0.373 0.300 0.100 0.030 0.061 0.100 96.40 -Ciriaco Corporation 6932Const. of Domalandan Bridge,Lingayen-Labrador Road (SA #4)Final I 77.193 C 0.354 0.300 0.300 - - - 95.4093.72%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 38


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONClifford ConstructionCorporationClifford ConstructionCorporationClifford ConstructionCorporationClifford ConstructionCorporationClifford ConstructionCorporationClifford ConstructionCorporation3724Completion of <strong>Jan</strong>ipaan Bridge,Phase IIFinal VI 12.494 C 0.365 0.300 0.300 - - - 96.503724 Completion of Pasanghilan Bridge Final VI 6.4<strong>31</strong> C 0.348 0.300 0.000 - - - 64.803724 Const. of Altavas Bridge 1st VI 14.323 O 0.350 0.300 0.100 0.030 0.051 0.100 93.10 -3724 Const. of Altavas Bridge 2nd VI 14.323 O 0.336 0.240 0.000 0.030 0.043 0.067 71.60 -3724 Const. of Altavas Bridge Final VI 15.755 C 0.349 0.230 0.000 - - - 57.903724 Const. of Dumga Bridge 2nd VI 13.932 O 0.337 0.300 0.100 0.030 0.030 0.100 89.70 -96.11%Outstanding70.50%Satisfac<strong>to</strong>ry69.92%FairClifford ConstructionCorporation3724 Const. of Dumga Bridge Final VI 13.932 C 0.<strong>31</strong>1 0.200 0.300 - - - 81.1084.73%V.Satisfac<strong>to</strong>ryClifford ConstructionCorporation3724Const. of Padanghilan Bridge(Phase I)Final VI 4.868 C 0.333 0.300 0.300 - - - 93.3087.14%V.Satisfac<strong>to</strong>ryClifford ConstructionCorporation3724Retrofitting/Underpinning of KaliboBridge (Phase I)Final VI 4.801 C 0.356 0.300 0.300 - - - 95.6092.72%OutstandingCLTG Builders 16852Concreting of Road @ PurokSagrada Familia, Brgy. IndanganFinal XI 1.413 C 0.299 - 0.500 - - - 79.9087.58%V.Satisfac<strong>to</strong>ryCLV Enterprises 18512 Const. MPB (Phase II) @ Mabuhay 1st X 0.942 O 0.328 0.300 0.100 0.015 0.032 0.067 84.20 -CM Tan Construction(Formerly: CM Tan Const.Supplies)CM Tan Construction(Formerly: CM Tan Const.Supplies)CM Tan Construction(Formerly: CM Tan Const.Supplies)CM Tan Construction(Formerly: CM Tan Const.Supplies)Coastland Constructionand Development Corp.280872808728087Const. of Bayan-Cabahian Farm-<strong>to</strong>-Market RoadConst./Widening of Dinagat-Lore<strong>to</strong>Road (Busay-Pangi Sect.)Const./Widening of Dinagat-Lore<strong>to</strong>Road (Busay-Pangi Sect.)1st XIII 13.790 O 0.347 0.200 0.100 0.030 0.056 0.100 83.30 -1st XIII 2.500 O 0.355 0.205 0.000 0.020 0.022 0.067 66.90 -2nd XIII 2.500 O 0.369 0.284 0.000 0.022 0.025 0.067 76.70 -28087 Upgrading of Kong Street 1st/Final XIII 3.954 C 0.364 - 0.500 - - - 86.4011487 Concreting of Magsaysay Road 1st XI 1.130 O 0.361 0.240 0.100 0.020 0.051 0.100 87.20 -86.40%V.Satisfac<strong>to</strong>ryCoastland Constructionand Development Corp.11487Impvt. of Manikling-Sigaboy Road(Talisay-Launion Section)1st XI 6.9<strong>31</strong> O 0.382 0.300 0.100 0.030 0.040 0.100 95.20 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 39


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONCoastland Constructionand Development Corp.11487Impvt. of Manikling-Sigaboy Road(Talisay-Launion Section)Final XI 6.9<strong>31</strong> C 0.256 0.277 0.300 - - - 83.3090.44%OutstandingCofejok Construction andSupply27493Competion of Multi-Purpose Bldg.,LambaFinal XII 1.036 C 0.360 0.300 0.300 - - - 96.0090.19%OutstandingCofejok Construction andSupply27493Completion of Multi-PurposeBuilding (Mini Gym) @ Tres de Mayo1st XII 1.420 O 0.3<strong>31</strong> 0.227 0.100 0.020 0.040 0.100 81.80 -Cofejok Construction andSupply27493Completion of Multi-PurposeBuilding @ Pamantingan1st/Final XII 0.289 C 0.<strong>31</strong>5 0.300 0.300 - - - 91.5091.50%OutstandingCofejok Construction andSupply27493Const. of 2-Cl, Academic Bldg. @Davao del Sur NHSFinal XI 0.658 C 0.393 - 0.500 - - - 89.3090.70%OutstandingCofejok Construction andSupply27493Const. of 2-S<strong>to</strong>rey Academic Bldg.@ Sta. Cruz NHS, Package IFinal R-XI 1.468 C 0.309 - 0.500 - - - 80.9082.72%V.Satisfac<strong>to</strong>ryCofejok Construction andSupply27493 Const. of MPB at Bayya E/S 1st XII 0.481 O 0.367 0.200 0.100 0.030 0.047 0.100 84.40 -Cofejok Construction andSupply27493Renovation of Multi-Purpose Bldg.,Brgy. Poblacion CESFinal XII 1.283 C 0.371 0.152 0.300 - - - 82.3082.30%V.Satisfac<strong>to</strong>ryCollera's Construction 13246Conc. of Sta. Fe-San Isidro-PulakRoad1st VIII 4.748 O 0.<strong>31</strong>0 0.272 0.100 0.030 0.033 0.100 84.50 -Collera's Construction 13246Concreting of Critical Portion ofNational Circumferential RoadFinal VIII 3.832 C 0.418 - 0.500 - - - 91.8061.32%FairCollera's Construction 13246Collera's Construction 13246Const. of Multi-Purpose Building(ABC Hall) @ Palo MunicipalCompoundConst. of Multi-Purpose Building(Inner Court)1st/Final VIII 1.446 C 0.388 0.300 0.300 - - - 98.8098.80%Outstanding1st VIII 1.900 O 0.327 0.300 0.100 0.020 0.022 0.100 86.90 -Collera's Construction 13246Const. of Multi-Purpose Building(Inner Court)Final VIII 1.900 C 0.347 0.300 0.300 - - - 94.7089.24%V.Satisfac<strong>to</strong>ryCompass Rose Builders 27024Repair/Rehab. of Flood Controlalong Kennon-Agat-National Road1st/Final CAR 4.619 C 0.244 0.235 0.300 - - - 77.9077.90%Satisfac<strong>to</strong>ryConcepcion BasicBuilders, Incorporated5255 Completion of Valencia Bridge Final X 16.558 C 0.368 0.300 0.300 - - - 96.8087.50%V.Satisfac<strong>to</strong>ryConcepcion BasicBuilders, Incorporated5255Completion of Valencia BridgeApproaches and Access Road1st X 27.513 O 0.300 0.300 0.100 0.030 0.037 0.100 86.70 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 40


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONConcepcion BasicBuilders, Incorporated5255 Const. of Bislig Bridge 1st XIII 19.168 O 0.388 0.300 0.100 0.030 0.020 0.100 93.80 -Concepcion BasicBuilders, Incorporated5255 Const. of Bislig Bridge 2nd XIII 19.168 O 0.393 0.240 0.100 0.030 0.048 0.100 91.10 -Concepcion BasicBuilders, Incorporated5255 Const. of Bislig Bridge Final XIII 19.169 C 0.391 0.300 0.300 - - - 99.1095.11%OutstandingConcepcion BasicBuilders, Incorporated5255 Const. of Bislig Bridge Final XIII 28.876 C 0.286 0.300 0.300 - - - 88.6090.61%OutstandingCongimar MechanicalServices<strong>31</strong>490Repair/Rehab. of District Hospital @BayambangFinal I 0.373 C 0.287 0.300 0.300 - - - 88.7089.61%V.Satisfac<strong>to</strong>ryConstructicons, Inc. <strong>31</strong>632Rehab./Const. (Conc.) of Talaba-Summit-Panaon National Road1st/Final IV-A 3.855 C 0.280 0.300 0.300 - - - 88.0088.00%V.Satisfac<strong>to</strong>ryConstruc<strong>to</strong>r'sDevelopment Multi-Purpose Cooperative<strong>31</strong>538Conc. of Bual Bridge Approachesincluding Slope Protection alongMakilala Jct. National Road1st XII 7.325 O 0.375 0.225 0.100 0.023 0.04 0.100 86.30 -Construc<strong>to</strong>r'sDevelopment Multi-Purpose CooperativeConstruc<strong>to</strong>r'sDevelopment Multi-Purpose CooperativeConstruc<strong>to</strong>r'sDevelopment Multi-Purpose CooperativeConstruc<strong>to</strong>r'sDevelopment Multi-Purpose Cooperative<strong>31</strong>538 Const. of Access Road Dep-Ed 1st/Final XII 0.433 C 0.323 0.249 0.300 - - - 87.20<strong>31</strong>538<strong>31</strong>538<strong>31</strong>538Const. of MPB @ DTI TrainingCenterConst./ Completion of Multi-PurposeBldg., at Senior Citizens KinsanteConst./Completion of Multi-PurposePavement Kampo Uno, Saguing1st/Final XII 0.477 C 0.378 0.300 0.300 - - - 97.801st/Final XII 0.228 C 0.350 0.300 0.300 - - - 95.001st/Final XII 0.159 C 0.371 0.300 0.300 - - - 97.1087.20%V.Satisfac<strong>to</strong>ry97.80%Outstanding95.00%Outstanding97.10%OutstandingConstruc<strong>to</strong>r'sDevelopment Multi-Purpose Cooperative<strong>31</strong>538Const./Completion of Multi-PurposeSchool Building (2-Span CoveredCourt), Phase II1st/Final XII 0.466 C 0.369 0.300 0.300 - - - 96.9096.90%OutstandingConstruc<strong>to</strong>r'sDevelopment Multi-Purpose CooperativeConstruc<strong>to</strong>r'sDevelopment Multi-Purpose Cooperative<strong>31</strong>538 Const./Completion of PWSP 1st XII 0.273 O 0.386 0.300 0.100 0.008 0.019 0.100 91.30 -<strong>31</strong>538Const./Completion of PWSP @Purok 6 (Calzado)1st/Final XII 0.528 C 0.371 0.200 0.300 - - - 87.1087.10%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 41


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONCrazy Cut Construction 18324 Completion of Baguio Health Center Final CAR 1.905 C 0.378 0.300 0.300 - - - 97.80CRDC Construction 29738Crest Construction 15240Crishelle Construction 17108Repair/Rehab. of Various Sch.Bldgs., Tabiawan E/SConst. of San Pedro Bridge (Phase1)Completion of Multi-PurposeBuilding92.76%Outstanding1st IX 0.027 O 0.201 0.300 0.100 0.015 0.070 0.100 78.60 -1st II 4.782 O 0.397 0.300 0.100 0.030 0.023 0.100 95.00 -1st/Final IV-B 0.369 C 0.396 0.238 0.300 - - - 93.4093.04%OutstandingCrishelle Construction 17108Concreting of Brgy Roads @ Brgy.Pancol1st/Final IV-B 0.458 C 0.386 0.200 0.300 - - - 88.6088.60%V.Satisfac<strong>to</strong>ryCrishelle Construction 17108Concreting of Palawan South Roadwith ExceptionFinal IV-B 4.371 C 0.258 0.200 0.300 - - - 75.8077.00%Satisfac<strong>to</strong>ryCrishelle Construction 17108 Const. of Line Canal Final IV-B 0.185 C 0.380 0.500 88.0088.00%V.Satisfac<strong>to</strong>ryCrishelle Construction 17108Const. of Puer<strong>to</strong> Princesa Pilot E/SPhase II1st/Final IV-B 1.077 C 0.397 0.200 0.300 - - - 89.7089.70%V.Satisfac<strong>to</strong>ryCrishelle Construction 17108Repair of Slip & Installation of SlopeProtection, Roxas-Taytay NationalRoad Km. 174+885 & Km. 174+895 &Km. 175+365-Km. 1755+3851st IV-B 2.128 O 0.360 0.300 0.100 0.030 0.023 0.100 91.30 -Crishelle Construction 17108CS Construction andSupply (Formerly: CSConstruction)CS Construction andSupply (Formerly: CSConstruction)CSR Construction andSupply ( Formerly: CSRConst.)CSR Construction andSupply ( Formerly: CSRConst.)24237Strengthening of General LunaBridge along Puer<strong>to</strong> Princesa SouthRoad (PPSR)Const. of 1 unit Sch. Bldg. @Madanding NHS1st IV-B 4.796 O 0.307 0.245 0.100 0.030 0.035 0.067 78.40 -1st/Final XII 0.462 C 0.341 0.200 0.300 - - - 84.1024237 Const. of MPB @ Brgy. Makat 1st/Final XII 0.463 C 0.385 0.300 0.300 - - - 98.501442714427Const. of Agnipa Multi-PurposeBuildingConst. of Macario Molino NationalHigh SchoolFinal IV-B 1.807 C 0.384 0.200 0.300 - - - 88.40Final IV-B 0.673 C 0.389 0.000 0.300 - - - 68.9084.10%V.Satisfac<strong>to</strong>ry98.50%Outstanding79.37%Satisfac<strong>to</strong>ry66.24%FairCTC Builder and SuppliesIncorporated12088Rehab. of Buhatan Bridge,Sorsogon-Casiguran Road1st V 9.403 O 0.366 0.203 0.100 0.030 0.038 0.100 83.70 -Currimao IntegratedBuilders Corporation8738 Concreting of Sta. Cruz Road 1st/Final I 3.339 C 0.332 0.297 0.300 - - - 92.9092.90%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 42


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONCVAP Construction 20410 Const. of Lined Canal 1st/Final V 0.139 C 0.382 0.200 0.300 - - - 88.2088.20%V.Satisfac<strong>to</strong>ryCVAP Construction 20410Repair/Repainting of Bicol MedicalCenter1st/Final V 0.716 C 0.395 0.200 0.300 - - - 89.5089.50%V.Satisfac<strong>to</strong>ryD. Morales EngineeringWorks85<strong>31</strong> Const. of Multi-Purpose Pavement 1st/Final VIII 0.473 C 0.368 0.221 0.300 - - - 88.9088.90%V.Satisfac<strong>to</strong>ryD.C.E. Construction 29347Const. of 3CL School Building @Amulung H/S, Bayabat1st/Final II 1.060 C 0.<strong>31</strong>7 0.200 0.300 - - - 81.7081.70%V.Satisfac<strong>to</strong>ryD.C.E. Construction 29347 Const. of Conner Public Market 1st CAR 4.611 O 0.400 0.242 0.100 0.030 0.042 0.100 91.40 -D.C.E. Construction 29347 Const. of Conner Public Market 2nd CAR 4.611 O 0.<strong>31</strong>7 0.300 0.070 0.030 0.018 0.067 80.20 -D.C.E. Construction 29347D.C.E. Construction 29347D.C.M. Construction 5641Impv't. Concreting of Tabuk-Tinglayan Road Bantay-PinaganSectionImpv't. Concreting of Tabuk-Tinglayan Road Bantay-PinaganSectionConst. of Agus III Bridge (PumpingBridge) & Approaches, Phase III1st CAR 4.763 O 0.325 0.240 0.070 0.023 0.037 0.067 76.20 -2nd CAR 4.763 O 0.<strong>31</strong>9 0.289 0.050 0.015 0.038 0.033 74.40 -2nd X 19.418 O 0.351 0.300 0.100 0.030 0.016 0.100 89.70 -D.C.M. Construction 5641Const. of Agus III Bridge (PumpingBridge) & Approaches, Phase III3rd X 19.418 O 0.358 0.300 0.100 0.015 0.018 0.100 89.10 -D.G. SarmentaConstruction13024 Const. of MPB @ Brgy. Camp Tinio 1st/Final III 2.574 C 0.267 0.300 0.300 - - - 86.7086.70%V.Satisfac<strong>to</strong>ryD.G. SarmentaConstruction13024Const. of MPB @ Brgy. SanGregorio1st/Final III 1.390 C 0.<strong>31</strong>7 0.282 0.300 - - - 89.9089.90%V.Satisfac<strong>to</strong>ryD.G. SarmentaConstruction13024Const. of Multi-Purpose Bldg.,(Gymnasium) Brgy. Bakod Bayan1st/Final III 1.655 C 0.373 0.300 0.300 - - - 97.3097.30%OutstandingD.G. SarmentaConstruction13024Rehab. of Tambo-MagpapalayokRoad1st/Final III 7.398 C 0.293 0.300 0.300 - - - 89.3089.30%V.Satisfac<strong>to</strong>ryD.J.D. Construction 32217 Conc. of Enrile St. 1st II 0.937 O 0.320 0.240 0.030 0.020 0.028 0.000 63.80 -D.K. Jocson Construction 6896Const. of One (1) Unit 3-CL SB @Ramon Torres NHSFinal VI 0.988 C 0.386 0.300 0.300 - - - 98.6085.58%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 43


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIOND.K. Jocson Construction 6896Rehab./Conc. of Isabela-GuihulnganRoadFinal VI 14.306 C 0.283 0.200 0.300 - - - 78.3080.34%V.Satisfac<strong>to</strong>ryD.L. Aureo Construction 24894 Const. of Multi-Purpose Building 1st/Final VIII 0.207 C 0.359 0.277 0.300 - - - 93.60D.L. Aureo Construction 24894 Const. of Multi-Purpose Building 1st/Final VIII 0.191 C 0.382 0.300 0.300 - - - 98.20D.L. Aureo Construction 24894 Const. of Seawall Barugo Boulevard 1st/Final VIII 0.376 C 0.292 0.200 0.300 - - - 79.2093.60%Outstanding98.20%Outstanding79.20%Satisfac<strong>to</strong>ryD.L. Aureo Construction 24894Repair/Rehab. of 3 Cl Elem. Sch.Bldg. @ Panalaron C/S1st/Final VIII 0.897 C 0.392 0.183 0.300 - - - 87.5087.50%V.Satisfac<strong>to</strong>ryD.M. House Const. Inc. 25810 Const./Rehab. of Capitangan E/S 1st/Final III 0.940 C 0.339 0.173 0.300 - - - 81.2081.20%V.Satisfac<strong>to</strong>ryD.M. Wenceslao &Associates, Inc.150Widening of R-10 Road ProjectMarala Bridge and its ApproachesFinal NCR 68.073 C 0.153 0.200 0.000 - - - 35.3064.66%FairD.R. Robles Construction 28559Repair and Maintenance of Sagbat-Pililia Diversion RoadFinal IV-A 1.705 C 0.373 0.300 0.300 - - - 97.3087.10%V.Satisfac<strong>to</strong>ryD.R. Robles Construction 28559Riprapping of Angono River (PhaseIV)1st/Final IV-A 2.881 C 0.293 0.300 0.300 - - - 89.3089.30%V.Satisfac<strong>to</strong>ryD.S.B. Construction andSupply16126Rehabilitation/Renovation of Multi-Purpose BuildingFinal NCR 3.772 C 0.388 0.300 0.300 - - - 98.8084.45%V.Satisfac<strong>to</strong>ryD.W. G & A Developers 27573 Const. of Flood Control @ Hibalyo 1st VII 0.906 O 0.213 - 0.200 0.000 0.0<strong>31</strong> 0.250 69.40 -D.W. G & A Developers 27573Const./Repair of Seawall atGuihulngan1st/Final VII 0.365 C 0.307 0.300 0.300 - - - 90.7090.70%OutstandingDadoy Freight ServicesConstruction & Supply28465Conc. of San Andres-CalatravaRoad (Agpudlos Section)1st IV-B 0.914 O 0.341 0.135 0.100 0.030 0.022 0.100 72.80 -Daewoo Engineering &Construction Company,Ltd.Daewoo Engineering &Construction Company,Ltd.FC-03-047/SL2-SN-000411CP II, Phil-Japan FriendshipHighway Mindanao Section Rehab.Project, Phase II, (Km.130+100-Km.1376+805.34SL2-SN-Metro Manila Flood Control Project-000543/FWest of Mangahan Floodway, CP1C-98-1133rd PJHL 1,559.690 O 0.350 0.300 0.050 0.030 0.048 0.100 87.80 -5th MFCP I 740.742 O 0.<strong>31</strong>6 0.200 0.100 0.024 0.061 0.200 90.10 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 44


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONDaewoo Engineering &Construction Company,Ltd.Daewoo Engineering &Construction Company,Ltd.FC-98-113/SL2-SN-000543Metro Manila Flood Control Project-West of Mangahan Floodway, CP1,SL2-SN-Metro Manila Flood Control Project-000543/FWest of Mangahan Floodway, CP1,C-98-1132nd MFCP I 725.017 O 0.305 0.200 0.100 0.030 0.061 0.200 89.60 -4th MFCP I 740.742 O 0.342 0.200 0.100 0.024 0.059 0.200 92.50 -Daewoo Engineering &Construction Company,Ltd.SL2-SN-000544/FC-01-047Philippine-Japn Friendship HighwayMindanao Section, RehabilitationProject, Phase II, CP-II, Km.130+000-Km.1376+805.344th PJHL 1,559.690 O 0.388 0.300 0.070 0.030 0.070 0.067 92.50 -Daewoo Engineering &Construction Company,Ltd.FC-03-047Philippine-Japn Friendship HighwayMindanao Section, RehabilitationProject, Phase II, CP-II, Km.130+000-Km.1376+805.345th XIII 1,559.690 O 0.393 0.295 0.050 0.030 0.070 0.067 90.50 -Daewoo Engineering &Construction Company,Ltd.FC-03-047Philippine-Japn Friendship HighwayMindanao Section, RehabilitationProject, Phase II, CP-II, Km.130+000-Km.1376+805.346th PJHL 1,586.357 O 0.350 0.300 0.100 0.030 0.056 0.100 93.60 -Daewoo Engineering &Construction, Ltd.FC-03-047Philippine-Japn Friendship HighwayMindanao Section, RehabilitationProject, Phase II, CP-II, Km.130+000-Km.1376+805.347th PJHL 1,586.357 O 0.368 0.300 0.100 0.030 0.070 0.100 96.80 -Dahl Construction 89<strong>31</strong>Damico Buildes &Supplies30355Completion of ConcepcionElementary SchoolConst. of Water System at Brgy. Sta.Juliana1st/Final NCR 3.813 C 0.309 0.300 0.300 - - - 90.9090.90%Outstanding1st III 0.472 O 0.368 0.294 0.100 0.010 0.019 0.100 89.10 -Damico Buildes &Supplies30355Const. of Water System at Brgy. Sta.JulianaFinal III 0.472 C 0.309 0.300 0.300 - - - 90.9089.64%V.Satisfac<strong>to</strong>ryDanfran Construction 28088Const. of MPB (for Police Station)and other impvt. Within the area1st/Final NCR 1.190 C 0.364 0.300 0.300 - - - 96.4096.40%OutstandingDanvic Construction 24439Conc. of Additional 2 lanes alongDavao City Diversion Road1st/Final XI 3.516 C 0.309 0.300 0.300 - - - 90.9090.90%OutstandingDanvic Construction 24439Const./Rehab. of School Bldg. @Bucana E/S1st/Final XI 1.408 C 0.383 0.300 0.300 - - - 98.3098.30%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 45


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONDarynn Construction &Supply22322Const. of 2 Cl Academic Sch. Bldg.@ Dongan Pekong E/S1st/Final XI 0.704 C 0.366 0.300 0.300 - - - 96.6096.60%OutstandingDarynn Construction &Supply22322 Const. of MPB at Brgy. 76-A 1st/Final XI 0.752 C 0.356 0.240 0.300 - - - 89.6089.60%V.Satisfac<strong>to</strong>ryDavao Concrete Products 12090Conc. of Babak-Samal-KaputianRoadFinal XI 13.974 C 0.<strong>31</strong>8 0.300 0.300 - - - 91.8090.54%OutstandingDavao Concrete Products 12090Const. of 3 Cl Academic @ DigosCity NHS1st/Final XI 1.247 C 0.369 0.300 0.300 - - - 96.9096.90%OutstandingDavao Concrete Products 12090Const. of Flood Control MoralizonHigh SchoolFinal XI 4.245 C 0.240 0.300 0.300 - - - 84.0084.48%V.Satisfac<strong>to</strong>ryDavao Concrete Products 12090Davao Concrete Products 12090Repair/Rehab. of MPB Bldg.(DAPECOL Hospital)Widening of Cotaba<strong>to</strong>-DavaoNational Road, Pob. PagalunganSection1st XI 4.151 O 0.396 0.287 0.100 0.030 0.038 0.100 95.10 -Final XII 5.436 C 0.323 0.300 0.000 - - - 62.3054.71%PoorDavao Contrac<strong>to</strong>rsDevelopment Cooperative(DACODECO)28542Const. of 2 CL Mod. Single S<strong>to</strong>reySchool Bldg., At Manat NHS KaoAnnex1st XI 0.802 O 0.<strong>31</strong>8 0.000 0.100 0.000 0.013 0.100 53.10 -Davao Contrac<strong>to</strong>rsDevelopment Cooperative(DACODECO)28542Const. of 2 CL Mod. Single S<strong>to</strong>reySchool Bldg., At Manat NHS KaoAnnexFinal XI 0.802 C 0.351 0.200 0.300 - - - 85.1062.70%FairDavao Contrac<strong>to</strong>rsDevelopment Cooperative(DACODECO)28542 Const. of N.N.C.H.S. Bldg. (Phase V) 1st XI 2.828 O 0.385 0.176 0.100 0.030 0.035 0.100 82.60 -Davao Gene Construction 3<strong>31</strong>7Const. of Rock Causeway and RCPier1st PPA 16.556 O 0.380 0.300 0.100 0.030 0.060 0.100 97.05 -Davao L.A. Parts &Hardware Corporation27208Conc. Reblocking of DigosDiversion Road1st XI 4.821 O 0.384 0.300 0.100 0.030 0.035 0.100 94.90 -Davao L.A. Parts &Hardware Corporation27208Conc. Reblocking of DigosDiversion RoadFinal XI 4.821 C 0.360 0.300 0.300 - - - 96.0095.34%OutstandingDavao L.A. Parts &Hardware Corporation27208 Const./Rehab. of FMR 1st/Final XI 2.824 C 0.301 0.219 0.300 - - - 82.0082.00%V.Satisfac<strong>to</strong>ryDaybreak EnterprisesEngineering &Construction30174Package II-Const. of Multi-PurposeBuilding on Various Location1st VIII 1.275 O 0.269 0.225 0.100 0.020 0.032 0.100 74.60 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 46


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONDigos Tess<strong>to</strong>nConstruction & Supplies8921Const. of FMR @ Baracata-Atan-AweSebulan Road1st XI 4.710 O 0.395 0.273 0.100 0.030 0.054 0.100 95.20 -Dimson (Manila), Inc. 112Dimson (Manila), Inc. 112Diplahan Commercial &ConstructionDiplahan Commercial &Construction3203732037DL Enterprises 18155Const. of Jones 2 Bridge andApproachesImprovement/Widening of MNRPackage I, MeycauayanConc. of Tinungtungan alongKauswagan-Lindag RoadConc. of Tinungtungan alongKauswagan-Lindag RoadConc. of Tudela Road (MunicipalGround)2nd II 102.498 O 0.284 0.300 0.030 0.030 0.045 0.033 72.20 -1st III 88.097 O 0.390 0.300 0.100 0.030 0.038 0.067 92.50 -1st IX 0.953 O 0.371 0.300 0.100 0.030 0.032 0.100 93.30 -Final IX 0.953 C 0.272 0.300 0.300 - - - 87.2090.86%Outstanding1st X 0.952 O 0.338 0.300 0.100 0.015 0.032 0.100 88.50 -DL Enterprises 18155Conc./Rehab. of FMR @ Sta. Cruz,Boniao & Maguiles RoadFinal IX 9.127 C 0.<strong>31</strong>8 0.184 0.300 - - - 80.2080.44%V.Satisfac<strong>to</strong>ryDL Enterprises 18155Conc./Rehab. of FMR @ Sta. Cruz,Boniao & Manguiles Road1st IX 8.320 O 0.289 0.265 0.100 0.018 0.056 0.100 82.80 -DL Enterprises 18155Concreting of Roads at Brgy.Kinuman SurFinal X 0.952 C 0.329 0.282 0.300 - - - 91.1087.92%V.Satisfac<strong>to</strong>ryDL Enterprises 18155Const. of Classrooms @ NorthernMindanao State College of Science& Technology1st X 1.906 O 0.308 0.300 0.100 0.015 0.053 0.100 87.60 -DL Enterprises 18155Const. of Classrooms @ NorthernMindanao State College of Science& TechnologyFinal X 1.906 C 0.305 0.300 0.300 - - - 90.5079.02%Satisfac<strong>to</strong>ryDL Enterprises 18155 Resurfacing of Unpaved Shoulder Final X 1.121 C 0.320 0.300 0.300 - - - 92.0072.26%Satisfac<strong>to</strong>ryDMJ Construction &Supply17211Asphalt Overlay along Amungan-Palauig-Banlog Road, Iba Section1st/Final III 9.553 C 0.354 0.300 0.300 - - - 95.4095.40%OutstandingDMJ Construction &Supply17211Asphalt Overlay of Cabangan-Dolores Section1st/Final III 9.554 C 0.364 0.207 0.300 - - - 87.1087.10%V.Satisfac<strong>to</strong>ryDMJ Construction &Supply17211Completion/ Continuation ofUnfinshed On-going Bridge MatainBridge along Olongapo-BugallomRoad-Phase II, MatainFinal III 10.706 C 0.301 0.261 0.300 - - - 86.2089.08%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 47


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONDMM ConstructionIndsutries<strong>31</strong>136Const. of 6 Cl Sch. Bldg., Sta. PazE/S (Pinamudlan E/S)1st/Final VIII 2.283 C 0.372 0.200 0.300 - - - 87.2087.20%V.Satisfac<strong>to</strong>ryDofel Construction 16333 Const. of FMR @ Lantian 1st IX 1.861 O 0.298 0.000 0.100 0.020 0.028 0.100 54.60 -Dofel Construction 16333 Const. of FMR @ Lantian Final IX 1.861 C 0.<strong>31</strong>0 0.265 0.300 - - - 87.5067.76%FairDofel Construction 16333Const. of Molave VocationalTechnical School Building1st IX 0.371 O 0.347 0.300 0.100 0.030 0.041 0.100 91.80 -Domarax Constructionand Development5502Const. of 1 Cl @ Claudia P. PimentelMemorial E/S1st/Final XIII 0.443 C 0.355 0.300 0.300 - - - 95.5095.50%OutstandingDomvee ConstructionCorporationDonber Construction &Supply19872Rehab./Completion of CCR,Guinsiliban Sagay Road Sectionalong Camiguin CircumferentialRoad15334 Improvement of MASSBA PIS 1st/FinalFinal X 1.850 C 0.320 0.300 0.000 - - - 62.00NIARegion V1.191 O 0.359 0.180 0.300 - - - 83.90 -53.81%PoorDonber Construction &Supply15334 Improvement of MASSBA PIS 1st/FinalNIARegion V1.191 C 0.359 0.180 0.300 - - - 83.9083.87%V.Satisfac<strong>to</strong>ryDouble L Construction &Development Enterprises9834Conc. of Multi-Purpose Pavement atBrgy. Poblacion1st/Final VII 0.475 C 0.303 0.300 0.300 - - - 90.3090.30%OutstandingDouble L Construction &Development Enterprises9834Const. of Flood Control @Maragondong1st/Final VII 0.445 C 0.362 0.100 0.300 - - - 76.2076.20%Satisfac<strong>to</strong>ryDouble L Constructionand DevelopmentEnterprises9834 Concreting of Bunga Brgy. Road 1st VII 0.827 O 0.306 0.300 0.100 0.030 0.040 0.100 87.60 -Double L Constructionand DevelopmentEnterprises9834Const. of Ayuquitan Bridge &Approaches, Km.13.922 alongDumaguete North Road2nd VII 10.416 O 0.330 0.280 0.070 0.008 0.050 0.067 80.50 -Double L Constructionand DevelopmentEnterprises9834Const. of Ayuquitan Bridge &Approaches, Km.13.922 alongDumaguete North RoadFinal VII 10.417 C 0.242 0.300 0.000 - - - 54.2072.24%Satisfac<strong>to</strong>ryDouble R Double MConstructionDSB Construction andSupply25385Const. of Cagayan River Control @Catayauan1st II 9.468 O 0.400 0.160 0.000 0.020 0.028 0.000 60.80 -16126 Const. of San Lorenzo Lined Canal 1st/Final V 0.375 C 0.345 0.100 0.300 - - - 74.5074.50%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 48


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONDSO Enterprises 10733 Completion of School Bldg. 1st/Final IV-A 0.955 C 0.322 0.227 0.300 - - - 84.9084.90%V.Satisfac<strong>to</strong>ryDSO Enterprises 10733Conc. of CSCF Jct. Road, PagsanjanSection1st IV-A 5.254 O 0.400 0.237 0.100 0.030 0.048 0.100 91.50 -DSO Enterprises 10733 Const. of FMR @ Sitio Tanliwan 1st/Final IV-A 0.955 C 0.268 0.300 0.300 - - - 86.8086.80%V.Satisfac<strong>to</strong>ryDungan Construc<strong>to</strong>rs &Trading19301 Conc. of FMR @ Brgy. Buhilit 1st/Final III 0.611 C 0.341 0.196 0.300 - - - 83.7083.70%V.Satisfac<strong>to</strong>ryDuragold Trading &Const. - CDO Branch<strong>31</strong>929Duros Development Corp. 22729Const. of One (1) S<strong>to</strong>rey Multi-Purpose Bldg.Repair/Rehab. & Widening ofCansagaFinal X 0.471 C 0.392 0.300 0.300 - - - 99.2092.13%Outstanding1st VII 5.694 O 0.362 0.300 0.100 0.030 0.050 0.067 90.90 -Duros Development Corp. 22729Repair/Rehab. & Widening ofCansaga BridgeFinal VII 11.388 C 0.400 0.100 0.300 - - - 80.0086.54%V.Satisfac<strong>to</strong>ryDynamic Builders &Construction Co., (Phil.),Inc.24712Impv't./Widening of Bacolod SouthKabankalan Road, Km.4+953 -Km.5+4203rd VI 17.790 O 0.386 0.300 0.100 0.030 0.070 0.100 98.60 -Dynamic Builders &Construction Co., (Phil.),Inc.24712Impv't./Widening of Bacolod SouthKabankalan Road, Km.4+953 -Km.5+4204th VI 17.790 S 0.289 0.300 0.100 0.030 0.060 0.100 87.9087.90%V.Satisfac<strong>to</strong>ryDynamic Builders &Construction Co., (Phil.),Inc.24712Impv't./Widening of Bacolod SouthKabankalan Road, Km.4+953 -Km.5+420Final VI 17.790 C 0.276 0.300 0.000 - - - 57.6078.04%Satisfac<strong>to</strong>ryDynamic Builders &Construction Co., (Phil.),Inc.24712Widening/Impvt. of Bacolod SouthKabankalan Road, Km.5+200 -Km.5+775.5 with exception1st VI 9.538 O 0.377 0.294 0.100 0.030 0.070 0.100 97.10 -E & L ReyesConstructionE & L ReyesConstructionE & L ReyesConstruction15338Const. of 1-unit 2 Cl High Sch. Bldg.at Samboan NHS1st/Final VII 0.826 C 0.362 0.300 0.300 - - - 96.2015338 Const. of Getafe Public Market 1st VII 1.895 O 0.368 0.300 0.100 0.010 0.018 0.100 89.60 -15338Rehab. (Conc.) of Maria An<strong>to</strong>niaVillage Road1st/Final VII 0.740 C 0.<strong>31</strong>3 0.300 0.300 - - - 91.3096.20%Outstanding91.30%OutstandingE and D Construction 32064 Const. of MPB (DENR Building) 1st XII 0.939 O 0.<strong>31</strong>1 0.2<strong>31</strong> 0.100 0.023 0.029 0.067 76.10 -E and D Construction 32064Const./Conc. of Lagundungan-Buaya-Buaya Road1st XII 4.815 O 0.345 0.300 0.000 0.015 0.043 0.067 77.00 -E and D Construction 32064Const./Conc. of Lagundungan-79.92%Final XII 4.815 C 0.343 0.200 0.300 - - - 84.30Buaya-Buaya RoadSatisfac<strong>to</strong>ryE S De GuzmanConstruction17494 Const. of Pob. South MPB Final II 0.277 C 0.228 0.200 0.300 - - - 72.8072.73%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 49


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100E. Cañeda Construction 22168 Road Conc. of Danglag-Garing Road 1st/Final VII 0.458 C 0.282 0.200 0.300 - - - 78.20<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTION78.20%Satisfac<strong>to</strong>ryE. Garcia Construction &E. Garcia Gravel & Sand7243 Const. of MPB @ Bonot 1st V 0.948 O 0.365 0.245 0.100 0.020 0.042 0.100 87.20 -E. Garcia Construction &E. Garcia Gravel & SandE. Garcia Construction &E. Garcia Gravel & Sand7243 Const. of MPB @ Bonot Final V 0.948 C 0.389 0.138 0.300 - - - 82.707243 Const. of Water System Final V 2.808 C 0.391 0.300 0.300 - - - 99.1085.85%V.Satisfac<strong>to</strong>ry94.90%OutstandingE. Gardiola Construction 17542Const. of C-5 Ext. Proj., from SLEX<strong>to</strong> Sucat RoadFinal NCR 95.556 C 0.295 0.300 0.300 - - - 89.5086.26%V.Satisfac<strong>to</strong>ryE. Gardiola Construction 17542Impvt./Rehab. Along San Celestino-San Francisco-S<strong>to</strong>. Toribio Rd.1st/Final IVA 9.642 C 0.362 0.254 0.300 - - - 91.6091.60%OutstandingE. Guadiz Construction 27172Const. of 2-CL at Guilermo A.Barsatan School of Arts & Trades1st CAR 0.558 O 0.<strong>31</strong>9 0.218 0.100 0.022 0.016 0.067 74.20 -E. Guadiz Construction 27172Const. of 2-CL at Guilermo A.Barsatan School of Arts & TradesFinal CAR 0.558 C 0.361 0.300 0.000 - - - 66.1076.04%Satisfac<strong>to</strong>ryE. Guadiz Construction 27172Const. of Marag Valley Agriculturaland Trade High School1st CAR 0.559 O 0.400 0.250 0.100 0.008 0.028 0.100 88.60 -E. Guadiz Construction 27172Const. of Marag Valley Agriculturaland Trade High SchoolFinal CAR 0.559 C 0.344 0.300 0.000 - - - 64.4081.34%V.Satisfac<strong>to</strong>ryE. Lapus Enterprises 10813 Const. of Balangkas Road Final NCR 3.514 C 0.330 0.200 0.300 83.00E. Lapus Enterprises 10813 Const. of Multi-Purpose Building 1st/Final VIII 3.340 C 0.399 0.285 0.300 - - - 98.4087.80%V.Satisfac<strong>to</strong>ry98.40%OutstandingE. Lapuz Enterprises 10813Const. of MP Building @ S<strong>to</strong>. TomasE/S1st/Final III 3.029 C 0.385 0.176 0.300 - - - 86.1086.10%V.Satisfac<strong>to</strong>ryE. Simba Marketing andConstruction Supply16398 Completion of MPB at Brgy. 36-D 1st/Final XI 0.939 C 0.345 0.268 0.300 - - - 91.3091.30%OutstandingE.A. Sancho Construction 5648Const. of Adiangao Bridge # 1 andApproaches (Phase I)2nd V 5.536 O 0.323 0.273 0.100 0.020 0.023 0.100 83.90 -E.B.J.R. Construction 19780 Const. of Talifugo-Manag FMR 1st/Final CAR 0.458 C 0.377 0.240 0.300 - - - 91.7091.70%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 50


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONE.D. TabangayConsructionE.D. TabangayConsructionE.D. TabangayConsructionE.D. TabangayConsruction<strong>31</strong>978E.G. Canabe Construction 27358Const. of 1 Cl @Panitian NationalHigh School1st/Final IV-B 0.424 C 0.370 0.300 0.300 - - - 97.00<strong>31</strong>978 Const. of San Juan High School 1st IV-B 0.424 O 0.350 0.000 0.100 0.030 0.029 0.100 60.90 -<strong>31</strong>978 Const. of San Juan High School Final IV-B 0.424 C 0.379 0.300 0.300 - - - 97.90<strong>31</strong>978 Rehab. of Cross-Country Road Final IV-B 1.866 C 0.240 0.300 0.300 - - - 84.00Const. of One (1) S<strong>to</strong>rey 4-CL H/SBldg. Carigara NHS (JugabanAnnex),1st/Final VIII 1.888 C 0.375 0.221 0.300 - - - 89.6097.00%Outstanding72.00%Satisfac<strong>to</strong>ry87.48%Satisfac<strong>to</strong>ry89.60%V.Satisfac<strong>to</strong>ryE.I. Templonuevo & Asso.Inc.1090 Const. of Brgy Laguinbanwa Road Final VI 2.409 C 0.301 0.286 0.300 - - - 88.7086.06%V.Satisfac<strong>to</strong>ryE.K.C. Construction &Aggregates14833Const. of Galap Bridge I and itsApproaches Gurel-Bokod-Kabayan-Abatan Road, LooFinal CAR 13.979 C 0.378 0.300 0.300 - - - 97.8090.60%OutstandingE.L. Torres Constructionand Trading<strong>31</strong>406Repair of Roads & Drainage along P.Jacin<strong>to</strong> St.1st/Final NCR 0.555 C 0.347 0.300 0.300 - - - 94.7094.70%OutstandingE.M. BayatanConstruction21332 Const. of MPB Phase III @ NVPH 1st/Final II 1.745 C 0.<strong>31</strong>2 0.200 0.300 - - - 81.2081.20%V.Satisfac<strong>to</strong>ryE.M. Cuerpo, Inc. 30963 Guadalupe Ferry Station Project 1st PRRC 11.379 O 0.358 0.284 0.100 0.000 0.035 0.100 87.70 -E.M. PalomaresConstruction23471 Const. of Multi-Purpose Building 1st/Final I 0.950 C 0.382 0.200 0.300 - - - 88.2088.20%V.Satisfac<strong>to</strong>ryE.M. PalomaresConstruction23471Impvt. of Gangal-Bazar-SallapadanBo. FMR Sallapadan ARC3rd CAR 12.255 O 0.333 0.278 0.070 0.018 0.013 0.067 77.90 -E.M. PalomaresConstruction23471Impvt. of Gangal-Bazar-SallapadanBo. FMR Sallapadan ARCFinal CAR 12.255 C 0.286 0.300 0.300 - - - 88.6080.04%V.Satisfac<strong>to</strong>ryE.P. ManantanConstruction andDevelopment Corp.6457Conc./Reblocking of Agusan-DavaoRoad2nd XI 9.949 O 0.368 0.225 0.100 0.010 0.050 0.100 85.30 -E.P. ManantanConstruction andDevelopment Corp.6457Impvt./Conc. of 4 lanes at TuganayBridge & Approaches1st XI 7.701 O 0.290 0.300 0.070 0.030 0.060 0.067 81.70 -E.P.L. GeneralConstruction15559Const. of 1Cl Sch. Bldg. @Calabanga H/S1st/Final V 0.439 C 0.335 0.237 0.300 - - - 87.2087.20%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 52


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONE.P.M. Construction 13307Const. of 1 S<strong>to</strong>rey 2 Cl Sch. Bldg. @Luck E/S1st/Final IV-A 0.858 C 0.334 0.300 0.300 - - - 93.4093.40%OutstandingE.S.L. Builders and PartsSupply9014 Const. of MPB @ Brgy. Camilmil Final IV-B 0.668 C 0.345 0.300 0.300 - - - 94.5086.10%V.Satisfac<strong>to</strong>ryE.T. LatawanConstruction13919 Const. of Tigil-Betwagan FMR 1st CAR 4.765 O 0.400 0.300 0.100 0.020 0.020 0.100 94.00 -EA-EC Constuction 15737 Const. of Flood Control 1st/Final V 2.088 C 0.307 0.100 0.300 - - - 70.7070.70%Satisfac<strong>to</strong>ryEastern ConstructionCompany, Inc.2225Completion of MPB @ Cainta GreenPark1st/Final IVA 2.395 C 0.340 0.200 0.300 - - - 84.0084.00%V.Satisfac<strong>to</strong>ryEBJR Construction 19780Const. of Baluan-Mawigui-Allanguigan RoadFinal CAR 1.413 C 0.280 0.300 0.300 - - - 88.0091.18%OutstandingECDA Construction 7013Rehab. of Road Network PoblacionFloridablanca1st/Final III 0.474 C 0.<strong>31</strong>3 0.100 0.300 - - - 71.3071.30%Satisfac<strong>to</strong>ryEcpia<strong>to</strong>s Constructionand Supply<strong>31</strong>540 Const. of Caramcam Bridge 1st XIII 3.693 O 0.320 0.200 0.100 0.030 0.027 0.100 77.70 -Ecpia<strong>to</strong>s Constructionand Supply<strong>31</strong>540 Const. of Caramcam Bridge Final XIII 3.693 C 0.213 0.300 0.300 - - - 81.3076.47%Satisfac<strong>to</strong>ryEd Ting Builders andConstruction SupplyEd Ting Builders andConstruction Supply2619926199Eddie G. Guillen Builders 14174Eddie G. Guillen Builders 14174Const. of San Jose-Tren<strong>to</strong> RoadBoundaryConst. of San Jose-Tren<strong>to</strong> RoadBoundaryConc. Paving of Jct. Dibalio-Calanasan Road, Phase VI, SanAn<strong>to</strong>nio SectionConcreting of Road Leading <strong>to</strong>Cagayan State University2nd XIII 9.180 O 0.361 0.225 0.000 0.020 0.028 0.100 73.40 -Final XIII 9.180 C 0.186 0.300 0.000 - - - 48.60Final II 4.512 C 0.297 0.300 0.300 - - - 89.7065.13%Fair87.66%V.Satisfac<strong>to</strong>ry1st II 2.849 O 0.<strong>31</strong>1 0.293 0.100 0.010 0.033 0.067 81.40 -Eddie G. Guillen Builders 14174Concreting of Road Leading <strong>to</strong>Cagayan State UniversityFinal II 2.849 C 0.321 0.210 0.300 - - - 83.1082.08%V.Satisfac<strong>to</strong>ryEddie G. Guillen Builders 14174 Const. of Tupang River Control 1st II 4.699 O 0.187 0.150 0.100 0.008 0.025 0.133 60.30 -Eddie G. Guillen Builders 14174 Const. of Tupang River Control Final II 4.699 C 0.373 0.300 0.300 - - - 97.3075.10%Satisfac<strong>to</strong>ryEDDMARI Construction &Trading20301Sct. Ranger Housing Project, PhaseIV1st NHA 46.983 O 0.391 0.300 0.100 0.030 0.047 0.100 96.71 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 53


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONEddmari Constructionand Trading20301Asphalting of Arayat-Apalit-Masan<strong>to</strong>l Setback Levee (Candaba-San Luis-Apalit-San Simon-Macabebe & Masan<strong>to</strong>l Section1st/Final III 9.510 C 0.309 0.200 0.300 - - - 80.9080.90%V.Satisfac<strong>to</strong>ryEddmari Constructionand TradingEddmari Constructionand Trading20301 Concreting of Laon FMR 1st/Final IVB 0.239 C 0.444 - 0.500 - - - 94.4020301Concreting of Road, Brgy. Minuyan41st/Final III 0.473 C 0.385 0.300 0.300 - - - 98.5094.40%Outstanding98.50%OutstandingEddmari Constructionand Trading20301Concreting of San Matias Brgy.Road1st/Final III 0.475 C 0.324 0.184 0.300 - - - 80.8080.80%V.Satisfac<strong>to</strong>ryEddmari Constructionand Trading20301Const./Repair/Rehab. of Sta. RitaBrgy. Road1st/Final III 0.381 C 0.258 0.230 0.300 - - - 78.8078.80%Satisfac<strong>to</strong>ryEdelcriz Construction 30864Conc. of Road @ Brgy. SapangPalay, Proper Sitio Lote1st/Final III 0.446 C 0.253 0.300 0.300 - - - 85.3085.30%V.Satisfac<strong>to</strong>ryEdison Lumber andConstruction<strong>31</strong>333Const. of 1-Classroom SchoolBuilding1st/Final I 0.480 C 0.363 0.200 0.300 - - - 86.3086.30%V.Satisfac<strong>to</strong>ryEdward Lui Construction 8459EEI Corporation 333Completion of MPB at Brgy. SawangCaleroNAIA Expressway and its RelatedRoads Project, Phase I, CP-II,Skyway Interchange Ramps 1 & 41st VII 0.959 O 0.383 0.300 0.100 0.030 0.027 0.100 94.00 -3rd URPO 523.999 O 0.<strong>31</strong>9 0.300 0.100 0.030 0.070 0.100 91.90 -EEI Corporation 333NAIA Expressway and its RelatedRoads Project, Phase I, CP-II,Skyway Interchange Ramps 1 & 45th URPO 601.681 O 0.370 0.240 0.100 0.023 0.065 0.100 89.80 -EFC Enterprises 11795Completion of Pieta Bridge alongDasmariñas-Carmona Road1st/Final IVA 11.093 C 0.366 0.200 0.300 - - - 86.6086.60%V.Satisfac<strong>to</strong>ryEFC Enterprises 11795 Conc. of A. P. Reyes Ave. 1st/Final NCR 9.539 C 0.<strong>31</strong>0 0.300 0.300 - - - 91.0091.00%OustandingEFC Enterprises 11795Const. of Las Piñas-Muntinlupa-SanPedro Road (Including DrainageSystem) Phase VIFinal NCR 13.571 C 0.355 0.200 0.300 - - - 85.5089.94%V.Satisfac<strong>to</strong>ryEFC Enterprises 11795 Const. of MPB @ Brgy. San Vicente 1st IVA 1.920 O 0.358 0.240 0.100 0.030 0.027 0.100 85.50 -EFC Enterprises 11795 Maeztranza Linear Park Project 1st PRRC 22.850 O 0.350 0.260 0.100 0.030 0.065 0.100 90.50 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 54


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONEG & I ConstructionCorporationEG & I ConstructionCorporation16225 Const. of Argao River Control 1st/Final VII 0.185 C 0.334 0.300 0.300 - - - 93.4016225EGB Construction 13722EGB Construction 13722Const. of Access Road <strong>to</strong> ROROPort (Phase I)Concrete Paving of Ilagan-DelfinAlbano-Mallig Road, Sta. IsabelNorte SectionConcrete Paving of Ilagan-DelfinAlbano-Mallig Road, Sta. IsabelNorte Section1st/Final VII 4.742 C 0.372 0.300 0.300 - - - 97.2093.40%Outstanding97.20%Outstanding1st II 1.852 O 0.355 0.235 0.100 0.020 0.037 0.100 84.70 -Final II 1.852 O 0.<strong>31</strong>2 0.284 0.300 - - - 89.60 -EGB Construction 13722Const. of School Building (Clustered15 Units) 1-CL@ Bimon<strong>to</strong>n E/S1st II 0.384 O 0.346 0.281 0.100 0.030 0.023 0.100 88.00 -EGB Construction 13722Const. of Various School Bldg., 3CLSch. Bldg. Cabagan Pilot School1st/Final II 0.790 C 0.322 0.200 0.300 - - - 82.2082.20%V.Satisfac<strong>to</strong>ryEJR Builders andConstruction Supply24255Completion of Multi-PurposeBuilding1st I 1.424 O 0.378 0.240 0.100 0.020 0.018 0.100 85.60 -EJR Builders andConstruction Supply24255Completion of Multi-PurposeBuildingFinal I 1.424 C 0.376 0.100 0.300 - - - 77.6083.20%V.Satisfac<strong>to</strong>ryEl Nido Construction &TradingEl Nido Construction &Trading25814 Const. of 1Cl Dumarao BHS 1st IVB 0.378 O 0.286 0.300 0.100 0.020 0.035 0.100 84.10 -25814Repair/Res<strong>to</strong>ration of Tabuan RoadSect. & Inst. of Box Culvert & SlopeProtection1st/Final IVB 6.413 C 0.303 0.300 0.300 - - - 90.3090.30%OutstandingElkan Konstrak &Aggregates26220Const. of Barangay Road, Sogod-S<strong>to</strong>. Domingo1st/Final V 0.458 C 0.281 0.226 0.300 - - - 80.7080.70%V.Satisfac<strong>to</strong>ryElkan Konstrak &Aggregates26220 Const. of Multi-Purpose Building 1st/Final V 0.280 C 0.394 0.200 0.300 - - - 89.4089.40%V.Satisfac<strong>to</strong>ryEMMROS Construction 27065Resurfacing of MWCR, Pagbahan-Talabaan Section, Km.391+134-Km.392+5001st/Final IV-B 0.573 C 0.324 0.300 0.300 - - - 92.4092.40%OutstandingEMQ Designs andConstruction16128Concreting/Improvement of BinocotFMR Bunsuran1st/Final IV-B 0.446 C 0.278 0.284 0.300 - - - 86.2086.20%V.Satisfac<strong>to</strong>ryEMS Sarmien<strong>to</strong>Construction29097ENC Enterprises 29819Impvt. (Conc. Paving) of Danao-Getafe RoadConst. of Multi-Purpose Bldg., Sta.Clara Sur1st VII 9.470 O 0.370 0.300 0.100 0.023 0.045 0.100 93.80 -1st IV-A 0.477 O 0.398 0.300 0.100 0.030 0.011 0.067 90.60 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 55


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONEP ManantanConstruction &Development Corp.6457Conc./Reblocking of Agusan-DavaoRoad1st XI 9.949 O 0.338 0.000 0.100 0.008 0.043 0.100 58.90 -EPN Builders andDevelopers30341Const. of MPB ( Phase I) @ AndresBonifacio1st/Final II 0.566 C 0.360 0.200 0.300 - - - 86.0086.00%V.Satisfac<strong>to</strong>ryEPN Builders andDevelopers30341 Const. of MPB (Community Center) 1st/Final II 0.189 C 0.400 0.200 0.300 - - - 90.0090.00%V.Satisfac<strong>to</strong>ryEPN Builders andDevelopers30341Const. of One Unit ClassroomSchool Building @ San LeonardoE/S1st II 0.416 O 0.369 0.213 0.100 0.015 0.027 0.100 82.40 -EPN Builders andDevelopers30341Const. of One Unit ClassroomSchool Building @ San LeonardoE/SFinal II 0.416 C 0.379 0.228 0.300 - - - 90.7084.89%V.Satisfac<strong>to</strong>ryEPN Builders andDevelopers30341 Const. of School Bldg. at Bannawag 1st/Final II 0.476 C 0.400 0.200 0.300 - - - 90.0090.00%V.Satisfac<strong>to</strong>ryEqui-Parco ConstructionCo.14332Const. of Jagupit Flood Control &Highway Res<strong>to</strong>ration1st XIII 14.<strong>31</strong>7 O 0.398 0.200 0.070 0.030 0.059 0.200 95.70 -Equi-Parco ConstructionCo.14332Const. of Jagupit Flood Control &Highway Res<strong>to</strong>rationFinal XIII 14.<strong>31</strong>7 C 0.325 0.020 0.300 - - - 64.5083.22%V.Satisfac<strong>to</strong>ryEqui-Parco ConstructionCo.14332Const. of Palapay Bridge andApproaches, Gingoog Claveria Road1st X 21.819 O 0.328 0.300 0.100 0.030 0.050 0.100 90.80 -Equi-Parco ConstructionCo.Equi-Parco ConstructionCo.1433214332Impvt. of JSH-Bagontaas-Lurogan-MVC-Lilingayeon Road, MVCSectionRehab. of Puyo River Flood Control(Downstream)1st X 23.709 O 0.274 0.273 0.100 0.030 0.047 0.100 82.40 -1st/Final XIII 14.303 C 0.469 - 0.500 - - - 96.9096.90%OutstandingEqui-Parco ConstructionCompany14332 Const. of Amontay Flood Control 1st XIII 9.<strong>31</strong>7 O 0.398 0.200 0.100 0.030 0.051 0.200 97.90 -Equi-Parco ConstructionCompany14332Improvement of Butuan City-MasaoPort Road2nd XIII 4.674 O 0.386 0.300 0.100 0.030 0.051 0.100 96.70 -Equi-Parco ConstructionCompany14332Improvement of Butuan City-MasaoPort RoadFinal XIII 4.674 C 0.295 0.284 0.300 - - - 87.9093.18%OutstandingEqui-Parco ConstructionCompany14332 Masao Flood Control 1st/Final XIII 14.451 C 0.472 - 0.500 - - - 97.2097.20%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 56


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONEqui-Parco ConstructionCompany14332 Nasipit Port Expansion Project 1st PPA 198.545 O 0.400 0.298 0.100 0.030 0.055 0.100 98.30 -Eric Van P. SesbrenoConstruction26243Const. of Aritao NHS, 2-S<strong>to</strong>rey Bldg.,8-CL School BuildingFinal II 4.817 C 0.363 0.200 0.300 - - - 86.3075.28%Satisfac<strong>to</strong>ryEric Van P. SesbrenoConstruction26243 Const. of MPB at Villaflores 1st/Final II 0.286 C 0.362 0.200 0.300 - - - 86.2086.20%V.Satisfac<strong>to</strong>ryErmy Construction 15741Concreting of Brgy. Road at Brgy.Sindalan City1st/Final III 0.478 C 0.360 0.221 0.300 - - - 88.1088.10%V.Satisfac<strong>to</strong>ryErmy Construction 15741 Impvt./Rehab. of Cabetican Road 1st/Final III 1.906 C 0.291 0.300 0.300 - - - 89.1089.10%V.Satisfac<strong>to</strong>ryESD Cruz Construction &Supply32368Const. of Conc. Drainage @ Brgy.S<strong>to</strong>. Niño1st/Final VIII 0.241 C 0.332 0.200 0.300 - - - 83.2083.20%V.Satisfac<strong>to</strong>ryESEK ConstructionCorporation12871 Completion of Malanday E/S 1st NCR 4.772 O 0.329 0.300 0.100 0.030 0.041 0.100 90.00 -ESR Construction andSupplies10451Concreting of Roads at Brgy.CanicapanFinal X 0.949 C 0.3<strong>31</strong> 0.280 0.300 - - - 91.1088.52%V.Satisfac<strong>to</strong>ryESR Construction andSupplies10451Siloy ARC (Rehab. of Purok 1, 2, 3, 4,5 Circumferntial)1st/Final X 8.341 C 0.329 0.200 0.300 - - - 82.9082.90%V.Satisfac<strong>to</strong>ryETM Construction 16285Conc. of Brgy. Road, Purok 1 Brgy.San Jose1st/Final III 0.437 C 0.363 0.108 0.300 - - - 77.1077.10%Satisfac<strong>to</strong>ryF. Gurrea Construction,Incorporated6995 Const. of Diclum Bridge Final VI 13.665 C 0.387 0.200 0.300 - - - 88.7086.99%V.Satisfac<strong>to</strong>ryF. Gurrea Construction,Incorporated6995 Const. of Pocien<strong>to</strong> Bridge 1st VI 12.459 O 0.393 0.300 0.070 0.030 0.035 0.067 89.50 -F. Gurrea Construction,Incorporated6995 Const. of Pocien<strong>to</strong> Bridge 2nd VI 12.459 O 0.400 0.261 0.030 0.030 0.033 0.067 82.10 -F. Gutierrez Construction 4572F. Vargas Construction 2366Const. of Cagayan de OroConvention and Civic CenterConst. of Permanent Bridge Support& Rehab. of Existing Pony Truss ofMagapit Suspension Bridge1st X 349.995 O 0.333 0.240 0.050 0.030 0.065 0.033 75.10 -1st II 13.307 O 0.338 0.266 0.100 0.030 0.045 0.100 87.90 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 57


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONF. Vargas Construction 2366Const. of Permanent Bridge Support& Rehab. of Existing Pony Truss ofMagapit Suspension Bridge3rd II 13.307 O 0.236 0.240 0.100 0.023 0.050 0.100 74.90 -F. Vargas Construction 2366Const. of Permanent Bridge Support& Rehab. of Existing Pony Truss ofMagapit Suspension BridgeFinal II 13.168 C 0.400 0.200 0.300 - - - 90.0084.18%V.Satisfac<strong>to</strong>ryF.C. MartinezConstruction<strong>31</strong>243Const. of Four (4) Classroom, SanFelipe H/S1st/Final III 1.3<strong>31</strong> C 0.390 0.200 0.300 - - - 89.0089.00%V.Satisfac<strong>to</strong>ryF.F. Cruz and Company,Incorporated123 Const. of Magsaysay Viaduct 3rd CARBDP 427.121 O 0.396 0.300 0.100 0.030 0.070 0.100 99.60 -F.F. Cruz and Company,Incorporated123 Const. of Magsaysay Viaduct 4th CARBDP 468.782 O 0.398 0.300 0.100 0.030 0.070 0.100 99.80 -F.F. Cruz and Company,Incorporated123 Const. of Magsaysay Viaduct 6th CARBDP 468.782 O 0.394 0.300 0.100 0.030 0.070 0.100 99.40 -F.F. Cruz and Company,Incorporated123 Const. of Magsaysay Viaduct 7th CARBDP 468.782 O 0.344 0.300 0.100 0.030 0.070 0.100 94.40 -F.F. Cruz and Company,Incorporated123 Const. of Magsaysay Viaduct 8th CARBDP 511.480 O 0.388 0.300 0.100 0.030 0.060 0.100 97.80 -F.F. Cruz and Company,Incorporated123 San Juan Port Development Project 1st PPA 45.336 O 0.397 0.300 0.000 0.030 0.065 0.033 82.50 -F.F. Galang Construction 26801 Const. of Multi-Purpose Building Final IV-B 0.745 C 0.395 0.206 0.300 - - - 90.1085.34%V.Satisfac<strong>to</strong>ryF.F. Galang Construction 26801Const. of Multi-Purpose Building(Bleacher), Brgy. Punta BajaFinal IV-B 0.279 C 0.328 0.200 0.300 - - - 82.8079.93%Satisfac<strong>to</strong>ryF.F. Rosales Construction 8814 Const. of Eco-Tourism Road 1st IV-A 14.410 O 0.3<strong>31</strong> 0.300 0.100 0.030 0.028 0.100 88.90 -F.F. Rosales Construction 8814 Const. of Eco-Tourism Road 1st IV-A 14.410 O 0.374 0.240 0.100 0.020 0.037 0.100 87.10 -F.L. Reguyal Construction 3<strong>31</strong>5Completion of Along-Along Bridge,Phase IV1st III 2.848 O 0.272 0.300 0.100 0.020 0.050 0.100 84.20 -F.L. Reguyal Construction 3<strong>31</strong>5 Const. of 2-CL @ Eastern Cabu E/S 1st/Final III 0.614 C 0.359 0.300 0.300 - - - 95.9095.90%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 58


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONF.P. De GuzmanConstruction, Inc.10296Concreting of Pathways @ Brgy.391, Brgy. 392, Soler St. & VicinityFinal NCR 3.713 C 0.285 0.200 0.300 78.5074.78%Satisfac<strong>to</strong>ryF.V. Chua Constructionand Supply27267Const. of MP Building at Brgy.Tiaong1st/Final III 0.237 C 0.390 0.138 0.300 - - - 82.8082.80%V.Satisfac<strong>to</strong>ryFairchild Builders &Developers Inc.(Formerly: FairchildMarketing & Const.)10024Concreting of Tabango & LilingBridge ApproachesFinal VIII 4.766 C 0.379 0.300 0.300 - - - 97.9093.64%OutstandingFairchild Builders &Developers, Inc.10024Const. of Tabunok II Bridge @ Brgy.TabunokFinal VIII 4.071 C 0.267 0.300 0.300 - - - 86.7084.24%V.Satisfac<strong>to</strong>ryFatima Builders 27939Const. & Repair of School Building@ Lazi National Agricultural School1st/Final VII 0.944 C 0.374 0.300 0.300 - - - 97.4097.40%OutstandingFatima Builders 27939 Repair/Rehab. of FMR at Pisong A 1st/Final VII 0.463 C 0.328 0.261 0.300 - - - 88.9088.90%V.Satisfac<strong>to</strong>ryFerdstar BuildersContrac<strong>to</strong>rsFerdstar BuildersContrac<strong>to</strong>rsFernz ConstructionCorporationFernz ConstructionCorporation4965Const. Brgy. Roads @ Brgys,Capaya & Pulung Maragul1st/Final III 0.469 C 0.352 0.300 0.300 - - - 95.204965 Const. of Kipot Bridge Final VI 8.141 C 0.346 0.300 0.000 - - - 64.6028238 Const. of Farm <strong>to</strong> Market Road 1st X 2.834 O 0.379 0.300 0.100 0.023 0.059 0.100 96.10 -28238 Const. of Farm <strong>to</strong> Market Road Final X 2.830 C 0.266 0.200 0.300 - - - 76.6095.20%Outstanding73.90%Satisfac<strong>to</strong>ry78.04%Satisfac<strong>to</strong>ryFFJJ Construction 16712Const. of 2-CL School Building @Molopolo Annex1st XI 0.721 O 0.<strong>31</strong>5 0.240 0.100 0.020 0.041 0.100 81.60 -FFJJ Construction 16712Const./Replacement of MalalagBridge1st XI 14.265 O 0.356 0.197 0.100 0.030 0.060 0.100 84.30 -FFJJ Construction 16712 Repair of Jones Timbol CES 1st/Final XI 0.150 C 0.329 0.300 0.300 - - - 92.9092.90%OutstandingFGM Builders Resources& Development Corp.<strong>31</strong>807 Rehab. of MPB at R.O. Quimpo E/S 1st/Final XI 0.465 C 0.287 0.212 0.300 - - - 79.9079.90%Satisfac<strong>to</strong>ryFH Gopiteo Construction& Supply21336Const. of Lined Canal @ Brgy.KalkamFinal XII 0.882 C 0.388 0.300 0.300 - - - 98.8091.48%OutstandingFiat ConstructionServices5463Cluster A-2004: Const. of VariousSchool Building under the 2ndCongressional District of Oriental3rd X 8.449 O 0.381 0.300 0.070 0.030 0.070 0.100 95.10 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 59


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONFiat ConstructionServices5463Cluster A-2004: Const. of VariousSchool Building under the 2ndCongressional District of OrientalFinal X 8.449 C 0.293 0.300 0.000 - - - 59.3065.58%FairFirst NorthwayDevelopment andConstruction Corporation11645 Conc. of Tablac Road 1st/Final I 1.609 C 0.208 0.300 0.300 - - - 80.8080.80%V.Satisfac<strong>to</strong>ryFlordes Construction &Trading16916Conc. of Sta. Trinidad St., OldPanaderos1st/Final NCR 0.945 C 0.351 0.300 0.300 - - - 95.1095.10%OutstandingFlordes Construction &Trading16916Proposed Road Rehab. alongPandacan & Sta. Mesa1st/Final NCR 4.719 C 0.358 0.300 0.300 - - - 95.8095.80%OutstandingFlordes Construction &Trading16916Repair/Rehab. ofRoofing/Renovation of MPB1st/Final NCR 1.420 C 0.337 0.300 0.300 - - - 93.7093.70%OutstandingFlordes Construction &Trading16916Repair/Rehab. ofRoofing/Renovation of Stage andRepair of Toilet @ Pio del Pilar E/S1st/Final NCR 2.150 C 0.386 0.300 0.300 - - - 98.6098.60%OutstandingFlordes Construction &Trading16916Road & Drainage Rehab. @ Brgy.599, Narra St.1st NCR 1.895 O 0.350 0.240 0.100 0.023 0.035 0.100 84.80 -Floriane Construction andSupply12261Const. of FMR at Kitambis-Valdeconcha Road1st/Final X 0.940 C 0.286 0.300 0.300 - - - 88.6088.60%V.Satisfac<strong>to</strong>ryFloriane Construction andSupplyFloriane Construction andSupplyFloriane Construction andSupply122611226112261FNR Construction 7051FNR Construction 7051Foremost Builders 23774Const. of River Control atMambayaan (Phase 2)Rehab. of Buluan-Cagayan de Oro-City-Iligan Road, Lagonglong ByPass RoadRehab. of Butuan-Cagayan de Oro-City-Iligan Road, Lagonglong ByPass RoadRes<strong>to</strong>ration of Multi-PurposeBuildingRes<strong>to</strong>ration of Multi-PurposeBuildingConst. / Rehab. / Replacement /Completion & Repair of Sch. Bldg.@ Ma-a NHS1st X 4.644 O 0.246 0.200 0.100 0.030 0.032 0.200 80.80 -1st X 9.534 O 0.332 0.300 0.100 0.015 0.040 0.100 88.70 -Final X 9.535 C 0.361 0.251 0.300 - - - 91.2082.83%V.Satisfac<strong>to</strong>ry2nd I 5.601 O 0.387 0.300 0.000 0.030 0.035 0.067 81.90 -Final I 5.601 C 0.385 0.100 0.000 - - - 48.501st/Final XI 0.440 C 0.368 0.300 0.300 - - - 96.8055.43%Poor96.80%OustandingFortrica Builders 24220Concreting of FMR @ Brgy.Calingcuan1st/Final III 0.625 C 0.287 0.300 0.300 - - - 88.7088.70%V.Satisfac<strong>to</strong>ryForts<strong>to</strong>ne ConstructionEnterprises<strong>31</strong>668Const. of Multi-Purpose Bldg. AtDPWH-Region XII3rd XII 1.832 O 0.361 0.300 0.100 0.015 0.007 0.067 85.00 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 60


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONFortuna<strong>to</strong> T. Sanchez 407 Asphalt Overlay (Pier <strong>to</strong> City Hall) 1st XIII 4.729 O 0.350 0.200 0.100 0.015 0.028 0.100 79.30 -Fortuna<strong>to</strong> T. Sanchez 407Fortuna<strong>to</strong> T. Sanchez 407Asphalt Overlay along SurigaoWharf RoadAsphalt Overlay along SurigaoWharf Road1st XIII 3.640 O 0.343 0.300 0.100 0.030 0.051 0.100 92.40 -Final XIII 3.640 C 0.323 0.281 0.300 - - - 90.4091.60%OutstandingFour J Construction 15104 Conc. of Road @ So. Nazareneville 1st/Final IV-A 1.918 C 0.297 0.244 0.300 - - - 84.1084.10%V.Satisfac<strong>to</strong>ryFour J Construction 15104 Const. of MPB @ UPS V Area I 1st NCR 0.475 O 0.353 0.200 0.100 0.030 0.047 0.100 83.00 -Four J Construction 15104Const. of Multi-Purpose Building atEmilio Jacin<strong>to</strong> E/SFinal NCR 2.976 C 0.292 0.300 0.300 - - - 89.2083.67%V.Satisfac<strong>to</strong>ryFour J Construction 15104Impvt. of Valenzuela GeneralHospital Bldg.Final NCR 0.937 C 0.372 0.300 0.300 - - - 97.2094.89%OutstandingFour J Construction 15104Repair & Impvt. of McArthurHighwayFinal NCR 9.387 C 0.334 0.300 0.300 - - - 93.4091.72%OutstandingFour Side Constructionand Supply24446Rep./Maint/of Looc Ferrol Road Km.103+500 (Tuburan Sect. Box Culvert)1st/Final IV-B 0.516 C 0.388 0.000 0.300 - - - 68.8068.80%FairFramecon Builders 22482FRD Construction 10227Repair/Impvt. of Mallorca-TabuatingRoadRehab./Impvt. of Laoang-CalomotanRd. (Sta. 793+713 - 796+298)1st III 1.853 O 0.252 0.300 0.100 0.015 0.026 0.100 79.30 -1st VIII 9.<strong>31</strong>4 O 0.351 0.300 0.070 0.020 0.033 0.067 84.10 -Full Blast Trading andConstruction29548Const./Rehab. of Multi-PurposeBuilding @ Brgy. Poblacion1st/Final III 0.944 C 0.397 0.300 0.300 - - - 99.7099.70%OutstandingFullido's Constructionand Enterprises20347 Const. of CVSCAFT School Building 1st VII 0.928 O 0.392 0.240 0.100 0.020 0.023 0.100 87.50 -Fullido's Constructionand Enterprises20347 Const. of CVSCAFT School Building Final VII 0.929 C 0.388 0.100 0.300 - - - 78.8084.89%V.Satisfac<strong>to</strong>ryG & P Builders,Incorporated3960Const. of CDO 3rd Bridge & AccessRoad Phase I, Kauswagan2nd X 35.266 O 0.289 0.199 0.100 0.015 0.048 0.100 75.10 -G. Uymatiao Jr.ConstructionG.C.I. Construction 11346G.C.I. Construction 113466663 Conc. of Brgy. Daro Road 1st VII 0.474 O 0.288 0.300 0.100 0.030 0.056 0.100 87.40 -Conc. of Brgy. Bagadion Danawan-San Vicente FMRConcreting of Tierra Nevada-LupiRoadFinal V 2.852 C 0.250 0.300 0.300 - - - 85.00Final V 0.955 C 0.292 0.100 0.300 - - - 69.2073.30%Satisfac<strong>to</strong>ry75.68%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 61


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONG.C.I. Construction 11346 Const. of MPB (Executive Building) 1st/Final V 2.837 C 0.390 0.200 0.300 - - - 89.0089.00%V.Satisfac<strong>to</strong>ryG.C.I. Construction 11346Const./Road Opening of San Vicente-Gutan-Luban-Aguib Road (P III)1st II 28.102 O 0.218 0.000 0.100 0.010 0.023 0.067 41.80 -G.C.I. Construction 11346Rehab./Impvt. of Nabua-BalatanRoad Cabanban Section1st/Final V 0.468 C 0.305 0.200 0.300 - - - 80.5080.50%V.Satisfac<strong>to</strong>ryG.C.I. Construction 11346G.C.I. Construction 11346Repair/Rehab. of National Road, SanAndres-Caramoan SectionRepair/Rehab. of National Road, SanAndres-Caramoan Section1st V 28.326 O 0.400 0.300 0.100 0.020 0.025 0.100 94.50 -Final V 28.326 C 0.346 0.300 0.300 - - - 94.6091.72%OutstandingG.F. Falcis Construction& Supply26147 Const. of Multi-Purpose Building 1st VI 3.850 O 0.225 0.240 0.100 0.023 0.013 0.100 70.10 -G.F. Falcis Construction& Supply26147 Const. of Multi-Purpose Building 2nd VI 3.848 O 0.348 0.170 0.100 0.030 0.035 0.100 78.30 -G.F. RoveroMerchandising27268Const./Impvt. of Multi PurposePavement @ Poblacion1st VI 4.817 O 0.399 0.196 0.100 0.030 0.023 0.100 84.80 -G.F. RoveroMerchandising27268Const./Impvt. of Multi PurposePavement @ PoblacionFinal VI 4.817 C 0.232 0.200 0.300 - - - 73.2080.16%V.Satisfac<strong>to</strong>ryG.F. RoveroMerchandising27268G.G. Uy Construction 32<strong>31</strong>9G.O. Marron GeneralContrac<strong>to</strong>rG.O. Marron GeneralContrac<strong>to</strong>rG.O. Marron GeneralContrac<strong>to</strong>rG.O. Marron GeneralContrac<strong>to</strong>r68446844Rehab. of New Buswang Prov'l.Road at New BuswangRehabilitation of Main Canal (Sta.13+150-Sta. 16+600Conc. Paving of Sitio NagbayuganFeeder RoadConst. of Multi-Purpose Bulding atBacsil1st/Final VI 0.988 C 0.<strong>31</strong>6 0.300 0.300 - - - 91.60FinalNIARegion I91.60%Outstanding12.410 C 0.250 0.300 0.300 - - - 85.00 84.84%1st I 1.881 O 0.236 0.225 0.100 0.000 0.005 0.000 56.60 -1st I 0.936 O 0.367 0.221 0.100 0.030 0.047 0.067 83.20 -6844 Const./Rehab. of MPB 2nd I 4.674 O 0.265 0.234 0.100 0.015 0.020 0.100 73.40 -6844 Const./Rehab. of MPB 3rd I 4.674 O 0.307 0.257 0.100 0.008 0.006 0.000 67.80 -Gacutan Construction 10789 Alibadabad CPIP FinalNIARegion II2.560 C 0.272 0.159 0.300 - - - 73.10 73.10%Galeno Construction, Inc. 3427 Const. of Magballo Bridge (Phase I) Final VI 7.547 T 0.333 0.300 0.000 - - - 63.3069.24%FairGaleno Construction, Inc. 3427 Const. of Maytubig Bridge, Phase II 2nd VI 6.838 O 0.237 0.203 0.000 0.008 0.000 0.000 44.80 -Galeno Construction, Inc. 3427 Const. of Maytubig Bridge, Phase II Final VI 6.838 C 0.259 0.256 0.000 - - - 51.5058.58%Poor<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 62


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONGampik Construction &Development Inc.8019Asphalt Overlay along Carmen-Patag-Bulua Road1st/Final X 14.462 C 0.259 0.286 0.300 - - - 84.5084.50%V.Satisfac<strong>to</strong>ryGampik Construction &Development Inc.8019Concreting of Babak-Samal-Kaputian Road, IGACOS, IslandGarden City of Samal1st XI 9.394 O 0.228 0.240 0.100 0.010 0.035 0.100 71.30 -Gampik Construction &Development Inc.8019Const. of Babak-Samal-KaputianRoad, IGACOS, Island Garden Cityof SamalFinal XI 9.392 C 0.350 0.300 0.300 - - - 95.0085.34%V.Satisfac<strong>to</strong>ryGampik Construction &Development Inc.8019Impvt./Rehab of Marbel-Allah-Valley-Cotaba<strong>to</strong> Road, Ampatuan-TalayanSectionFinal XII 14.372 C 0.371 0.300 0.300 - - - 97.1092.78%OutstandingGampik Construction &Development Inc.8019Impv't./Rehab./Asphalt Overlay ofInitao-Naawan Road Sect.1st X 14.462 O 0.343 0.200 0.100 0.008 0.038 0.100 78.90 -Gampik Construction &Development Inc.8019Impv't./Rehab./Asphalt Overlay ofInitao-Naawan Road Sect.2nd X 14.462 O 0.349 0.251 0.000 0.030 0.047 0.000 67.70 -Gampik Construction &Development Inc.8019Provision of Slope Protection @Sinuda Slip and Repair ofBituminous PavementFinal X 2.027 C 0.377 0.300 0.300 - - - 97.7078.53%Satisfac<strong>to</strong>ryGampik Construction &Development Inc.8019 Rehab. of Agusan-Davao Road Final XI 14.130 C 0.343 0.272 0.300 - - - 91.5084.27%V.Satisfac<strong>to</strong>ryGarnic Construction 22861Package 3: Const. of MP Building(2nd Floor Only) @ Brgy. Bulac1st/Final III 0.756 C 0.359 0.253 0.300 - - - 91.2091.20%OutstandingGawana<strong>to</strong> Construction 28687 Const. of Line Canal @ Talaga 1st/Final IV-A 0.191 C 0.371 0.200 0.300 - - - 87.1087.10%V.Satisfac<strong>to</strong>ryGCI Construction 11346Concreting of Tierra Nevada-LupiRoadGCI Construction 11346 Repair/Rehab of LCPIS 1stGCI Construction 11346 Repair/Rehab of LCPIS 1st1st V 0.955 O 0.300 0.250 0.100 0.015 0.035 0.100 80.00 -NIARegion VNIARegion V11.652 C 0.380 0.120 0.000 0.006 0.023 0.200 72.9011.652 O 0.380 0.120 0.000 0.006 0.023 0.200 72.90GCMG Construction 9743 Completion of Sagay Public Market Final X 1.845 C 0.375 0.300 0.300 - - - 97.5072.90%Satisfac<strong>to</strong>ry72.90%Satisfac<strong>to</strong>ry90.85%OutstandingGCMG Construction 9743 Const./Conc. of Manduao Road 1st X 0.930 O 0.322 0.191 0.100 0.008 0.038 0.100 75.90 -GCMG Construction 9743 Const./Conc. of Manduao Road Final X 0.930 C 0.334 0.200 0.300 - - - 83.4078.90%Satisfac<strong>to</strong>ryG-Cube Construction 17219Concrete Reblocking of Del MonteAvenue, Quezon City1st/Final NCR 4.891 C 0.294 0.300 0.300 - - - 89.4089.40%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 63


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONGED Construction 13614 Const. of Road @ San An<strong>to</strong>nio 1st/Final I 0.475 C 0.276 0.300 0.300 - - - 87.6087.60%V.Satisfac<strong>to</strong>ryGeety Realty & Dev.Corporation30447Asphalt Overlay of Imus Road(Sta.1+606 - Sta.2+523 w/ exception)1st/Final VII 9.647 C 0.330 0.250 0.300 - - - 88.0088.00%V.Satisfac<strong>to</strong>ryGeety Realty &Development Corporation30447 Rehabilitation of Canlumampao 1stNIARegion VII9.598 O 0.333 0.300 0.070 0.030 0.033 0.100 86.60 -Gemma ConstructionSupply5044Cluster I - Const. of Various SchoolBldg., Project CY 2003 Oringo E/S,Brgy. Dadiagas HeightsFinal XII 0.686 C 0.361 0.254 0.300 - - - 91.5087.51%V.Satisfac<strong>to</strong>ryGemma ConstructionSupply5044 Const. of Bridge 1st XII 3.687 O 0.360 0.239 0.100 0.030 0.023 0.100 85.20 -Gemma ConstructionSupply5044Const. of Multi-Purpose Building @Purok Marcos, Sta. Cruz Tampakanrealigned <strong>to</strong> Const. of Multi-PurposeBuilding1st XII 0.903 O 0.397 0.300 0.100 0.030 0.018 0.100 94.50 -Geneson Construction &Supply13728Rehab. w/ Asphalt Overlay, Crack &Joint Sealing @ Onyx St.1st/Final NCR 1.887 C 0.366 0.300 0.300 - - - 96.6096.60%OutstandingGenetian Builders 18052Const. of 1 Cl Sch. Bldg. @ PioneerNHS San Pedro Annex1st/Final IX 0.500 C 0.178 0.138 0.300 - - - 61.6061.60%FairGeovan Marketing 10824 Const. of Agbalili River Control Final VI 4.815 C 0.277 0.300 0.300 - - - 87.7083.38%V.Satisfac<strong>to</strong>ryGerezsons ResourcesCorporationGerezsons ResourcesCorporationGershli Construction &Supply20699 Const. of Drainage Canal @ Pob. 1 1st/Final VIII 0.275 C 0.336 0.200 0.300 - - - 83.6020699 Const. of Inopacan Seawall 1st/Final VIII 9.297 C 0.133 0.300 0.300 - - - 73.3028480 Conc. of Road @ Brgy. Sico 1st/Final IV-A 0.189 C 0.373 0.200 0.300 - - - 87.3083.60%V.Satisfac<strong>to</strong>ry73.30%Satisfac<strong>to</strong>ry87.30%V.Satisfac<strong>to</strong>ryGershli Construction andSupply28480Const. of Multi-Purpose Bldg., @(Talipapa) Brgy. 2-A1st/Final IV-A 0.478 C 0.379 0.200 0.300 - - - 87.9087.90%V.Satisfac<strong>to</strong>ryGershli Construction andSupply28480Const. of Reinforced Concrete BoxCulvert1st/Final IV-A 0.191 C 0.367 0.200 0.300 - - - 86.7086.70%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 64


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONGe<strong>to</strong> Construction 17689 Concreting of Interior Roads 1st/Final IV-A 1.910 C 0.398 0.200 0.300 - - - 89.8089.80%V.Satisfac<strong>to</strong>ryGicar Construction 12624Gicar Construction 12624Gicar Construction 12624Const. of Kag-ayongan Bridge andApproaches Phase IConst. of Kag-ayongan Bridge andApproaches Phase IImpvt./Conc. of Lantay-Maraboc-Pangantucan Road1st XIII 10.274 O 0.334 0.300 0.100 0.030 0.043 0.100 90.70 -2nd XIII 10.274 O 0.346 0.200 0.100 0.030 0.040 0.100 81.60 -2nd X 14.005 O 0.302 0.236 0.070 0.023 0.047 0.067 74.50 -Gicar Construction 12624 Replacement of San Isidro Bridge 1st XIII 14.151 O 0.370 0.123 0.100 0.030 0.048 0.100 77.10 -Gind Construction andEnterprises18679Repair of Multi-Purpose Building @Poblacion EsteFinal I 0.567 C 0.363 0.200 0.300 - - - 86.3087.56%V.Satisfac<strong>to</strong>ryGiovanni Construction 12168Conc. of Jct. Agusan-Misamis Nat'lHighway1st XIII 9.193 O 0.353 0.300 0.100 0.030 0.019 0.100 90.20 -Giovanni Construction 12168Conc. of Jct. Agusan-Misamis Nat'lHighwayFinal XIII 9.193 C 0.354 0.200 0.300 - - - 85.4088.28%V.Satisfac<strong>to</strong>ryGJD Construction &Supply25866Const. of 2 CL Sch. Bldg. @ TitayNHS Malagandis Annex1st IX 0.871 O 0.264 0.110 0.100 0.015 0.026 0.100 61.50 -GJE Builders 18286 Conc. of FMR @ Brgy. Bawa 1st/Final III 0.614 C 0.250 0.200 0.300 - - - 75.00GLCT Construction 30657Completion/Continuation ofUnfinished Matain Bridge alongOlongapo-Bugallon RoadFinal III 5.519 C 0.328 0.149 0.300 - - - 77.70GLCT Construction 30657 Rehab./Impvt. of Bangal Bridge 1st III 13.950 O 0.320 0.257 0.070 0.022 0.028 0.067 76.40 -Global V Builders / HITRIConstruction joint venture29763GNE Construction 21764Goldbern Construction 28509Goldfin Construction 21343Gonzalo Construction 1826Good FortuneInternational, Inc.9246Boracay EnvironmentalInfrastucture Project DrainageSystemConc. of Liloy-Labason Road(Osukan Sect.) Realigned <strong>to</strong>Labason-Gutalac, Zamboanga delNorteRepair / Rehabilitation of Buildings 9& 10 @ Bagong LipunanCondominium (BLC)Completion of Multi-PurposeBuildingReplacement/ Const. of Man-asokBridge & ApproachesConst. of Arevalo-Sooc Bridge &ApproachesPTARegion VI75.00%Satisfac<strong>to</strong>ry78.66%Satisfac<strong>to</strong>ry94.176 Suspended 0.366 0.300 0.000 0.024 0.047 0.101 83.80 -Final IX 4.6<strong>31</strong> C 0.395 0.291 0.300 - - - 98.601st / Final NCR 1.690 C 0.393 0.300 0.300 99.3094.22%Outstanding99.30%Outstanding1st VII 1.324 O 0.255 0.251 0.100 0.022 0.019 0.100 74.70 -1st CAR 9.305 O 0.324 0.300 0.100 0.030 0.045 0.100 89.90 -1st VI 7.237 O 0.306 0.300 0.100 0.030 0.037 0.100 87.30 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 65


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONGood FortuneInternational, Inc.9246Improvement of Mandurriao-SanMiguel-Alimodin-Maasim Road1st VI 11.564 O 0.<strong>31</strong>3 0.2<strong>31</strong> 0.050 0.023 0.035 0.067 71.90 -Good FortuneInternational, Inc.9246Improvement of Mandurriao-SanMiguel-Alimodin-Maasin Road2nd VI 11.564 O 0.304 0.237 0.100 0.030 0.028 0.100 79.90 -Good FortuneInternational,IncorporatedGood FortuneInternational,IncorporatedGood FortuneInternational,Incorporated9246Const. of Arevalo-Sooc Bridge &ApproachesFinal VI 7.237 C 0.281 0.300 0.300 - - - 88.109246 Const. of Odol Bridge 1st VI 12.222 O 0.400 0.248 0.070 0.030 0.035 0.067 85.00 -9246 Const. of Odol Bridge 2nd VI 12.222 O 0.400 0.281 0.050 0.030 0.028 0.067 85.60 -87.62%V.Satisfac<strong>to</strong>ryGood Medal Constructionand Supplies19309Const. of Drainage System @ SanIsidro1st/Final V 0.143 C 0.200 0.300 0.300 - - - 80.0080.00%Satisfac<strong>to</strong>ryGowil Builders 18733Repair/Rehab. of Roads at N.Bacalso Ave.1st/Final VII 4.795 C 0.276 0.300 0.300 - - - 87.6087.60%V.Satisfac<strong>to</strong>ryGPJ Construction 10613 Conc. of Makati Ave. (Phase III) 1st/Final NCR 0.712 C 0.398 0.300 0.300 - - - 99.8099.80%OutstandingGrace ConstructionCorporation3771Completion of Tagoloan ParallelBridge & Approaches along Butuan-Cagyan de Oro-Iligan Road (SA #3)1st X 54.184 O 0.396 0.300 0.100 0.030 0.055 0.100 98.10 -Grace ConstructionCorporation3771Conc. of Oroqiueta-Calamba Mt.Road2nd X 2.863 O 0.352 0.300 0.100 0.023 0.045 0.100 92.00 -Grace ConstructionCorporation3771Conc. of Oroqiueta-Calamba Mt.RoadFinal X 2.863 C 0.294 0.300 0.300 - - - 89.4085.02%V.Satisfac<strong>to</strong>ryGrace ConstructionCorporation3771Const. of 108 m Steel Truss Bridgewith one Pier Steel Components1st IX 62.851 O 0.3<strong>31</strong> 0.291 0.100 0.022 0.033 0.100 87.70 -Grace ConstructionCorporation3771Const. of Cagayan de Oro City 3rdBridge & Approaches Phase VFinal X 16.854 C 0.395 0.300 0.300 - - - 99.5086.56%V.Satisfac<strong>to</strong>ryGrace ConstructionCorporation3771Const. of Kipit II Bridge andApproaches3rd IX 69.136 O 0.338 0.300 0.100 0.030 0.043 0.067 87.80 -Grace ConstructionCorporation3771Const. of Kipit II Bridge andApproaches5th IX 69.136 O 0.293 0.193 0.100 0.024 0.037 0.100 74.70 -Grace ConstructionCorporation3771Const. of Kipit II Bridge andApproaches6th IX 69.136 O 0.284 0.293 0.000 0.030 0.042 0.100 74.90 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 66


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONGrace ConstructionCorporation3771Const./Impv't. (PCCP) of CP-D: Sect.A-Monte Alegre Jct.-Aurora RoadSect. B-Monte Alegre Jct.-MolaveRoad4th KFAED <strong>31</strong>0.371 O 0.361 0.283 0.050 0.030 0.047 0.067 83.80 -Grace ConstructionCorporation3771Const./Impv't. (PCCP) of CP-D: Sect.A-Monte Alegre Jct.-Aurora RoadSect. B-Monte Alegre Jct.-MolaveRoadFinal KFAED <strong>31</strong>0.371 C 0.378 0.300 0.000 - - - 67.8081.29%V.Satisfac<strong>to</strong>ryGrace ConstructionCorporation3771Maint./Rehab. & Imp. of NationalArterial & Secondary Rd., Oroquieta-Plaridel-Calamba-Sapang Dalaga Rd.Final X 4.780 C 0.301 0.300 0.300 - - - 90.1088.54%V.Satisfac<strong>to</strong>ryGrace ConstructionCorporation/UlticonBuilders, Inc. (JV)JV-05-061Reconst. of Padada Bridge alongDigos-Makar Road inc. Const. ofBypass Bridge and Approaches1st XI 226.982 O 0.354 0.300 0.050 0.030 0.060 0.067 86.10 -Graia Const. & Supply(Formerly: Graia Const. &SuppliesGranby Trading &Construction3082627554Impvt./Rehab. of Mc-DonaldJunction-Aguinaldo via Talaba Road 1st/Final IV-A 14.449 C 0.344 0.300 0.300 - - - 94.40 94.40%OutstandingConcreting of Brgy. Road @ Brgy.Sabang1st IV-A 1.917 O 0.<strong>31</strong>5 0.300 0.100 0.020 0.014 0.100 84.90 -Granby Trading &Construction27554Concreting of Brgy. Road @ Brgy.SabangFinal IV-A 1.917 C 0.386 0.200 0.300 - - - 88.6088.55%V.Satisfac<strong>to</strong>ryGranby Trading &Construction27554 Const. of Malvar Public Market Final IV-A 3.855 C 0.347 0.200 0.300 - - - 84.7088.55%V.Satisfac<strong>to</strong>ryGrand Tower EngineeringTechnology<strong>31</strong>946Const. of Library & Multi-PurposeHE Type Building (P-I) BNHS AnnexFinal X 0.471 C 0.343 0.300 0.300 - - - 94.3083.59%V.Satisfac<strong>to</strong>ryGrand Tower EngineeringTechnology<strong>31</strong>946 Const. of MPB @ Nabag-o Final X 0.471 C 0.346 0.300 0.300 - - - 94.6066.46%FairGreen HorizonsLandscapers andDevelopers, Inc.Green HorizonsLandscapers andDevelopers, Inc.Green HorizonsLandscapers andDevelopers, Inc.1880218802Conc. of Calapan South Road(Conc./Impvt. of Pasi II & HappyValley Section)Conc. of Calapan South Road(Conc./Impvt. of Pasi II & HappyValley Section)1st IVB 28.906 O 0.334 0.235 0.100 0.030 0.054 0.100 85.30 -Final IVB 28.906 C 0.205 0.287 0.300 - - - 79.2018802 Const. of MPB @ Sitio IV Agua 1st IVB 1.899 O 0.360 0.241 0.100 0.030 0.053 0.100 88.40 -82.86%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 67


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONGuinsalinan Construction& Concrete AggregatesSupplies28965 Completion of Baywalk 1st XIII 1.913 O 0.271 0.300 0.100 0.030 0.070 0.067 83.80 -GVN Builders 29577 Rehab. of MPB @ Cupang West 1st/Final III 1.410 C 0.320 0.153 0.300 - - - 77.3077.30%Satisfac<strong>to</strong>ryH R B Construction 10528Const./Impvt. of Multi-Purpose Bldg.@ Gubat1st/Final V 0.141 C 0.373 0.200 0.300 - - - 87.3087.30%V.Satisfac<strong>to</strong>ryH.G. Lopez Construction 17691Const. of Multi-Purpose Building(Phse II) Town ProperFinal I 2.817 C 0.396 0.300 0.300 - - - 99.6086.86%V.Satisfac<strong>to</strong>ryH.L.J. Construction &Enterprises18080Conc. of Iloilo-Capiz Road (NewRoute)1st VI 16.538 O 0.371 0.245 0.100 0.030 0.055 0.100 90.10 -H.L.J. Construction &Enterprises18080Concrete Paving of Brgy. Carol-an-Ayungon Farm-<strong>to</strong>-Market RoadFinal VI 1.518 C 0.228 0.200 0.300 - - - 72.8077.12%Satisfac<strong>to</strong>ryH.L.J. Construction &Enterprises18080Const. of 1 CL @ @ Hermenegilda F.Gloria Memorial H/S1st VII 0.414 O 0.397 0.240 0.100 0.030 0.039 0.100 90.60 -H.L.J. Construction &Enterprises18080Const. of 1 CL @ @ Hermenegilda F.Gloria Memorial H/SFinal VII 0.432 C 0.301 0.300 0.300 - - - 90.1090.45%OutstandingH.L.J. Construction &EnterprisesH.L.J. Construction &EnterprisesH.L.J. Construction &EnterprisesH.P.L. GeneralConstruction18080Const. of 1 Unit 1 CL School Bldg. @Daan Banua E/SFinal VI 0.378 C 0.380 0.245 0.300 - - - 92.5018080 Const. of Naiba-Maningcao Road 1st VII 0.940 O 0.308 0.234 0.100 0.008 0.025 0.100 77.50 -18080 Const. of Pedestrian Overpass Final VII 4.522 C 0.398 0.300 0.300 - - - 99.8022289Concreting of Various Municipal andBarangya Roads91.59%Outstanding94.25%Outstanding1st II 1.708 O 0.329 0.240 0.100 0.022 0.030 0.100 82.10 -Haidee Construction andDevelopment Corporation10365Completion of Friendship Bridge &Approaches, Phase V1st III 23.917 O 0.303 0.300 0.100 0.030 0.040 0.100 87.30 -Haidee Construction andDevelopment Corporation10365Const. of Friendship Bridge &Approaches, Phase III1st III 23.478 O 0.274 0.204 0.100 0.030 0.054 0.100 76.20 -Halrey Construction, Inc. 2267Halrey Construction, Inc. 2267GeometricImprovement/Rehab./Reblocking ofPortions of EDSA Q.C.Rehab. (Concrete Blocking) of EDSAfrom Quezon Ave. <strong>to</strong> Annapolis(South Bound)1st/Final NCR 9.530 C 0.347 0.300 0.300 - - - 94.7094.70%Outstanding1st NCR 9.554 O 0.360 0.300 0.100 0.030 0.070 0.100 96.00 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 68


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.Halrey Construction, Inc. 2267Hanjin Heavy Industries &Const. Co. Ltd.FC-98-329PROJECT NAMERehab. (Concrete Blocking) of EDSAfrom Quezon Ave. <strong>to</strong> Annapolis(South Bound)Const./Impv't. (PCCP) of C.P.A. Sect.A-Tukuran Rd., Doblis<strong>to</strong>n Jct. &Sect. B-Kapatagan-Doblis<strong>to</strong>n Jct.RoadNO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFinal NCR 9.554 C 0.382 0.300 0.300 - - - 98.20Final KFAED 633.001 C 0.304 0.300 0.300 - - - 90.40FINAL RATING/QUALITATIVEDESCRIPTION96.88%Outstanding89.65%V.Satisfac<strong>to</strong>ryHanjin Heavy Industries &Const. Co. Ltd.SL2-SN- IFCP Phase II, Package I, Const. of00646/FC- Jaro Floodway & Impvt. of Tigum &03-010 Aganan River2nd MFCP I 1,194.106 O 0.391 0.200 0.100 0.030 0.055 0.200 97.60 -Hanjin Heavy Industries &Construction Co. Ltd.Hanjin Heavy Industries &Construction Co. Ltd.SL2-SN-000445SL2-SN-000445Bohol Cicumferential Road Impv't.Project CP-1, Valencia-Tagbilaran-Calape SectionBohol Circumferential Road Impv't.Project Phase 2, CP-1, Valencia-Tagbilaran-Calape Section7th PJHL 1,000.084 O 0.381 0.300 0.100 0.030 0.070 0.100 98.10 -4th PJHL 784.924 O 0.385 0.300 0.100 0.030 0.070 0.100 98.50 -Hanjin Heavy Industries &Construction Co. Ltd.SL2-SN-000445Bohol Circumferential Road Impv't.Project Phase 2, CP-1, Valencia-Tagbilaran-Calape Section6th PJHL 1,000.084 O 0.385 0.300 0.100 0.030 0.070 0.100 98.50 -Hanjin Heavy Industries &Construction Co. Ltd.FC-98-216CP MN-A: Iligan-Aurora Road 6thRoad ProjectFinal ADB 714.824 C 0.385 0.300 0.300 - - - 98.5096.85%OutstandingHanjin Heavy Industries &Construction Co. Ltd.FC-98-329CP-A Section A: Const./Impv't. ofTukuran-Doblis<strong>to</strong>n Road4th KFAED 577.304 O 0.368 0.297 0.050 0.030 0.042 0.100 88.70 -Hanjin Heavy Industries &Construction Co. Ltd.FC-98-329CP-A Section A: Const./Impv't. ofTukuran-Doblis<strong>to</strong>n Road5th KFAED 577.304 O 0.330 0.300 0.100 0.030 0.054 0.100 91.40 -Hanjin Heavy Industries &Construction Co. Ltd.SL2-SN-00556CP-III, Reconst. of Four (4) Bridgesalong Arterial Roads Project, PhaseIV (Baroro Bridge)1st PJHL 128.692 O 0.363 0.300 0.070 0.030 0.050 0.067 88.00 -Hanjin/ Kurimo<strong>to</strong> JVSL2-SN-000452Bohol Irrigation Project Stage 2 2nd NIA 1,561.393 O 0.356 0.200 0.100 0.030 0.054 0.200 94.00 -Hazama/ Taisei/ NipponSteel HTN JVFC-04-025Subic-Clark-Tarlac ExpresswayProject-Package 210thBCDARegion III9,097.880 O 0.352 0.300 0.070 0.024 0.047 0.033 82.58 -Hazama/ Taisei/ NipponSteel HTN JVFC-04-025Subic-Clark-Tarlac ExpresswayProject-Package 211thBCDARegion III9,097.880 O 0.357 0.300 0.070 0.030 0.042 0.000 79.90 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 69


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONHazama/ Taisei/ NipponSteel HTN JVFC-04-025Subic-Clark-Tarlac ExpresswayProject-Package 212thBCDARegion III9,097.880 O 0.350 0.293 0.050 0.024 0.047 0.067 83.07 -Hazama/ Taisei/ NipponSteel HTN JVFC-04-025Subic-Clark-Tarlac ExpresswayProject-Package 213thBCDARegion III9,097.880 O 0.354 0.300 0.070 0.030 0.060 0.033 84.70 -Hazama/ Taisei/ NipponSteel HTN JVFC-04-025Subic-Clark-Tarlac ExpresswayProject-Package 21stBCDARegion III9,097.880 O 0.385 0.289 0.070 0.018 0.051 0.067 88.08 -Hazama/ Taisei/ NipponSteel HTN JVFC-04-025Subic-Clark-Tarlac ExpresswayProject-Package 22ndBCDARegion III9,097.880 O 0.373 0.275 0.070 0.030 0.047 0.033 82.79 -Hazama/ Taisei/ NipponSteel HTN JVFC-04-025Subic-Clark-Tarlac ExpresswayProject-Package 23rdBCDARegion III9,097.880 O 0.374 0.279 0.070 0.030 0.056 0.033 84.15 -Hazama/ Taisei/ NipponSteel HTN JVFC-04-025Subic-Clark-Tarlac ExpresswayProject-Package 24thBCDARegion III9,097.880 O 0.378 0.298 0.050 0.030 0.047 0.033 83.62 -Hazama/ Taisei/ NipponSteel HTN JVFC-04-025Subic-Clark-Tarlac ExpresswayProject-Package 25thBCDARegion III9,097.880 O 0.365 0.296 0.050 0.012 0.051 0.033 80.69 -Hazama/ Taisei/ NipponSteel HTN JVFC-04-025Subic-Clark-Tarlac ExpresswayProject-Package 214thBCDARegion III9,097.880 O 0.335 0.295 0.070 0.030 0.051 0.033 81.49 -Hazama/ Taisei/ NipponSteel HTN JVFC-04-025Subic-Clark-Tarlac ExpresswayProject-Package 26thBCDARegion III9,097.880 O 0.362 0.299 0.050 0.023 0.056 0.067 85.58 -Hazama/ Taisei/ NipponSteel HTN JVFC-04-025Subic-Clark-Tarlac ExpresswayProject-Package 27thBCDARegion III9,097.880 O 0.362 0.295 0.050 0.030 0.047 0.033 81.69 -Hazama/ Taisei/ NipponSteel HTN JVFC-04-025Subic-Clark-Tarlac ExpresswayProject-Package 28thBCDARegion III9,097.880 O 0.389 0.299 0.070 0.030 0.042 0.033 86.40 -Hazama/ Taisei/ NipponSteel HTN JVFC-04-025Subic-Clark-Tarlac ExpresswayProject-Package 29thBCDARegion III9,097.880 O 0.378 0.293 0.070 0.024 0.042 0.067 87.41 -HCM ConstructionCorporation19382Const. of Las Piñas-Muntinlupa-SanPedro Link Road1st/Final NCR 9.519 C 0.369 0.300 0.300 - - - 96.9096.90%OutstandingHCM ConstructionCorporationHCM ConstructionCorporation19382 Const. of Road/Bridge 2nd NCR 14.374 O 0.374 0.300 0.100 0.022 0.063 0.100 95.90 -19382 Const. of Road/Bridge 3rd NCR 14.374 O 0.384 0.300 0.100 0.030 0.051 0.100 96.50 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 70


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONHCM ConstructionCorporation19382Slope Protection of Creek @ Brgy.Pulang Lupa & Manuyo1st NCR 9.600 O 0.337 0.200 0.100 0.030 0.063 0.200 93.00 -HCM ConstructionCorporation19382Slope Protection of Creek @ Brgy.Pulang Lupa & ManuyoFinal NCR 9.600 C 0.376 0.300 0.300 - - - 97.6094.84%OutstandingHG III Construction andDev't Corp.84<strong>31</strong>Sct. Ranger Housing Project, PhaseIII1st NHA 49.688 O 0.395 0.300 0.100 0.030 0.047 0.100 97.19 -HGG Builders and Supply 17824 Const. of Multi-Purpose Building Final V 1.929 C 0.400 0.249 0.300 - - - 94.9089.93%V.Satisfac<strong>to</strong>ryHibiscus Trading andConstruction Services28280Completion of Pedestrian OverpassAcross Commonwealth Ave.1st NCR 1.873 O 0.340 0.250 0.100 0.030 0.035 0.100 85.50 -Hibiscus Trading andConstruction Services28280Completion of Pedestrian OverpassAcross Commonwealth Ave.Final NCR 1.873 C 0.267 0.300 0.300 - - - 86.7085.98%V.Satisfac<strong>to</strong>ryHibiscus Trading andConstruction Services28280Package 8: a)Renovation/Improvement of Multi-Purpose Bldg. Brgy. Socorro: b)Completion of Multi-Purpose Bldg.Brgy. Masagana1st NCR 1.590 O 0.368 0.245 0.100 0.023 0.029 0.100 86.50 -Hibiscus Trading andConstruction Services28280Package 8: a)Renovation/Improvement of Multi-Purpose Bldg. Brgy. Socorro: b)Completion of Multi-Purpose Bldg.Brgy. MasaganaFinal NCR 1.590 C 0.282 0.277 0.300 - - - 85.9086.32%V.Satisfac<strong>to</strong>ryHibiscus Trading andConstruction Services28280Repair/Rehab. of Multi-PurposeBuildingFinal NCR 2.687 C 0.294 0.300 0.300 - - - 89.4088.14%V.Satisfac<strong>to</strong>ryHi-point ConstructionCorporation30744 Rehab./Conc. of Roads 1st/Final VIII 4.563 C 0.125 0.200 0.300 - - - 62.5062.50%FairHLC Construction andDevelopment Corporation8775Rehab./Impvt. of Panabo CoastalRoad, Arieta Section1st XI 11.096 O 0.375 0.300 0.070 0.030 0.065 0.067 90.70 -HLJ Construction &EnterprisesHLJ Construction &Enterprises18080 Concreting of Roads 1st/Final VI 0.892 C 0.356 0.300 0.300 - - - 95.6018080Const. of Pedestrian Bridge @Hibbard Avenue95.60%Outstanding1st VII 4.472 O 0.325 0.300 0.100 0.030 0.047 0.100 90.20 -Horamabi Builders 24129 Const. of MPB @ Bataan NHS Final III 1.881 C 0.253 0.300 0.300 - - - 85.30HPL General Construction 22289Completion of Multi-PurposeBuilding77.53%Satisfac<strong>to</strong>ry1st II 0.426 O 0.329 0.263 0.100 0.015 0.027 0.067 80.10 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 71


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONHPL General Construction 22289Completion of Multi-PurposeBuildingFinal II 0.426 C 0.327 0.250 0.300 - - - 87.7082.38%V.Satisfac<strong>to</strong>ryHPL General Construction 22289Concreting of Various Municipal andBrgy. RoadsFinal II 1.708 C 0.323 0.300 0.300 - - 92.3089.48%V.Satisfac<strong>to</strong>ryHPL General Construction 22289 Const. of Tupang River Control 1st II 1.871 O 0.185 0.092 0.100 0.015 0.025 0.133 55.00 -HPL General Construction 22289 Const. of Tupang River Control Final II 1.871 C 0.373 0.300 0.300 - - - 97.30HRB Construction 10528HVC SagittariusCommercial andConstructionRoad Concreting of Sta. Cruz-Ratay(CSSAC School Campus)1st/Final V 0.620 C 0.357 0.300 0.300 - - - 95.7012954 Completion of Multi-Purpose Bldg., Final XII 2.751 C 0.375 0.292 0.300 - - - 96.7071.92%Satisfac<strong>to</strong>ry95.70%Outstanding86.<strong>31</strong>%V.Satisfac<strong>to</strong>ryI & E Construction 10410Improvement/Rehab. of city Streets(Rueda & Navarro Sts.)1st/Final VIII 1.908 C 0.400 0.200 0.300 - - - 90.0090.00%V.Satisfac<strong>to</strong>ryI & E Construction 10410Impv't./Rehab. of Roadside Lopez-Buenavista Road1st/Final IV-A 4.728 C 0.388 0.200 0.300 - - - 88.8088.80%V.Satisfac<strong>to</strong>ryI & E Construction 10410Repair/Rehab./Impvt. of Nat'l Roadsalong Bagahupi-Babatngon Road,Tanauan-Dagami Road, Mainit-SanMiguel San<strong>to</strong>il Road1st/Final VIII 24.097 C 0.372 0.300 0.300 - - - 97.2097.20%OutstandingI.F. Blanco's Construction 25350 Const. of Manihala-Apnagan Road 1st/Final IV-B 4.709 O 0.263 0.300 0.100 0.030 0.022 0.100 81.50 -I.F. Blanco's Construction 25350 Const. of Manihala-Apnagan Road Final IV-B 4.710 C 0.298 0.230 0.300 - - - 82.8086.80%V.Satisfac<strong>to</strong>ryI.M. ConstructionCorporationIBC International BuildersCorporationIBC International BuildersCorporationIBC International BuildersCorporationIBC International BuildersCorporation200748576Concrete Reblocking along Gov. A.Pascual St.Asphalting of Priority Gravel RoadGap along Guimaras CircumferentialRoad1st NCR 4.744 O 0.336 0.300 0.100 0.030 0.047 0.100 91.30 -1st/Final VI 2.722 C 0.355 0.200 0.300 - - - 85.508576 Completion of Cabano Bridge (Final) 1st/Final VI 4.776 C 0.355 0.253 0.300 - - - 90.808576 Const. of Banayan Bridge 1st VI 15.499 O 0.400 0.300 0.070 0.030 0.030 0.067 89.70 -8576 Const. of Banayan Bridge 2nd VI 15.499 O 0.400 0.300 0.030 0.030 0.033 0.067 86.00 -85.50%V.Satisfac<strong>to</strong>ry90.80%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 72


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONIBC International BuildersCorporation8576Rehab. of Batiano Bridge @ MoloBlvd.Final VI 4.375 C 0.286 0.300 0.300 - - - 88.6086.56%V.Satisfac<strong>to</strong>ryIBC International BuildersCorporation (Formerly:IBC Iloilo Builders Corp.)8576Asphalt Overlay of M. LasermaStreet-C. Laserma Street1st/Final VI 2.404 C 0.333 0.300 0.300 - - - 93.3093.30%OutstandingIBC International BuildersCorporation (Formerly:IBC Iloilo Builders Corp.)8576Cabano Bridge along GuimarasCircumferential Road1st VI 6.258 O 0.273 0.268 0.100 0.030 0.040 0.100 81.10 -IBC International BuildersCorporation (Formerly:IBC Iloilo Builders Corp.)8576Cabano Bridge along GuimarasCircumferential Road3rd VI 6.258 O 0.274 0.300 0.100 0.030 0.037 0.100 84.10 -IBC International BuildersCorporation (Formerly:IBC Iloilo Builders Corp.)8576 Const. of Cuartero Bridge (Phase I) 1st/Final VI 9.661 C 0.290 0.240 0.300 - - - 83.0083.00%V.Satisfac<strong>to</strong>ryIBC International BuildersCorporation (Formerly:IBC Iloilo Builders Corp.)8576Const. of Two (2) S<strong>to</strong>rey Iloilo Hall ofJustice Building1st VI 11.480 O 0.376 0.300 0.100 0.023 0.050 0.100 94.90 -IBC International BuildersCorporation (Formerly:IBC Iloilo Builders Corp.)8576Const. of Two (2) S<strong>to</strong>rey Iloilo Hall ofJustice BuildingFinal VI 12.629 C 0.368 0.191 0.300 - - - 85.9087.41%V.Satisfac<strong>to</strong>ryIcalina Builders andConstruction Supply26889Rehab./Impvt./Conc. of TubodGanassi National Road1st/Final X 4.574 C 0.308 0.300 0.300 - - - 90.8090.80%OutstandingIDI Trading & Contrac<strong>to</strong>r 29006Completion of Multi-PurposeBuilding1st/Final III 0.762 C 0.377 0.279 0.300 - - - 95.6095.60%OutstandingIM ConstructionCorporation20074Concrete Reblocking along Gov. A.Pascual St.Final NCR 4.744 C 0.347 0.300 0.300 - - - 94.7092.66%OutstandingIM ConstructionCorporation20074Rehab./Reblocking of General LuisSt.1st/Final NCR 2.862 C 0.<strong>31</strong>7 0.300 0.300 - - - 91.7091.70%OutstandingIMB Construction 13259 Const. of Multi-Purpose Building 1st/Final VII 0.938 C 0.306 0.200 0.300 - - - 80.6080.60%V.Satisfac<strong>to</strong>ryInternational BuildersCorporation (IBC)8576 Fort San Pedro Improvement Project 1st PPA 181.489 O 0.364 0.275 0.100 0.030 0.053 0.100 92.20 -Irving Doyle T. ParasConstruction27362Conc. of Caraycaray-Cabungan-Lib<strong>to</strong>ng FMR1st/Final VIII 0.944 C 0.355 0.200 0.300 - - - 85.5085.50%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 73


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONIrving Doyle T. ParasConstruction27362 Const. of River Control 1st/Final VIII 4.339 C 0.267 0.300 0.300 - - - 86.7086.70%V.Satisfac<strong>to</strong>ryIsaga Builders 8652Const. of Conner Central NationalHigh SchoolFinal CAR 0.864 C 0.326 0.265 0.300 - - - 89.1084.97%V.Satisfac<strong>to</strong>ryIsaga Builders 8652Isaga Builders 8652ISH Construction, Inc. 30407ISH Construction, Inc. 30407Repair & Maintenance of Nat'l Road& Bridges, Abbut-Conner-KabugaoRoadRepair & Maintenance of Nat'l Road& Bridges, Abbut-Conner-KabugaoRoadConst. of One Unit 3-S<strong>to</strong>rey SchollBuildingConst. of One Unit 3-S<strong>to</strong>rey SchollBuilding2nd CAR 4.711 O 0.3<strong>31</strong> 0.128 0.100 0.030 0.050 0.100 73.90 -Final CAR 4.711 C 0.323 0.261 0.300 - - - 88.4082.40%V.Satisfac<strong>to</strong>ry1st NHA 16.404 O 0.338 0.138 0.100 0.030 0.070 0.100 77.52 -2nd NHA 17.762 C 0.394 0.295 0.300 - - - 98.94 83.95%Italian-Thai DevelopmentPublic Company LimitedSL2-SN-000419CP III, Liloan-San Ricardo Sect.Under the Aterial Road links Dev't.Project (Himayangan-Silago-AbuyogRoad & Liloan-San Ricardo RoadProject) Phase IV2nd VIII 971.846 O 0.385 0.291 0.100 0.030 0.028 0.100 93.40 -Italian-Thai DevelopmentPublic Company LimitedSL2-SN-000419CP III, Liloan-San Ricardo Sect.Under the Aterial Road links Dev't.Project (Himayangan-Silago-AbuyogRoad & Liloan-San Ricardo RoadProject) Phase IV3rd PJHL 971.846 O 0.349 0.300 0.100 0.030 0.037 0.100 91.60 -Italian-Thai DevelopmentPublic Company LimitedSL2-SN-000419CP III, Liloan-San Ricardo Sect.Under the Aterial Road links Dev't.Project (Himayangan-Silago-AbuyogRoad & Liloan-San Ricardo RoadProject) Phase IV4th PJHL 1,010.701 O 0.<strong>31</strong>6 0.300 0.100 0.030 0.061 0.100 90.70 -ITP Construction, Inc. 9392Ivy Michelle Trading &Construction24093Sct. Ranger Housing Project, PhaseIConc. of Puer<strong>to</strong> Princesa SouthRoad (PPSR), Burirao-AboAboSection1st NHA 51.850 O 0.400 0.300 0.100 0.030 0.032 0.100 96.23 -1st/Final IV-B 11.395 C 0.226 0.299 0.300 - - - 82.5082.50%V.Satisfac<strong>to</strong>ryIvy Michelle Trading &Construction24093Concreting of PPNR Roxas Taytay-El Nido National RoadFinal IV-B 3.508 C 0.233 0.300 0.300 - - - 83.3087.02%V.Satisfac<strong>to</strong>ryIvy Michelle Trading &Construction24093Const. of 1 Cl Sch. Bldg. @ NarraNHS1st/Final IV-B 0.435 C 0.335 0.118 0.300 - - - 75.3075.30%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 74


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONIvy Michelle Trading &Construction24093Const. of 1-CL, New Barbacan E/S,Roxas North (part of CY 2004 DepEdSchool Building Program Clustered)Final IV-B 0.381 C 0.390 0.285 0.300 - - - 97.5083.92%V.Satisfac<strong>to</strong>ryJ & A PimentelConstruction7953 Const. of Balibadon I Bridge 1st XIII 5.785 O 0.3<strong>31</strong> 0.300 0.070 0.030 0.043 0.100 87.40 -J & A PimentelConstruction7953 Const. of Balibadon I Bridge Final XIII 5.785 C 0.223 0.200 0.300 - - - 72.3081.36%V.Satisfac<strong>to</strong>ryJ & A PimentelConstruction7953Const. of Bocawe Bridge &Approaches1st XIII 11.180 O 0.333 0.300 0.100 0.030 0.043 0.100 90.60 -J & A PimentelConstruction and Supply7953 Const. of Banahaw Bridge Phase VI 1st XIII 19.263 O 0.343 0.300 0.050 0.022 0.032 0.067 81.40 -J & A PimentelConstruction and Supply7953Const. of Multi-Purpose BuildingPhase III1st XIII 4.552 O 0.294 0.300 0.050 0.030 0.006 0.067 74.70 -J & A PimentelConstruction and Supply7953Const. of Multi-Purpose BuildingPhase IIIFinal XIII 4.522 C 0.362 0.300 0.300 - - - 96.2081.15%V.Satisfac<strong>to</strong>ryJ & A PimentelConstruction and Supply7953Const. of Tandag Multi-PurposeBldg. Phase IIFinal XIII 4.546 C 0.1<strong>31</strong> 0.300 0.300 - - - 73.1075.41%Satisfac<strong>to</strong>ryJ. C. Baac ConstructionCorporation25974Replacement/Const. of LangsoBridge2nd CAR 7.699 O 0.3<strong>31</strong> 0.233 0.000 0.030 0.045 0.100 73.90 -J. Cus<strong>to</strong>rio Construction 16237Rehab./Conc. Paving alongBantayan-Malobago-Pagsang-an-Genagdanan Road1st/Final VIII 0.477 C 0.247 0.200 0.300 - - - 74.7074.70%Satisfac<strong>to</strong>ryJ. Cus<strong>to</strong>rio Construction 16237Rehab./Impv't. of DPWH-NorthernSamar 2nd DEO1st/Final VIII 0.246 C 0.396 0.158 0.300 - - - 85.4085.40%V.Satisfac<strong>to</strong>ryJ.B. Alarcon Enterprises 18849Const. of 2 CL Sch. Bldg. @ CavintiE/S1st IVA 0.681 O 0.367 0.247 0.100 0.030 0.022 0.100 86.60 -J.B. Alarcon Enterprises 18849Const. of 2 CL Sch. Bldg. @ CavintiE/SFinal IVA 0.681 C 0.370 0.200 0.300 - - - 87.0086.72%V.Satisfac<strong>to</strong>ryJ.B. De Jesus Buildersand Design Services22867 Const. of FMR at Brgy. San Agustin 1st/Final III 4.693 C 0.<strong>31</strong>8 0.204 0.300 - - - 82.2082.20%V.Satisfac<strong>to</strong>ryJ.D. Legaspi Construction 9608 Pasig River Ferry Service Station 1st PRRC 7.303 O 0.280 0.180 0.100 0.020 0.020 0.100 70.00 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 75


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONJ.E. ArradazaConstruction & Supply42124Const. of Duguan CommunalIrrigation ProjectFinalNIARegion VII2.338 C 0.326 0.300 0.300 - - - 92.60 92.60%J.E. ArradazaConstruction & Supply25353Const. of Public Market-BuildingPhase II1st/Final VIII 1.421 C 0.375 0.212 0.300 - - - 88.7088.70%V.Satisfac<strong>to</strong>ryJ.E. ArradazaConsttruction & Supply25353Const. of Multi Purpose Pavement atBrgy. Banilad1st/Final VII 0.478 C 0.336 0.217 0.300 - - - 85.3085.30%V.Satisfac<strong>to</strong>ryJ.E. Manalo & Company,Inc.422 Zamboanga Port Expansion Project 1st PPA 282.050 O 0.400 0.300 0.100 0.030 0.059 0.100 98.92 -J.G. & P Enterprises 5090Ripraping of Imus River Brgy.Salinas1st/Final IV-A 0.961 C 0.279 0.300 0.300 - - - 87.9087.90%V.Satisfac<strong>to</strong>ryJ.H. Pajara ConstructionCorp.1890Const. of Calaba Bridge &Approaches (Phase I)2nd Sp. Bridges 174.420 O 0.352 0.180 0.030 0.030 0.065 0.067 72.40 -J.H. Pajara ConstructionCorp.1890Const. of Dalibubon Bridge, alongIpil-Jones-San AgustinFinal II 239.834 C 0.393 0.284 0.000 - - - 67.7079.96%Satisfac<strong>to</strong>ryJ.H. Pajara ConstructionCorporation1890Const. of Dalibubon Bridge alongIpil-Jones-San Agustin Rd.7th II 235.627 O 0.356 0.240 0.100 0.030 0.030 0.100 85.60 -J.H. Pajara ConstructionCorporation1890NAIA Expressway & its RelatedRoad Projects Phase I Package-IVASales St. Viaduct Ramp Structure (M& E Retaining Wall)1st URPO 403.779 O 0.283 0.300 0.000 0.030 0.070 0.067 75.00 -J.I. ViacrusisConstruction14382Completion of 4CL, S<strong>to</strong>rey SchoolBuilding Balic-balic E/SFinal III 0.889 C 0.378 0.242 0.300 - - - 92.0084.51%V.Satisfac<strong>to</strong>ryJ.I.L. Trading &Construction Co.14634Const. of Brgy Road @ Brgy.Kayumanggi1st/Final IVA 1.921 C 0.349 0.200 0.300 - - - 84.9084.90%V.Satisfac<strong>to</strong>ryJ.M. Luciano Const.,Inc./Dimson (Manila), Inc.(JV)J.M. Luciano Const.,Inc./Dimson (Manila), Inc.(JV)J.M. Luciano Const.,Inc./Dimson (Manila), Inc.(JV)Phil-Japan Friendship HighwayJV-03-Mindanao Section Rehabiltation023/SLN-Project, Phase 1 (Contract Package0044527 & 8)Phil-Japan Friendship HighwayJV-03-Mindanao Section Rehabiltation023/SLN-Project, Phase 1 (Contract Package0044527 & 8)Phil-Japan Friendship HighwayJV-03-Mindanao Section Rehabiltation023/SLN-Project, Phase 1 (Contract Package0044527 & 8)4th XIII 655.465 O 0.358 0.300 0.100 0.030 0.037 0.100 92.50 -6th PJHL 713.641 O 0.136 0.300 0.100 0.030 0.070 0.100 73.60 -7th PJHL 754.879 O 0.284 0.297 0.100 0.030 0.056 0.100 86.70 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 76


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONJ.M. Luciano Const.,Inc./Dimson (Manila), Inc.(JV)J.M. MaligayaConstruction &Construction SupplyJ.N. Dela TorreConstructionPhil-Japan Friendship HighwayJV-03-Mindanao Section Rehabiltation023/SLN-Project, Phase 1 (Contract Package0044527 & 8)1501824978Concreting of Farm-<strong>to</strong>-Market Road@ Brgy. Asis II (Sitio Magsili)Const. of Canangcaan Road (ARISP)Phase II, SofronioFinal PJHL 754.879 C 0.265 0.300 0.300 - - - 86.501st/Final IV-A 0.380 C 0.387 0.200 0.300 - - - 88.7087.01%V.Satisfac<strong>to</strong>ry88.70%V.Satisfac<strong>to</strong>ry1st IV-B 6.220 O 0.347 0.300 0.100 0.015 0.027 0.067 85.60 -J.N. Dela TorreConstruction24978Const. of Canangcaan Road(ARISP), Phase II, SofronioFinal IV-B 6.219 C 0.376 0.200 0.300 - - - 87.6086.40%V.Satisfac<strong>to</strong>ryJ.N. Dela TorreConstruction24978 Const. of Multi-Purpose Bldg. (PNP) 1st IV-B 0.467 O 0.338 0.245 0.100 0.020 0.026 0.100 82.90 -J.N. Dela TorreConstruction24978Const. of Multi-Purpose Building(PNP), Brgy. PoblacionFinal IV-B 0.466 C 0.361 0.200 0.300 - - - 86.1083.86%V.Satisfac<strong>to</strong>ryJ.N. Dela TorreConstruction24978 Impvt. of MPB @ Pinaglabanan 1st/Final IV-B 0.365 C 0.282 0.218 0.300 - - - 80.00J.Q.G. Construction 10530 Const. of 3 Cl at Maungib H/S 1st III 1.091 O 0.<strong>31</strong>7 0.222 0.100 0.030 0.011 0.100 78.00 -80.00%Satisfac<strong>to</strong>ryJ.R.C.F. Construction <strong>31</strong>641Const. of Multi-Purpose Building @Various Sts. Brgy. Roxas1st/Final NCR 0.662 C 0.396 0.300 0.300 - - - 99.6099.60%OutstandingJ.S. General Contrac<strong>to</strong>r 15258J.S. General Contrac<strong>to</strong>r 15258Const. of Multi-Purpose Bldg. @Brgy. Maranan IImprovement of School Building atCavite State University1st IV-A 0.475 O 0.344 0.200 0.100 0.030 0.027 0.100 80.10 -1st IV-A 0.950 O 0.353 0.240 0.100 0.030 0.047 0.100 87.00 -J.T. Gamolo Construction 15759Cementing of Road from MountainView College <strong>to</strong> Bagontaas1st/Final X 0.916 C 0.320 0.300 0.300 - - - 92.0092.00%OutstandingJ.T. Gamolo Construction 15759 Completion of Quezon NHS 2nd X 2.790 O 0.367 0.300 0.100 0.030 0.058 0.100 95.50 -J.T. Gamolo Construction 15759 Completion of Quezon NHS Final X 2.790 C 0.397 0.300 0.300 - - - 99.70J.T. Gamolo Construction 15759J.T. Gamolo Construction 15759J.T. Gamolo Construction 15759Concreting of Dologon Busco-Quezon Road (Maramag Sect.)Const. of Sayre Nat'l Highway (DonCarlos Section)Const. of Sayre Nat'l Highway (DonCarlos Section)Final X 4.688 C 0.335 0.300 0.300 - - - 93.5095.82%Outstanding94.40%Outstanding1st X 14.008 O 0.342 0.246 0.100 0.008 0.057 0.100 85.30 -2nd X 14.008 O 0.237 0.300 0.100 0.030 0.051 0.100 81.80 -J.V. Lagon ConstructionCorporation11561Widening of Kapingkong Bridge Bo.2,Final XII 13.377 C 0.287 0.179 0.000 - - - 46.6065.68%Fair<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 77


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONJ.V. Lore<strong>to</strong> Const. & Dev't.Corp.1<strong>31</strong>20 Const. of Marcasa Bridge 1st/Final VIII 9.370 C 0.356 0.300 0.300 - - - 95.6095.60%OutstandingJager Construction &Supply13619Const. of Multi Purpose Building @San PabloFinal III 0.467 C 0.363 0.300 0.300 - - - 96.3082.79%V.Satisfac<strong>to</strong>ryJag-Vail Construction &Supply24055Jalse Construction 13839Jameetrix Construction 19176<strong>Jan</strong> Sha Construction &Supply19462Const. of Potenciano Gregorio Multi-Purpose BuildingConst. of FMR , Lumbia-Cani<strong>to</strong>anRoadConc. of Additional 2-lanes alongDavao City Diversion Road,Buhangin-Maa SectionRehabilitation of Mataoroc CIS,Taisan CIS & Tariric CIS1st/Final V 1.156 C 0.390 0.300 0.300 - - - 99.0099.00%Outstanding1st X 1.889 O 0.359 0.300 0.100 0.030 0.048 0.100 93.70 -1st XI 9.234 O 0.377 0.300 0.100 0.030 0.050 0.100 95.70 -1st/FinalNIARegion V1.763 C 0.323 0.244 0.300 - - - 86.70 86.70%<strong>Jan</strong>n-Norris Constructionand Supplies<strong>31</strong>814 Const. of Banganan Flood Control 1st/Final II 2.850 C 0.207 0.218 0.300 - - - 72.5072.50%Satisfac<strong>to</strong>ryJapuz-<strong>Jan</strong>sol Enterprises 22869Const. / Completion of MahinogMunicipal Bldg.,2nd X 3.257 O 0.357 0.300 0.100 0.030 0.047 0.100 93.40 -Japuz-<strong>Jan</strong>sol Enterprises 22869Const. / Completion of MahinogMunicipal Bldg.,Final X 3.257 C 0.360 0.300 0.300 - - - 96.0088.09%V.Satisfac<strong>to</strong>ryJapuz-<strong>Jan</strong>sol Enterprises 22869Const. / Completion of MahinogMunicipal Bldg.,Final X 1.394 C 0.382 0.300 0.300 - - - 98.2082.87%V.Satisfac<strong>to</strong>ryJapuz-<strong>Jan</strong>sol Enterprises 22869Const. of Lined Canal along NationalRoad (Poblacion Letecia &Poblacion San Roque)1st/Final X 2.106 C 0.244 0.300 0.300 - - - 84.4084.40%V.Satisfac<strong>to</strong>ryJapuz-<strong>Jan</strong>sol Enterprises 22869Const./Impv't. of Yumbing Multi-Purpose Building1st/Final X 1.395 C 0.<strong>31</strong>1 0.300 0.300 - - - 91.1091.10%OutstandingJargon Construction &Supply23474Const. of MPB (Brgy. Stage) at Brgy.Baluntay1st/Final XII 0.193 C 0.329 0.200 0.300 - - - 82.9082.90%V.Satisfac<strong>to</strong>ryJargon Construction &SupplyJargon Construction &SupplyJaro Builders andConstruction SupplyJaro Builders andConstruction Supply23474 Const. of Valdez Street Final XII 0.939 C 0.<strong>31</strong>1 0.200 0.300 - - - 81.1023474Rehab. of Sitio Niño-Sitio Taclobo @Brgy. Upper MainitFinal XII 3.660 C 0.000 0.000 0.300 - - - 30.0025560 Const. of MPB @ San Vicente East 1st/Final IV-B 0.474 C 0.343 0.300 0.300 - - - 94.3025560Replacement of Slope Protectionalong National Rd., Minas-Maca<strong>to</strong>cSect.1st/Final IV-B 1.566 C 0.217 0.000 0.300 - - - 51.7088.42%V.Satisfac<strong>to</strong>ry38.64%Poor94.30%Oustanding51.70%Poor<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 78


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONJasa Builders <strong>31</strong>330 Conc. of Road at Sitio Camambugan 1st/Final I 0.473 C 0.266 0.300 0.300 - - - 86.6086.60%V.Satisfac<strong>to</strong>ryJasa Builders <strong>31</strong>330Const. of 1 Cl Sch. Bldg. @Magalong NHS1st/Final I 0.436 C 0.279 0.173 0.300 - - - 75.2075.20%Satisfac<strong>to</strong>ryJasmarc Builders andConstruction Supply, Co.<strong>31</strong>801 Const. of MPB @ Brgy. Mahayag 1st XI 1.177 O 0.<strong>31</strong>6 0.300 0.100 0.020 0.053 0.100 88.90 -Jasmig ConstructionSupply26069Const. of 2 S<strong>to</strong>rey 6 CL RGR TypeS/B @ Bonifacio E/S1st/Final IV-A 8.547 C 0.376 0.200 0.300 - - - 87.6087.60%V.Satisfac<strong>to</strong>ryJasmig ConstructionSupply26069Const. of Brgy. MPB @ SanFernando1st/Final IV-A 0.287 C 0.293 0.300 0.300 - - - 89.3089.30%V.Satisfac<strong>to</strong>ryJaykris Enterprises 30906 Conc. of Datu Panas St. 1st/Final IX 0.960 C 0.303 0.200 0.300 - - - 80.3080.30%V.Satisfac<strong>to</strong>ryJay-mar Builder 7900Jay-mar Builder 7900Const. of MPB @ SAV 12 Brgy. SanIsidroRepair of Sidewalk/Roads of SanNicolas St.1st/Final NCR 1.426 C 0.348 0.300 0.300 - - - 94.8094.80%Outstanding1st NCR 1.424 O 0.333 0.000 0.100 0.030 0.032 0.100 59.50 -JBGM ConstructionConstruction of Canal and Canal<strong>2005</strong>-0283Structures (LMC-ARIP-03-06)1stNIARegion II4.919 C 0.360 0.200 0.000 0.020 0.060 0.200 84.0084.15%V.Satisfac<strong>to</strong>ryJBGM ConstructionConstruction of Canal and Canal<strong>2005</strong>-0283Structures (LMC-ARIP-07-06)FinalNIARegion II4.684 C 0.400 0.300 0.000 - - - 70.0070.00%FairJCA Builders & Supply 20358Rehab. of FMR, Little Panay-KasilakRoadFinal XI 2.864 C 0.200 0.300 0.300 - - - 80.0068.72%FairJCA Builders & Supply 20358JDC Builders 32048Jeada Construction 17869Jecel ConstructionSupply21956Repair/Rehab. of Road @ Package 2,02634 (A) Brgy. CabantianRehab./Impvt. of MPB (CoveredCourt) Phase IIImprovement/Rehabilitation of ShoreProtection alongside NHA, SeaBreeze HomesConst. / Rehab. / Replacement /Completion & Repair of E/S Bldg. @Six<strong>to</strong> Babao E/S3rd XI 2.359 O 0.211 0.225 0.000 0.030 0.025 0.000 49.10 -1st/Final VIII 1.918 C 0.373 0.300 0.300 - - - 97.3097.30%Outstanding1st V 6.745 O 0.377 0.300 0.100 0.024 0.028 0.100 92.90 -Final XI 0.833 C 0.276 0.300 0.300 - - - 87.6084.38%V.Satisfac<strong>to</strong>ryJegma Construction andDevelopment Corporation14775Repair/Maintenace of TrancentralHighway1st VII 19.096 O 0.363 0.300 0.100 0.030 0.070 0.100 96.30 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 79


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONJejor's ConstructionCorporation5143Rehab./ Impv't. of CCR, MAAC-Kalipagas Section6th X 9.063 O 0.378 0.200 0.100 0.015 0.048 0.200 94.10 -Jejor's ConstructionCorporation5143Rehab./ Impv't. of CCR, MAAC-Kalipagas SectionFinal X 8.994 C 0.272 0.200 0.300 - - - 77.2082.78%V.Satisfac<strong>to</strong>ryJejor's ConstructionCorporation5143Rehab./Improvement of CCR, MAAC-Kalipagas Sect.1st X 9.263 O 0.286 0.300 0.100 0.030 0.025 0.100 84.10 -Jejor's ConstructionCorporation5143Rehab./Improvement of CCR, MAAC-Kalipagas Sect.3rd X 9.063 O 0.323 0.300 0.100 0.030 0.035 0.100 88.80 -Jejor's ConstructionCorporation5143Rehab./Improvement of CCR, MAAC-Kalipagas Sect.4th X 9.063 O 0.347 0.300 0.100 0.023 0.040 0.100 91.00 -Jenzab Construction &Design30654Const. of 1 Cl Sch. Bldg @ SimeonAyuda E/S1st VII 0.386 O 0.388 0.180 0.100 0.030 0.028 0.100 82.60 -Jenzab Construction &Design30654Const. of 1 Cl Sch. Bldg @ SimeonAyuda E/SFinal VII 0.386 C 0.265 0.300 0.300 - - - 86.5083.77%V.Satisfac<strong>to</strong>ryJenzab Construction &Design30654Road Conc. At Brgy. Sta. Catalina,Bagong Daan1st/Final VII 0.741 C 0.168 0.300 0.300 - - - 76.8076.80%Satisfac<strong>to</strong>ryJerber Trading andConstruction19713Const. of Multi-Purpose Building/Structure @ Brgy. Valle Cruz1st/Final III 0.468 C 0.362 0.300 0.300 - - - 96.2096.20%OutstandingJervie Const. & SupplyCorp.7022Completion of MPB @ Brgy.BulwangFinal VI 0.959 C 0.375 0.240 0.000 - - - 61.5075.78%Satisfac<strong>to</strong>ryJet Construction Supply 7063Concreting of Ajuy-ConcepcionRoad2nd/Final VI 9.626 C 0.345 0.200 0.300 - - - 84.5074.48%Satisfac<strong>to</strong>ryJFAP Construction 21706Const./Rehab. of Ormoc-Margen-Sitio Palimpinon Box Culvert1st/Final VIII 0.381 C 0.347 0.300 0.300 - - - 94.7094.70%OutstandingJFAP Construction 21706Const./Rehab./Impv't. of Multi-Purpose Bldg. Ormoc City Centerfor Sports & Development1st/Final VIII 0.480 C 0.374 0.241 0.300 - - - 91.5091.50%OutstandingJhall Marketing &Services15760Conc. of Carles-Balasan Road,Guinticgan Section1st/Final VI 5.099 C 0.280 0.211 0.300 - - - 79.10JHJ Construction 3781 Completion of Codingle Bridge Final VI 4.452 C 0.200 0.200 0.300 - - - 70.00JHJ Construction 3781JHJ Construction 3781Const. of Capiz State UniversityAudi<strong>to</strong>rium, Capiz State UniversityMain CampusConst. of Capiz State UniversityAudi<strong>to</strong>rium, Capiz State UniversityMain Campus79.10%Satisfac<strong>to</strong>ry75.64%Satisfac<strong>to</strong>ry1st VI 5.708 O 0.330 0.240 0.100 0.023 0.018 0.100 81.10 -Final VI 5.708 C 0.348 0.300 0.300 - - - 94.80JHJ Construction 3781 Const. of Maragubdob Bridge 1st VI 7.999 O 0.333 0.300 0.070 0.030 0.035 0.067 83.50 -85.21%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 80


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONJHJ Construction 3781 Const. of Maragubdob Bridge Final VI 7.999 C 0.400 0.200 0.300 - - - 90.0086.10%V.Satisfac<strong>to</strong>ryJireh Construction &Supply8240Const. of Lib<strong>to</strong>ng-Mobo Bridge,Phase XVI @ Estancia-Mobo1st/Final VI 4.906 C 0.362 0.293 0.300 - - - 95.5095.50%OutstandingJireh Construction &Supply8240Const./Impv't. of Sitio-Agtinga-Madrona Estate FMR, Camili ARC2nd IV-B 17.<strong>31</strong>8 O 0.380 0.300 0.100 0.030 0.028 0.100 93.80 -Jireh Construction &Supply8240Const./Impv't. of Sitio-Agtinga-Madrona Estate FMR, Camili ARC3rd IV-B 17.443 O 0.371 0.240 0.100 0.030 0.028 0.100 86.90 -Jireh Construction &Supply8240Const./Impv't. of Sitio-Agtinga-Madrona Estate FMR, Camili ARCFinal IV-B 17.443 C 0.232 0.267 0.000 - - - 49.9070.48%Satisfac<strong>to</strong>ryJirk Construction 29918 Const. of Cagayan River Control 1st II 9.469 O 0.400 0.200 0.000 0.030 0.023 0.067 72.00 -Jirk Construction 29918Const. of Drainage Canal @Bagumbayan and Tucalana1st/Final II 0.435 C 0.260 0.104 0.300 - - - 66.4066.40%FairJJ & J Construction &General Supply3023Rehabilitation of Owak IsidroCommunal Irrigation SystemFinalNIARegion VII2.377 O 0.342 0.300 0.300 - - - 94.20 -JJ & J Construction andGeneral SupplyJJ & J Construction andGeneral SupplyJJ & J Construction andGeneral SupplyJJA Construction andSupplyJLP Construction &Supply (Formerly: JLPConstruction)JLP Construction &Supply (Formerly: JLPConstruction)302<strong>31</strong>302<strong>31</strong>Const. of Multi-Purpose Building @Brgy. DumlogConst. of Multi-Purpose Building @Brgy. Dumlog2nd VII 1.138 O 0.372 0.240 0.100 0.010 0.048 0.100 87.00 -Final VII 1.138 C 0.366 0.300 0.300 - - - 96.60302<strong>31</strong> Impvt. of Sapangdaku Riverwall 1st/Final VII 1.898 C 0.<strong>31</strong>1 0.300 0.300 - - - 91.10226762698326983Conc. of Calanan Jct.-Pinukpuk Jct.RoadRehab. of 4 Cl Sch.Bldg. (GabaldonType) @ Solsona South E/SRehab. of 4 Cl Sch.Bldg. (GabaldonType) @ Solsona South E/S91.46%Outstanding91.10%Outstanding1st CAR 4.599 O 0.358 0.300 0.100 0.030 0.030 0.100 91.80 -1st I 2.842 O 0.336 0.300 0.100 0.008 0.022 0.067 83.30 -2nd I 2.842 O 0.302 0.300 0.100 0.015 0.018 0.100 83.50 -JLV Construction &Supply9953 Const. of Multi-Purpose Building Final IV-A 0.960 C 0.259 0.300 0.300 - - - 85.9084.36%V.Satisfac<strong>to</strong>ryJLV Construction &Supply9953Const. of School and MPB @ BatuanCENTEX1st/Final IV-A 1.430 C 0.262 0.268 0.300 - - - 83.0083.00%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 81


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONJLV Construction &Supply9953Impvt./Rehab. of Multi-PurposeBuilding @ Brgy. Pantay Matanda1st IV-A 3.858 O 0.367 0.240 0.100 0.030 0.025 0.100 86.20 -J-Marbela Constructionand Supply24268Const. of 3 Cl Sch. Bldg. @ SanRoque E/S1st/Final V 1.146 C 0.334 0.120 0.300 - - - 75.4075.40%Satisfac<strong>to</strong>ryJMT Construction 14186 Const. of Jagupit-Lilang FMR 1st/Final XIII 4.563 C 0.352 0.200 0.300 - - - 85.2085.20%V.Satisfac<strong>to</strong>ryJMT Construction 14186JMT Construction 14186JMT Construction 14186JMU Construction 6877JNA Construction 10615Impvt./Conc. of Dapa-Del CarmenRoadImpvt./Conc. of Dapa-Del CarmenRoadImpvt./Conc. of Dapa-Del CarmenRoadConst. of Multi-Purpose Building(Gymnasium)Const. of FMR Cluster 1, Brgy.Poblacion III1st XIII 9.522 O 0.321 0.237 0.100 0.023 0.015 0.100 79.60 -2nd XIII 9.522 O 0.388 0.248 0.070 0.030 0.018 0.067 82.10 -3rd XIII 9.522 O 0.363 0.240 0.000 0.022 0.035 0.067 72.70 -2nd II 1.888 O 0.<strong>31</strong>7 0.300 0.070 0.015 0.027 0.050 77.90 -1st/Final III 0.773 C 0.<strong>31</strong>5 0.300 0.300 - - - 91.5091.50%OutstandingJ'ner CepadaConstruction30212Concrete Paving of BarangayCambooc Road1st/Final VIII 0.471 C 0.<strong>31</strong>1 0.200 0.300 - - - 81.1081.10%V.Satisfac<strong>to</strong>ryJ'ner CepadaConstructionJ'ner CepadaConstructionJ'ner CepadaConstruction30212 Mahayhay CIS 1st/Final NIA 1.910 C 0.362 0.180 0.300 - - - 84.2030212 San Francisco CIS 1st NIA 1.993 O 0.381 0.180 0.070 0.015 0.023 0.100 76.9030212 Tambis CIS 1st/Final NIA 1.994 C 0.369 0.180 0.300 - - - 84.9084.20%V.Satisfac<strong>to</strong>ry84.90%V.Satisfac<strong>to</strong>ryJohn Arne Construction 24621John Ray Developer &Supplies20795Const. of Pinamungajan PublicMarket, Cebu (Phase VII)Const. of Drainage Canal alongCotaba<strong>to</strong>-Davao Road (CentralMarketing/Metro Bank Side)Final VII 2.089 C 0.284 0.178 0.300 - - - 76.2076.78%Satisfac<strong>to</strong>ry1st XII 4.508 O 0.334 0.159 0.100 0.023 0.045 0.200 86.10 -John Ray Developer &Supplies20795Const./Completion (Repair/Rehab.)of MPB @ BPI Balindog1st XII 0.466 O 0.300 0.240 0.100 0.030 0.023 0.100 79.30 -John Ray Developer &Supplies20795Rehab./Impv't. of Cotaba<strong>to</strong> 1stDistrict Engineering office Bldg.,1st/Final XII 0.964 C 0.390 0.265 0.300 - - - 95.5095.50%OutstandingJomar Builders & Supply 9138 Const. of Multi-Purpose Building 1st/Final V 0.953 C 0.257 0.300 0.300 - - - 85.7085.70%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 82


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONJomar Builders & Supply 9138Jomar Builders & Supply 9138Jomarcann GeneralConstruction30599Const. of Multi-Purpose Building @Brgy. BagumbayanConst. of Multi-Purpose Building @Brgy. BagumbayanConst. Flood Control alongAmbalanga River1st V 0.469 O 0.344 0.249 0.100 0.000 0.022 0.100 81.50 -Final V 0.469 C 0.286 0.100 0.300 - - - 68.6077.63%Satisfac<strong>to</strong>ry1st CAR 4.765 O 0.390 0.120 0.100 0.022 0.032 0.200 86.40 -Jomarcann GeneralConstruction30599Const. Flood Control alongAmbalanga RiverFinal CAR 4.763 C 0.305 0.300 0.300 - - - 90.5088.04%V.Satisfac<strong>to</strong>ryJometron Engineering &Construction2<strong>31</strong>47 Const. of Castilla Flood Control 1st V 4.778 O 0.352 0.124 0.100 0.023 0.025 0.200 82.40 -Jometron Engineering &Construction2<strong>31</strong>47 Const. of Castilla Flood Control Final V 4.778 C 0.373 0.200 0.300 - - - 87.3084.36%V.Satisfac<strong>to</strong>ryJorvivs Construction 6527Jorvivs Construction 6527Const. of Tertiary School Bldg.Northern Bukidnon CommunityCollege (Const. of 3-S<strong>to</strong>rey Bldg.Phase I)Const. of Tertiary School Bldg.Northern Bukidnon CommunityCollege (Const. of 3-S<strong>to</strong>rey Bldg.Phase I)1st X 4.744 O 0.381 0.244 0.100 0.022 0.062 0.100 90.90 -3rd X 4.744 O 0.371 0.300 0.000 0.030 0.057 0.067 82.50 -Jorvivs Construction 6527Const. of Tertiary School Bldg.Northern Bukidnon CommunityCollege (Const. of 3-S<strong>to</strong>rey Bldg.Phase I)Final X 4.744 C 0.372 0.300 0.000 - - - 67.2080.06%V.Satisfac<strong>to</strong>ryJoselle Construction 16243Const./Completion of Multi-PurposeBuilding1st/Final XIII 0.914 C 0.388 0.300 0.300 - - - 98.8098.80%OutstandingJoy Construction 14386Const of 1-Unit, 1-CL SchoolBuildingFinal IX 0.362 C 0.385 0.257 0.300 - - - 94.2082.09%V.Satisfac<strong>to</strong>ryJoy Construction 14386Const. & Repair/Rehab. of VariousSchool Bldg. (Clustered-2) 2ndBatch CY 2004Final IX 0.657 C 0.378 0.000 0.300 - - - 67.8082.22%V.Satisfac<strong>to</strong>ryJoy Construction 14386Const. of 1 unit 2 Cl at Port HolandE/S1st IX 0.675 O 0.268 0.208 0.000 0.030 0.020 0.050 57.60 -Joy Construction 14386Const. of 1-Unit 1-CL SchoolBuilding @ Tumahubong CES1st/Final IX 0.366 C 0.362 0.200 0.300 - - - 86.2086.20%V.Satisfac<strong>to</strong>ryJR Contrac<strong>to</strong>r 9638 Const. of Drainage System, 1st V 0.951 O 0.273 0.200 0.100 0.010 0.013 0.200 79.60 -JSG ConstructionCompany, Inc.9350Impvt./Rehab. of Lipa-Mataas naKahoy Road, Lipa Section1st IVA 14.458 O 0.367 0.2<strong>31</strong> 0.100 0.030 0.033 0.100 86.10 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 83


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.JUF Construction 17987PROJECT NAMEConst. of Brgy. Road @ Brgy. SanRufinoNO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATING1st/Final VIII 0.952 C 0.365 0.262 0.300 - - - 92.70FINAL RATING/QUALITATIVEDESCRIPTION92.70%OutstandingJUF Construction 17987Impvt. Along Nabang-Bagaho RoadSection, Calbayog-Catarman viaLope de Vega Road1st/Final VIII 4.819 C 0.205 0.290 0.300 - - - 79.5079.50%Satisfac<strong>to</strong>ryJulita Builders 13936Const. of Multi-Purpose Building @Brgy. Parasan1st/Final VIII 0.289 C 0.368 0.300 0.300 - - - 96.8096.80%OutstandingJuncynth ConstructionGeneral Services18385 Const. of Bon<strong>to</strong>c MPB 1st/Final VIII 0.950 C 0.300 0.300 0.300 - - - 90.0090.00%V.Satisfac<strong>to</strong>ryJupa Construction 23577Lined Canal along Allen-CatarmanRoad (Lavezares-Enriquita Section)1st/Final VIII 1.444 C 0.233 0.300 0.300 - - - 83.3083.30%V.Satisfac<strong>to</strong>ryJV Lagon ConstructionCorporation11561Concreting of Chua Sect. alongIsulan Highway Junction Dukay-Bagumbayan-Sen. Ninoy Aquino-Lebak Road2nd XII 10.267 O 0.358 0.300 0.050 0.030 0.023 0.067 82.80 -JV Lagon ConstructionCorporation11561Const. of Approach & RiverbedProtection of Sinawal Bridge II alongGSC Circumferential Road1st XII 2.518 O 0.374 0.143 0.030 0.030 0.051 0.200 82.80 -JV Lagon ConstructionCorporation11561Const. of Approach & RiverbedProtection of Sinawal Bridge II alongGSC Circumferential RoadFinal XII 2.518 C 0.353 0.300 0.000 - - - 65.3070.79%Satisfac<strong>to</strong>ryJV Lagon ConstructionCorporation11561 Widening of Kapingkong Bridge 3rd XII 13.377 O 0.370 0.300 0.000 0.030 0.023 0.000 72.30 -K.D.C.M. Construction 29023 Const. of Binwaan Bridge (Phase II) 1st/Final CAR 5.961 C 0.328 0.300 0.300 - - - 92.8092.80%OutstandingKajima CorporationSL2-SN-000286Lower Agusan Dev't. Project, Stage1, Phase II, Package IV Masao RiverImprovements and Const. of UrbanDrainage System7th CARBDP 912.171 O 0.398 0.200 0.100 0.030 0.070 0.200 99.80 -Kajima CorporationSL2-SN-000286Masao River Improvement & Const.of Urban Drainage System CP IV(Lower Agusan Development Project- Stage I, Phase II)Final CARBDP 1,083.477 C 0.382 0.300 0.300 - - - 98.2099.00%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 84


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONKajima CorporationFC-04-023Const. of Cebu South Coastal RoadProject, Segment 3B-2, MCDP III,Subway Tunnel Section1st MCDP III 1,264.367 O 0.358 0.300 0.100 0.030 0.065 0.100 95.30 -Kajima/ Obayashi/ JFE/Mitsubishi KOJM JVFC-04-023Subic-Clark-Tarlac ExpresswayProject-Package 110thBCDARegion III13968.698 O 0.378 0.285 0.000 0.030 0.051 0.067 81.04 -Kajima/ Obayashi/ JFE/Mitsubishi KOJM JVFC-04-023Subic-Clark-Tarlac ExpresswayProject-Package 111thBCDARegion III13968.698 O 0.379 0.264 0.000 0.030 0.061 0.067 80.03 -Kajima/ Obayashi/ JFE/Mitsubishi KOJM JVFC-04-023Subic-Clark-Tarlac ExpresswayProject-Package 112thBCDARegion III13968.698 O 0.349 0.300 0.030 0.030 0.065 0.067 84.07 -Kajima/ Obayashi/ JFE/Mitsubishi KOJM JVFC-04-023Subic-Clark-Tarlac ExpresswayProject-Package 113thBCDARegion III13968.698 O 0.368 0.272 0.070 0.024 0.033 0.067 83.27 -Kajima/ Obayashi/ JFE/Mitsubishi KOJM JVFC-04-023Subic-Clark-Tarlac ExpresswayProject-Package 11stBCDARegion III13968.698 O 0.364 0.284 0.070 0.030 0.050 0.067 86.40 -Kajima/ Obayashi/ JFE/Mitsubishi KOJM JVFC-04-023Subic-Clark-Tarlac ExpresswayProject-Package 12ndBCDARegion III13968.698 O 0.369 0.261 0.070 0.030 0.042 0.067 83.87 -Kajima/ Obayashi/ JFE/Mitsubishi KOJM JVFC-04-023Subic-Clark-Tarlac ExpresswayProject-Package 13rdBCDARegion III13968.698 O 0.387 0.262 0.070 0.030 0.032 0.067 84.82 -Kajima/ Obayashi/ JFE/Mitsubishi KOJM JVFC-04-023Subic-Clark-Tarlac ExpresswayProject-Package 14thBCDARegion III13968.698 O 0.390 0.229 0.050 0.030 0.056 0.067 82.13 -Kajima/ Obayashi/ JFE/Mitsubishi KOJM JVFC-04-023Subic-Clark-Tarlac ExpresswayProject-Package 15thBCDARegion III13968.698 O 0.386 0.291 0.030 0.024 0.035 0.067 83.30 -Kajima/ Obayashi/ JFE/Mitsubishi KOJM JVFC-04-023Subic-Clark-Tarlac ExpresswayProject-Package 16thBCDARegion III13968.698 O 0.374 0.264 0.050 0.023 0.040 0.067 81.73 -Kajima/ Obayashi/ JFE/Mitsubishi KOJM JVFC-04-023Subic-Clark-Tarlac ExpresswayProject-Package 17thBCDARegion III13968.698 O 0.365 0.279 0.050 0.024 0.033 0.033 78.42 -Kajima/ Obayashi/ JFE/Mitsubishi KOJM JVFC-04-023Subic-Clark-Tarlac ExpresswayProject-Package 18thBCDARegion III13968.698 O 0.369 0.269 0.030 0.023 0.051 0.067 80.92 -Kalantas Construction &Development Corporation23915Rehabilitation of Dughan-GamutFMR9thBCDARegion III1.733 O 0.351 0.263 0.100 0.022 0.022 0.100 85.80 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 85


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONKalantas Construction &Development Corporation23915Rehabilitation of Dughan-GamutFMR1st XIII 1.733 C 0.000 0.073 0.300 - - - 37.3066.40%FairKamagong Builders &Developers Corporation1720Const. of Molino Blvd. By Pass (Inc.RROW Acquisition)Final XIII 20.527 O 0.381 0.282 0.100 0.030 0.058 0.100 95.10 -Kamagong Builders &Developers Corporation1720Const. of Molino Blvd. By Pass (Inc.RROW Acquisition)2nd IV-A 20.032 C 0.353 0.200 0.300 - - - 85.3084.46%V.Satisfac<strong>to</strong>ryKane Construction, Inc. 2888Completion of 2 S<strong>to</strong>rey 2 CL SB @BCNHS-MainFinal IV-A 1.442 C 0.373 0.249 0.300 - - - 92.2091.43%OutstandingKarangyan Builders &Traders22622Const. of 2-Classroom Building @Polytechnic College of CalapanFinal CAR 0.951 C 0.366 0.300 0.300 - - - 96.6081.34%V.Satisfac<strong>to</strong>ryKawi Construction 25844 Completion of MPB Phase III Final IV-B 0.960 O 0.330 0.300 0.100 0.030 0.026 0.100 88.60 -Kenwood ConstructionEnterprises22186 Const. of 12 Cl Building with CR 1st CAR 4.816 O 0.235 0.210 0.100 0.023 0.016 0.100 68.40 -Kenwood ConstructionEnterprises22186Const. of Multi-Purpose CoveredCourt @ Lomboy E/S1st I 2.357 C 0.332 0.300 0.300 - - - 93.2087.55%V.Satisfac<strong>to</strong>ryKez Enterprises(Formerly: I. AgripoConstruction)25556Const. of Flood Control/ConcreteCanalFinal I 0.800 C 0.391 0.300 0.300 - - - 99.1099.10%OutstandingKGD Builders 21960Const. of Water System @ PurokPag-asa 21st/Final X 0.752 C 0.<strong>31</strong>8 0.200 0.300 - - - 81.8081.80%V.Satisfac<strong>to</strong>ryKilusang MagkaibiganM.P. Cooperative(KMMPC)<strong>31</strong>666Conc. of Access Road (Jct. Agusan-Davao Road)1st/Final XII 2.245 O 0.328 0.300 0.100 0.030 0.052 0.100 91.00 -Kim Harold TradingManufacturing and Const.28019Repair/Maintenance of Kaylubong IRiver Waterways1st XI 0.4<strong>31</strong> C 0.320 0.000 0.300 - - - 62.0062.00%FairKim-Harold Trading,Manufacturing & 28019ConstructionKimphil Construction 21890Kimphil Construction 21890Rehab. of Roxas-Taytay-El Nido Rd.,PPNRConst. of Calapan South Road, BantiSectionConst. of Calapan South Road,Himpararay Section1st/Final IV-B 1.828 C 0.309 0.144 0.300 - - - 75.30Final IV-B 1.408 C 0.375 0.300 0.300 - - - 97.5077.94%Satisfac<strong>to</strong>ry97.50%Outstanding1st/Final IV-B 2.351 O 0.348 0.300 0.100 0.007 0.028 0.100 88.30 -King's Builders &Development Corporation29199Const. of 1-CL @ Vicente YlaganNational High School1st IVB 0.764 C 0.287 0.244 0.300 - - - 83.1083.10%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 86


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONKing's Builders &Development Corporation29199Const. of Calapan South Road (SanFrancisco Sect.)1st/Final IV-B 1.409 C 0.263 0.300 0.300 - - - 86.3086.30%V.Satisfac<strong>to</strong>ryKing's Builders &Development Corporation29199Const. of Line Canal at Brgy. Sta.Teresita1st/Final IV-B 0.941 O 0.229 0.145 0.100 0.030 0.045 0.200 74.90 -King's Builders &Development Corporation29199Improvement of Sta. TeresitaSection Road1st IV-B 0.937 C 0.458 - 0.500 - - - 95.8092.56%OutstandingKLDS Trading andConstruction28091Const. of 2 S<strong>to</strong>rey 2 ClassroomSchoolbuilding w/ CR @ AmuyongElem. SchoolFinal IVB 1.333 C 0.396 0.200 0.300 - - - 89.6089.60%V.Satisfac<strong>to</strong>ryKrenz Construction &Trading19907Const. of MPB @ Pamantasan ngLungsod ng Maynila1st/Final IV-A 7.460 C 0.393 0.300 0.300 - - - 99.3089.36%V.Satisfac<strong>to</strong>ryKrisjohn Constructionand Supply Corporation<strong>31</strong>901Repair/Rehab. of San FranciscoRiver ControlFinal NCR 0.905 C 0.400 0.200 0.300 - - - 90.0087.84%V.Satisfac<strong>to</strong>ryKuntel Construction 10234Concreting of Road alongMagsunday Bridge IIIFinal V 0.956 C 0.287 0.185 0.300 - - - 77.2082.30%V.Satisfac<strong>to</strong>ryKuntel Construction 10234Rehab./Conc. of Himamaylan RoadSectionFinal VI 7.324 O 0.386 0.220 0.100 0.008 0.035 0.100 84.90 -KV Constraction & Supply 17509 Rehabilitation of Pinagwarasan CIS 1st VI 3.189 C 0.371 0.180 0.300 - - - 85.1085.14%V.Satisfac<strong>to</strong>ryKV Constraction & Supply 17509 Rehabilitation of Pinagwarasan CIS 1st/FinalNIARegion V3.189 C 0.371 0.180 0.300 - - - 85.1085.14%V.Satisfac<strong>to</strong>ryKVC Construction 28959 Const. of Tocucan Bridge 1st/FinalNIARegion V4.041 C 0.359 0.200 0.300 - - - 85.9077.74%Satisfac<strong>to</strong>ryKVC Construction 28959Repair/Rehab. Along Alapang-Labueg RoadFinal CAR 0.284 C 0.276 0.300 0.300 - - - 87.6087.60%V.Satisfac<strong>to</strong>ryKwikbuilt Construction 24577Const. of Std. 1 unit 1Cl Sch. Bldg.@ Paglaum NHS NOSof Ext.1st/Final CAR 3.181 C 0.335 0.300 0.300 - - - 93.5093.50%OutstandingKyro Builders 19567Kyro Builders 19567Const. of Multi-PurposeBuilding/Health CenterConst. of Multi-PurposeBuilding/Health Center1st/Final VI 7.488 O 0.329 0.223 0.050 0.023 0.022 0.033 68.00 -2nd III 7.488 C 0.348 0.200 0.300 - - - 84.8075.21%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 87


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONL. Bal<strong>to</strong>nadoConstruction &Development Corporation25250Conc. Paving of San Isidro-TabangoRoadFinal III 2.846 C 0.364 0.200 0.300 - - - 86.4086.40%V.Satisfac<strong>to</strong>ryL. Bal<strong>to</strong>nadoConstruction &Development Corporation25250Const. of Multi-Purpose Building(Bleacher & Gym)1st/Final VIII 1.444 C 0.343 0.276 0.300 - - - 91.9091.90%OutstandingL. P. O. Enterprises 20730Const, of River Control in Brgy, DelaPaz1st/Final VIII 0.477 O 0.264 0.240 0.100 0.030 0.016 0.100 75.00 -L.A. Arizola Construction& Supply<strong>31</strong>060Const. of 1 Cl 1 S<strong>to</strong>rey Sch. Bldg. @Mulig NHS1st IV-A 0.452 C 0.275 0.300 0.300 - - - 87.5087.50%V.Satisfac<strong>to</strong>ryL.A. Arizola Construction& Supply<strong>31</strong>060Impvt./Conc. of Additional 2 lanesfrom Church of Later Day Saints up<strong>to</strong> Carmen1st/Final XI 4.129 O 0.293 0.143 0.100 0.030 0.050 0.100 71.60 -L.A. Arizola Construction& Supply<strong>31</strong>060 Road Conc. @ Sitio Tamayong 1st XI 0.914 C 0.389 0.200 0.300 - - - 88.9088.90%V.Satisfac<strong>to</strong>ryL.A. Clamor Construction 26413Const. of MPB @ Brgy. BuenavistaWest1st/Final XI 0.669 C 0.389 0.300 0.300 - - - 98.9098.90%OutstandingL.C. Ting Construction 23666Conc. of Surigao-Davao CoastalRoad Hinatuan-Bislig (TagasakaSection) (Sta.1438+673.577-Sta.1439+415.61)1st/Final IV-A 9.369 O 0.389 0.300 0.100 0.018 0.042 0.067 91.60 -L.C. Ting Construction 23666Conc. of Surigao-Davao CoastalRoad Hinatuan-Bislig (TagasakaSection) (Sta.1438+673.577-Sta.1439+415.61)1st XIII 9.365 C 0.254 0.300 0.300 - - - 85.4089.12%V.Satisfac<strong>to</strong>ryL.C. Ting Construction 23666Const. of Matho Bridge andApproachesFinal XIII 14.369 O 0.306 0.258 0.100 0.023 0.032 0.100 81.90 -L.C. Ting Construction 23666 Rehab. of Amontay Bailey Bridge 1st XIII 5.765 C 0.225 0.300 0.300 - - - 82.5082.50V.Satisfac<strong>to</strong>ryL.C. Ting Construction 23666L.C. Ting Construction 23666Rehab. of Libertad Bridge alongButuan City-Misamis Oriental Rd.Rehab./Const.of Mamkas RiverControl @ Sitio Siringan Kitcharao1st/Final XIII 10.857 O 0.304 0.300 0.100 0.030 0.070 0.100 90.40 -1st XIII 9.534 O 0.230 0.111 0.100 0.030 0.035 0.200 70.60 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 88


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONL.C. Ting Construction 23666Rehab./Const.of Mamkas RiverControl @ Sitio Siringan Kitcharao1st XIII 9.534 C 0.345 0.300 0.300 - - - 94.5080.16%V.Satisfac<strong>to</strong>ryL.G. Lasacar Construction 11960Const. of Cross-Country Road atCatarman-Mambajao SectionFinal XIII 9.293 C 0.280 0.300 0.300 - - - 88.0072.22%Satisfac<strong>to</strong>ryL.G. Lasacar Construction 11960L.G. Lasacar Construction 11960L.N. SalvadorConstruction16661Const./Improvement of CrossCountry Road, Catarman-MambajaoSectionConst./Improvement of CrossCountry Road, Catarman-MambajaoSectionConst. of Drainage System atMalayas-PoblacionFinal X 4.533 O 0.400 0.300 0.100 0.022 0.044 0.100 96.60 -1st X 4.368 C 0.349 0.008 0.300 - - - 65.7084.24%V.Satisfac<strong>to</strong>ryFinal X 4.642 O 0.301 0.200 0.100 0.030 0.040 0.200 87.10 -L.N. SalvadorConstruction16661Const. of Drainage System atMalayas-Poblacion2nd IV-B 4.642 C 0.337 0.221 0.300 - - - 85.8086.13%V.Satisfac<strong>to</strong>ryL.P.O. Enterprises 20730 Consst. of MPB at Market Area Final IV-B 1.920 C 0.<strong>31</strong>6 0.200 0.300 - - - 81.6081.60%V.Satisfac<strong>to</strong>ryL.P.O. Enterprises 20730L.P.O. Enterprises 20730Const. of 2 S<strong>to</strong>rey 4 Cl Sch. Bldg. @San Isidro NHSConst. of 2 S<strong>to</strong>rey 4 Cl Sch. Bldg. @San Isidro NHS1st/Final IV-A 5.549 O 0.356 0.297 0.100 0.030 0.027 0.100 91.00 -1st/Final IV-A 5.547 C 0.389 0.228 0.300 - - - 91.70L.P.O. Enterprises 20730 Const. of FMR @ Brgy. Gatid Final IV-A 0.955 C 0.361 0.295 0.300 - - - 95.60L.P.O. Enterprises 20730L.P.O. Enterprises 20730Const. of River Control in Brgy. DelaPazConst./Rehab. of School Bldg. @Los Banos Community NHS91.21%Outstanding95.60%Outstanding1st/Final IV-A 0.477 O 264.000 240.000 0.100 0.030 0.016 0.100 75.00 -1st IV-A 1.915 O 0.300 0.300 0.100 0.030 0.027 0.100 85.70 -L.R. Tiqui Builders, Inc. 13810Impv't. / Widening of Manila NorthRoad (MNR) Package III Km.44+00-Km.51+330 with exception,1st IV-A 89.250 O 0.385 0.300 0.100 0.030 0.035 0.100 95.00 -L.R. Tiqui Builders, Inc. 13810Impv't. / Widening of Manila NorthRoad (MNR) Package III Km.44+00-Km.51+330 with exception,1st III 91.249 C 0.397 0.300 0.300 - - - 99.7096.85%OutstandingL.R. Tiqui Builders, Inc.(Formerly Luisi<strong>to</strong> R. TiquiBuilders13810Const. of Plaridel By Pass includingconnecting RoadsFinal III 28.425 O 0.323 0.300 0.100 0.030 0.038 0.100 89.10 -L.R. Tiqui Builders, Inc.(Formerly Luisi<strong>to</strong> R. TiquiBuilders13810Const. of Plaridel By Pass includingconnecting Roads1st III 28.425 C 0.284 0.300 0.300 - - - 88.4088.28%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 89


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONL.S.D. Construction &Supplies8980L.V. Capule Construction 15578Const. of 1 Cl Sch. Bldg @ BalibagoII E/SCompletion 0f Conc. of Road &Drainage @ FaustaFinal III 0.377 O 0.320 0.254 0.100 0.030 0.029 0.100 83.30 -1st III 2.838 O 0.354 0.300 0.100 0.015 0.028 0.100 89.70 -LA Milagrosa Enterprises 17404 Conc. of Yumbing Road 1st III 0.926 C 0.288 0.217 0.300 - - - 80.5080.50%V.Satisfac<strong>to</strong>ryLabb Construction 13524Impvt./Conc. Paving of Jct. LIR Loay-Loboc-Carmen Road1st/Final X 8.680 O 0.352 0.241 0.100 0.030 0.035 0.100 85.80 -Lady of AssumptionEnterprises25360 Cagni<strong>to</strong>an CIS and Extension 1st VII 3.998 C 0.370 0.180 0.300 - - - 85.0085.00%V.Satisfac<strong>to</strong>ryLady of AssumptionEnterprises25360 Const. of Brgy. Road 1st/Final NIA 0.467 C 0.<strong>31</strong>8 0.200 0.300 - - - 81.8081.80%V.Satisfac<strong>to</strong>ryLambayong Constructionand Supply20800Rehabilitation of Manin Canal (Sta.16+626-21+714)1st/Final VIII 12.594 C 0.250 0.300 0.300 - - - 85.00 84.87%Lanao Builder andEnterprisesLanao Builder andEnterprisesLanao Builder andEnterprisesLanao Builder andEnterprises15982Conc. of Bacolod-Pagayawan-Munai-Tangkal RoadFinalNIARegion I4.645 O 0.351 0.250 0.100 0.015 0.047 0.100 86.30 -15982 Conc. of San Manuel Road 1st X 0.139 C 0.367 0.300 0.300 - - - 96.701598215982Conc./Impvt. of Tubod-GanassiRoadConst. of MPB @ Brgy. Lower Sta.Cruz96.70%Outstanding1st/Final X 13.785 O 0.296 0.300 0.100 0.030 0.037 0.100 86.30 -1st X 0.189 C 0.369 0.300 0.300 - - - 96.9096.90%OutstandingLanao Builder andEnterprises15982Const./Impv't. of Bacolod-Pagayawan-Munai-Tangkad Road1st/Final X 11.988 C 0.361 0.300 0.300 - - - 96.1086.14%V.Satisfac<strong>to</strong>ryLanao Builder andEnterprises15982Impvt. of Iligan-Aurora Road (Rawan-Magpaytao-Lanipao-AbagaSect.)Final X 9.389 O 0.286 0.300 0.100 0.030 0.027 0.100 84.30 -Lanao Builder andEnterprises15982Impvt./Const. of Maranding Drainagealong Nat'l Highway1st X 4.692 C 0.362 0.200 0.300 - - - 86.2085.54%V.Satisfac<strong>to</strong>ryLandmark Builders 7400 Concreting of Madang Road Final X 9.446 O 0.329 0.235 0.070 0.023 0.043 0.100 80.00 -Landmark Builders 7400 Concreting of Madang Road 2nd XI 9.446 C 0.356 0.200 0.300 - - - 85.6087.49%V.Satisfac<strong>to</strong>ryLandmark Builders 7400 Const. of MPB (Gymnasium) Final XI 2.800 O 0.<strong>31</strong>7 0.244 0.000 0.015 0.023 0.067 66.60 -Landmark Builders 7400Const./Completion of ManoloFortich Municipal Hall Bldg. (P-IX)1st XI 7.590 O 0.351 0.300 0.100 0.030 0.013 0.100 89.40 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 90


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONLandmark Builders 7400Const./Completion of ManoloFortich Municipal Hall Bldg. (P-IX)2nd X 7.590 C 0.380 0.300 0.300 - - - 98.0093.73%OutstandingLandmark Builders 7400Landmark Builders 7400Package 11, Const. of Multi-PurposeBldg. (Gymnasium)Repair/Const. of Don Mariano E/S(H.E.) Bldg.Final X 3.766 C 0.361 0.241 0.300 - - - 90.2073.68%Satisfac<strong>to</strong>ryFinal XI 0.289 O 0.379 0.300 0.100 0.030 0.012 0.100 92.10 -Landmark Builders 7400Repair/Const. of Don Mariano E/S(H.E.) Bldg.1st XI 0.289 C 0.358 0.067 0.300 - - - 72.5086.22%V.Satisfac<strong>to</strong>ryLangit Construction 23462Langit Construction 23462LB Builders Center 14115Leadtek Construction Inc. 25978Const. of 2 S<strong>to</strong>rey 4 ClassroomSchool BuildingConst. of 2 S<strong>to</strong>rey 4 ClassroomSchool BuildingConc. Paving of Calubian-San IsidroRoadConst. of (1) Classroom (1) UnitSchool Building D. Moises E/S,MalingawanFinal XI 2.407 O 0.287 0.195 0.100 0.020 0.058 0.100 76.00 -1st IV-A 2.407 O 0.388 0.300 0.000 0.030 0.047 0.067 83.20 -2nd IV-A 2.844 O 0.307 0.163 0.100 0.030 0.027 0.100 72.70 -1st VIII 0.382 C 0.361 0.000 0.300 - - - 66.1059.55%PoorLeadtek Construction Inc. 25978 Const. of Sinanguyan NHS Final XII 0.595 O 0.229 0.000 0.000 0.030 0.032 0.033 32.40 -Legacy Construction 22465Widening/Impvt. of Bacolod SouthKabankalan Road (Tangub Sect.)1st X 7.870 O 0.259 0.237 0.100 0.030 0.045 0.100 77.10 -Legazpi PremiumDevelopment Corporation20701Road Conc./Impvt. of Magallang-Mararag Road1st VI 14.387 C 0.340 0.200 0.300 - - - 84.0084.00%V.Satisfac<strong>to</strong>ryLeymarc Construction 22094 Conc. of Roads (Brgy. Cansaging) 1st/Final V 0.414 C 0.351 0.300 0.300 - - - 95.10Leymarc Construction 22094LGC Trucking andConstruction14464Const. of 1 unit 1 Cl Sch. Bldg. @Sta. Catalina North C/SConst. of Lugom Bridge alongCircumferential Road1st/Final VII 0.701 C 0.386 0.100 0.300 - - - 78.601st/Final VII 9.223 C 0.2<strong>31</strong> 0.199 0.300 - - - 73.0095.10%Outstanding78.60%Satisfac<strong>to</strong>ry73.48%Satisfac<strong>to</strong>ryLibrius Construction andSuppply Corporation23580Const. of 2 S<strong>to</strong>rey RGR Type SchoolBuilding @ Batangas NHSFinal XIII 8.596 C 0.385 0.200 0.300 - - - 88.5086.05%V.Satisfac<strong>to</strong>ryLibrius ConstructionSuppply Corporation23580Const. of 2 S<strong>to</strong>rey RGR Type SchoolBuilding @ Batangas NHSFinal IV-A 8.596 O 0.354 0.240 0.100 0.015 0.022 0.100 83.10 -Ligao S<strong>to</strong>. Niño 9279Lim General Contrac<strong>to</strong>r 8482Rehabilitation of Canal Network(package 1)Const. of Buyo Bridge, Approaches& De<strong>to</strong>ur2nd IV-A 10.323 O 0.283 0.200 0.100 0.018 0.033 0.200 83.40 -1stNIARegion V19.200 O 0.322 0.240 0.100 0.015 0.027 0.067 77.10 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 91


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONLim General Contrac<strong>to</strong>r 8482Const. of Buyo Bridge, Approaches& De<strong>to</strong>ur1st V 19.200 O 0.388 0.157 0.100 0.015 0.035 0.067 76.20 -Lim General Contrac<strong>to</strong>r 8482 Const. of Luya Bridge 2nd V 15.827 C 0.341 0.300 0.300 - - - 94.1089.18%V.Satisfac<strong>to</strong>ryLim General Contrac<strong>to</strong>r 8482Lim General Contrac<strong>to</strong>r 8482Const. of San Fernando South Road,Batuan SectionPreventive Maintenance of Masbate-Cataingan RoadFinal V 11.250 O 0.325 0.181 0.100 0.023 0.043 0.100 77.20 -1st V 9.496 O 0.400 0.300 0.100 0.008 0.027 0.000 83.50 -Lim General Contrac<strong>to</strong>r 8482Preventive Maintenance of Masbate-Cataingan Road1st V 9.496 C 0.377 0.100 0.300 - - - 77.7081.18%V.Satisfac<strong>to</strong>ryLimar Construction 10203 Const. of Manlumay Bridge Final V 3.807 O 0.327 0.300 0.100 0.022 0.047 0.100 89.60 -Limar Construction 10203 Const. of Manlumay Bridge 1st VIII 3.807 C 0.300 0.300 0.300 - - - 90.0089.76%V.Satisfac<strong>to</strong>ryLimes<strong>to</strong>ne Constructionand DevelopmentCorporationLimes<strong>to</strong>ne Constructionand DevelopmentCorporationLinear ConstructionCorporation44534453Impv't. along Jct. PPH-Jones-Maddela Road (Km. 380+000-Km.384+320)cDivisoria Norte-SanBernabe Sect.Impv't. along Jct. PPH-Jones-Maddela Road (Km. 380+000-Km.384+320)cDivisoria Norte-SanBernabe Sect.Final VIII 8.200 O 0.335 0.300 0.050 0.020 0.033 0.067 80.50 -1st II 8.200 C 0.256 0.300 0.300 - - - 85.603575 NBP Resettlement Project, Phase IV Final II 148.890 O 0.320 0.300 0.100 0.020 0.028 0.100 86.80 -82.54%V.Satisfac<strong>to</strong>ryLiong-Co Construction &Construction Supply28361 Conc. of FMR at Purok Gampis 1st/Final NHA NCR 0.951 C 0.344 0.285 0.300 - - - 92.9092.90%OutstandingLiong-Co Construction &Construction Supply28361 Const. of Multi Purpose Day Care 1st/Final IX 0.550 C 0.304 0.300 0.300 - - - 90.4090.40%OutstandingLiong-Co Construction &Construction Supply28361Const./Completion of Multi-PurposeBuilding (Perimeter Fence)1st/Final IX 0.089 C 0.302 0.300 0.300 - - - 90.2090.20%OutstandingLiong-Co Construction &Construction Supply28361Const./Rehab. of Various SchoolBuilding Project (Clustered)1st/Final IX 0.277 C 0.399 0.200 0.300 - - - 89.9089.90%V.Satisfac<strong>to</strong>ryLiong-Co Construction &Construction Supply28361Const./Rehab. of Various SchoolBuilding Project Clustered)1st/Final IX 4.265 C 0.399 0.200 0.300 - - - 89.9096.05%OutstandingLisa Construction 24134Asphalt Overlay along CabanatuanCircumferential RoadFinal IX 0.952 C 0.362 0.300 0.300 - - - 96.2096.20%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 92


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONLisa Construction 24134Const. of Flood Control at SanVicente1st/Final III 2.835 C 0.369 0.300 0.300 - - - 96.9096.90%OutstandingLJPM Builders &Construction Supply29981Repair of Multi-Purpose Building,DTI Compound1st/Final III 0.961 C 0.377 0.200 0.300 - - - 87.7088.47%V.Satisfac<strong>to</strong>ryLlaban Construction &TruckingLLM Concrete Products 14235LLM Concrete Products 1423529504 Const. of Hanging Bridge Final VIII 1.309 C 0.340 0.300 0.300 - - - 94.00Const. of 1 CL Academic Bldg. @KapocConst. of Multi-Purpose (Brgy Hall)Ba<strong>to</strong>Final XII 0.322 C 0.332 0.300 0.300 - - - 93.20Final XI 0.755 C 0.378 0.300 0.300 - - - 97.8079.12%Satisfac<strong>to</strong>ry93.34%Outstanding92.90%OutstandingLLM Concrete Products 14235Const. of Tagum Drainage alongAgusan-Davao RoadFinal XI 2.830 C 0.230 0.300 0.300 - - - 83.0083.00%V.Satisfac<strong>to</strong>ryLM Construction andGeneral Marketing9213Const. of CY 2004 School BuildingProjects1st/Final XI 0.818 O 0.373 0.244 0.100 0.020 0.013 0.100 85.00 -LM Construction andGeneral Marketing9213Const. of CY 2004 School BuildingProjects1st XIII 0.818 O 0.350 0.200 0.100 0.030 0.041 0.100 82.10 -LMD Construction 9410Impvt./Conc. Paving of Kagawasan-Pi<strong>to</strong>go Road (Kagawasan Section)2nd XIII 4.535 O 0.209 0.148 0.100 0.022 0.008 0.067 55.40 -Lo-Tone Construction &Supply23385Const. of Multi-Purpose Hall-PhaseII1st IX 1.851 C 0.346 0.300 0.300 - - - 94.6085.92%V.Satisfac<strong>to</strong>ryLo-Tone Construction &Supply23385Rehab. Works Including Removal ofSlides along CatanduanesCircumferential RoadFinal V 12.167 C 0.378 0.288 0.300 - - - 96.6093.30%OutstandingLo-Tone Construction &Supply23385Road Impv't./Widening of IntegratedBus TerminalFinal V 4.640 O 0.400 0.300 0.100 0.020 0.038 0.100 95.80 -Lo-Tone Construction &Supply23385Road Impv't./Widening of IntegratedBus Terminal1st IX 4.640 C 0.232 0.000 0.300 - - - 53.2078.76%Satisfac<strong>to</strong>ryLo-Tone Construction &Supply23385Road Rehab./Impv't. of Ba<strong>to</strong>, Bula,Minabalac (Excl. acquisition ofRoads/Traffic Signs & SafetyDevicesFinal IX 9.407 C 0.258 0.300 0.300 - - - 85.80Lotrim Construction Inc. 12273 Const. of Banaybanay Public Market Final V 2.504 C 0.372 0.300 0.300 - - - 97.20Lotrim Construction Inc. 12273 Const. of MPB @ Flores Subd. Final XI 0.752 C 0.379 0.226 0.300 - - - 90.50Lotrim Construction Inc. 12273 Const. of MPB @ Rizal E/S 1st/Final XI 0.657 C 0.367 0.300 0.300 - - - 96.7086.64%V.Satisfac<strong>to</strong>ry92.93%Outstanding90.50%Outstanding96.70%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 93


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONLubo Construction &DevelopmentLubo Construction &DevelopmentLubo Construction &DevelopmentLucky Armn'sConstruction &Enterprises30508 Const. of MPB @ Calamagui 1st 1st/Final XI 0.921 O 0.356 0.214 0.100 0.022 0.035 0.100 82.70 -305083050823434Const./Rehab. of Ilagan NorthCentral SchoolRehab. of Ilagan North CentralSchoolConc. of Shoulder at Picas San JoseDZR Airport Road1st II 1.192 C 0.336 0.200 0.300 - - - 83.6478.21%Satisfac<strong>to</strong>ryFinal II 1.192 O 0.293 0.212 0.100 0.030 0.012 0.100 74.70 -1st II 1.898 C 0.300 0.200 0.300 - - - 80.0080.00%Satisfac<strong>to</strong>ryLumel GlennConstruction26817 Conc. of Sitio Tabtabong Road 1st/Final VIII 1.413 C 0.209 0.300 0.300 - - - 80.9080.90%V.Satisfac<strong>to</strong>ryLumel GlennConstruction26817Const. of Drainage Canal @ DonPedro1st/Final IV-B 1.875 O 0.324 0.212 0.100 0.022 0.016 0.100 77.40 -LVRO Construction &Supply18116 Concreting of Brgy. 3, Bliss Road 1st IV-B 2.786 C 0.384 0.300 0.000 - - - 68.4080.76%V.Satisfac<strong>to</strong>ryLVRO Construction andSupply18116Const. of 1 Cl Sch. Bldg. @ TinagoE/SFinal XIII 0.385 C 0.386 0.200 0.300 - - - 88.6088.60%V.Satisfac<strong>to</strong>ryLVRO Construction andSupplyM F Construction 2219218116 Const. of Concepcion-Mt. Zion FMR 1st/Final XIII 4.552 O 0.334 0.000 0.100 0.030 0.025 0.100 58.90 -Completion of Multi-PurposeBuilding @ Tigbawan, Phase 21st XIII 1.882 O 0.<strong>31</strong>4 0.300 0.100 0.030 0.035 0.100 87.90 -M F Construction 22192Completion of Multi-PurposeBuilding @ Tigbawan, Phase 21st VII 1.882 C 0.267 0.300 0.300 - - - 86.7087.54%V.Satisfac<strong>to</strong>ryM. Montesclaros6506Enterprises, Inc.M. Montesclaros6506Enterprises, Inc.M. Montesclaros6506Enterprises, Inc.M. MontesclarosEnterprises, Inc.M. MontesclarosEnterprises, Inc.M. MontesclarosEnterprises, Inc.M.C. Torio Construction 10534Const. of Diversion Road at Kipolot-Palacapao SectionConst. of Diversion Road at Kipolot-Palacapao SectionConst. of Diversion Road at Kipolot-Palacapao SectionFinal VII 14.111 O 0.400 0.294 0.100 0.030 0.038 0.100 96.20 -1st X 14.101 O 0.383 0.300 0.100 0.030 0.045 0.100 95.80 -2nd X 14.101 C 0.378 0.300 0.300 - - - 97.806506 Const. of MPB @ Palacapao Final X 9.375 O 0.381 0.300 0.100 0.030 0.061 0.100 97.20 -6506 Const. of MPB @ Palacapao 1st X 9.375 O 0.276 0.300 0.100 0.030 0.047 0.100 85.30 -6506 Const. of Sayre National Highway 2nd X 33.060 O 0.<strong>31</strong>9 0.300 0.100 0.030 0.042 0.100 89.10 -Alibadabad Communal PumpIrrigation Project96.72%Outstanding1st X 2.193 O 0.360 0.119 0.100 0.018 0.030 0.200 82.70 -M.C. Torio Construction 10534 Alibadabad CPIP 1st NIA 2.193 C 0.300 0.296 0.300 - - - 89.60 85.47%<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 94


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONM.C. Torio Construction 10534 Const. of MPB (Community Center) FinalNIARegion II0.283 C 0.400 0.200 0.300 - - - 90.0090.00%V.Satisfac<strong>to</strong>ryM.C. Torio Construction 10534M.C. Torio Construction 10534M.C. Torio Construction 10534Delfin Albano Communal PumpIrrigation ProjectDelfin Albano Communal PumpIrrigation ProjectDelfin Albano Communal PumpIrrigation Project1st/Final II 8.030 O 0.351 0.084 0.100 0.024 0.058 0.200 81.30 -2nd NIA 8.706 C 0.298 0.240 0.300 - - - 83.80 82.30%FinalNIARegion II2.991 O 0.291 0.240 0.300 - - - 83.10 -M.C.B. ZamoraConstruction & Supplies32006 Const. of MPB at Brgy. Calangain FinalNIARegion II0.948 C 0.308 0.300 0.300 - - - 90.8090.80%OutstandingM.G. Jacin<strong>to</strong> Construction 20617M.G. Jacin<strong>to</strong> Construction 20617M.G. Salazar Const.Corp./Candace Const.(JV)JV-03-064Const. of Multi-Purpose Building(Learning Center)Const. of Multi-Purpose Building(Learning Center)Impv't./Conc. Paving of BasilanCircumferential Rd., Isabela-MalusoRd.1st/Final III 0.750 O 0.357 0.061 0.100 0.015 0.027 0.100 66.00 -1st II 0.750 C 0.382 0.280 0.300 - - - 96.2075.06%Satisfac<strong>to</strong>ryFinal II 36.385 O 0.296 0.300 0.050 0.030 0.051 0.100 82.70 -M.G. SamidanConstruction16779 Const. of Bolinawen Flood Control 5th IX 1.051 C 0.300 0.300 0.300 - - - 90.0090.00%V.Satisfac<strong>to</strong>ryM.G. SamidanConstruction16779Const. of Kin-iway-Tambo-an TribalARC, FMR1st/Final CAR 21.993 C 0.345 0.300 0.300 - - - 94.5094.50%OutstandingM.G. SamidanConstruction16779Improvement of Access Road <strong>to</strong>Tourism Hubs & Spokes as definedby DOT1st/Final CAR 12.221 O 0.<strong>31</strong>8 0.300 0.100 0.030 0.037 0.100 88.50 -M.G. SamidanConstruction16779Improvement of Access Road <strong>to</strong>Tourism Hubs & Spokes as definedby DOT1st CAR 12.222 O 0.298 0.298 0.300 - - - 89.60 -M.G. SamidanConstruction16779Improvement of Benguet-Bon<strong>to</strong>c(Mt. Province)-Tinglayan (Kalinga)Road Mt. Data Bon<strong>to</strong>c SectionFinal CAR 8.188 C 0.384 0.300 0.300 - - - 98.4089.10%V.Satisfac<strong>to</strong>ryM.G. SamidanConstruction16779Impvt. of Benguet-Bon<strong>to</strong>c (Mr. Prov.)-Tinglayan-Lubuagan (Kalinga) RoadAt-A<strong>to</strong>-Circle SectionFinal CAR 7.286 C 0.374 0.300 0.300 - - - 97.4092.33%OutstandingM.H. SouthernConstructionM.H. SouthernConstruction5841 Const. of Multi-Purpose Building Final CAR 0.370 C 0.362 0.300 0.300 - - - 96.205841Const. of Public Market @ Pob.Malungon1st/Final XII 9.102 C 0.370 0.224 0.300 - - - 89.4096.20%Outstanding71.96%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 95


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONM.J. Apin Builders 12179Const. of 1-Cl School Building @Bacolod National High SchoolFinal XII 0.378 C 0.300 0.000 0.300 - - - 60.0056.01%PoorM.J. Apin Builders 12179 Const. of Sch. Bldg. Pa<strong>to</strong>ng E/S Final V 0.468 C 0.291 0.200 0.300 - - - 79.10M.R. Oribiana Gravel &Sand Dealer &Construction26070 Conc. of Critical Portion of FTMR 1st/Final V 0.470 C 0.245 0.300 0.300 - - - 84.5079.10%Satisfac<strong>to</strong>ry84.50%V.Satisfac<strong>to</strong>ryM.R. SantiagoConstruction27329 Conc. of Road, Brgy. Maguinao 1st/Final IVA 0.947 C 0.377 0.200 0.300 - - - 87.7087.70%V.Satisfac<strong>to</strong>ryM.R. SantiagoConstructionM.S. Ramos Construction <strong>31</strong>684M.S. Ramos Construction <strong>31</strong>684M.S. Ramos Construction <strong>31</strong>68427329 Const. of MPB @ San Roque E/S 1st/Final III 0.950 C 0.332 0.300 0.300 - - - 93.20Const. of two (2) S<strong>to</strong>rey, 4CL SchoolBldg., @ Heritage Homes Brgy.Loma de Ga<strong>to</strong>Const. of two (2) S<strong>to</strong>rey, 4CL SchoolBldg., @ Heritage Homes Brgy.Loma de Ga<strong>to</strong>Impvt./Rehab of Mac Arthur Highwayincluding drainage93.20%Outstanding1st/Final III 3.283 O 0.346 0.263 0.100 0.015 0.025 0.100 84.90 -1st III 3.283 C 0.378 0.200 0.300 - - - 87.8085.77%V.Satisfac<strong>to</strong>ryFinal III 9.425 O 0.383 0.225 0.100 0.030 0.052 0.100 89.00 -M.V. Caldo EngineeringConstruction andSupplies16938Concreting with DrainageImprovement of Hondradez St.1st NCR 1.781 C 0.371 - 0.500 - - - 87.1087.10%V. SatisfacrotyM.V. Caldo EngineeringConstruction andSupplies16938Const.Rehab. of ShallowWell/Artesian Well @ Zone 13-241st NCR 0.465 O 0.333 0.250 0.100 0.015 0.018 0.100 81.60 -M.V. Caldo EngineeringConstruction andSupplies16938Const.Rehab. of ShallowWell/Artesian Well @ Zone 13-241st NCR 0.932 C 0.222 0.300 0.300 82.2081.84%V.Satisfac<strong>to</strong>ryM.Y. Reyes Builders &Development Corporation26386 Const. of 3-S<strong>to</strong>rey School Building Final NCR 16.409 O 0.394 0.300 0.100 0.030 0.059 0.100 98.30 -M.Y. Reyes Builders &Development Corporation26386Const. of Multi-Purpose CovredCourt1stNHARegion III4.698 O 0.398 0.300 0.100 0.030 0.070 0.100 99.84 -M.Y. Reyes Builders &Development Corporation26386Const. of Multi-Purpose CovredCourt1stNHANCR II4.711 O 0.398 0.300 0.100 0.030 0.070 0.100 99.84 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 96


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONM2R Construction 134<strong>31</strong>Asphalt Overlay along Olongapo-Bugallon Road, Phase 3, PananSection1stNHANCR II0.979 C 0.356 0.300 0.300 - - - 95.6095.60%OutstandingM2R Construction 134<strong>31</strong>Const. of Multi-Purpose Building @Palauig C/S1st/Final III 1.061 C 0.481 - 0.500 - - - 98.1088.23%V.Satisfac<strong>to</strong>ryM2R Construction 134<strong>31</strong>Improvement/Rehab. of WaterSupplyFinal III 0.935 O 0.400 0.022 0.100 0.020 0.025 0.100 66.70 -M2R Construction 134<strong>31</strong> Various Water System 1st III 1.955 C 0.302 - 0.500 - - - 80.2080.20%V.Satisfac<strong>to</strong>ryMa. Gina M. PadorConstruction25600 Conc. of Concepcion Sur Nat'l Road 1st III 0.933 C 0.256 0.300 0.300 - - - 85.6085.60%V.Satisfac<strong>to</strong>ryMa. Gina M. PadorConstruction25600Repair/Maint. of Ferrol-OdionganRoad (Tubigon Section) Km.120+8001st/Final IV-B 0.139 C 0.337 0.200 0.300 - - - 83.7085.20%V.Satisfac<strong>to</strong>ryMa-an ConstructionCorporation28751 Repair/Rehab. of Wright-Taft Road Final IV-B 2.614 C 0.375 - 0.500 - - - 87.5087.50%V.Satisfac<strong>to</strong>ryMAC Builders / UbasConstruction (JV)Mac-Morales GeneralMerchandise &Construction SupplyMadyaw Construction &Dev't. Corp.Maer Summit KonstruckCo.Maer Summit KonstruckCo.JV-05-0212287295982526225262Const. of Catarman Bridge(Completion)Conc. of FMR in Brgy. San IsidroIbabaConst. of San-Isidro-HinimbanganFMRConst. of MPB (Legislative Bldg.,Phase II)Impvt. of Manikling-Lavugan Road(Lavigan-Talisay Sect.)1st/Final VIII 58.<strong>31</strong>3 O 0.293 0.300 0.100 0.030 0.030 0.067 82.00 -1st VIII 0.471 C 0.296 0.218 0.300 - - - 81.4081.40%V.Satisfac<strong>to</strong>ry1st/Final IV-A 19.238 O 0.307 0.020 0.100 0.030 0.033 0.100 59.00 -1st XIII 1.887 C 0.388 0.300 0.300 - - - 98.8094.53%OutstandingFinal XI 14.464 O 0.294 0.220 0.100 0.030 0.060 0.100 80.40 -Maer Summit KonstruktCo. (Formerly: SummitKonstrukt)25262Const. of DOSCST Nursing Blsg.,Guang-Guang1st XI 2.359 O 0.377 0.225 0.100 0.030 0.045 0.100 87.70 -Maer Summit KonstruktCo. (Formerly: SummitKonstrukt)25262Const. of DOSCST Nursing Blsg.,Guang-Guang1st XI 2.359 C 0.386 0.200 0.300 - - - 88.6087.97%V.Satisfac<strong>to</strong>ryMaer Summit KonstruktCo. (Formerly: SummitKonstrukt)25262 Const. of MPB (Covered Court) Final XI 1.251 O 0.294 0.250 0.100 0.015 0.023 0.100 78.20 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 97


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONMaer Summit KonstruktCo. (Formerly: SummitKonstrukt)25262Improvement of CDC - PoblacionFMR (ARSIP II)1st XI 11.869 C 0.<strong>31</strong>0 0.011 0.300 - - - 62.1074.97%Satisfac<strong>to</strong>ryMaer Summit KonstruktCo. (Formerly: SummitKonstrukt)25262Impv't./Rehab. of Don Enrique Lopez-Don Salvador Lopez FMRFinal XI 7.364 C 0.384 - 0.500 - - - 88.4088.40%V. Satisfac<strong>to</strong>ryMafil Enterprises 27226Provision of Line Canal @ Km. 1546,450-Km.1546.7<strong>31</strong>st XI 0.280 C 0.411 - 0.500 - - - 91.1091.10%OutstandingMaghuyop Construction 21641Const. of 4 Cl Sch. Bldg. at PondolE/S1st X 1.435 C 0.333 0.300 0.300 - - - 93.3093.30%OutstandingMagscon Construction 25362Const. of Multi-Purpose Building @Brgy. Padu Grande1st/Final VII 0.189 C 0.368 0.300 0.300 - - - 96.8096.80%OutstandingMainbest Enterprise 26127Completion of Multi-PurposeBuilding (Gymnasium), Gamis1st/Final I 1.283 C 0.305 0.200 0.300 - - - 80.5080.50%V.Satisfac<strong>to</strong>ryMakapa Corporation 30029 Const. of Multi-Purpose Building 1st/Final II 1.380 C 0.391 0.300 0.300 - - - 99.1083.77%V.Satisfac<strong>to</strong>ryMakapa Corporation 30029Makapa Corporation 30029Makapa Corporation 30029Makati DevelopmentCorporationMakati DevelopmentCorporationMakati DevelopmentCorporationMakati DevelopmentCorporation2<strong>31</strong>32<strong>31</strong>32<strong>31</strong>32<strong>31</strong>3Const./Impvt. of Cawayan RiverControlConst./Impvt. of Cawayan RiverControlRehab./Impvt. of Cawayan RiverControlConst. of 10th & 11th Aveneus ofBonifacio Triangle ProjectConst. of 10th and 11th Avenues ofBonifacio TriangleConst. of 34.5 KVA UPDS along 26thSt., 32nd St. & McKinley Parkway,Phase 3Construction of 10th & 11thAveneus of Bonifacio TriangleProjectFinal V 9.452 O 0.333 0.133 0.100 0.023 0.025 0.200 81.40 -1st/Final V 9.452 O 0.341 0.148 0.100 0.023 0.032 0.200 84.40 -2nd V 4.728 C 0.306 0.300 0.300 - - - 90.6090.60%Outstanding1st/Final V 52.800 O 0.<strong>31</strong>6 0.300 0.100 0.020 0.047 0.100 88.28 -1st BCDA 52.800 O 0.377 0.275 0.070 0.023 0.045 0.100 88.94 -2nd BCDA 12.084 O 0.400 0.300 0.100 0.020 0.045 0.067 93.17 -1st BCDA 52.800 O 0.<strong>31</strong>6 0.300 0.100 0.020 0.047 0.100 88.28Mak-Well Enterprises 25003 Const. of MPB at Brgy. Pansol 1st BCDA 2.674 C 0.423 - 0.500 - - - 92.3088.28%V.Satisfac<strong>to</strong>ry92.30%OutstandingMak-Well Enterprises 25003Const. of Multi-Purpose Bldg. @ LosBanos Park1st IV-A 1.049 C 0.325 0.200 0.300 - - - 82.5082.50%V.Satisfac<strong>to</strong>ryMak-Well Enterprises 25003Const. of Multi-Purpose Bldg.Barangay Ba<strong>to</strong>ng Malake1st/Final IV-A 0.955 C 0.433 - 0.500 - - - 93.3093.30%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 98


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONMalihan Enterprises 6963MAM Construction &Trading19915Concreting of Road, Brgy. SanAn<strong>to</strong>nioConst. of Three 3-CL Building @Bucanan Elem. School1st/Final IV-A 0.954 C 0.467 - 0.500 - - - 96.7096.70%Outstanding1st/Final IV-A 1.410 O 0.400 0.300 0.100 0.020 0.018 0.100 93.80 -Mamsar Enterprises Agro-Industrial Corporation15885Cluster B 2004: Const. of Various2004 School Bldg. (OpolNSTS.)under the 2nd CongressionalDistrict, Misamis Oriental1st III 9.049 O 0.308 0.300 0.100 0.030 0.032 0.100 87.00 -Mamsar Enterprises Agro-Industrial Corporation15885Cluster B 2004: Const. of Various2004 School Building1st X 9.049 O 0.400 0.300 0.100 0.020 0.000 0.100 92.00 -Mamsar Enterprises Agro-Industrial Corporation15885Completion of Cumba Bridge &Approaches1st X 15.583 O 0.350 0.300 0.100 0.023 0.050 0.100 92.30 -Mamsar Enterprises Agro-Industrial Corporation15885Completion of Cumba Bridge &Approaches1st X 15.583 O 0.350 0.300 0.000 0.023 0.065 0.067 80.50 -Mamsar Enterprises Agro-Industrial Corporation15885Completion of Cumba Bridge &Approaches3rd X 16.484 O 0.292 0.200 0.050 0.030 0.037 0.000 60.90 -Mamsar Enterprises Agro-Industrial Corporation15885Completion of Mandulog Brdige Ialong Ma. Cristina-Misamis OrientalRd., Brgy. San Roque-Hinaplanon4th X 13.667 O 0.396 0.300 0.100 0.024 0.055 0.100 97.50 -Mamsar Enterprises Agro-Industrial Corporation15885Completion of Mandulog Bridge Ialong Ma. Cristina-Misamis OrientalRd., Brgy. San Roque-Hinaplanon1st X 18.663 O 0.393 0.300 0.070 0.015 0.049 0.100 92.70 -Mamsar Enterprises Agro-Industrial Corporation15885Completion of Mandulog Bridge Ialong Ma. Cristina-Misamis OrientalRd., Brgy. San Roque-Hinaplanon1st X 13.667 O 0.347 0.300 0.100 0.030 0.065 0.100 94.20 -Mamsar Enterprises Agro-Industrial Corporation15885Completion of Mandulog Bridge Ialong Ma. Cristina-Misamis OrientalRd., Brgy. San Roque-Hinaplanon2nd X 13.667 O 0.376 0.300 0.100 0.023 0.054 0.100 95.30 -Mamsar Enterprises Agro-Industrial Corporation15885Completion of Mandulog Bridge Ialong Ma. Cristina-Misamis OrientalRd., Brgy. San Roque-Hinaplanon3rd X 10.711 C 0.381 - 0.500 - - - 88.1087.02%V.Satisfac<strong>to</strong>ryMamsar Enterprises Agro-Industrial Corporation15885Completion of Nunucan BridgePhase III, Brgy. SuarezFinal X 7.608 C 0.425 - 0.500 - - - 92.5088.96%V. Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 99


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONMamsar Enterprises Agro-Industrial Corporation15885Const. of Mambu-ao Bridge &ApproachesFinal X 22.230 O 0.367 0.300 0.000 0.023 0.053 0.067 81.00 -Mamsar Enterprises Agro-Industrial Corporation15885Const.of Iligan-Bukidnon Road(Digkila-an-Rogongon Sect.)2nd X 7.769 C 0.276 - 0.500 - - - 77.6077.48%Satisfac<strong>to</strong>ryMamsar Enterprises Agro-Industrial Corporation15885Iligan-Bukidnon Road Brgy.San RoqueFinal X 8.037 C 0.444 - 0.500 - - - 94.4093.86%OutstandingManingo Enterprises 13330Maningo Enterprises 13330Manuel A. Dela Torre Jr.BuildersMar Castillo Const.Supply Gravel & SandMarbel Dynamic Builders 6150Const. of 4-Cl, 2-S<strong>to</strong>rey S/B @Bangkal NHSRoad Asphalting/Conc. @ Brgy.MalubogFinal X 1.962 C 0.218 0.230 0.300 - - - 74.80Final VII 0.478 C 0.307 0.300 0.300 - - - 90.70<strong>31</strong>024 Conc. of Road, Brgy Maasin 1st/Final VII 0.379 C 0.380 0.286 0.300 - - - 96.6021073 Const. of Lined Canal @ Sta. Maria 1st/Final III 0.283 C 0.4<strong>31</strong> - 0.500 - - - 93.10Const. of 2 Cl @ Mariani<strong>to</strong> VillegasE/S1st IV-A 0.680 C 0.381 0.300 0.300 - - - 98.10Marbel Dynamic Builders 6150 Const. of 2 Cl @ Surallah NHS 1st/Final XII 0.783 C 0.381 0.300 0.300 - - - 98.10Marbel Dynamic Builders 6150Const. of Ladol flood ControlProtecting Sarangani-Davao del SurCoastal Road74.80%Satisfac<strong>to</strong>ry90.70%Oustanding96.70%Outstanding93.10%Outstanding98.10%Outstanding98.10%Outstanding1st/Final XII 1.234 O 0.323 0.200 0.000 0.010 0.021 0.133 68.70 -Marbel Dynamic Builders 6150 Const. of MPB @ Brgy. Assumption 1st XII 0.190 C 0.360 0.200 0.300 - - - 86.0086.00%V.Satisfac<strong>to</strong>ryMarbel Dynamic Builders 6150Marbel Dynamic Builders 6150Const. of Multi-Purpose Bldg. @Brgy. LibertyConst. of Multi-Purpose Bldg., Brgy.Lake Selo<strong>to</strong>n1st/Final XII 0.759 C 0.276 0.216 0.300 - - - 79.2079.20%Satisfac<strong>to</strong>ry1st/Final XII 0.760 O 0.270 0.300 0.100 0.030 0.047 0.100 84.70 -Marbel Dynamic Builders 6150Const. of Multi-Purpose Bldg., Brgy.Lake Selo<strong>to</strong>n1st XII 0.760 C 0.330 0.200 0.300 - - - 83.0084.19%V.Satisfac<strong>to</strong>ryMarcons Builder 8044Marcons Builder 8044Marcons Builder 8044Marcons Builder 8044Const. of U.P. College Baguio Multi-Purpose Bldg.Impvt. of Benguet-Bon<strong>to</strong>c-KalingaRoadImpvt. of Benguet-Bon<strong>to</strong>c-KalingaRoadRehab./Impvt./Const. of DPWHBuilding (Phase III)Final XII 1.448 C 0.350 - 0.500 - - - 85.00Final CAR 12.369 O 0.266 0.032 0.070 0.022 0.035 0.067 49.20 -2nd CAR 12.369 O 0.390 0.285 0.050 0.022 0.035 0.067 84.90 -3rd CAR 14.475 O 0.380 0.274 0.100 0.030 0.035 0.100 91.90 -65.61%Fair<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 100


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONMarcphil Construction 10949 Conc. of Dangay Port Road 1st CAR 0.937 C 0.417 - 0.500 - - - 91.7084.38%V. Satisfac<strong>to</strong>ryMarcphil Construction 10949Conceting of San Jose-KaligtasanRoadFinal IV-B 0.945 C 0.398 - 0.500 - - - 89.8089.80%V. Satisfac<strong>to</strong>ryMarcphil Construction 10949Impvt./Repair of San Mariano-TaugaRoad1st IV-B 1.860 C 0.170 0.276 0.300 - - - 74.6074.60%Satisfac<strong>to</strong>ryMarcus Construction 12601Const. of Multi-Purpose Bldg. (ABCHall) Phase I1st/Final IV-B 0.932 C 0.470 - 0.500 - - - 97.0076.49%Satisfac<strong>to</strong>ryMarcus Construction 12601Const. of Multi-Purpose Bldg.,(DSWD Crisis Intervention Bldg.)Brgy. Pob. (Realigned <strong>to</strong> Singao)Final XII 0.909 C 0.372 0.300 0.300 - - - 97.2097.20%OutstandingMarcus Construction 12601Const. of Multi-Purpose Building @Brgy. Capi<strong>to</strong>n1st/Final XII 1.906 C 0.350 0.300 0.300 - - - 95.0083.24%V.Satisfac<strong>to</strong>ryMarcus Construction 12601Proposed Impv't./Conc. of Labason-Gutalac Nat'l. Rd., An<strong>to</strong>nio-LabasonRiver Sect.Final XII 3.913 C 0.450 - 0.500 - - - 95.0095.00%OutstandingMarcus Construction 12601Reblocking/Conc. Along Cotaba<strong>to</strong>-Davao Road, Sadaan Sect.Final IX 4.625 O 0.325 0.200 0.100 0.030 0.047 0.100 80.20 -Marcus Construction 12601Rehab./Impvt. of Banisilan-Guiling-Alamada-Libungan Road,(Kapayawe-Grebona Section)1st XII 4.742 C 0.332 0.300 0.300 - - - 93.2093.20%OutstandingMar-Deb Construci<strong>to</strong>n &Development6715Completion of 2-S<strong>to</strong>rey Multi-Purpose Building (Phase IV)1st/Final XII 0.936 O 0.342 0.240 0.100 0.015 0.032 0.100 82.90 -Mar-Deb Construci<strong>to</strong>n &Development6715Completion of 2-S<strong>to</strong>rey Multi-Purpose Building (Phase IV)2nd II 0.936 C 0.306 0.300 0.300 - - - 90.6086.12%V.Satisfac<strong>to</strong>ryMar-Deb Construci<strong>to</strong>n &Development6715Concreting of PNP RegionalTraining Center Road, Minante IFinal II 0.561 C 0.341 - 0.500 - - - 84.1084.10%V. Satisfac<strong>to</strong>ryMar-Deb Construci<strong>to</strong>n &Development6715Const. of Angad Bridge &Approaches Angad1st II 7.906 C 0.459 - 0.500 - - - 95.9086.72%V.Satisfac<strong>to</strong>ryMar-Deb Construci<strong>to</strong>n &Development6715 Gravelling of FMR Final II 0.470 C 0.354 - 0.500 - - - 85.4085.40%V. Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 101


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONMar-Deb Construci<strong>to</strong>n &Development6715Impv't./Gravelling/Concreting alongCDMA Boundary and its relatedRoads1st II 3.396 C 0.<strong>31</strong>2 - 0.500 - - - 81.2071.42%Satisfac<strong>to</strong>ryMar-Deb Construci<strong>to</strong>n &Development6715Impv't./Rehab. of Jct. Cauayan-Cabatuan Road (Km.371+449-Km.372+649)Final II 9.573 O 0.354 0.239 0.070 0.020 0.037 0.067 78.70 -Mar-Deb Construci<strong>to</strong>n &Development6715Impv't./Rehab. of Jct. Cauayan-Cabatuan Road (Km.371+449-Km.372+649)1st II 9.573 O 0.366 0.295 0.100 0.030 0.035 0.100 92.60 -Mar-Deb Construci<strong>to</strong>n &Development6715Widening/Regravelling of FMRMunoz East2nd II 0.940 C 0.367 - 0.500 - - - 86.7084.60%V. Satisfac<strong>to</strong>ryMar-deb Construction &Development6715Const. of 2 Cl Sch. Bldg. @ ReinaMercedes Vocational SchoolFinal II 0.817 C 0.390 0.178 0.300 - - - 86.8086.80%V.Satisfac<strong>to</strong>ryMar-Deb Construction &Development6715Const. of Bank Protection Works,Phase III1st/Final II 16.225 C 0.375 - 0.500 - - - 87.5091.10%OustandingMar-deb Construction &Development6715Const. of Bintacan Bridge &ApproachesFinal II 24.964 O 0.382 0.300 0.030 0.030 0.019 0.033 79.40 -Mar-Deb Construction &Development6715Const. of Centro Multi-PurposeBuilding1st II 0.090 C 0.321 0.236 0.300 - - - 85.7085.70%V.Satisfac<strong>to</strong>ryMar-deb Construction &Development6715Const. of MPB (Phase II) @ CauayanCity C/S1st/Final II 0.941 C 0.3<strong>31</strong> 0.074 0.300 - - - 70.5066.23%FairMar-deb Construction &Development6715Impvt./Rehab. of Jct. Cauayan-Cabatuan RoadFinal II 0.937 C 0.291 0.017 0.300 - - - 60.8060..80%FairMar-Deb Construction &Development6715Reblocking of Concrete Pavementalong Jct. Cauayan-Cabatuan Road(Intermittent Section)1st/Final II 0.623 C 0.<strong>31</strong>7 - 0.500 - - - 81.7081.70%V.Satisfac<strong>to</strong>ryMargarita Construction 20201Const. of 3-Cl School Building(FFHNAS)1st/Final II 1.415 C 0.479 - 0.500 - - - 97.90Margarita Construction 20201 Upgrading of Banga Road Final III 2.838 C 0.472 - 0.500 - - - 97.2094.68%Outstanding97.20%OutstandingMarigold DevelopmentCorporation4707Const. of Multi-Purpose Building @Brgy. New Era1st III 1.432 C 0.394 0.300 0.300 - - - 99.4099.40%OutstandingMarilag Construction 22813Const. of Multi-Purpose @ TalangkaE/S1st/Final NCR 0.240 C 0.339 0.300 0.300 - - - 93.9093.90%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 102


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONMarilag Construction 22813Const. of Multi-Purpose Bldg., @San Jose1st/Final IV-A 0.287 C 0.398 0.224 0.300 - - - 92.2092.20%OutstandingMarknest Construction 16818 Concreting of Barangay Road 1st / Final IV-A 0.475 C 0.263 0.300 0.300 - - - 86.3086.30%V.Satisfac<strong>to</strong>ryMarknest Construction 16818Const. of 2-S<strong>to</strong>rey Bldg. with 12Rooms Sindalan E/S1st/Final III 1.418 C 0.427 - 0.500 - - - 92.7087.94%V.Satisfac<strong>to</strong>ryMarknest Construction 16818Const./Repair/Completion of WaterSupplyFinal III 0.954 C 0.381 0.258 0.300 - - - 93.9093.90%OutstandingMarquin Construction 13332 Proposed Const. of Line Canal 1st/Final III 0.963 O 0.<strong>31</strong>6 0.200 0.100 0.022 0.025 0.200 86.30 -Marquin Construction 13332 Road Conc. @ St. James Poblacion 1st VII 0.461 C 0.390 0.100 0.300 - - - 79.0079.00%Satisfac<strong>to</strong>ryMar-Vel Construction 23722Completion of Multi-PurposeBuilding (LSPC)1st/Final VII 0.475 C 0.383 0.150 0.300 - - - 83.3083.30%V.Satisfac<strong>to</strong>ryMar-Vel Construction 23722 Conc./Rehab. of Barangay Road 1st/Final IV-A 3.848 C 0.194 - 0.500 - - - 69.40Mar-vel Construction 23722Mar-vel Construction 23722Const. Impv't. of Water SupplySystemConst./Impvt. of Flood Control andDrainage @ Brgy. Tulo-MakilingMaharlika Highway1st/Final IV-A 2.464 C 0.386 0.283 0.300 - - - 96.901st/Final IV-A 0.286 C 0.359 0.200 0.300 - - - 85.90Mar-vel Construction 23722 Impv't. of Calauan-Nagcarlan Road 1st/Final IV-A 4.674 C 0.380 0.200 0.300 - - - 88.0069.40%Fair96.90%Outstanding85.90%V.Satisfac<strong>to</strong>ry88.00%V.Satisfac<strong>to</strong>ryMasbate-Iloilo Const. &Trading Corporation26579Const. of Multi-Purposee Building @Cabatuan H/S1st/Final IV-A 1.446 C 0.398 0.200 0.300 - - - 89.8089.80%V.Satisfac<strong>to</strong>ryMash Construction 20806Const. of 1 CL at Plaridel Elem.School1st/Final VI 0.333 C 0.459 - 0.500 - - - 95.9095.90%OutstandingMasulot Construction 10716Widening of Cotaba<strong>to</strong>-Allah-Gen.San<strong>to</strong>s Road including sidewalk1st IV-A 3.107 C 0.395 - 0.500 - - - 89.5081.88%V.Satisfac<strong>to</strong>ryMatco Builders 12929Const./Repair/Rehab. of Brgy. Rds.@ Brgy. Balibago & Ninoy Package IIFinal XII 3.768 C 0.411 - 0.500 - - - 91.1091.10%OutstandingMBB Construction 11363Concreting of Manila North RoadKm. 343+000 - Km.344+0001st III 9.597 O 0.303 0.252 0.100 0.022 0.030 0.100 80.70 -MBB Construction 11363Concreting of Manila North RoadKm. 343+000 - Km.344+0001st I 9.597 C 0.371 0.200 0.300 - - - 87.1083.26%V.Satisfac<strong>to</strong>ryMBB Construction 11363 Const. of MPB Final I 9.462 O 0.216 0.099 0.000 0.023 0.025 0.067 43.00 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 103


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONMBB Construction 11363 Const. of Vic<strong>to</strong>ry Bridge 1st I 9.357 C 0.303 - 0.500 - - - 80.3075.92%Satisfac<strong>to</strong>ryMBB Construction 11363Package III-Completion of Multi-Purpose Bldg., @ ISPSCFinal I 0.946 C 0.352 - 0.500 - - - 85.2085.20%V.Satisfac<strong>to</strong>ryMBB Construction 11363MBD GeneralConst./Duragold Trading& Const. (JV)MBD GeneralConst./Duragold Trading& Const. (JV)JV-05-013JV-05-014Renovation of Narvacan MunicipalBldg.Const. of Sagayon Bridge &ApproachesConst. of Sagayon Bridge &Approaches1st I 0.946 C 0.450 - 0.500 - - - 95.0095.00%Outstanding1st I 24.015 O 0.382 0.204 0.070 0.030 0.065 0.067 81.80 -1st X 24.015 O 0.388 0.300 0.070 0.030 0.048 0.067 90.30 -MBD GeneralConstruction9991Const. /Cementing ofCircumferential Rd., from PurokBrgy. Mobod <strong>to</strong> Brgy. Villaflor3rd X 0.811 C 0.294 0.300 0.300 - - - 89.4085.38%V.Satisfac<strong>to</strong>ryMBD GeneralConstruction9991MBF Construction 9803MBF Construction 9803Const. of Dalacon Bridge &Approaches along Oroquieta-Calamba Mt. Rd.Concreting of Municipal Street,Sia<strong>to</strong>n, Negros OrientalRepair/Rehab./Impv't. of FMR,LicoanFinal X 15.544 O 0.362 0.300 0.100 0.030 0.054 0.100 94.60 -1st X 2.027 C 0.299 - 0.500 - - - 79.90Final VII 0.486 C 0.450 - 0.500 - - - 95.0073.12%Satisfac<strong>to</strong>ry95.00%OutstandingMC Torio Construction 10534Construction of Canal and CanalStructures (LMC-ARIP-01-06)1st VII 4.070 C 0.400 0.300 - - - - 70.0070.00%FairMCB Construction &Supply12128 Conc. of FMR @ Doyong 1st/FinalNIARegion II4.723 C 0.300 0.300 0.300 - - - 90.0090.00%V.Satisfac<strong>to</strong>ryMcguire IndustrialDevelopment Co.<strong>31</strong>302 Concreting of FMR 1st/Final I 0.467 C 0.355 0.200 0.300 - - - 85.5085.50%V.Satisfac<strong>to</strong>ryMCL Construction / RNDConst. (JV)JV-03-116Impv't./Conc. of Sitio Malasin FMRSan Macario Sur ARC1st/Final IV-A 7.749 C 0.284 - 0.500 - - - 78.4072.58%Satisfac<strong>to</strong>ryMeditech Trade &Development16545Impv't./Rehab./Const. of MSR-Pagbilao Sect.Final I 4.728 C 0.417 - 0.500 - - - 91.7091.70%OutstandingMeditech Trade &Development16545Repair/Rehab. & Installation ofReflec<strong>to</strong>rized Pavm't Stud alongMalicboy-P. Burgos-Unisan-Po<strong>to</strong>tanin Rd. & Mulanay SanNarciso Rd.1st IV-A 9.643 C 0.373 0.300 0.300 - - - 97.3097.30%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 104


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONMeditech Trade &Development16545Repair/Rehab. of Dinagat-Lore<strong>to</strong>Road1st/Final IV-A 4.489 C 0.3<strong>31</strong> - 0.500 - - - 83.1083.10%V.Satisfac<strong>to</strong>ryMega M Builders 20515 Const. of Farm-<strong>to</strong>-Market Road 1st/Final XIII 0.373 C 0.417 - 0.500 - - - 91.7091.70%OutstandingMega M Builders 20515Const. of Multi-Purpose Hall @ DelRemedio (DPWH-Compound)1st/Final IV-A 0.704 C 0.439 - 0.500 - - - 93.9084.59%V.Satisfac<strong>to</strong>ryMega Plus Construction 28322Const. of Multi-Purpose Building @Brgy. QuiotFinal IV-A 0.958 O 0.322 0.240 0.100 0.010 0.041 0.100 81.30 -Mega Plus Construction 28322Const. of Multi-Purpose Building @Brgy. Quiot1st VII 0.958 C 0.358 0.300 0.300 - - - 95.8085.65%V.Satisfac<strong>to</strong>ryMega Plus Construction 28322Rehab./ of Multi-Purpose Bldg., @Sitio Opra, Brgy. KalunasanFinal VII 0.767 C 0.403 - 0.500 - - - 90.309.30%OutstandingMegila Const. &Development Supply19262 Completion of MPB at Brgy. 18-B 1st VII 0.468 C 0.390 0.146 0.300 - - - 83.6083.60%V.Satisfac<strong>to</strong>ryMegila Const. &Development Supply19262Const / Rehab. / Replacement /Completion & Repair of E/S Bldg. @Kapitan Tomas Monteverde E/S1st/Final XI 0.883 C 0.358 0.300 0.300 - - - 95.8095.80%OutstandingMegila Const. &Development Supply19262Const. of 2CL, 2 S<strong>to</strong>rey Bldg., @Matina Aplaya E/S, Matina1st/Final XI 1.414 O 0.248 0.000 0.100 0.020 0.045 0.100 51.30 -Megila Const. &Development Supply19262Const. of 2CL, 2 S<strong>to</strong>rey Bldg., @Matina Aplaya E/S, Matina1st XI 1.440 O 0.382 0.300 0.100 0.030 0.064 0.100 97.60 -Mel-Jean Const. Corp./C.S. Rayos Const. &General ServicesJV-04-004Const. impv't. of Ternate-NasugbuRoad, Papaya-Hamilo Section2nd XI 28.923 C 0.381 0.200 0.300 - - - 88.1088.40%V.Satisfac<strong>to</strong>ryMel-Jean ConstructionCorp. (Formerly: Mel-JeanEnterprises)16344 Const. of Balintawak Barangay Hall Final IV-A 1.432 C 0.435 - 0.500 - - - 93.5093.50%OutstandingMel-Jean ConstructionCorporation16344Const. of 2 S<strong>to</strong>rey RGR Type SchoolBldg., @ Don Juan Pas<strong>to</strong>r MemorialNational H/S, Brgy. Talaibon1st/Final IVA 8.596 O 0.356 0.205 0.100 0.030 0.023 0.067 78.10 -Mel-Jean ConstructionCorporation16344Const. of 2 S<strong>to</strong>rey RGR Type SchoolBldg., @ Don Leon MemorialNational H/S, Brgy. Mabalanoy1st IV-A 8.506 O 0.364 0.235 0.100 0.030 0.023 0.067 81.90 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 105


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONMel-Jean ConstructionCorporationMelrobe Builders &Const. SuppliesMelrobe Builders &Const. SuppliesMelrobe Builders &Const. Supply16344 Rehab. of Rosario-San Juan Road 1st IV-A 9.618 O 0.344 0.240 0.100 0.015 0.029 0.100 82.80 -29752Const. of 1 Cl. Mod. FFCCCII TypeBldg. SB-06 Banaybanay, DinagsaanE/S1st IV-A 0.385 C 0.378 0.300 0.300 - - - 97.8029752 Const. of San Isidro MPB (Phase II) 1st/Final XI 1.889 O 0.337 0.240 0.100 0.020 0.038 0.100 83.50 -29752Package IV, Const. of MPB, Brgy.Corporacion97.80%Outstanding1st XI 0.924 C 0.348 0.238 0.100 0.015 0.023 0.100 82.40 -Melrobe Builders &Const. Supply29752Package IV, Const. of MPB, Brgy.Corporacion1st XI 2.786 C 0.396 0.2<strong>31</strong> 0.300 - - - 92.7085.49%V.Satisfac<strong>to</strong>ryMelrobe BuildersConstruction Supplies29752Const. of Caganganan Multi-Purpose BuildingFinal XI 1.605 C 0.375 0.300 0.300 - - - 97.5094.35%OutstandingMEP Construction 18759 Completion of Baguio Health Center Final XI 1.904 C 0.472 - 0.500 - - - 97.20Mercado ConcreteProducts4898Const. of Lilingayon ElementarySchool1st/Final CAR 0.422 C 0.377 0.235 0.300 - - - 91.2097.20%Outstanding91.20%OutstandingMercado ConcreteProducts4898 Const. of Multi-Purpose Building 1st/Final X 0.471 C 0.355 - 0.500 - - - 85.5085.50%V.Satisfac<strong>to</strong>ryMercedita BenasasGeneral Mdse.Mercedita BenasasGeneral Mdse.<strong>31</strong>745Completion/Conc. of Capt. CarioRoad with Slope Protection & LinedCanal1st/Final X 0.956 C 0.353 0.200 0.300 - - - 85.30<strong>31</strong>745 Concreting Brgy. Crlo Brgy. Road 1st/Final IV-B 1.862 O 0.344 0.200 0.100 0.030 0.022 0.100 79.60 -85.30%V.Satisfac<strong>to</strong>ryMercedita BenasasGeneral Mdse.<strong>31</strong>745Repair / Reconst. of PinamanaanFlood Control1st IV-B 7.719 C 0.288 0.285 0.300 - - - 87.3082.38%V.Satisfac<strong>to</strong>ryMesgo Construction 30677Const. of Flood Control & AccessRoad Land FillFinal IV-B 0.944 C 0.341 0.300 0.300 - - - 94.1088.82%V.Satisfac<strong>to</strong>ryMeta Construction 28882Repair/Rehab. of Ipil Bridge @Daang MaharlikaFinal X 0.725 C 0.284 0.123 0.300 - - - 70.7070.70%Satisfac<strong>to</strong>ryMeta Construction 28882Repair/Rehab. of Sch. Bldg. @Baptists E/S1st/Final II 0.287 C 0.265 0.200 0.300 - - - 76.5076.50%Satisfac<strong>to</strong>ryMeta Construction 28882Repair/Rehab. of Scoured Shouldersalong Jct.Ipil-Panang-Quirino Bdry.Road, Dappig1st/Final II 0.257 C 0.214 0.223 0.300 - - - 73.7073.70%Satisfac<strong>to</strong>ryMetrics Construction andTrading18223 Const. of Multi-Purpose Bldg. 1st/Final II 2.357 C 0.413 - 0.500 - - - 91.3079.12%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 106


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.MGBJ RisingConstruction & Land 18656DeveloperMGBJ RisingConstruction & Land 18656DeveloperMGBJ RisingConstruction & LandDeveloperMGBJ RisingConstruction & Land 18656DeveloperMGDJ Construction 29352PROJECT NAMEConc. of Brgy. Road @ Brgy.PoblacionConcreting of Additional 2 Lanesalong Marbel-Tupi-Makar Rd. UpperTupi Sect.NO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFinal NCR 1.228 C 0.308 0.190 0.300 - - - 79.801st/Final XII 2.320 C 0.452 - 0.500 - - - 95.2018656 Const. of Lined Canal Bololmala 1st XII 0.912 C 0.473 - 0.500 - - - 97.30Impv't. of Drainage along Digos-Makar Road, Lagao SectionConst. of Multi-Purpose Bldg. AtBrgy. 11st XII 0.695 C 0.<strong>31</strong>3 0.207 0.300 - - - 82.00Final XII 0.957 C 0.451 - 0.500 - - - 95.10MGDJ Construction 29352 Const. of Multi-Purpose Building 1st IV-A 1.340 C 0.372 0.200 0.300 - - - 87.20MGDJ Construction 29352 Impvt. of Brgy. MPB @ Pob. 3 1st/Final IV-A 0.191 C 0.367 0.300 0.300 - - - 96.70FINAL RATING/QUALITATIVEDESCRIPTION79.80%Satisfac<strong>to</strong>ry95.20%Outstanding47.30%Poor84.94%V.Satisfac<strong>to</strong>ry95.10%Outstanding87.20%V.Satisfac<strong>to</strong>ry96.70%OutstandingMicah Construction andSupply26625Const. of Multi-Purpose Bldg., atBrgy. Sasa1st/Final IV-A 0.942 C 0.393 - 0.500 - - - 89.3089.34%V. Satisfac<strong>to</strong>ryMicah Construction andSupply26625Package IV-Const. of 2-Cl, 2-Cl SB @Tugbok SPEDFinal XI 0.617 O 0.381 0.253 0.100 0.030 0.042 0.100 90.60 -Michelle Const. Corp. 22204 Bobon, Seawall 1st XI 0.609 C 0.333 - 0.500 - - - 83.3083.30%V.Satisfac<strong>to</strong>ryMidnorth LuzonConstruction andDevelopment Corp.<strong>31</strong>783Const. of 2 Cl @ Maba-ay NHS Bldg.(Lesseb Annex)1st VIII 0.716 C 0.347 0.300 0.300 - - - 94.7094.70%OutstandingMin Construction 14656Conc. Const. of Gil SanchezLumbuyan FMR1st/Final CAR 1.854 C 0.354 - 0.500 - - - 85.4075.44%Satisfac<strong>to</strong>ryMin Construction 14656Const. of Drainage System alongLabason Seawall including Impv't. ofexisting CanalFinal IX 0.776 C 0.402 - 0.500 - - - 90.2089.30%V. Satisfac<strong>to</strong>ryMin Construction 14656 Const. of MPB (Tribal Hall) Final IX 0.925 C 0.268 0.182 0.300 - - - 75.00Min Construction 14656 Impvt. of Imelda-Alicia Nat'l Road Final IX 9.628 C 0.333 0.300 0.300 - - - 93.30Min Construction 14656Proposed Concreting of Liloy-Labason Road (MalintuboanSection)1st/Final IX 4.6<strong>31</strong> C 0.481 - 0.500 - - - 98.1080.46%V.Satisfac<strong>to</strong>ry93.30%Outstanding89.58%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 107


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONMindanao Rock 23479Completion of Farmers TrainingCenter (ABC Gym Phase X)Final IX 0.959 C 0.408 - 0.500 - - - 90.8091.64%OutstandingMindanao Rock 23479 Const. of Flood Control Taguima Final X 0.479 C 0.404 - 0.500 - - - 90.4089.50%V. Satisfac<strong>to</strong>ryMindanao Rock 23479Mindanao Rock 23479Mindanao Rock 23479Minrock Multi-Builders 15845Minrock Multi-Builders 15845Const. of Multi-Purpose Hall(Jimenez Socio-Cultural Audi<strong>to</strong>rium,Phase XII)Const. of Phase III Multi-PurposeBuildingConst. of Phase III Multi-PurposeBuildingConst. of College School BuildingCotaba<strong>to</strong> City State PolytechnicCollege (CCSPC)Const. of College School BuildingCotaba<strong>to</strong> City State PolytechnicCollege (CCSPC)Final X 1.873 C 0.333 - 0.500 - - - 83.3076.65%Satisfac<strong>to</strong>ryFinal X 1.423 O 0.323 0.300 0.070 0.030 0.038 0.067 82.80 -1st X 1.423 C 0.286 0.300 0.000 - - - 58.6075.54%Satisfac<strong>to</strong>ryFinal X 1.904 O 0.285 0.300 0.100 0.022 0.035 0.100 84.20 -1st XII 1.904 C 0.<strong>31</strong>3 0.274 0.300 - - - 88.7085.55%V.Satisfac<strong>to</strong>ryMiracle Builders 28502Repair/Rehab. of H.E. Bldg. &Comfort Room @ E. Rodriguez E/SFinal XII 0.475 C 0.330 0.235 0.300 - - - 86.5086.50%V.Satisfac<strong>to</strong>ryMivico Builders andDevelopers20551Const. of Gymnasium (Multi-Purpose Hall)1st/Final NCR 1.058 C 0.479 - 0.500 - - - 97.9097.90%OutstandingMJB Const. & TradingCorp.15059Const. of Drainage System Brgy.Ninoy Aquino1st III 1.652 C 0.390 - 0.500 - - - 89.0089.00%V.Satisfac<strong>to</strong>ryMJB Const. & TradingCorp.15059CP-II Const./Repair/Rehab. of Brgy.Road @ Various Brgy. In SanFrancisco1st III 0.473 C 0.388 - 0.500 - - - 88.8088.80%V.Satisfac<strong>to</strong>ryMJF Neulid Enterprises 29107Concreting of Shoulder, Manlurip-McArthur Road1st III 1.771 C 0.455 - 0.500 - - - 95.5095.50%OutstandingMJR Construction 18794 Const. of Road, Barangay Poblacion 1st VIII 0.948 O 0.350 0.240 0.100 0.010 0.037 0.100 83.70 -MJR Construction 18794 Const. of Road, Barangay Poblacion 1st II 0.948 C 0.347 0.300 0.300 - - - 94.7088.10%V.Satisfac<strong>to</strong>ryML Patawaran Trading &Const.28869 Rehab. of Barangay Road Final II 0.475 C 0.385 - 0.500 - - - 88.5088.50%V.Satisfac<strong>to</strong>ryMN Revelo Construction 24789 Conc. of FMR at Brgy Dansulao 1st III 0.947 C 0.434 - 0.500 - - - 93.40MN Revelo Construction 24789Rehab. of Roads (5 ClusteredRoads)93.40%Outstanding1st IX 4.099 O 0.400 0.300 0.100 0.022 0.037 0.100 95.90 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 108


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONMNG Builders & Dev't.Corporation (FormerlyMNG Builders)16098Const. of Doña Carmen Denia NHSMulti-Purpose Hall1st IX 2.023 C 0.394 - 0.500 - - - 89.4089.96%V.Satisfac<strong>to</strong>ryMolte Aries Construction& Industries3684 Const. of 2Cl School Building Final XI 0.671 C 0.341 - 0.500 - - - 84.1084.10%V.Satisfac<strong>to</strong>ryMolte Aries Construction& Industries3684Const. of Multi-Purpose Building atBarangay Sevilla1st/Final I 1.<strong>31</strong>6 O 0.379 0.285 0.100 0.030 0.029 0.100 92.30 -Monolithic Const. &Concrete Products, Inc.5733Construction of Diversion Workincluding Supply, Delivery,Installation and Comissioning ofRubber Dam (Cabilogan-San JuanCIP)1st I 46.981 C 0.390 0.180 0.300 - - - 87.0087.00%V.Satisfac<strong>to</strong>ryMonolithic Const. &Concrete Products, Inc.5733Construction of Diversion Workincluding Supply, Delivery,Installation and Comissioning ofRubber Dam (South Quinale CIS)1st/Final NIA 68.027 0.389 0.200 0.070 0.030 0.047 0.067 80.3080.30%V.Satisfac<strong>to</strong>ryMonolithic Const. &Concrete Products, Inc.5733South Quinale Communal IrrigationSystem1st NIA 68.027 C 0.375 0.263 0.300 - - - 93.80 85.70%Monro Construction &Supply Corp.14084Conc. Paving of Shoulder alongNational Rd., @ Brgy. GuilijunganFinalNIARegion V0.915 C 0.444 - 0.500 - - - 94.4091.16%OutstandingMontaño Construction &Development Corporation19473Completion of Multi-PurposeBuilding (Phase V)Final VI 3.734 C 0.450 - 0.500 - - - 95.0095.00%OutstandingMontaño Construction &Development Corporation19473Const. of Dilawa Bridge &Approaches1st/Final IX 17.394 O 0.337 0.096 0.100 0.024 0.051 0.100 70.80 -Montaño Construction &Development Corporation19473Const. of Dilawa Bridge &Approaches1st IX 17.394 C 0.293 0.283 0.300 - - - 87.6085.47%V.Satisfac<strong>to</strong>ryMontaño Construction &Development Corporation19473Impv't. & Const. of RoadsideProtection Structure along Dipolog-Punta-DansullanFinal IX 3.945 C 0.369 - 0.500 - - - 86.9083.00%V. Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 109


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONMonte Construction &Supply19474Conc. of Danguilan St., @ Brgy.Osmeña Solano, Nueva VizcayaBrgy. OsmeñaFinal IX 0.270 C 0.459 - 0.500 - - - 95.9095.90%OutstandingMonte Construction &Supply19474Rehab. of Maddiangat Bridge Piersand Bank Protection, alongBambang-Kasibu-Quezon-SolanoRoad1st II 4.765 C 0.276 0.300 0.300 - - - 87.6087.60%V.Satisfac<strong>to</strong>ryMonterey Builders 11103Const. of Seawall with WaveDeflec<strong>to</strong>r, Brgy. Melgar A1st/Final II 0.948 C 0.333 - 0.500 - - - 83.3074.72%Satisfac<strong>to</strong>ryMontphil ConstructionCorporation24285Concrete Paving of Dipolog-Polanco-Macleodes National RoadFinal IV-B 0.915 C 0.381 0.300 0.300 - - - 98.1098.10%OutstandingMontphil ConstructionCorporation24285 Concreting of Brgy. Dionum FMR 1st/Final IX 0.458 C 0.433 - 0.500 - - - 93.3093.30%OutstandingMontphil ConstructionCorporation24285 Const. of MPB @ Brgy. Silano 1st IX 0.070 C 0.270 0.201 0.300 - - - 77.1077.10%Satisfac<strong>to</strong>ryMontphil ConstructionCorporation24285Const. of Slope Protection Structurealong Dipolog-Potanco-Pinan Jct.Oroquieta Road (Guinles Section)1st/Final IX 0.940 C 0.<strong>31</strong>1 0.300 0.300 - - - 91.1091.10%OutstandingMontphil ConstructionCorporation24285Const./Completion of Multi-PurposeBldg., (Mun. Hall Phase III)1st/Final IX 0.973 C 0.479 - 0.500 - - - 97.9092.79%OutstandingMontphil ConstructionCorporation24285Const./Extension of MPB (MunicipalBldg.)Final IX 0.279 C 0.356 0.145 0.300 - - - 80.1080.10%V.Satisfac<strong>to</strong>ryMorning Coffee Builders 29027Const. of Multi-Purpose Buildingcovered Court Lian Central School1st/Final IX 0.948 C 0.434 - 0.500 - - - 93.4093.40%OutstandingMorning SteelConstruction30698Completion of Multi-Purpose Bldg.,Sitio Diaboyo1st IV-A 0.281 C 0.290 0.300 0.300 - - - 89.0089.00%V.Satisfac<strong>to</strong>ryMorning SteelConstructionMountaineersEngineering & Const.ServicesMountaineersEngineering & Const.Services30698 Const. of Flood Control 1st/Final III 0.846 C 0.417 - 0.500 - - - 91.7061546154Const. of Benguet SPED Center LaTrinidad, BenguetConst. of BSU Multi-PurposeBuilding (IPA Building)1st/Final III 0.522 C 0.364 - 0.500 - - - 86.401st/Final CAR 0.949 C 0.354 - 0.500 - - - 85.4091.70%Outstanding86.40%V.Satisfac<strong>to</strong>ry85.40%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 110


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONMountaineersEngineering & Const.ServicesMountaineersEngineering & Const.ServicesMR. SantiagoConstraction6154 Const. of Maslog-Kabilisan FMR 1st/Final CAR 1.972 C 0.174 - 0.500 - - - 67.40615427239Const. of Various School Building(Labino-Aquiso E/S)Rehabilitation of Lateral G Canal(Sta. 2+380-6+637)1st CAR 0.671 C 0.324 - 0.500 - - - 82.4067.40%Fair82.89%V.Satisfac<strong>to</strong>ryFinal CAR 5.617 C 0.250 0.300 0.300 - - - 85.00 85.19%MRP Merchandising 13656 Concreting of Barangay Road FinalNIARegion I0.459 C 0.378 - 0.500 - - - 87.8087.80%V.Satisfac<strong>to</strong>ryMRP Merchandising 13656Concreting of Brgy. Road atCalagbangan <strong>to</strong> Bocol, Sipocot1st/Final V 0.917 C 0.382 - 0.500 - - - 88.2085.14%V.Satisfac<strong>to</strong>ryMSF Construction 25307Concreting of Various BarangayRoad2nd V 0.471 C 0.333 - 0.500 - - - 83.3083.30%V.Satisfac<strong>to</strong>ryMSF Construction 25307Const. of Multi-Purpose BuildingPhase I1st/Final I 2.385 O 0.381 0.216 0.100 0.010 0.029 0.100 83.60 -MSF Construction 25307Const. of Multi-Purpose BuildingPhase I1st I 2.385 C 0.308 0.200 0.300 - - - 80.8082.76%V.Satisfac<strong>to</strong>ryMt. Guiting-GuitingConstruction17412Repair/Maintenance of Agnipa RiverControlFinal I 0.277 C 0.373 0.200 0.300 - - - 87.3087.30%V.Satisfac<strong>to</strong>ryMuaña Construction 9354Const. of Multi-Purpose Bldg., U.P.-Cebu High School Dept.1st/Final IV-B 1.904 C 0.447 - 0.500 - - - 94.7087.63%V.Satisfac<strong>to</strong>ryMulaña Construction 30708Const. of Foot Bridge @ Sitio Napo,SapangdakuFinal VII 0.956 C 0.410 - 0.500 - - - 91.0083.62%V.Satisfac<strong>to</strong>ryMulaña Construction 30708Const. of Multi-Purpose Bldg. @PoblacionFinal VII 0.472 C 0.293 0.300 0.300 - - - 89.3084.19%V.Satisfac<strong>to</strong>ryMulaña Construction 30708Const. of Multi-Purpose Bldg.,Labangon-BlissFinal VII 0.669 C 0.<strong>31</strong>6 - 0.500 - - - 81.6079.08%Satisfac<strong>to</strong>ryMust Enterprises 13336 Const. of MPB at Brgy. Rajahmuda Final VII 0.285 C 0.321 0.200 0.300 - - - 82.1082.10%V.Satisfac<strong>to</strong>ryMVVK Construction andTrading25721Const. of Multi-Purpose Bldg. Brgy.Tuyom1st/Final XII 0.470 C 0.395 - 0.500 - - - 89.5089.50%V. Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 111


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONMWJ Construction 14882Concrete Paving of La-Paz-BurauenRd., Brgy. Sta. Elena1st VI 2.848 C 0.415 - 0.500 - - - 91.5087.00%V. Satisfac<strong>to</strong>ryMWJ Construction 14882Rehab./Impvt. of National Arterial &Secondary Roads Public InfraFinal VIII 0.979 C 0.327 0.200 0.300 - - - 82.7082.70%V.Satisfac<strong>to</strong>ryMWJ Construction 14882Road Concreting of Burauen-La PazRoad1st/Final VIII 0.939 C 0.308 0.300 0.300 - - - 90.8090.80%OutstandingMWJ Construction 14882Road Concreting of Burauen-La PazRoad1st/Final VIII 1.859 C 0.372 0.300 0.300 - - - 97.2084.96%V.Satisfac<strong>to</strong>ryMY Builders andConstruction22687Const. of Multi-Purpose Bldg., @Canaoay E/SFinal VIII 1.407 C 0.342 - 0.500 - - - 84.2075.03%Satisfac<strong>to</strong>ryN & N ConstructionCorporation30716Const. of Geotextile SoilReinforcement and Repair/RehabFinal I 6.450 C 0.384 - 0.500 - - - 88.4088.40%V. Satisfac<strong>to</strong>ryN.B. Avila Construction 13751Concreting of Pantihan Rd., &Const. of Multi-Purpose Pavement1st IV-A 2.293 C 0.404 - 0.500 - - - 90.4090.40%OutstandingN.B. Avila Construction 13751Const. of One Classroom SchoolBuilding, Bulihan E/S1st IV-A 0.475 C 0.396 - 0.500 - - - 89.6089.60%V.Satisfac<strong>to</strong>ryN.B. Garcia Construction 30983Concreting of Poblacion MagsaysayFMR1st/Final IV-A 0.478 C 0.414 - 0.500 - - - 91.4091.40%OutstandingN.B. Garcia Construction 30983Rehab. of Various Brgy. Rd., SanJose Area, Package IV (Conc. ofBaula Brgy. Rd.) Pag-asa1st IV-B 0.283 C 0.347 0.300 0.300 - - - 94.7084.98%V.Satisfac<strong>to</strong>ryN.B. Salvo Construction 6091 Conc. of Golden Shower St. Final IV-B 0.942 C 0.359 0.200 0.300 - - - 85.9085.90%V.Satisfac<strong>to</strong>ryN.B. Salvo Construction 6901Const. of Poblacion El SalvadorFlood Control1stFinal X 9.462 O 0.281 0.200 0.050 0.030 0.037 0.200 79.80 -N.F. Yamat Construction 5401 Rehab. of MPB @ Brgy. 72, Zone 6 1st X 0.420 C 0.299 0.300 0.300 - - - 89.9080.73%V.Satisfac<strong>to</strong>ryN.K. Enterprise 29292N.M. Parafina BuildersInc., (Formerly N.M.Parafina Builders)11505Concreting of Various RoadSegments along Anini-y-T Fornier-Hamtic Road SectionConst. of 1 Cl @ PamantasangBayan, PUPFinal NCR 0.964 C 0.293 0.132 0.300 - - - 72.50Final VI 0.383 C 0.342 0.268 0.300 - - - 91.0074.36%Satisfac<strong>to</strong>ry91.00%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 112


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONN.M. Parafina BuildersInc., (Formerly N.M.Parafina Builders)N.M. Parafina BuildersInc., (Formerly N.M.Parafina Builders)N.M. Parafina BuildersInc., (Formerly N.M.Parafina Builders)11505Const. of One (1) Classroom SchoolBldg. Atimonan Nat'l, H/S1st/Final IV-A 0.377 C 0.448 - 0.500 - - - 94.8011505 Const./Impv't. of FTMR, Brgy. Duhat 1st IV-A 0.941 C 0.362 - 0.500 - - - 86.2011505Repair/Const. of Multi-PurposePavemnet @ Purok Ilaya Brgy.Tagbakin1st/Final IVA 0.940 C 0.386 0.200 0.300 - - - 88.60N.M.E. Construction 22984a)Rep./Rehab. of H.E.Bldg. @E.Delos San<strong>to</strong>s E/S b) Const. ofAdd'l. CL @ AA Quezon E/S1st/Final IV-A 2.419 C 0.375 - 0.500 - - - 87.50N.M.E. Construction 22984 Const. of Multi-Purpose Gymnasium Final NCR 2.387 C 0.452 - 0.500 - - - 95.2094.80%Outstanding86.20%V.Satisfac<strong>to</strong>ry88.60%V.Satisfac<strong>to</strong>ry77.04%Satisfac<strong>to</strong>ry95.20%OutstandingN.M.E. Construction 22984Rehab. of Jct. Layac-Balanga-Mariveles Port Road (Pilar Sect.)1st IV-A 2.880 C 0.329 0.211 0.300 - - - 84.0084.00%V.Satisfac<strong>to</strong>ryN.M.E. Construction 22984 Repair/Rehab. of MPB at Brgy. 889 1st/Final III 1.419 O 0.<strong>31</strong>0 0.300 0.100 0.030 0.053 0.100 89.30 -N.P. Uy Builders 16551Const. of Malajog ShorelineProtection (Phase I) Bry. Malajog1st NCR 1.420 C 0.395 - 0.500 - - - 89.5089.50%V.Satisfac<strong>to</strong>ryN.P. Uy Builders 16551Const. of Malajog ShorelineProtection (Phase I) Bry. Malajog1st VIII 2.822 C 0.379 - 0.500 - - - 87.9092.70%OutstandingN.S. Construction andSupply23203Const. of Slope Protection alongNaguilian Bridge, DallipaoenFinal VIII 1.927 C 0.274 0.226 0.300 - - - 80.0071.63%Satisfac<strong>to</strong>ryN.V. BalbuenaConstructionN-22 Construction &Trading12055 Const. of Gabon-Hacienda FMR Final I 2.805 C 0.330 - 0.500 - - - 83.0025254Const./Impv't. of Amedo Dike SlopeProtection San SimonFinal III 0.950 C 0.477 0.500 - - - 97.7061.10%Fair97.70%OutstandingN-22 Construction &Trading25254Const./Rehab./Completion ofSampaloc Brgy. Road1st III 0.477 C 0.348 - 0.500 - - - 84.8084.80%V.Satisfac<strong>to</strong>ryN-22 Construction &Trading25254 Impvt. of Minalin-S<strong>to</strong>. Tomas Road 1st III 4.744 C 0.342 0.300 0.300 - - - 94.2094.20%OutstandingNaga E.S. Constructionand Supply6593Const. of Multi-Purpose Bldg., Brgy.Poblacion1st/Final III 0.936 C 0.384 - 0.500 - - - 88.4088.40%V.Satisfac<strong>to</strong>ryNaga E.S. Constructionand Supply6593 Const. of Multi-Purpose Building 1st V 0.938 C 0.362 0.300 0.300 - - - 96.2093.61%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 113


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONNale Construction 18552Repair/Rehab./Widening/Regravelling of FMR, Cantabon-LuzongFinal V 0.697 C 0.400 0.100 0.300 - - - 80.0085.88%V.Satisfac<strong>to</strong>ryNBL Construction 30396 Conc. of FMR @ Brgy. Dao Final VII 1.888 C 0.325 0.200 0.300 - - - 82.5082.50%V.Satisfac<strong>to</strong>ryNescon Builders 24751Const. of Multi-Purpose Building(Const. of Veterans Bldg.)1st/Final IV-A 1.443 O 0.286 0.240 0.070 0.030 0.018 0.067 71.10 -Nescon Builders 24751Const. of Multi-Purpose Building(Const. of Veterans Bldg.)1st VI 1.443 C 0.308 0.279 0.000 - - - 58.7067.38%FairNessan Builders 25142 Const. of 2 Cl Bldg. @ Navaling P/S Final VI 0.536 C 0.282 0.300 0.300 - - - 88.2088.20%V.Satisfac<strong>to</strong>ryNessan Builders 25142Const./Repair/Rehab/ of Brgy/Roads, Brgy. Dau1st/Final III 1.877 C 0.456 - 0.500 - - - 95.6095.60%OutstandingNessan Builders 25142Package XIV-Const.of Multi-PurposeCovered Court1st III 1.403 C 0.222 - 0.500 - - - 72.2072.20%Satisfac<strong>to</strong>ryNes-san Builders 25142Asphalt Overlay along Arayat-Magalang-Mabalacat Road1st III 4.763 C 0.366 0.300 0.300 - - - 96.6096.60%OutstandingNes<strong>to</strong>r D. MercadoConstruction18658 Conc./Repair Calanipawan Rd. 1st/Final III 1.873 C 0.350 - 0.500 - - - 85.0085.00%V.Satisfac<strong>to</strong>ryNew Arcond Builders Inc.(Formerly ArcondBuilders)New Arcond Builders Inc.(Formerly ArcondBuilders)New Arcond Builders Inc.(Formerly ArcondBuilders)New Arcond Builders Inc.(Formerly ArcondBuilders)New Arcond Builders Inc.(Formerly ArcondBuilders)New Arcond Builders Inc.(Formerly ArcondBuilders)9614Concrete Blocking along Edsa,Quezon City (Km. 10+687-Km.16+417)1st VIII 9.555 C 0.403 - 0.500 - - - 90.309614 Impv't./Rehab. of Quezon Avenue 1st/Final NCR 4.642 C 0.356 - 0.500 - - - 85.609614961496149614Proposed Pedestrian OverpassCrossing Roxas Blvd.Proposed Pedestrian OverpassCrossing Roxas Blvd.Proposed Pedestrian OverpassCrossing Roxas Blvd.Rehab./Improvement of ReparoRoad90.30%Outstanding85.60%V. Statisfac<strong>to</strong>ry1st NCR 8.212 O 0.293 0.163 0.100 0.030 0.030 0.100 71.60 -1st NCR 9.<strong>31</strong>4 O 0.334 0.267 0.100 0.000 0.000 0.000 70.10 -2nd NCR 8.437 C 0.382 0.300 0.300 - - - 98.2081.79%V.Statisfac<strong>to</strong>ryFinal NCR 9.434 O 0.372 0.300 0.100 0.024 0.039 0.100 93.50 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 114


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONNew Arcond Builders Inc.(Formerly ArcondBuilders)9614Rehab./Improvement of ReparoRoad1st NCR 9.434 C 0.350 0.300 0.300 - - - 95.0094.10%OutstandingNew Kanlaon Const.,Inc/Markbilt Const./JV896 /12522Water Impounding/Earth Dam withSpillway (Dauin Dam)Final NCR 158.868 O 0.325 0.174 0.100 0.030 0.055 0.200 88.38 -New Kanlaon Const.,Inc/Markbilt Const./JV896 /12522Water Impounding/Earth Dam withSpillway (Dauin Dam)1st NIA 158.868 O 0.325 0.174 0.100 0.030 0.055 0.200 88.3888.38%V.Satisfac<strong>to</strong>ryNew Rich Gen. Contrac<strong>to</strong>rServices & Trading Co.Inc.New San Fabian Builders& SuppliesNew TBP Construction &Development Corp.New TBP Construction &Development Corp.27629163482915529155Newadis Construction 23806Newadis Construction 23806Concreting of Road @ Brgy.BubukalConst. of Multi-Purpose Bldg., Brgy.DianawanConst. of Multi-Purpose Building(Covered Court @ Haven forWoman) Phase IConst. of Multi-Purpose Building(Covered Court @ Haven forWoman) Phase ICompletion of Lumang Bayan WaterSystemCompletion of the Conc. ofMagsaysay-San Jose Road1st NIA 0.475 C 0.382 - 0.500 - - - 88.201st IV-A 0.663 C 0.396 0.250 0.300 - - - 94.6088.20%V.Satisfac<strong>to</strong>ry94.60%Outstanding1st/Final III 11.547 O 0.<strong>31</strong>9 0.300 0.100 0.030 0.049 0.100 89.80 -1st NCR 11.546 C 0.352 0.300 0.300 - - - 95.2091.42%OutstandingFinal NCR 0.955 O 0.353 0.300 0.100 0.020 0.013 0.100 88.60 -1st IV-B 9.619 O 0.280 0.220 0.100 0.030 0.035 0.100 76.50 -Newadis Construction 23806Const. of Pagbahan Flood Control(Phase II)1st IV-B 2.294 C 0.298 0.300 0.300 - - - 89.8089.50%V.Satisfac<strong>to</strong>ryNFH Construction &Supply16055NFH Construction &Supply16055NFL Builders 12524Const. of Adiangao Bridge # 2 &Approaches (Phase 1),Const. of Nagas Bridge &ApproachesConst. of Drainage Canal @Barangay 17Final IV-B 8.396 C 0.392 0.300 0.000 - - - 69.2076.82%Satisfac<strong>to</strong>ryFinal V 16.745 O 0.3<strong>31</strong> 0.100 0.100 0.030 0.041 0.100 70.20 -1st V 0.474 O 0.253 0.200 0.100 0.015 0.000 0.200 76.80 -N-Four GeneralContrac<strong>to</strong>r and Supply19475Concreting of San Isidro-Iraya Brgy.Road1st X 0.275 C 0.394 - 0.500 - - - 89.4089.40%V.Satisfac<strong>to</strong>ryN-Four GeneralContrac<strong>to</strong>r and Supply19475Const. of 2Cl School Bldg. @Tanagan E/S1st/Final V 0.945 C 0.307 0.259 0.300 - - - 86.6086.60%V.Satisfac<strong>to</strong>ryN-Four GeneralContrac<strong>to</strong>r and Supply19475Impv't./Rehab. of Tanawan RiverControl (Part of Cluster I)1st/Final V 0.459 O 0.233 0.287 0.100 0.015 0.028 0.100 76.30 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 115


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONNippon Steel Corp./ToaCorp. (JV)Nippon Steel/ToaCorporation (JV)Nippon Steel/ToaCorporation (JV)Nirvana Construction andSuppliesSL2-SN/00059 Second Magsaysay Bridge & Butuan8/FC-04- City By Pass Road001FC-04-001/SLI-SN-004628Second Magsaysay Bridge & ButuanCity Bypass Road ProjectSL2-SN/00059 Second Magsaysay Bridge & Butuan8/FC-04- City Bypass Road Project0011st V 2,158.802 C 0.366 0.300 0.300 - - - 96.6094.86%OutstandingFinal PJHL 1,962.547 O 0.321 0.300 0.100 0.030 0.070 0.100 92.10 -4th PJHL 2,158.802 O 0.376 0.300 0.100 0.030 0.070 0.100 97.60 -18691 Const. of 2 Cl @ KNCHS 6th PJHL 0.694 O 0.382 0.180 0.100 0.030 0.038 0.100 83.00 -Nishimatsu ConstructionCompany LimitedSLZ-SN- KAMANAVA Area Flood Control &00053/FC- Drainage System Improvement02-036 Project1st XII 3.479 O 0.299 0.183 0.100 0.030 0.061 0.200 87.30 -Nishimatsu ConstructionCompany LimitedSLN-SN- KAMANAVA Area Flood Control &000579/F Drainage System ImprovementC-02-036 Project1st NCR 3,479.584 O 0.390 0.200 0.070 0.030 0.070 0.200 96.00 -NMJ Construction &Trading<strong>31</strong>017 Gravelling of Brgy. Del Pilar Road 3rd NCR 0.285 C 0.432 - 0.500 - - - 93.2093.20%OutstandingNorsatek Engineering andConstruction Supply26627Multi-Purpose Pavement underCluster CARP-04-D2-011st IX 0.093 C 0.356 0.244 0.300 - - - 90.0090.00%V.Satisfac<strong>to</strong>ryNorthern Builders 8789Northern Builders 8789Completion of Ternate-NasugbuRoad, Looc-Pingkian-Papaya-HamiloSectionCompletion of Ternate-NasugbuRoad, Looc-Pingkian-Papaya-HamiloSection1st/Final VIII 23.990 O 0.347 0.300 0.100 0.030 0.022 0.100 89.90 -1st IV-A 24.124 C 0.296 0.300 0.300 - - - 89.6089.78%V.Satisfac<strong>to</strong>ryNorthern Builders 8789Const. of 6-Cl (2-S<strong>to</strong>rey Bldg.) @Sta. Maria E/SFinal IV-A 3.525 C 0.444 - 0.500 - - - 94.4085.65%V.Satisfac<strong>to</strong>ryNorthern Builders 8789 Const. of Water Supply System Final III 9.335 C 0.489 - 0.500 - - - 98.90Northern Builders 8789Const./Repair/Rehab. of Brgy. RoadBrgy. Ninoy AquinoFinal III 1.880 C 0.433 - 0.500 - - - 93.3094.35%Outstanding93.30%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 116


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONNorthern Builders 8789Impv't./Widening of Manila NorthRoad (MNR) Package V, Km.118+700<strong>to</strong> Km.119+338.40; Km.124+680 <strong>to</strong>Km.124+940; Km.129+390 <strong>to</strong>Km.132+500; (Tarlac Section)1st III 47.288 C 0.386 0.300 0.300 - - - 98.6089.54%V.Satisfac<strong>to</strong>ryNorthern Builders 8789 Pangasinan-Nueva Vizcaya Rd. Final III <strong>31</strong>.182 C 0.445 - 0.500 - - - 94.5094.50%OutstandingNorthern Builders 8789Rehab./Reconst. of Villa CervezaFlood Mitigation Project1st I 55.2<strong>31</strong> O 0.328 0.160 0.100 0.030 0.032 0.200 85.00 -Northern Builders 8789Repair/Strengthening of InsularBilibid Prison Bridge1st IV-B 6.049 C 0.171 0.300 0.300 - - - 77.1077.10%Satisfac<strong>to</strong>ryNorthern Builders/Hanjin(JV)FC-06-007Completion/Const. of Subic-Cawag-Balaybay Road, Phase II (Segment 4)1st/Final NCR 119.113 C 0.211 0.200 0.300 - - - 71.1071.10%Satisfac<strong>to</strong>ryNorthern Cotaba<strong>to</strong>Construction and SupplyNorthern Cotaba<strong>to</strong>Construction and SupplyNorthern NegrosConstruction & Dev't.Northern NegrosConstruction & Dev't.1551515515Conc. of Kidapawan-Calunasan-M'lang Road Magsaysay-MaligayaSect.Rehabilitation of Grebona Bridgealong Banisilan-Guiling-Alamada-Libungan Road1st/Final III 5.290 C 0.454 - 0.500 - - - 95.40Final XII 13.633 C 0.386 0.300 0.300 - - - 98.6017962 Concreting of Leon Kilat Street Final XII 1.484 C 0.370 - 0.500 - - - 87.0017962 Const. of Calo River Control Final VII 0.876 C 0.397 - 0.500 - - - 89.7092.88%Outstanding88.34%V.Satisfac<strong>to</strong>ry67.44%Fair88.74%V.Satisfac<strong>to</strong>ryNorthpoint DevelopmentCorp.29573Const. of Footbridge with DrainageSystemFinal VII 1.490 C 0.372 - 0.500 - - - 87.2085.46%V.Satisfac<strong>to</strong>ryNovanne VenturesConstruction22107Const. of FMR Brgy. Lumpatan-Lapak-Sumaray Rd.Final VII 2.886 C 0.378 - 0.500 - - - 87.8087.80%V.Satisfac<strong>to</strong>ryNovanne VenturesConstruction22107 Cont. of MPB at Brgy. Singcang 1st VI 2.794 O 0.400 0.220 0.100 0.023 0.028 0.100 87.10 -Nueva Ecija ConstructionCompany, Inc.135Const. of School Building, CaviteState University1st VI 1.914 C 0.416 - 0.500 - - - 91.6091.74%OutstandingNulas Builders 32172Const. of 1 CL Bldg. @ Pulong BuloPS2nd IV-A 0.379 C 0.3<strong>31</strong> 0.300 0.300 - - - 93.1089.60%V.Satisfac<strong>to</strong>ryNVF Construction 13941 Const. of Ponong River Wharf Final III 0.655 C 0.392 0.165 0.300 - - - 85.7085.70%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 117


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.O R C Construction &Supply17337PROJECT NAMERehab./Impvt. of Road Protectionalong Daang Maharlika (BontalSection)NO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATING1st/Final V 0.932 C 0.239 0.225 0.300 - - - 76.40FINAL RATING/QUALITATIVEDESCRIPTION76.40%Satisfac<strong>to</strong>ryO.L. De LeonConstruction16194 Concreting of Daet-Mercedes Road 1st/Final II 0.942 C 0.354 - 0.500 - - - 85.4086.24%V.Satisfac<strong>to</strong>ryO.L. De LeonConstruction16194Const. of 2 CL S/B P. Ponayo H/SBrgy. Mambelite2nd V 0.719 C 0.351 - 0.500 - - - 85.1085.10%V.Satisfac<strong>to</strong>ryO.L. De LeonConstruction16194Road Opening of Matango-SingiBarangay Road1st V 4.604 O 0.323 0.230 0.100 0.010 0.028 0.100 79.10 -O.R. Sarmien<strong>to</strong>Construction1411Const. of Spillway - Phase I, TalibonSmall Reservoir Irrigation Project1st V 8.708 O 0.358 0.200 0.070 0.023 0.014 0.200 86.50 -O.R. Sarmien<strong>to</strong>Construction1411Const. of Spillway - Phase I, TalibonSmall Reservoir Irrigation Project1stNIARegion VII8.708 O 0.358 0.200 0.070 0.023 0.014 0.200 86.5086.50%V.Satisfac<strong>to</strong>ryO.R. Sarmien<strong>to</strong>Construction1411Naga-Toledo Road Project; Jct. Pajo<strong>to</strong> Brgy. Ibo <strong>to</strong> Boundary1stNIARegion VII18.733 C 0.394 - 0.500 - - - 89.4088.14%V.Satisfac<strong>to</strong>ryOctant Builders &Development Corp.23668Const. of Health Center at SaniboyHealth CenterFinal R-VII 0.959 C 0.327 - 0.500 - - - 82.7082.70%V.Satisfac<strong>to</strong>ryOIC Construction &Supply23727 Const. of Water Works System 1st NCR 2.406 C 0.343 0.200 0.300 - - - 84.3084.30%V.Satisfac<strong>to</strong>ryOmengan Constructionand DevelopmentCorporation5119Const. of Bagu Bridge &Approaches1st/Final IV-A 6.938 C 0.348 0.134 0.300 - - - 78.2082.94%V.Satisfac<strong>to</strong>ryOmengan Constructionand DevelopmentCorporation5119Const. of Saltan Bridge &ApproachesFinal CAR 76.227 O 0.341 0.300 0.100 0.030 0.040 0.100 91.10 -Omengan Constructionand DevelopmentCorporation5119Const. of Tuga Bridge & itsApproaches1st CAR 11.158 O 0.288 0.225 0.100 0.015 0.028 0.100 75.60 -Omengan Constructionand DevelopmentCorporation5119Const. of Tuga Bridge & itsApproaches1st CAR 12.262 C 0.327 0.035 0.300 - - - 66.2071.84%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 118


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONOmengan Constructionand DevelopmentCorporation5119Upgrading & Conc. of Tuguegarao-Tabuk-Tinglayan Road, Pingaan-Dalimuno SectionFinal CAR 14.329 O 0.362 0.200 0.100 0.030 0.035 0.100 82.70 -Omicron Construction 9575Const. of Multi-Purpose Bldg. at SanMatias Realigned <strong>to</strong> Const. of MPBat San Jose1st CAR 0.949 C 0.457 - 0.500 - - - 95.7095.70%OutstandingOmicron Construction 9575Repair/Rehab. of Dike/BanksClearing Sapang Maragul1st III 9.490 C 0.357 - 0.500 - - - 85.7085.70%V.Satisfac<strong>to</strong>ryOmnicon Builders 22816Concreting of Brgy Roads at HabayI, Molino I Proj. 18 & Niog II1st III 0.959 C 0.267 - 0.500 - - - 76.7076.70%Satisfac<strong>to</strong>ryOmnicon Builders 22816Omnicon Builders 22816Omnicon Builders 22816OQC Construction 22690OQC Construction 22690Const. of 2 Cl Sch. Bldg. @Pinagturilan NHSPartial Const. of 2CL S/B at JulianFelipe E/SRehab./Impvt. of Punta-Looc-Odiongan-Anahao RoadCompletion of Multi-PurposeBuilding @ San Andres E/SConst. of MPB (Phase II) @ CagayanNHS1st IV-A 1.339 O 0.249 0.132 0.100 0.030 0.029 0.100 64.00 -1st IV-B 0.767 C 0.447 - 0.500 - - - 94.701st IV-A 9.577 C 0.179 0.200 0.300 - - - 67.90Final IV-B 0.522 C 0.322 0.300 0.300 - - - 92.20Final II 4.749 C 0.350 0.000 0.000 - - - 35.00OQC Construction 22690 Const. of MPB @ Brgy. 9 1st/Final II 1.924 O 0.385 0.177 0.100 0.020 0.023 0.100 80.50 -OQC Construction 22690Const. of Multi-Purpose Building(Gymnasium)1st II 4.821 O 0.304 0.300 0.100 0.015 0.035 0.100 85.40 -94.70%Outstanding74.50%Satisfac<strong>to</strong>ry91.64%Outstanding35.00%PoorOQC Construction 22690Const. of Multi-Purpose Building @Cagayan National High School3rd II 4.821 O 0.389 0.236 0.050 0.030 0.030 0.067 80.20 -OQC Construction 22690Seal Widening along DaangMaharlika km. 324+000-Km.327+7001st II 9.543 O 0.378 0.300 0.100 0.020 0.051 0.100 94.90 -OQC Construction 22690Seal Widening along DaangMaharlika km. 324+000-Km.327+7001st II 9.543 O 0.347 0.300 0.100 0.030 0.050 0.100 92.70 -OQC Construction 22690Seal Widening along DaangMaharlika km. 324+000-Km.327+7002nd II 9.543 C 0.294 0.000 0.300 - - - 59.4076.64%Satisfac<strong>to</strong>ryOQC Construction 22690Seal Widening of intersection atDaang Maharlika & Jct. Ipil-Panang-Quirino Bdry RoadFinal II 4.775 C 0.291 0.200 0.300 - - - 79.1079.10%Satisfac<strong>to</strong>ryOrani Builders Supply 5349Cluster CY 2004 DepEd SchoolBuilding Program1st/Final II 4.560 C 0.478 - 0.500 - - - 97.8095.00%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 119


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONOrani Builders Supply 5349Const. of Multi-Purpose BuildingSan VicenteFinal III 2.814 C 0.456 - 0.500 - - - 95.6089.02%V.Satisfac<strong>to</strong>ryOrani Builders Supply 5349Repair/Rehab. of Multi-PurposeBuildingFinal III 0.472 O 0.245 0.300 0.100 0.015 0.011 0.033 70.40 -Orguer Trading &Construction17111Concreting of Road at Brgy.Concepcion1st VII 0.286 C 0.346 - 0.500 - - - 84.6084.60%V.Satisfac<strong>to</strong>ryOrguer Trading &Construction17111 Const. of Multi-Purpose Building 1st IV-A 0.950 C 0.351 - 0.500 - - - 85.1085.10%V.Satisfac<strong>to</strong>ryOrguer Trading &Construction17111Const. of Multi-Purpose Building @Brgy. Poblacion1st/Final IV-A 0.477 C 0.289 0.300 0.300 - - - 88.9088.90%V.Satisfac<strong>to</strong>ryOrguer Trading &ConstructionOriental Sales Center &Contrac<strong>to</strong>rOriental Sales Center &Contrac<strong>to</strong>r17111 Repair of Hanging Bridge 1st/Final IV-A 0.190 C 0.083 - 0.500 - - - 58.303816 Const. of Bridge (Phase I) 1st/Final IV-A 0.958 O 0.304 0.200 0.100 0.000 0.020 0.100 72.40 -3816Const. of MPB at Sabangan E/S,Bonuan-Guesset (Phase I)1st I 1.4<strong>31</strong> C 0.323 0.300 0.300 - - - 92.3058.30%Poor92.30%OutstandingOrzan BuildersEnterprises13382Concreting of Ariman-Bulusan LakeRoad1st/Final I 2.750 C 0.321 - 0.500 - - - 82.1089.66%V.Satisfac<strong>to</strong>ryP.B. Obial Construction 16784 Const. of Multi-Purpose Building Final V 0.289 C 0.355 0.300 0.300 - - - 95.5094.<strong>31</strong>%OutstandingP.B. Obial Construction 16784 Const. of Pedestrian Overpass Final VII 3.678 O 0.<strong>31</strong>2 0.240 0.100 0.010 0.044 0.100 80.60 -P.B. Obial Construction 16784 Const. of Pedestrian Overpass 1st VII 3.678 O 0.308 0.240 0.100 0.030 0.040 0.100 81.80 -P.B. Obial Construction 16784Const./Rehab. of Sch. Bldg. @Mandaue City School for the Arts2nd VII 1.446 C 0.377 0.100 0.300 - - - 77.7077.70%Satisfac<strong>to</strong>ryP.J. Cruz Construction &Trading14223Const. of Additional Classroom(Sampaloc Site II E/S)1st/Final VII 1.420 C 0.343 - 0.500 - - - 84.3078.70%Satisfac<strong>to</strong>ryP.J. Cruz Construction &Trading14223Const. Partial of Two (2) S<strong>to</strong>rey,Four (4) Cl School Bldg. @ Unit 1,Baclaran E/SFinal NCR 2.861 O 0.386 0.248 0.100 0.030 0.058 0.100 92.20 -P.J. Cruz Construction &Trading14223Const. Partial of Two (2) S<strong>to</strong>rey,Four (4) Cl School Bldg. @ Unit 1,Baclaran E/S1st NCR 2.861 C 0.335 0.300 0.300 - - - 93.5078.70%Satisfac<strong>to</strong>ryP.J. Cruz Construction &Trading14223Repair/Rehab. of Guardrails/Railingsalong Nat'l Roads anng BridgesFinal NCR 2.963 C 0.261 0.150 0.300 - - - 71.1071.10%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 120


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONP.J. San Pedro Const.Supply14994Const. / Rehab. / Completion &Repair of Secondary Sch. Bldg. @Sta. Ana NHS1st/Final NCR 1.323 C 0.376 0.300 0.300 - - - 97.6097.60%OutstandingP.J. San Pedro Const.Supply14994Const. of MPB @ Km. 6, Brgy.Buhangin Proper1st/Final XI 1.692 C 0.380 0.300 0.300 - - - 98.0098.00%OutstandingP.L. SebastianConstruction1076Const. of Bit-os Lat. Canal "D",Sta.0+920-6+032 (new station)1st/Final XI 72.059 O 0.345 0.151 - 0.030 0.070 0.200 81.15 -P.L. SebastianConstruction1076Const. of Bit-os Main Canal &Regulating Pond2nd NIA 247.675 C 0.299 0.300 0.300 - - - 85.4788.47%V.Satisfac<strong>to</strong>ryP.L. SebastianConstruction1076Const. of Diversion Works, Rightand Left Main Canal, Road SystemFinal NIA 224.599 O 0.343 0.160 0.100 0.020 0.030 0.200 85.33 -P.L. SebastianConstruction1076Const. of Limpapa-Sibuco Road,Lintangan-Pasilnahut Sect., Phase IIalong Zamboanga West Coast Road1st NIA 30.212 O 0.332 0.273 0.100 0.030 0.042 0.100 87.70 -P.L. SebastianConstruction1076Const. of Limpapa-Sibuco Road,Lintangan-Pasilnahut Sect., Phase IIalong Zamboanga West Coast Road2nd IX 32.526 C 0.389 0.300 0.300 - - - 98.9092.42%OutstandingP.L. SebastianConstruction1076Const./Impv't. of Contract PackageXI-A Libo<strong>to</strong>n-Tupas Rd.Final IX 101.877 C 0.337 0.300 0.070 0.030 0.037 0.067 84.10 -P.L. SebastianConstruction1076Const./Impv't. of Contract PackageXI-A Libo<strong>to</strong>n-Tupas Rd.1st XI 89.986 O 0.360 0.300 0.100 0.030 0.045 0.100 93.50 -P.L. SebastianConstruction1076Widening of Cotaba<strong>to</strong>-Allah-GeneralSan<strong>to</strong>s National Rd. PoblacionShariff Aguak Sect.3rd XI 6.170 C 0.436 - 0.500 - - - 93.6082.98%V.Satisfac<strong>to</strong>ryP.T. Adhi Karya (PerSero)/Vicente T. LaoConst. (J.V.)7040C.P. I-A: Replacement/Repair/Retrofitting of Thirteen BridgesIligan-Cagayan de Oro-Butuan Rd.Final XII 190.137 O 0.365 0.286 0.100 0.030 0.061 0.100 94.20 -P.T. Adhi Karya (PerSero)/Vicente T. LaoConst. (J.V.)7040C.P. I-A: Replacement/Repair/Retrofitting of Thirteen BridgesIligan-Cagayan de Oro-Butuan Rd.3rd X 190.137 O 0.372 0.289 0.100 0.030 0.055 0.100 94.60 -P.T. DiamondMerchandise &Construction15451Rehab./Slope Protection ofCalaoaan, Tamurong FMR, Calaoaan4th X 0.474 O 0.307 0.200 0.100 0.030 0.035 0.200 87.20 -P.T. DiamondMerchandise &Construction15451Replacement of Sapilang Bridgealong MNR1st I 12.993 O 0.347 0.279 0.100 0.015 0.038 0.067 84.60 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 121


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONPablo S. LabasbasConstruction6302Concreting of Guiuan-SulanganRoad1st I 4.778 O 0.373 0.222 0.050 0.022 0.027 0.067 76.10 -Pablo S. LabasbasConstruction6302Concreting of Guiuan-SulanganRoad1st VIII 4.778 C 0.281 0.300 0.300 - - - 88.1084.56%V.Satisfac<strong>to</strong>ryPablo S. LabasbasConstruction6302Rehab./Impvt. Along TablasCircumferential RoadFinal VIII 9.643 O 0.217 0.200 0.070 0.030 0.032 0.067 61.60 -Pablo S. LabasbasConstruction6302Rehabilitation of Cabacungan-Panoypoy Farm-<strong>to</strong>-Market Road1st IVB 0.954 C 0.355 0.300 0.300 - - - 95.5095.50%OutstandingPacer Construction &Development Corporation4839Const. of Kabadiangan Bridge (UK-Phase III)1st/Final VIII 4.605 O 0.<strong>31</strong>6 0.240 0.100 0.022 0.023 0.100 80.10 -Pacific Construction 15800Completion of the Rehab. of Pan-Phil. Hi-Way (Agas-Agas Sect.)1st VIII 14.092 C 0.388 0.300 0.300 - - - 98.8085.61%V.Satisfac<strong>to</strong>ryPacific Star Erec<strong>to</strong>rs 14224Completion of Conner Multi-Purpose BuildingFinal VIII 0.962 C 0.322 - 0.500 - - - 82.2086.05%V.Satisfac<strong>to</strong>ryPacific Star Erec<strong>to</strong>rs 14224Const. of Apayao Science H/S PhaseIVFinal CAR 1.591 O 0.338 0.300 0.100 0.022 0.012 0.100 87.20 -Pacific Star Erec<strong>to</strong>rs 14224Const. of Apayao Science H/S PhaseIV2nd CAR 1.591 C 0.<strong>31</strong>4 0.300 0.300 - - - 91.4086.89%V.Satisfac<strong>to</strong>ryPacific Star Erec<strong>to</strong>rs 14224Const. of Apayao State College Multi-Purpose BldgFinal CAR 1.395 C 0.464 - 0.500 - - - 96.4092.27%OutstandingPacific Star Erec<strong>to</strong>rs 14224 Const. of Poblacion-Bulo-Waga FMR Final CAR 0.919 O 0.400 0.300 0.100 0.020 0.020 0.100 94.00 -Pacific Star Erec<strong>to</strong>rs 14224Pacific Star Erec<strong>to</strong>rs 14224Pacific Star Erec<strong>to</strong>rs 14224Pacific Star Erec<strong>to</strong>rs 14224Const. of San Carlos Bridge &ApproachesConst. of Tammang Bridge (Pier 2and 3)Maintenance/Rehab. & Impv't. ofNational Arterial Roads & BridgesReplacement of Capagu Bridgealong MNR1st CAR 10.903 O 0.396 0.300 0.000 0.030 0.037 0.067 83.00 -1st II 9.254 C 0.343 0.300 0.000 - - - 64.3075.07%Satisfac<strong>to</strong>ryFinal CAR 2.825 O 0.<strong>31</strong>1 0.257 0.070 0.015 0.016 0.067 73.60 -3rd II 12.913 O 0.243 0.288 0.100 0.030 0.035 0.100 79.60 -Pacific Star Erec<strong>to</strong>rs 14224Replacement of Capagu Bridgealong MNR2nd II 12.913 C 0.381 0.200 0.300 - - - 88.1083.78%V.Satisfac<strong>to</strong>ryPader Construction andSupply20213 Conc. of Road @ Brgy. Ulamian Final II 0.468 C 0.368 0.200 0.300 - - - 86.8086.80%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 122


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONPalafox Construction 18424 Const. of FTMR @ Cacandungan 1st/Final XII 0.480 C 0.286 - 0.500 - - - 78.60Palmares GeneralMerchandise24657Const. of Gymnasium Bldg. @ Brgy.Mayo1st I 0.964 C 0.247 0.200 0.300 - - - 74.7078.60%Satisfac<strong>to</strong>ry74.70%Satisfac<strong>to</strong>ryPalmares GeneralMerchandise24657Const. of Multi-Purpose Bldg. (Mini-Gym) Poblacion Uno1st/Final XII 1.419 C 0.384 0.300 0.300 - - - 98.4087.41%V.Satisfac<strong>to</strong>ryPalmares GeneralMerchandise24657Const. of Sch. Bldg. @ SultanKudarat Polytechnic State CollegeFinal XI 0.921 C 0.396 0.200 0.300 - - - 89.6089.60%V.Satisfac<strong>to</strong>ryPangasinan New WilsonLumber and Construction8<strong>31</strong>3Const. of Multi-Purpose Bldg. forBoy Scout1st/Final XII 0.944 C 0.298 - 0.500 - - - 79.8079.80%Satisfac<strong>to</strong>ryParadox Construction 18557Concreting of FTMR @ Palina East-Awed1st/Final I 0.479 C 0.389 - 0.500 - - - 88.9088.90%V. Satisfac<strong>to</strong>ryParadox Construction 18557 Const. of Farm-<strong>to</strong>-Market Road 1st I 0.479 C 0.334 - 0.500 - - - 83.4083.40%V.Satisfac<strong>to</strong>ryParadox Construction 18557Const. of Farm-<strong>to</strong>-Market RoadBrgy. Cabaruan1st/Final I 0.479 C 0.262 - 0.500 - - - 76.2076.20%Satisfac<strong>to</strong>ryParis Construction &Marketing14306Completion/Const. of Multi-PurposeBuilding1st I 0.669 C 0.385 0.300 0.300 - - - 98.5084.36%V.Satisfac<strong>to</strong>ryParojinog & SonsConstruction CompanyPartido Construction andSupplyPartido Construction andSupplyPartido Construction andSupplyPartido Construction andSupplyPartido Construction andSupply18694 Rehab. of Guingona-Trigos Road Final XII 2.328 C 0.347 0.300 0.300 - - - 94.70206<strong>31</strong> Concreting of Brgy. Road Mabca 1st/Final X 0.183 C 0.401 - 0.500 - - - 90.10206<strong>31</strong>206<strong>31</strong>Const. of 1 Cl School Buildings @San MiguelConst. of 1 Cl RM Sch. Bldg. @ IpilE/S1st V 0.337 C 0.373 0.200 0.300 - - - 87.30Final V 0.380 C 0.<strong>31</strong>5 0.168 0.300 - - - 78.30206<strong>31</strong> Const. of Flood Control San Roque 1st/Final V 0.453 C 0.233 - 0.500 - - - 73.30206<strong>31</strong>Const. of Multi-Purpose Bldg. GoaCentral School1st V 1.088 F 0.434 - 0.500 - - - 93.4094.70%Outstanding90.10%Outstanding93.67%Outstanding78.30%Satisfac<strong>to</strong>ry73.30%Satisfac<strong>to</strong>ry94.38%OutstandingPartido Construction andSupply206<strong>31</strong>Const. of Various School Buildings@ 3rd District Congressional Distric<strong>to</strong>f Camarines SurFinal V 0.337 O 0.393 0.300 0.100 0.030 0.041 0.100 96.40 -Partido Construction andSupply206<strong>31</strong>Re-decking of 2nd Span & Repair ofBridge approaches Agos Bridge1st V 1.418 O 0.390 0.300 0.100 0.008 0.040 0.100 93.80 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 123


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONPartido Construction andSupply206<strong>31</strong>Re-decking of 2nd Span & Repair ofBridge approaches Agos Bridge1st V 1.418 C 0.299 0.137 0.300 - - - 73.6085.72%V.Satisfac<strong>to</strong>ryPartido Construction andSupply/Jeff Const. (JV)JV-05-051Const. of Gipangpang Bridge &Approaches (Phase I)Final V 14.550 O 0.347 0.213 0.100 0.015 0.040 0.100 81.50 -Partido Construction andSupply/Jeff Const. (JV)JV-05-051Const. of Gipangpang Bridge &Approaches (Phase I)2nd V 14.550 O 0.361 0.240 0.100 0.015 0.040 0.100 85.60 -Pastrana Construction 17340Const./Rehab. of Havana-BugnayRoad3rd V 1.910 C 0.<strong>31</strong>2 0.269 0.300 - - - 88.1084.86%V.Satisfac<strong>to</strong>ryPatricia Builders 28745 Concreting of Farm-<strong>to</strong>-Market Road Final VI 0.467 C 0.325 - 0.500 - - - 82.5082.50%V.Satisfac<strong>to</strong>ryPatricia Builders 28745 Impvt. of Brgy. San Jose FMR 1st/Final IV-A 0.467 C 0.383 0.200 0.300 - - - 88.3088.30%V.Satisfac<strong>to</strong>ryPatrila Builders Inc, 26628 Const. of Cuartero Bridge Phase III 1st/Final IV-A 10.494 O 0.338 0.300 0.100 0.023 0.070 0.100 93.10 -Paula Mae BuhongConstruction26128Impvt/ along Banawe-Mayoyao-Aguinaldo-Isabela Bdry. Road1st VI 1.435 C 0.384 0.300 0.300 - - - 98.4093.90%OutstandingPayunan Builders 16824Impv't. of Sarangani-Davao del SurCoastal Road (Jct. Alabel-GlanBoundary) Sarangani-Davao del SurFinal CAR 13.433 C 0.307 0.289 0.000 - - - 59.6065.14%FairPBO Construction 18403 Const. of Lawig-Pieza Bridge Final XII 9.090 O 0.330 0.233 0.100 0.018 0.028 0.100 80.90 -PBO Construction 18403 Const. of Lawig-Pieza Bridge 2nd CAR 9.027 O 0.<strong>31</strong>7 0.300 0.070 0.030 0.043 0.100 86.00 -PBO Construction 18403 Const. of Lawig-Pieza Bridge 3rd CAR 9.027 C 0.<strong>31</strong>7 0.300 0.300 - - - 91.7085.36%V.Satisfac<strong>to</strong>ryPBO Construction 18403PBO Construction 18403Const. of Tammang Bridge (PartialCompletion)Const. of Tammang Bridge (PartialCompletion)Final CAR 19.<strong>31</strong>5 O 0.340 0.300 0.100 0.030 0.055 0.100 92.50 -3rd CAR 19.<strong>31</strong>5 O 0.357 0.300 0.100 0.030 0.045 0.100 93.20 -PBO Construction 18403Contruction of Habbang Bridge, Km.362+303-Km. 302+4604th CAR 20.145 C 0.389 0.300 0.300 - - - 98.9098.90%OutstandingPBO Construction 18403 Rehab. of Balawag - Malin-awa FMR 1st & Final CAR 19.<strong>31</strong>5 O 0.360 0.190 0.100 0.023 0.054 0.100 82.70 -PC Builders and Supply 19191Impvt./ Repair of Shore Protectionalong side NHA-Seabreeze Homes1st CAR 2.871 C 0.388 - 0.500 - - - 88.8088.80%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 124


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.Pentagon IndustrialDevelopment & Const.Co., Inc12796PROJECT NAMEImprovement/Widening of ManilaNorth Road (MNR) Package IINO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTION1st V 87.050 O 0.393 0.300 0.100 0.030 0.043 0.100 96.60 -Performance Builders &Dev't. Corp.5303 Const. of Calatrava Seawall 1st III 0.462 C 0.440 0.500 94.0094.00%OutstandingPerformance Builders &Dev't. Corp.5303 Const. of Tan-Agan Bridge II Final IV-B 21.239 O 0.366 0.300 0.100 0.024 0.060 0.067 91.70 -Performance Builders &Dev't. Corp.5303 Const. of Tan-Agan Bridge II 1st IV-B 21.239 O 0.255 0.284 0.070 0.006 0.038 0.033 68.60 -Performance Builders &Dev't. Corp.5303 Desilting of Dubduban River 2nd IV-B 0.281 O 0.267 0.200 0.033 0.067 0.250 81.70 -Persan Const. Inc.(Formerly: PersanConstruction)Persan Construction, Inc. 2852Persan Construction, Inc. 28522852 Replacement of Loboc Bailey Bridge 1st IV-B 11.564 O 0.210 0.240 0.100 0.015 0.010 0.100 67.50 -Asphalt Overlay of Putiao-Pilar-Donsol Road (Putiao-BayasongSection)Asphalt Overlay of Putiao-Pilar-Donsol Road (Putiao-BayasongSection)1st VII 40.123 O 0.396 0.300 0.100 0.030 0.035 0.100 96.10 -1st V 40.123 C 0.397 210.000 0.300 - - - 90.7093.94%OutstandingPersan Construction, Inc. 2852Improvement/Asphalting of PanglaoIsland Circumferential RoadFinal V 38.069 O 0.384 0.300 0.030 0.023 0.045 0.067 84.90 -Persan Construction, Inc. 2852Improvement/Asphalting of PanglaoIsland Circumferential Road1st VII 38.360 O 0.366 0.300 0.050 0.023 0.025 0.067 83.10 -Persan Construction, Inc. 2852Improvement/asphalting of PanglaoIsland Circumferential Road2nd VII 38.360 O 0.341 0.127 0.000 0.030 0.056 0.067 62.10 -Persan Construction, Inc. 2852Improvement/asphalting of PanglaoIsland Circumferential Road3rd VII 38.360 C 0.330 0.287 0.000 - - - 61.7070.70%Satisfac<strong>to</strong>ryPersan Construction, Inc. 2852Persan Construction, Inc. 2852Improvement/Const. of Bridge alongPanabo Coastal Road (ArietaSection)Improvement/Const. of Bridge alongPanabo Coastal Road (ArietaSection)Final VII 28.905 O 0.400 0.279 0.100 0.030 0.051 0.100 96.00 -1st XI 28.918 C 0.348 0.300 0.300 - - - 94.8096.00%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 125


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONPersan Construction, Inc. 2852Improvement/Const. of Bridge alongPanabo Coastal Road (ArietaSection)Final XI 28.764 C 0.436 - 0.500 - - - 93.6091.56%OutstandingPersan Construction, Inc. 2852Impvt. (Conc. Paving) along Carmen-Sagbayan-Bacane Nat'l RoadFinal XI 14.255 O 0.375 0.240 0.000 0.030 0.058 0.067 77.00 -Persan Construction, Inc. 2852Persan Construction, Inc. 2852Persan Construction, Inc. 2852Persan Construction, Inc. 2852Impvt. (Conc. Paving) along Carmen-Sagbayan-Bacane Nat'l RoadImpvt. of Panabo Coastal Road,Arieta-Puyod SectionImpvt. of Panabo Coastal Road,Arieta-Puyod SectionRehab. Old Daang Maharlika Road(Cagayan Valley Road), San Rafael<strong>to</strong> San Ildefonso1st VII 14.256 O 0.279 0.036 0.000 0.030 0.065 0.067 47.70 -2nd VII 28.285 O 0.301 0.300 0.100 0.030 0.046 0.100 87.70 -1st XI 28.257 C 0.380 0.300 0.300 - - - 98.0091.82%OutstandingFinal XI 28.640 O 0.395 0.225 0.100 0.030 0.035 0.100 88.50 -Persan Construction/ A.L.Salazar Const., Inc. (JV)Asphalt Overlay of Daang Maharlika2852/3899(MSR)1st III 41.038 C 0.450 - 0.500 - - - 95.0093.62%OutstandingPeter Construction andAggregate Supply17343Const. of MPB (Covered Court) @Estaka E/SFinal V 2.036 C 0.330 0.173 0.300 - - - 80.3080.30%V.Satisfac<strong>to</strong>ryPeter Construction andAggregate Supply17343Const./Extension of River ControlStructure1st/Final IX 2.762 O 0.280 0.200 0.100 0.023 0.023 0.200 82.60 -Peter Construction andAggregate Supply17343Const./Extension of River ControlStructure1st IX 2.762 C 0.285 0.217 0.300 - - - 80.2081.64%V.Satisfac<strong>to</strong>ryPeter Construction andAggregate Supply17343Road Improvement/Const. ofDrainage Canal Jct. Polo-DapitanPark Nat'l. Rd.Final IX 1.847 C 0.490 - 0.500 - - - 99.0093.87%OutstandingPeter G. Chua Builders 25367Completion of Multi-PurposeBuilding at Brgy. West RemboFinal X 0.480 C 0.366 - 0.500 - - - 86.6086.60%V.Satisfac<strong>to</strong>ryPeter G. Chua Builders 25367Improvement/Concreting of Merville-Moonwalk Access Road1st NCR 0.961 C 0.278 0.200 0.300 77.8077.02%Satisfac<strong>to</strong>ryPetrina Grocers Marketing 29695Petrina Grocers Marketing 29695Const. of 2-Cl School Building @Cugman ESConst. of MPB (Phase II) @ Brgy.PoblacionFinal NCR 0.839 O 0.377 0.300 0.100 0.020 0.006 0.100 90.30 -1st X 0.565 O 0.361 0.300 0.100 0.015 0.013 0.100 88.90 -Petrina Grocers Marketing 29695 Const. of MPB at Lumbia NHS 1st X 1.401 O 0.352 0.209 0.100 0.030 0.035 0.100 82.60 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 126


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONPetrina Grocers Marketing 29695Petrina Grocers Marketing 29695Const. of Multi-Purpose BarangayHall CapinonanConst. of Multi-Purpose Building(Phase I)1st X 0.925 C 0.355 - 0.500 - - - 85.5073.04%Satisfac<strong>to</strong>ryFinal X 0.942 O 0.359 0.240 0.100 0.030 0.025 0.100 85.40 -Petrina Grocers Marketing 29695Const. of Multi-Purpose Building(Phase I)1st X 0.942 C 0.376 0.212 0.300 - - - 88.8086.42%V.Satisfac<strong>to</strong>ryPett Builders 26825Completion of Multi-PurposeBuilding @ JEM SubdivisionFinal X 1.428 C 0.369 0.300 0.300 - - - 96.9096.90%OutstandingPhil Manna Construction& Supply10320Const. of Multi-Purpose Building atSitio Maligay1st/Final NCR 0.927 C 0.421 - 0.500 - - - 92.1092.10%OutstandingPhil Manna Construction& Supply10320Const. of Multi-Purpose Building atSta. Cruz-Sta. Isabel1st/Final V 0.851 C 0.389 0.200 0.300 - - - 88.9088.90%V.Satisfac<strong>to</strong>ryPhilippine ChemsteelIndustries Inc.16965 Const. of Water System 1st/Final V 3.271 C 0.330 0.200 0.300 - - - 83.0083.00%V.Satisfac<strong>to</strong>ryPhilippine ChemsteelIndustries Inc.16965Repair/Rehab. Along National Roads@ CDO-Lumbia Airport-Uguiban Rd.1st/Final XI 4.709 C 0.320 0.300 0.300 - - - 92.0092.00%OutstandingPhilippines ChemsteelIndustries Inc.16965Const. of Round Abouts TrafficSignal Lights & Road Signs andPavement Markings1st/Final X 4.625 C 0.395 0.262 0.300 - - - 95.7095.70%OutstandingPhilippines ChemsteelIndustries, Inc.16965Repair/Rehab./Impvt. of Nat'l Roadsalong Calbiga Road-Jct. Dolongan-Basey Road1st/Final V 9.625 C 0.197 0.300 0.300 - - - 79.7079.70%Satisfac<strong>to</strong>ryPhilworks Construction &Supply (Formerly:Philworks Const.)32103Const. of Arimbay Bridge, De<strong>to</strong>ur &Approaches1st/Final VIII 18.504 O 0.386 0.300 0.100 0.023 0.060 0.100 96.90 -Philworks Construction &Supply (Formerly:Philworks Const.)32103Const. of Arimbay Bridge, De<strong>to</strong>ur &Approaches1st V 18.785 O 0.326 0.300 0.100 0.023 0.028 0.100 87.70 -Philworks Construction &Supply (Formerly:Philworks Const.)10181Const. of Basud Bridge &Approaches, Phase II-B2nd V 55.604 C 0.405 - 0.500 - - - 90.5088.94%V.Satisfac<strong>to</strong>ryPhilworks Construction &Supply (Formerly:Philworks Const.)10181Const. of Panagan Bridge andApproaches (Phase II)Final V 12.497 O 0.<strong>31</strong>6 0.259 0.100 0.020 0.028 0.100 82.30 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 127


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONPhilworks Construction &Supply (Formerly:Philworks Const.)10181Slope Protection of Various SlippedSect. along Tigaon Mayon-Rd,Sibaguan1st V 4.506 C 0.333 - 0.500 - - - 83.3090.26%OutstandingPhilworks Constructionand Supply10181Const. of Arimbay Bridge, De<strong>to</strong>ur &ApproachesFinal V 18.785 C 0.386 0.100 0.300 - - - 78.6086.82%V.Satisfac<strong>to</strong>ryPhilworks Constructionand Supply32103Const. of Cabo<strong>to</strong>nan Bridge andApproaches (Phase 1)Final V 18.848 O 0.<strong>31</strong>5 0.200 0.000 0.015 0.040 0.100 67.00 -Philworks Constructionand Supply32103Const. of Cabo<strong>to</strong>nan Bridge andApproaches (Phase 1)1st V 17.749 O 0.366 0.240 0.100 0.015 0.050 0.100 87.10 -Phranaret Construction 16878Phranaret Construction 16878Phranaret Construction 16878Phranaret Construction 16878Ban-May-Agui-A. Lista Isabela Brgy.RoadImpvt. Along Banawe-Mayoyao-Aguinaldo-Alfonso-Lista-IsabelaBdry. Road, Kinakin SectionRepair/Rehab. of Lamut RiverControl, (Upstream of Lamut Bay)Pob. WestRepair/Rehab. of Lamut RiverControl, (Upstream of Lamut Bay)Pob. West2nd V 3.195 O 0.320 0.291 0.000 0.015 0.037 0.100 76.30 -3rd CAR 3.195 O 0.339 0.300 0.000 0.000 0.019 0.050 70.80 -4th CAR 0.947 O 0.253 0.040 0.100 0.008 0.028 0.200 62.90 -1st CAR 0.925 C 0.<strong>31</strong>3 0.300 0.300 - - - 91.3074.26%Satisfac<strong>to</strong>ryPIBS Trading &Construction14734Const. of Multi-Purpose Bldg.Isabela West E/SFinal CAR 0.459 C 0.397 - 0.500 - - - 89.7089.70%V. Satisfac<strong>to</strong>ryPins Construction 13630Rehab. of Drainage System SanPedro District1st IX 0.929 C 0.375 - 0.500 - - - 87.5088.94%V.Satisfac<strong>to</strong>ryPJ San Pedro Const.Supply14994 Const. of Roads Brgy. 18-B Final IX 0.414 C 0.397 - 0.500 - - - 89.7089.70%V.Satisfac<strong>to</strong>ryPJ San Pedro Const.Supply14994Rehabilitation of Road @ Purok 5-Panalum Proper1st XI 0.365 O 0.373 0.000 0.100 0.030 0.033 0.100 63.60 -PLD Construction 1859Asphalting of Brgy. Road 1:Dungoan, 2 San Isidro and 3 Tacdog1st XI 1.646 C 0.437 - 0.500 - - - 93.7093.70%OutstandingPLD Construction 1859PLD Construction 1859Const. of Multi-Purpose Bldg.(Phase III)Rehab. of Processional Rd.Including Const. of Bridge1st VII 1.929 C 0.494 - 0.500 - - - 99.4099.40%Outstanding1st VII 1.274 O 0.325 0.300 0.100 0.030 0.040 0.100 89.50 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 128


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONPMC ConstructionCorporation1630Const. of Covered Basketball Court& Renovation of Viewdeck at BLC1st VII 5.657MutualTermination0.371 0.300 0.300 - - - 97.1098.57OutstandingPolangui Construction 8660Repair/Rehab. of Unpaved Shoulderwith Reblocking San JoseFinal NHA 0.360 C 0.368 - 0.500 - - - 86.8086.80%V. Satisfac<strong>to</strong>ryPolangui Construction 8660 Road Const./Rehab. @ Bongoran 1st V 0.377 C 0.360 0.200 0.300 - - - 86.0086.00%V.Satisfac<strong>to</strong>ryPolymer-vic Construction 6157Const. of 2 CL School Bldg. @Luakan NHS1st/Final V 0.865 C 0.293 0.090 0.300 - - - 68.3086.43%V.Satisfac<strong>to</strong>ryPostema Construction &Development15283Concreting of Sitio Ilang-Ilang Brgy.Batas FMRFinal III 0.952 C 0.306 - 0.500 - - - 80.6083.42%V.Satisfac<strong>to</strong>ryPostema Construction &Development15283 Const. of Brgy. Hall at Medina Final IV-A 0.665 C 0.432 - 0.500 - - - 93.2093.20%OutstandingPostema Construction &Development15283 Const. of Multi-Purpose Building 1st IV-A 2.121 C 0.399 0.300 0.300 - - - 99.9099.90%OutstandingPostema Construction &Development15283 Const. of Pooc Bridge 1st/Final IV-A 5.703 O 0.400 0.188 0.100 0.030 0.038 0.100 85.60 -Postema Construction &Development15283Repair of Flood Control & DrainageSystem @ Timala River Brgy.Cabuco (Baquero Br.)1st IV-A 0.630 O 0.306 0.200 0.300 - - - 80.60 -Power Move Builders &Construction Supply22894MBC CY 2004 Dumaguete AirportRoad & DSR, DPR, DNR, BKR1st/Final IV-A 2.710 C 0.443 - 0.000 - - - 44.3058.10%PoorPRC Construction 166<strong>31</strong>Const. of 1-CL Acad Bldg., atSanchez Mira C/SFinal VII 0.359 C 0.<strong>31</strong>9 - 0.500 - - - 81.9081.90%V.Satisfac<strong>to</strong>ryPRC Construction 166<strong>31</strong>Construction of Canal and CanalStructures (LMC-ARIP-02-06)1st II 4.804 C 0.389 0.200 0.000 0.015 0.028 0.200 83.1983.19%V.Satisfac<strong>to</strong>ryPRC Construction 166<strong>31</strong>Construction of Canal and CanalStructures (LMC-ARIP-05-06)1stNIARegion II3.008 C 0.400 0.300 0.000 - - - 70.0070.00%FairPRC Construction 166<strong>31</strong>PRC Construction 166<strong>31</strong>Lapogan Communal Pump IrrigationProjectLapogan Communal Pump IrrigationProjectFinalNIARegion II5.542 O 0.348 0.1<strong>31</strong> 0.050 0.023 0.064 0.200 81.40 -2nd NIA 5.541 C 0.261 0.240 0.300 - - - 80.10 80.80%<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 129


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONPRC Construction 166<strong>31</strong>Repair/Rehab of CIS of Aglipay ,QuirinoFinalNIARegion II3.384 C 0.307 0.186 0.300 - - - 79.3079.30%V.Satisfac<strong>to</strong>ryPrime Edge Construction& Concrete Products7902Concreting of Road, Salud MitraBrgy.1st CAR 0.573 C 0.442 - 0.500 - - - 94.2094.20%OutstandingPrime Edge Construction& Concrete Products7902Const. of Road at S<strong>to</strong>. Tomas Brgy.S<strong>to</strong>. Tomas Proper leading <strong>to</strong>Adiwang E/SFinal CAR 1.233 C 0.389 0.300 0.300 - - - 98.9092.66%OutstandingPrime Edge Construction& Concrete Products7902Const./ Rehab. of Health Facilities,Campo Filipino Health CenterCampo Pilipino Health District1st CAR 1.924 O 0.372 0.236 0.100 0.010 0.043 0.100 86.10 -Prime Edge Construction& Concrete Products7902Const./ Rehab. of Health Facilities,Campo Filipino Health CenterCampo Pilipino Health DistrictFinal CAR 1.924 C 0.376 0.178 0.300 - - - 85.4085.89%V.Satisfac<strong>to</strong>ryPrimitivo P. EslabonConstruction andHardwareProgressive Design &ConstructionProgressive Design &Construction21904Const. of Sta. Marcela Hall & Pud<strong>to</strong>lMun. HallFinal CAR 1.405 C 0.444 - 0.500 - - - 94.4011826 Conc. of Camestizoan FMR 1st/Final I 0.190 C 0.328 0.300 0.300 - - - 92.8011826Const. of FMR, Poblacion EastLeading <strong>to</strong> Brgy. Sagneb, Arnap &Belen1st I 0.474 C 0.200 - 0.500 - - - 70.0076.67%Satisfac<strong>to</strong>ry92.80%Outstanding70.00%FairProgressive Design &Construction11826Const. of Multi-Purpose Building @University of Northern Phils.1st I 0.569 O 0.393 0.204 0.100 0.020 0.018 0.100 83.50 -Pulsar Construction 24422Conc. of Nabannaga West NewOrlins-Cabatacan East Rd.Final II 11.984 C 0.386 - 0.500 - - - 88.6083.20%V. Satisfac<strong>to</strong>ryPulsar Construction 24422Pulsar Construction 24422Concrete Paving of JLLGR (GabunSect) at LasamRiver Control along Cagayan RiverBasinFinal II 4.100 C 0.415 - 0.500 - - - 91.5090.36%Outstanding2nd II 8.680 O 0.265 0.200 0.050 0.030 0.035 0.133 71.30 -Pulsar Construction 24422River Control along Cagayan RiverBasinFinal II 8.611 C 0.347 0.300 0.300 - - - 94.7085.46%V.Satisfac<strong>to</strong>ryQM Builders 30743Concreting of Dungo-an-BolinawanRd (Cluster C)1st VII 1.404 C 0.424 - 0.500 - - - 92.4092.40%OutstandingQM Builders 30743 Const. of Multi-Purpose Building 1st VII 1.056 O 0.334 0.300 0.100 0.030 0.006 0.100 87.00 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 130


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONQM Builders 30743Impv't./Concreting of Kang-Ac<strong>to</strong>lBrgy. Rd.Final VII 1.088 C 0.429 - 0.500 - - - 92.9083.96%V.Satisfac<strong>to</strong>ryQM Builders 30743Repair/Rehab. of Sibunga-DumanjugRd. (km. 51+950 - km. 53+298)1st/Final VII 9.645 C 0.<strong>31</strong>1 0.300 0.300 - - - 91.1091.10%OutstandingQuality BuilderCorporation17790Const. of Two Classroom SchoolBldg1st VII 1.350 C 0.425 - 0.500 - - - 92.5092.50%OutstandingQueen City Builders 21535Concreting of Road @ Sitio HabitatCoronon1st XI 0.611 C 0.361 - 0.500 - - - 86.1086.10%V. Satisfac<strong>to</strong>ryQuezon Vic<strong>to</strong>ry GeneralContrac<strong>to</strong>r66<strong>31</strong>Completion of Multi-Purpose Bldg atBrgy. 3 Poblacion1st IV-A 0.235 C 0.410 - 0.500 - - - 91.0091.00%OutstandingQuezon Vic<strong>to</strong>ry GeneralContrac<strong>to</strong>r66<strong>31</strong> Conc. of Bonliw FMR 1st/Final IVB 0.287 C 0.326 0.203 0.300 - - - 82.9082.90%V.Satisfac<strong>to</strong>ryQuezon Vic<strong>to</strong>ry GeneralContrac<strong>to</strong>r66<strong>31</strong>Conc. of Brgy. Road @ Tanada St.Brgy. San Vicente1st/Final IV-A 0.283 C 0.397 0.000 0.300 - - - 69.7069.70%FairQuezon Vic<strong>to</strong>ry GeneralContrac<strong>to</strong>r66<strong>31</strong>Conc. Reblocking along MSRDiversion Road1st/Final IV-A 0.288 C 0.267 0.200 0.300 - - - 76.7076.70%Satisfac<strong>to</strong>ryQuezon Vic<strong>to</strong>ry GeneralContrac<strong>to</strong>r66<strong>31</strong>Concreting of Brgy. Road, Brgy.Villa Padua1st IV-A 0.283 C 0.410 - 0.500 - - - 91.0091.00%OutstandingQuezon Vic<strong>to</strong>ry GeneralContrac<strong>to</strong>r66<strong>31</strong>Const. of Drainage System at Brgy.Cotta1st/Final IV-A 0.755 C 0.473 - 0.500 - - - 97.3097.30%OutstandingQuezon Vic<strong>to</strong>ry GeneralContrac<strong>to</strong>r66<strong>31</strong>Const. of Multi-Purpose Hall @Brgy. San Joaquin1st/Final IV-A 0.862 C 0.283 0.300 0.300 - - - 88.3088.30%V.Satisfac<strong>to</strong>ryQuezon Vic<strong>to</strong>ry GeneralContrac<strong>to</strong>r66<strong>31</strong>Impvt. of Water Supply System @Brgy. Pacabit1st/Final IV-A 0.964 C 0.377 0.300 0.300 - - - 97.7097.70%OutstandingR. A. De LeonConstruction18078Concreting of Binubusan Brgy.Road1st IV-A 0.945 C 0.389 - 0.500 - - - 88.9088.90%V. Satisfac<strong>to</strong>ryR. Allosa Construction 12964Concrete Paving Tabango-San IsidroRd1st VIII 3.893 C 0.421 - 0.500 - - - 92.10R. Anin Jr. Construction 14888 Const. of Cabacao Flood Control 1st/Final IV-B 1.926 C 0.333 0.300 0.300 - - - 93.3092.10%Outstanding93.30%OutstandingR. Anin Jr. Construction 14888Resurfacing of Bulalacao-San JoseJct. Mapaya Road, Paclolo Section,Km.222+000-Km.225+5001st/Final IV-B 0.573 C 0.332 0.300 0.300 - - - 93.2093.20%OutstandingR. B. Ombao Const. 17042Replacement of Cabcaben BridgeCabcabenFinal III 4.709 C 0.393 - 0.500 - - - 89.3073.34%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 1<strong>31</strong>


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONR. CalingasanConstruction8173 Conc/ Widening of Road Brgy. 1st/Final IV-A 0.188 C 0.373 0.200 0.300 - - - 87.3087.30%V.Satisfac<strong>to</strong>ryR. D. Ramos Const. &Enterprises18771Concreting of Road at Brgy. Pook niKapitan1st IV-A 0.284 C 0.394 - 0.500 - - - 89.4089.40%V. Satisfac<strong>to</strong>ryR. G. Diaz Builders &Trading23814Const./Repair/Rehab. of Multi-Purpose School Bldg., @ AngelesCity1st IV-B 0.748 C 0.488 - 0.500 - - - 98.8098.00%OutstandingR. G. Roque Const. &Trading21788Rehab. of School Premises @Mexico National H/S San Carlos1st III 0.952 C 0.468 - 0.500 - - - 96.8096.80%OutstandingR. K. Engineering &Construction12534Conc. of Critical Section alongNational Circumferential (Salawad-Pawikan-Baso Section)1st VIII 4.755 O 0.354 0.241 0.100 0.030 0.051 0.100 87.60 -R. K. Engineering &Construction12534 Const. of Biliran NAHS 2 Cl Bldg. 1st/Final VIII 0.830 C 0.340 0.101 0.300 - - - 74.1074.10%Satisfac<strong>to</strong>ryR. Ochea Construction &Supplies15775Concreting of Toledo-Tabuelan-SanRemegio Road, Mangga Sect.Final VII 4.675 C 0.385 0.200 0.300 - - - 88.5089.88%V.Satisfac<strong>to</strong>ryR. Ochea Construction &Supplies15575 Const. of Multi-Purpose Building Final VII 4.748 C 0.399 0.100 0.300 - - - 79.9085.61%V.Satisfac<strong>to</strong>ryR. Ochea Construction &Supplies15775Const. of Multi-Purpose Building atPoblacion Tuburan1st VII 4.748 O 0.373 0.240 0.100 0.015 0.027 0.100 85.50 -R. Ochea Construction &Supplies15775Const. of Multi-Purpose Building atPoblacion Tuburan2nd VII 4.748 O 0.346 0.300 0.100 0.030 0.030 0.100 90.60 -R. R. SeismundoConstruction and Supply10961Const. of 1 CL School Bldg., atMontevista NHS, DNAS1st XI 0.469 C 0.335 0.000 0.100 0.020 0.032 0.100 58.7260.40%FairR. Semilla Constructionand Marketing9263Const. of Multi-Purpose Bldg.,LapulabaoFinal XI 0.939 C 0.404 - 0.500 - - - 90.4059.74%PoorR.A. Abaño Construction 11828 Const. of Farm-<strong>to</strong>-Market Road 1st/Final IV-A 0.653 C 0.347 - 0.500 - - - 84.7084.70%V.Satisfac<strong>to</strong>ryR.A. Abaño Construction 11828Const. of Multi-Purpose Bldg. AtBrgy. Malinao-Ilaya1st IV-A 0.236 C 0.464 - 0.500 - - - 96.4096.40%OutstandingR.A. Del RosarioConstruction4636Const. of Two (2), Four (4)Cl SchoolBuildingFinal IV-A 2.857 C 0.367 0.300 0.300 - - - 96.7070.17%Satisfac<strong>to</strong>ryR.A. Matias Const. &Developer26346Concreting of FTMR @ PoblacionEast1st I 0.480 C 0.259 - 0.500 - - - 75.9075.90%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 132


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONR.A. Matias Const. &Developer26346Const. of Multi-Purpose San VicenteBrgy. Hall Brgy. San Vicente1st I 0.336 C 0.390 - 0.500 - - - 89.0089.00%V.Satisfac<strong>to</strong>ryR.A. MontejoConstructionR.A. YolangcoConstruction21718Renovation of Research Bldg. @Leyte Normal University1st/Final VIII 0.945 C 0.393 0.300 0.300 - - - 99.3015602 Const. of Farm-<strong>to</strong>-Market Road 1st/Final IV-A 0.962 C 0.380 0.300 0.300 - - - 98.0099.30%Outstanding98.00%OutstandingR.B. CandareConstruction8819Conc. of Bay-ang-Calamba Prov.Road1st/Final XIII 1.896 C 0.354 0.200 0.300 - - - 85.4085.40%V.Satisfac<strong>to</strong>ryR.C. MirandaConstruction & Supplies9036Conc. of Sta. Ines-Matalapitap RoadPhase IIFinal III 5.795 C 0.325 - 0.500 - - - 82.5080.88%V.Satisfac<strong>to</strong>ryR.C. Tagala Construction 11597Completion of Multi-PurposeBuildingFinal VI 2.854 C 0.<strong>31</strong>9 0.147 0.300 - - - 76.6083.81%V.Satisfac<strong>to</strong>ryR.C. Tagala Construction 11597Concreting of Calategas-AramaywanRd., Sect.1st IV-B 2.154 C 0.390 - 0.500 - - - 89.0089.00%V.Satisfac<strong>to</strong>ryR.C. Tagala Construction 11597Concreting of Parian-CabuluanRoad SectionFinal IV-B 3.749 C 0.424 - 0.500 - - - 92.4093.88%V.Satisfac<strong>to</strong>ryR.C. Tagala Construction 11597Concreting of Tugdan-AlcantaraLooc Road1st IV-B 2.209 O 0.320 0.240 0.100 0.030 0.047 0.100 83.70 -R.C. Tagala Construction 11597Concreting of Tugdan-Alcantara-Looc Road2nd IV-B 2.209 O 0.356 0.000 0.100 0.030 0.033 0.100 61.90 -R.C. Tagala Construction 11597 Const. of Boac River Control Final IV-B 3.981 C 0.282 - 0.500 - - - 78.2075.50%Satisfac<strong>to</strong>ryR.C. Tagala Construction 11597Const. of Manggamnan BridgeApproach1st IV-B 1.672 O 0.309 0.300 0.100 0.030 0.033 0.100 87.20 -R.C. Tagala Construction 11597Const. of Pagbahan Flood Control(Phase I)1st IVB 13.920 O 0.340 0.200 0.100 0.015 0.028 0.200 88.30 -R.C. Tagala Construction 11597Const. of Pagbahan Flood Control(Phase I)2nd IV-B 13.920 O 0.266 0.200 0.100 0.023 0.025 0.200 81.40 -R.C. Tagala Construction 11597 Const. of Taritien Bridge 1st IV-B 14.253 O 0.<strong>31</strong>3 0.267 0.100 0.030 0.025 0.067 80.20 -R.C. Tagala Construction 11597Const. of Various School Bldg.(Tagumpay E/S)Final IV-B 9.043 C 0.393 - 0.500 - - - 89.3080.34%V.Satisfac<strong>to</strong>ryR.C. Tagala Construction 11597Reblocking of Jct. MWCR-San JoseAirport Rd.-Jct. Bubog Road2nd IV-B 9.607 O 0.<strong>31</strong>4 0.300 0.100 0.015 0.027 0.100 85.60 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 133


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONR.C. Tagala Construction 11597Reblocking of Jct. MWCR-San JoseAirport Rd.-Jct. Bubog RoadFinal IV-B 9.607 C 0.324 0.171 0.300 - - - 79.5071.58%Satisfac<strong>to</strong>ryR.C. Tagala Construction 11597Rehab. of Existing Asphalt andConst. of Lined CanalFinal IV-B 5.491 C 0.376 - 0.500 - - - 87.6049.54%PoorR.C. Tagala Construction 11597 Repair/Rehab. of FMR 1st VII 0.465 O 0.200 0.300 0.100 0.000 0.022 0.100 72.20 -R.C. Tagala Construction 11597 Repair/Rehab. of FMR Final VII 0.464 C 0.293 0.300 0.300 - - - 89.30R.D. CobachaConstructionR.D. CobachaConstruction20833 Const. of ABC Hall 1st VIII 1.280 O 0.328 0.108 0.100 0.015 0.018 0.100 66.90 -20833 Const. of ABC Hall Final VIII 1.280 C 0.350 0.196 0.300 - - - 84.6079.04%Satisfac<strong>to</strong>ry72.21%Satisfac<strong>to</strong>ryR.D. Interior JuniorConst./J.H. Pajara Const.Corp. (J.V.)SL2-SN-000366/JV02-019Const./Impv't. (PCCP) of C.P.B.:Sultan Gumander-Doblis<strong>to</strong>n Jct.Road3rd KFAED 383.448 O 0.381 0.300 0.100 0.030 0.056 0.100 96.70 -R.D. Interior JuniorConstruction6483Const. of Runruno Bridge &ApproachesFinal II 7.803 C 0.480 - 0.500 - - - 98.0097.46%OutstandingR.D. Interior JuniorConstruction6483Const. of Sinippil Bridge andApproachesFinal II 13.688 C 0.335 0.277 0.300 - - - 91.2086.90%V.Satisfac<strong>to</strong>ryR.D. Interior JuniorConstruction6483Const./Asphalting of Guinalbin Brgy.Road1st/Final II 0.932 C 0.356 0.200 0.300 - - - 85.6085.60%V.Satisfac<strong>to</strong>ryR.D. Interior JuniorConstruction6483Repair/Maint. of Nat'l Road alongSantiago-Tuguegarao Road1st/Final II 4.975 C 0.304 0.200 0.300 - - - 80.4080.40%V.Satisfac<strong>to</strong>ryR.D. Policarpio & Co. Inc. 4414R.D. Policarpio & Co. Inc. 4414Const. of Overpasses Project in theProvinces of Bataan, Pampanga andTarlacConstruction of Overpasses Projectin the Provinces of Bataan,Pampanga and Tarlac1st BCDA 208.033 O 0.384 0.300 0.070 0.030 0.035 0.033 85.20 -1st BCDA 208.033 O 0.384 0.300 0.070 0.030 0.035 0.033 85.2085.23%V.Satisfac<strong>to</strong>ryR.D. Policarpio &Company, Inc. / PumyangConstruction Company,Ltd. (JV)REF#1890ADB Sixth Road Impv't. Project CP6MI-153rd IX 740.582 O 0.360 0.300 0.000 0.024 0.037 0.067 78.80 -R.D. Policarpio Company,Inc.4414Contract Package "N":Replacement/Retrofitting of Three(3) Bridges2nd ADB 67.207 O 0.335 0.300 0.000 0.030 0.042 0.000 70.70 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 134


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONR.D. Policarpio Company,Inc.4414Sixth Road Project Component CP 4Gen. San<strong>to</strong>s-Cotaba<strong>to</strong> City Road1st XII 170.852 O 0.301 0.298 0.000 0.030 0.061 0.067 75.70 -R.D. Sadsad Const. &Trading19240Package 16: Const./Rehab./Impv't. ofFMR Porac, Sta. Rita & Guagua1st III 0.944 C 0.<strong>31</strong>1 - 0.500 - - - 81.1081.10%V. Satisfac<strong>to</strong>ryR.D. Sadsad Const. &Trading19240Rehab. of Canal @ Brgy. San PabloII Road1st/Final III 0.949 C 0.267 0.300 0.300 - - - 86.7086.70%V.Satisfac<strong>to</strong>ryR.D. Sadsad Const. &Trading19240Upgrading/Impvt. of San Fernando-Lubao Road (S<strong>to</strong>. Tomas Section)1st/Final III 4.730 C 0.337 0.300 0.300 - - - 93.7093.70%OutstandingR.F. Diaz Construction 3398R.F. Diaz Construction 3998R.F. Diaz Construction 3998R.F.G. Construction 1<strong>31</strong>88R.F.G. Construction 1<strong>31</strong>88Const. of School Building atUniversity of Rizal SystemImpvt./Completion of Calalay Bldg.@ S<strong>to</strong>. Cris<strong>to</strong> E/SImpvt./Completion of Calalay Bldg.@ S<strong>to</strong>. Cris<strong>to</strong> E/SCompletion of MPB @ Brgy.DayanoCompletion of MPB @ Brgy.DayanoFinal IV-A 9.609 C 0.155 0.300 0.300 - - - 75.501st NCR 2.6<strong>31</strong> O 0.367 0.255 0.100 0.030 0.051 0.100 90.30 -Final NCR 2.6<strong>31</strong> C 0.326 0.300 0.300 - - - 92.6069.83%Fair90.99%Outstanding1st XIII 0.555 O 0.333 0.021 0.100 0.030 0.013 0.100 59.70 -Final XIII 0.555 C 0.377 0.221 0.300 - - - 89.8068.73%FairR.F.G. Construction 1<strong>31</strong>88Concreting of Shoulder alongSurigao Wharf RoadFinal XIII 7.274 C 0.393 - 0.500 - - - 89.3083.72%V.Satisfac<strong>to</strong>ryR.F.G. Construction 1<strong>31</strong>88Concreting of Surigao-San JuanLipata Coastal Rd.Final XIII 1.548 C 0.411 - 0.500 - - - 91.1084.74%V.Satisfac<strong>to</strong>ryR.F.G. Construction 1<strong>31</strong>88 Const. of Banahaw Bridge, Phase IV Final XIII 9.904 C 0.367 0.300 0.300 - - - 96.7091.30%OutstandingR.F.G. Construction 1<strong>31</strong>88Const. of Municipal Public Market,Phase IIIFinal XIII 1.795 C 0.<strong>31</strong>1 0.300 0.300 - - - 91.1081.86%V.Satisfac<strong>to</strong>ryR.F.G. Construction 1<strong>31</strong>88 Const. of Sabang Bridge III Phase V Final XIII 9.167 C 0.364 0.300 0.300 - - - 96.40R.F.G. Construction 1<strong>31</strong>88 Const. of Sabang Bridge III, Phase IV Final XIII 4.583 C 0.328 - 0.500 - - - 82.8090.14%Outstanding79.38%Satisfac<strong>to</strong>ryR.F.G. Construction 1<strong>31</strong>88 Const. of Toledo S. Pantilo MPB 1st XIII 0.927 O 0.375 0.240 0.000 0.015 0.013 0.100 74.30 -R.F.G. Construction 1<strong>31</strong>88Const.Completion of TayagaDisaster Evacuation CenterFinal XIII 0.463 C 0.384 0.224 0.300 - - - 90.8090.80%OutstandingR.G. Diaz Builders &Trading23814Package XIV-Const. of Multi-Purpose Bldg. (Covered Court) @San Nicolas E/S1st/Final III 0.937 C 0.381 0.300 0.300 - - - 98.1098.10%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 135


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONR.G. Erillo Construction,Incorporated932Widening/Impv't. of Bacolod South-Kabankalan Rd.Final VI 9.623 C 0.396 - 0.500 - - - 89.6090.68%OutstandingR.G. FlorentinoConstruction & Trading18301 Concreting of Upper Jun Carlo FMR Final IV-B 0.462 C 0.344 0.084 0.300 - - - 72.8072.80%Satisfac<strong>to</strong>ryR.G. FlorentinoConstruction & Trading18301Const. of Brgy. Multi-Purpose Bldg.Poblacion1st IV-B 0.268 C 0.388 - 0.500 - - - 88.8088.80%V. Satisfac<strong>to</strong>ryR.G. FlorentinoConstruction & Trading18301Rep./Maintain of Colis RCDG BridgeApproach Km.019+342Final IV-B 0.189 C 0.433 0.500 - - - 93.3093.30%OutstandingR.J. Ibarra Construction 23538Asphalt Overlay & Conc. Reblockingalong Olongapo-Bugallon Rd.Final III 4.670 C 0.333 0.300 0.000 - - - 63.3077.34%Satisfac<strong>to</strong>ryR.J. Ibarra Construction 23538 Const. of MPB @ Brgy. Rizal 1st III 0.930 O 0.278 0.300 0.100 0.030 0.044 0.067 81.90 -R.J. Ibarra Construction 23538 Const. of MPB @ Brgy. Rizal Final III 0.930 C 0.272 0.300 0.300 - - - 87.2083.49%V.Satisfac<strong>to</strong>ryR.J. Ibarra Construction 23538Repair/Rehab. of 3-Cl, 1-S<strong>to</strong>rey S/BBangal E/SFinal III 0.281 C 0.473 - 0.500 - - - 97.3081.87%V.Satisfac<strong>to</strong>ryR.K.X. OdiamarConstruction16107 Const. of MPB @ Penfrancia 1st/Final V 1.498 C 0.365 0.200 0.300 - - - 86.5086.50%V.Satisfac<strong>to</strong>ryR.M. Padillo Builders <strong>31</strong>205Const. of Reinforced Concrete BoxCulvert (RCBC)Final VIII 2.830 C 0.358 0.300 0.300 - - - 95.8070.36%Satisfac<strong>to</strong>ryR.M. Pingol Const. &Dev't. Corporation11163CP IV-A, Jct. Maharlika Highway-Jaen-San Isidro Rd.(Km.98+453.0 <strong>to</strong>Km.105+256.275) w/ exception2nd III 34.837 O 0.372 0.300 0.000 0.012 0.025 0.033 74.20 -R.M. Vitug Construction 9227 Conc. of Sta. Barbara Road 1st III 4.026 C 0.361 - 0.500 - - - 86.1086.10%V.Satisfac<strong>to</strong>ryR.M. Vitug Construction 9227 Const./Impvt. of San Jose Road 1st/Final III 5.703 C 0.328 0.200 0.300 - - - 82.8082.80%V.Satisfac<strong>to</strong>ryR.M. Vitug Construction 9227Const./Repair/Rehab. of VariousRoad Brgy. Cutcut1st III 3.380 C 0.416 - 0.500 - - - 91.6091.60%OutstandingR.M. Vitug Construction 9227Improvement of Multi-PurposeBuildingFinal III 0.187 C 0.437 - 0.500 - - - 93.7090.34%OutstandingR.M. Vitug Construction 9227Repair/Rehab. of Retaining Wall andDrainage Out Fall1st/Final III 0.468 C 0.<strong>31</strong>0 0.300 0.300 - - - 91.0091.00%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 136


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONR.M. Vitug Construction 9227Riprapping of Balimbing River,Country Homes,1st/Final NCR 0.958 C 0.350 - 0.500 - - - 85.0085.00%V.Satisfac<strong>to</strong>ryR.M.A.J. Construction 18623Conc. of Manburao-Paluan Rd.(Tayamaan Sect.)Final IV-B 1.433 C 0.327 - 0.500 - - - 82.70R.M.A.J. Construction 18623 Concreting of Paclolo FMR 1st IV-B 0.937 C 0.409 - 0.500 - - - 90.90R.M.A.J. Construction 18623Rehab. of Abut. B of MompongBridge Approach "B"1st/Final IV-B 2.894 C 0.<strong>31</strong>7 0.300 0.300 - - - 91.70R.N.G.M. Construction 20281 Water Supply Project @ Brgy. 3 & 4 Final III 2.353 C 0.<strong>31</strong>1 0.300 0.300 - - - 91.1065.24%Fair90.90%Outstanding91.70%Outstanding85.50%V.Satisfac<strong>to</strong>ryR.O. Builders & Dev.Corp.22393Conc. of Aritao-Dupax-Kasibu-Quirino Road, Mangagyang-Banganan Section1st II 6.677 O 0.400 0.300 0.100 0.020 0.011 0.100 93.10 -R.O. Builders & Dev.Corp.22393Const. of Banganan Flood Control,Upstream of Mangayang Bridge1st II 2.853 O 0.240 0.150 0.100 0.023 0.014 0.100 62.70 -R.O. Builders & Dev.Corp.22393Const. of Banganan Flood Control,Upstream of Mangayang BridgeFinal II 2.853 C 0.380 0.300 0.300 - - - 98.0076.82%Satisfac<strong>to</strong>ryR.O. Builders & Dev.Corp.22393Const. of Inaban Bridge andApproaches1st II 7.939 C 0.472 - 0.500 - - - 97.2097.20%OutstandingR.O. Builders & Dev.Corp.22393Const. of Mangayang Bridge PhaseIV, Banganan1st II 14.449 C 0.392 0.299 0.100 0.030 0.039 0.067 92.70 -R.O. Builders & Dev.Corp.22393Const. of Mangayang Bridge PhaseIV, BangananFinal II 14.449 C 0.466 - 0.500 - - - 96.6094.26%OutstandingR.O. Builders & Dev.Corp.22393Const. of Mangayang Bridge PhaseVFinal II 14.266 C 0.321 - 0.500 - - - 82.1078.26%Satisfac<strong>to</strong>ryR.O. Builders & Dev.Corp.22393Const. of Namamparan Bridge &Approaches3rd II 13.528 O 0.262 0.253 0.070 0.030 0.028 0.067 71.00 -R.O. Builders & Dev.Corp.22393Repair/Maint./Rehab. & Impv't. ofDaang MaharlikaFinal II 4.180 C 0.286 - 0.500 - - - 78.6080.64%V.Satisfac<strong>to</strong>ryR.R. A. RequillasConstruction & Supply20217 Const. of Revetment 1st V 1.425 O 0.257 0.133 0.100 0.010 0.019 0.200 71.90 -R.R. A. RequillasConstruction & Supply20217 Const. of Revetment Final V 1.425 C 0.335 0.200 0.300 - - - 83.5076.54%Satisfac<strong>to</strong>ryR.R. RicafortConstructionR.R. RicafortConstruction14402 Conc. of FMR @ Brgy. Balayang 1st/Final III 0.614 C 0.213 0.200 0.300 - - - 71.3014402Const. of 1 CL School Bldg. @Carangian E/S71.30%Satisfac<strong>to</strong>ry1st III 0.376 O 0.356 0.262 0.100 0.030 0.029 0.100 87.70 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 137


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONR.R. RicafortConstructionR.R. SeismundoConstruction & Supply14402 Const. of North Central E/S 1st/Final III 0.373 C 0.322 0.300 0.300 - - - 92.2010961Const. of Add'l Two (2) Lanes @Nabunturan-Mainit Park Rd. Pob.Nabunturan Sect.Final XI 3.557 C 0.207 - 0.500 - - - 70.7092.20%Outstanding77.78%Satisfac<strong>to</strong>ryR.R. SeismundoConstruction & Supply10961Const. of One (1) Cl School Bldg. inNew Allegria ESFinal XI 0.384 C 0.367 0.209 0.300 - - - 87.6084.80%V.Satisfac<strong>to</strong>ryR.R. SeismundoConstruction & Supply10961Const. of One (1) CL School Bldg.,at Montevista NHS, DNAS1st XI 0.469 O 0.352 0.000 0.100 0.020 0.032 0.100 60.40 -R.R. SeismundoConstruction & Supply10961Const. of Two (2) CL Bldg., @Mawab Nat'l. High School1st XI 0.723 C 0.475 - 0.500 - - - 97.5097.50%OutstandingR.T. Lim Constructionand Supply17045Improvement of Roads IncludingDrainage, Ozamis-Oroquieta Road1st/Final X 0.803 C 0.381 - 0.500 - - - 88.1088.10%V.Satisfac<strong>to</strong>ryR.T. Morabe Construction 11377Completion of UP Tacloban Multi-Purpose Bldg.1st/Final VIII 0.921 C 0.462 - 0.500 - - - 96.2096.20%OutstandingR.T. Morabe Construction 11377 Conc. of Municipal Road 1st/Final VIII 4.720 C 0.321 0.200 0.300 - - - 82.1082.10%V.Satisfac<strong>to</strong>ryR.T. Morabe Construction 11377Const. of Oras-Concepcion-JipapadRdFinal VIII 11.428 C 0.385 - 0.500 - - - 88.5083.46%V.Satisfac<strong>to</strong>ryR.T. Morabe Construction 11377 Impvt. of ABC Hall 1st/Final VIII 0.192 C 0.371 0.200 0.300 - - - 87.1087.10%V.Satisfac<strong>to</strong>ryR.T.Y. Construction 10341 Conc. of Bachao-Ibaba FMR 1st/Final IVB 0.285 C 0.<strong>31</strong>3 0.283 0.300 - - - 89.6089.60%V.Satisfac<strong>to</strong>ryR.T.Y. Construction 10341R.T.Y. Construction 10341R.T.Y. Construction 10341R.T.Y. Construction 10341Conc. of Boac-MogpogCircumferential Road(Murallon-Tampos Section)Conc./Impvt. of Boac-Gasan Nat'lRoadConc./Impvt. of Boac-Gasan Nat'lRoadConcreting of Sumangga-Magapua-Malusak Section1st IV-B 6.645 O 0.341 0.300 0.100 0.023 0.022 0.100 88.60 -1st IVB 10.803 O 0.174 0.197 0.100 0.008 0.022 0.100 60.10 -Final IVB 10.803 C 0.343 0.219 0.300 - - - 86.201st/Final IVB 2.004 C 0.415 - 0.500 - - - 91.5070.54%Satisfac<strong>to</strong>ry91.50%OutstandingR.T.Y. Construction 10341 Const. & Impvt. of Plaridel Bridge 1st IVA 4.773 O 0.363 0.240 0.070 0.030 0.033 0.067 80.30 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 138


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONR.T.Y. Construction 10341 Const. & Impvt. of Plaridel Bridge Final IVA 4.773 C 0.357 0.200 0.300 - - - 85.7082.46%V.Satisfac<strong>to</strong>ryR.T.Y. Construction 10341Const. of 2 Classroom 2 S<strong>to</strong>reySchool bldg., Lusacan National HighSchool1st/Final IV-A 1.435 C 0.369 0.200 0.300 - - - 86.9086.90%V.Satisfac<strong>to</strong>ryR.T.Y. Construction 10341Const. of 2 S<strong>to</strong>rey 2 CL SchoolBldg., @ Luis Palad National H/S1st IV-A 1.439 C 0.396 0.217 0.100 0.030 0.015 0.100 85.8085.80%V.Satisfac<strong>to</strong>ryR.T.Y. Construction 10341Const. of 2-Cl, 2-S<strong>to</strong>rey S/B @ Talao-Talao E/S1st/Final IVA 1.405 C 0.447 - 0.500 - - - 94.7094.70%OutstandingR.T.Y. Construction 10341Const. of Flood Control at Brgy.Muliguin1st/Final IVA 2.892 C 0.386 0.300 0.300 - - - 98.6098.60%OutstandingR.T.Y. Construction 10341Const. of Multi-Purpose Bldg.(Covered Court) at South E/S1st IV-A 1.137 C 0.473 - 0.500 - - - 97.3097.30%OutstandingR.T.Y. Construction 10341Const. of Prov. Hospital (Dr. DamianReyes Memorial Hospital1st IV-B 6.930 O 0.354 0.225 0.100 0.020 0.013 0.100 81.20 -R.T.Y. Construction 10341Const. of Prov. Hospital (Dr. DamianReyes Memorial HospitalFinal IV-B 6.972 C 0.277 0.240 0.300 - - - 81.7080.55%V.Satisfac<strong>to</strong>ryR.T.Y. Construction 10341Const. of Various FMR (CaganhaoB/R)Final IV-B 5.720 C 0.417 - 0.500 - - - 91.7082.82%V.Satisfac<strong>to</strong>ryR.T.Y. Construction 10341Const./Impv't. of Multi-PurposeBldg. @ Don Gregorio C. Yumul Sr.E/S1st/Final IV-A 0.473 C 0.476 - 0.500 - - - 97.60R.T.Y. Construction 10341 Const./Impv't. of Spillway Bridge 1st/Final IV-A 0.472 C 0.369 0.233 0.300 - - - 90.2097.60%Outstanding90.20%OutstandingR.V. Construction 6110Const. of 1 Cl School Bldg. @ Brgy.Cag-Olango E/S1st/Final VIII 0.477 C 0.275 0.300 0.300 - - - 87.5087.50%V.Satisfac<strong>to</strong>ryR.V. Construction 6110 Const. of Covered Court 1st VIII 1.392 O 0.320 0.200 0.100 0.020 0.032 0.100 77.20 -R.V. Construction 6110 Const. of Covered Court 3rd VIII 1.392 O 0.269 0.300 0.070 0.015 0.032 0.067 75.30 -R.V. Construction 6110 Const. of Gandara-Matuguinao Road 1st/Final VIII 0.952 C 0.4<strong>31</strong> - 0.500 - - - 93.1093.10%OutstandingR.V. Construction 6110Impvt./Rehab. of Flood ControlStructure along Calbayog-CatarmanRoad, Brgy. Oquendo Road Section1st VIII 4.820 O 0.320 0.200 0.100 0.015 0.013 0.200 84.80 -R.V. Construction 6110Rehabilitation of Gadgaran-Limarayon Brgy. Road1st/Final VIII 0.952 C 0.307 0.300 0.300 - - - 90.7090.70%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 139


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONR.V. GaitanMerchandising7075Const. of MPB @ Guimaras StateCollege1st/Final VI 1.283 C 0.<strong>31</strong>4 0.200 0.300 - - - 81.4081.40%V.Satisfac<strong>to</strong>ryR.V. GaitanMerchandising7075 Const. of MPB @ Sta. Teresa E/S 1st VI 0.398 O 0.334 0.189 0.100 0.030 0.023 0.100 77.60 -R.V. GaitanMerchandisingR.V. GaitanMerchandising7075 Const. of MPB @ Sta. Teresa E/S Final VI 0.419 C 0.370 0.200 0.300 - - - 87.007075 Const. of MPB, San Miguel 1st VI 0.236 C 0.473 - 0.500 - - - 97.3080.42%V.Satisfac<strong>to</strong>ry97.30%OutstandingR.V. Laborte Builders 20459 Concreting of Tiaong By-Pass Road 1st/Final IV-A 9.435 C 0.362 0.200 0.300 - - - 86.2086.20%V.Satisfac<strong>to</strong>ryR.V. Laborte Builders 20459Concreting of Torrijos-BuenavistaNational Road (Phase I)Final IVB 2.869 C 0.422 - 0.500 - - - 92.2091.00%OutstandingR.V. Laborte Builders 20459Concreting of Torrijos-BuenavistaRoad with exception Km.78+034-Km.78+463 (Marilao Sect.) andKm.72+300-Km.73+367, BanocbocSectionFinal IV-B 8.687 C 0.<strong>31</strong>4 0.300 0.300 - - - 91.4090.14%OutstandingR.V. Laborte Builders 20459 Const. of 1-Cl School Building 1st/Final IV-A 0.376 C 0.295 0.300 0.300 - - - 89.50R.V. Laborte Builders 20459 Const. of 1-Cl School Building 2nd/Final IV-A 0.376 C 0.303 0.160 0.300 - - - 76.30R.V. Laborte Builders 20459Const. of 1-Cl School Building @Jongo E/S1st/Final IV-A 0.376 C 0.154 0.300 0.300 - - - 75.4089.50%V.Satisfac<strong>to</strong>ry72.59%Satisfac<strong>to</strong>ry75.40%Satisfac<strong>to</strong>ryR.V. Laborte Builders 20459Const. of 2-S<strong>to</strong>rey, 2-Cl S/B @Gumaca 1 CS1st/Final IVA 1.320 C 0.392 - 0.500 - - - 89.2089.20%V.Satisfac<strong>to</strong>ryR.V. Laborte Builders 20459 Const. of MPB @ Maasin Norte E/S 1st/Final IV-A 1.052 C 0.360 0.300 0.300 - - - 96.00R.V. Laborte Builders 20459R.V. Rieta Trading & Gen.Construction28671Impv't./Concreting of VariousMunicipal RoadsConcreting of Roads at SanRafael IIIFinal IV-B 10.625 C 0.275 - 0.500 - - - 77.501st/Final IV-A 0.288 C 0.320 0.300 0.300 - - - 92.0096.00%Outstanding74.92%Satisfac<strong>to</strong>ry92.00%OutstandingR2K BuildersConstruction and Trading29708Const. of Sch. Bldg. at Brgy. HighSchool Poblacion1st/Final III 1.896 C 0.366 0.269 0.300 - - - 93.5093.50%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 140


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONRabbit Construction &Development Corporation8545Completion (Impvt./Conc. Paving) ofLicomo-Quiniput Road, Segment(Sinoropan-Vitali Section)1st IX 32.120 O 0.297 0.300 0.100 0.030 0.051 0.100 87.80 -Racso Construction 14601Improvement of Nueva Viscaya-Ifugao-Mt. Province Bdry. Road1st CAR 1.184 C 0.369 - 0.500 - - - 86.9082.16%V.Satisfac<strong>to</strong>ryRacso Construction 14601Improvement of Nueva Viscaya-Ifugao-Mt. Province Bdry. RoadFinal CAR 1.196 C 0.415 - 0.500 - - - 91.5082.92%V.Satisfac<strong>to</strong>ryRacso Construction 14601Impv't. along Nueva Viscaya-Ifugao-Mt. Province Bdry. Rd.Final CAR 0.985 C 0.373 - 0.500 - - - 87.3085.86%V.Satisfac<strong>to</strong>ryRaf General Construction 6699 Const. of Flood Control 1st/Final X 4.787 C 0.239 0.300 0.300 - - - 83.9083.90%V.Satisfac<strong>to</strong>ryRaf General Construction 6699 Const. of MPB @ Upper Jasaan 1st/Final X 1.445 C 0.362 0.259 0.300 - - - 92.10Ramar Enterprises 8092Const. of Iriga Flood Control andDrainage Structure PNR, SanFrancisco-San RoqueFinal V 4.618 C 0.434 - 0.500 - - - 93.40Ramar Enterprises 8092 Rehab. of Malinta-Tigbao Road Final V 4.738 C 0.371 0.300 0.300 - - - 97.10Ramconstrack Dev'tServices & Supplies22821Ramises Construction 17351Ramona Construction &EnterprisesRamona Construction &EnterprisesRamona Constructionand EnterprisesRamona Constructionand EnterprisesRamona Constructionand EnterprisesRamona Constructionand EnterprisesRamona Constructionand EnterprisesRehab. of Old Hospital Building,MalasinConst. of Lake MainitCircumferential RoadFinal II 1.904 C 0.297 0.200 0.300 - - - 79.70Final XIII 6.219 C 0.454 - 0.500 - - - 95.4014661 Const. of Multi-Purpose Bldg Final VII 0.865 C 0.396 - 0.500 - - - 89.6014661 Repair/Rahab./Impv't. of FMR at Olo 1st VII 0.372 C 0.413 - 0.500 - - - 91.30146611466114661Concreting of SiquijorCircumferential Road Sta. 0+000-Sta.0+130Concreting of SiquijorCircumferential Road Sta. 0+000-Sta.0+130Const. of 2 CL School Bldg. @Payao NHS92.10%Outstanding90.10%Outstanding91.46%Outstanding55.97%Poor95.40%Outstanding71.89%Satisfac<strong>to</strong>ry91.30%Outstanding2nd VII 1.867 O 0.357 0.300 0.100 0.030 0.056 0.100 94.30 -Final VII 1.867 C 0.341 0.300 0.300 - - - 94.1092.06%Outstanding1st IX 0.871 O 0.287 0.134 0.100 0.030 0.026 0.100 67.70 -14661 Const. of MPB Phase 1 1st IX 4.600 O 0.272 0.210 0.100 0.015 0.032 0.100 72.90 -14661 Const. of MPB Phase 1 Final IX 4.600 C 0.285 0.169 0.300 - - - 75.4073.65%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 141


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONRamona Constructionand Enterprises14661 Const. of Multi-Purpose Building 1st VII 4.714 O 0.322 0.300 0.100 0.030 0.035 0.100 88.70 -Ramona Constructionand Enterprises14661 Const. of Multi-Purpose Building Final VII 4.722 C 0.378 0.168 0.300 - - - 84.6087.47%V.Satisfac<strong>to</strong>ryRamsa Construction 25580Completion of Home EconomicsBldg., Pug-os E/S1st I 0.283 C 0.473 - 0.500 - - - 97.3097.30%OutstandingRamsa Construction 25580 Conc. of MNR Solot-Solot Road 1st/Final I 0.608 C 0.340 0.200 0.300 - - - 84.0084.00%V.Satisfac<strong>to</strong>ryRamsa Construction 25580 Const. of Tagudin Bridge 1st/Final I 0.758 C 0.305 - 0.500 - - - 80.5080.50%V.Satisfac<strong>to</strong>ryRamsa Construction 25580Improvement/Concreting of FMRBayubay Sur1st I 0.473 C 0.375 - 0.500 - - - 87.5087.50%V. Satisfac<strong>to</strong>ryRamsa Construction 25580Impv't./Concreting of Farm-<strong>to</strong>-Market Road, Brgy. Nanerma1st I 0.472 C 0.285 - 0.500 - - - 78.50Rano's Construction 11433 Const. of Public Market Final XII 1.366 C 0.358 0.300 0.300 - - - 95.80Rano's Construction 11433Rasec Builders & GeneralMerchandiseRepair/Rehab. & Impv't. ofCabidianan-Mainit Sect.1st XI 4.815 C 0.300 - 0.500 - - - 80.0013866 Const. of MPB @ Brgy. Caduawan 1st/Final VII 0.186 C 0.335 0.300 0.300 - - - 93.5078.50%Satisfac<strong>to</strong>ry62.62%Fair80.00%Satisfac<strong>to</strong>ry93.50%OutstandingRaykin Construction andSupply14404Const. of School Bldg., @ TagumNational High SchoolFinal XI 0.944 C 0.437 - 0.500 - - - 93.7088.94%V.Satisfac<strong>to</strong>ryRaykin Construction andSupply14404Improvement of National Road alongCateel-Baganga Section1st/Final XI 9.434 C 0.358 0.200 0.300 - - - 85.8085.80%V.Satisfac<strong>to</strong>ryRaykin Construction andSupply14404 Impv't. of Roads along Caraga Sect. Final XI 4.704 C 0.384 - 0.500 - - - 88.4088.82%V.Satisfac<strong>to</strong>ryRaykin Construction andSupply14404Impvt./Rehab. of Lumao-SanAn<strong>to</strong>nio Section1st XI 9.209 O 0.<strong>31</strong>6 0.244 0.100 0.030 0.045 0.100 83.50 -Raymundo H. TecsonConst.21681Impv't./Concreting of Baguio-Cadalian RoadFinal XI 4.091 C 0.447 - 0.500 - - - 94.7071.48%Satisfac<strong>to</strong>ryRaymundo H. TecsonConstruction21681 Const. of Bridge @ Purok 2 1st/Final XI 1.354 C 0.302 - 0.500 - - - 80.2080.20%V.Satisfac<strong>to</strong>ryRBM Construction 5961Const. of Multi-Purpose Bldg. Brgy.Gen. LunaFinal III 0.468 C 0.451 - 0.500 - - - 95.1073.82%Satisfac<strong>to</strong>ryRBM Construction 5961Const. of Salian ConcreteRevetment Brgy. Salian1st/Final III 0.470 C 0.347 0.300 0.300 - - - 94.7094.70%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 142


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONRBT Construction 15290Impv't. of Multi-Purpose Bldg., @Brgy. Nangkaan1st/Final IV-A 0.191 C 0.388 0.200 0.300 - - - 88.8088.80%V.Satisfac<strong>to</strong>ryRCD Gen. Contrac<strong>to</strong>r &Construction Supply21616Rehab. of Don Andres, Valdez &Ferdinand Road1st I 2.143 C 0.425 - 0.500 - - - 92.5092.50%OutstandingRCD General Contrac<strong>to</strong>r& Construction Supply21616Completion of Banna Multi-PurposeHall1st I 2.850 O 0.333 0.253 0.100 0.030 0.032 0.100 84.80 -RCD General Contrac<strong>to</strong>r& Construction Supply21616Completion of Banna Multi-PurposeHallFinal I 2.850 C 0.386 0.200 0.300 - - - 88.6085.94%V.Satisfac<strong>to</strong>ryRCD General Contrac<strong>to</strong>r& Construction Supply21616Const. of MPB (Phase I) at Brgy.Madamba1st/Final I 0.379 C 0.194 0.300 0.300 - - - 79.4079.40%Satisfac<strong>to</strong>ryRCDG Construction Corp. 5063RCDG Construction Corp. 5063Impv't./Widening of Z.C. West CoastRoad (Caragasan-Maasin Sect.) &Const. of 1 Barrel RCBC withexception of Maasin BridgeWidening of Zamboanga City WestCoast Road, Const. of Three (3)Barrels RCBC3rd IX 11.560 O 0.382 0.239 0.100 0.030 0.058 0.100 90.90 -1st IX 4.678 O 0.349 0.240 0.100 0.030 0.059 0.100 87.80 -RCDG ConstructionCorporation5063Impv't./Widening of Z.C. West CoastRoad (Caragasan-Maasin Sect.) &Const. of 1 Barrel RCBC withexception of Maasin BridgeFinal IX 11.560 C 0.348 0.226 0.300 - - - 87.4088.68%V.Satisfac<strong>to</strong>ryR'Cel General Contrac<strong>to</strong>r& General Merch.13385Concreting of Mabunga-San IsidroBrgy. Road1st IV-A 0.471 C 0.398 - 0.500 - - - 89.8089.80%V.Satisfac<strong>to</strong>ryR'Cel General Contrac<strong>to</strong>r& General Merch.13385Concreting of Road at Hugo St.Brgy. San An<strong>to</strong>nio1st IV-A 0.476 C 0.415 - 0.500 - - - 91.5091.50%OutstandingR'Cel General Contrac<strong>to</strong>r& General Merch.13385Const. of FTM Road @ Nagcarlan-Calauan Road1st/Final IV-A 2.336 C 0.451 - 0.500 - - - 95.1095.10%OutstandingR'Cel General Contrac<strong>to</strong>r& General Merchandise13385 Completion of MPB @ Sta. Ana 1st/Final IV-A 0.955 C 0.393 0.200 0.300 - - - 89.3089.30%V.Satisfac<strong>to</strong>ryR'Cel General Contrac<strong>to</strong>r& General Merchandise13385Completion of MPB @ S<strong>to</strong>. AngelSur1st/Final IV-A 0.955 C 0.372 0.200 0.300 - - - 87.2087.20%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 143


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONR'Cel General Contrac<strong>to</strong>r& General Merchandise13385Const. of Atingay SuspensionBridge (Phase II)1st/Final IV-A 2.192 C 0.308 0.278 0.300 - - - 88.6088.60%V.Satisfac<strong>to</strong>ryR'Cel General Contrac<strong>to</strong>r& General Merchandise13385Const. of Three (3) S<strong>to</strong>rey, Six (6)Classroom1st IV-A 4.776 O 0.397 0.180 0.100 0.023 0.053 0.067 82.00 -R'Cel General Contrac<strong>to</strong>r& General Merchandise13385Const./Completion of Limao-PerezBridge1st IV-A 14.250 O 0.396 0.300 0.050 0.023 0.027 0.033 82.90 -RD Pimentel Construction 19487Completion of Multi-PurposeBuilding1st/Final CAR 0.282 C 0.451 - 0.500 - - - 95.1095.10%OutstandingRDF Construction andSupply12843 Const. of Barangay Hall @ Tubod Final XI 0.561 C 0.357 - 0.500 - - - 85.7081.22%V. Satisfac<strong>to</strong>ryRDF Construction andSupply12843 Const. of MPB @ F. Bustamante E/S Final XI 0.809 C 0.367 0.300 0.300 - - - 96.7088.72%V.Satisfac<strong>to</strong>ryRDG Construction &Supply (Formerly: RDGConstruction)Readycon Trading &Const. Corp.19488Const. of Multi Purpose Pavement @Bastida E/S Science Park1st XI 1.180 O 0.377 0.255 0.100 0.030 0.058 0.100 92.00 -15452 Repair/Rehab. of MSR Old Route 1st/Final IV-A 14.401 C 0.274 0.200 0.300 - - - 77.4077.40%Satisfac<strong>to</strong>ryRebsons Construction 17118 Const. of Mambalili-Sitio Bong FMR Final XIII 7.545 C 0.400 0.200 0.300 - - - 90.00Red Mole Construction 15710 Const. of Uyugan Diversion Road 1st II 1.922 C 0.417 - 0.500 - - - 91.7088.26%V.Satisfac<strong>to</strong>ry91.70%OutstandingRed ScorpionConstruction & Supply32046 Completion of San Roque E/S 1st/Final NCR 0.812 C 0.355 0.300 0.300 - - - 95.5095.50%OutstandingRedcar Trading &Construction27368Const. of Multi-Purpose Hall atTopland1st NCR 1.878 C 0.457 - 0.500 - - - 95.7095.70%OutstandingREE Construction 10342 Conc. of FMR @ Brgy. Luna 1st/Final IVA 0.374 C 0.397 - 0.500 - - - 89.7089.70%V.Satisfac<strong>to</strong>ryRegenterprises Const.*Fabrication* Supplies &Gen. Services17177 Const. of Abatan E/S School Bldg. Final II 0.442 C 0.328 0.137 0.300 - - - 76.5071.32%Satisfac<strong>to</strong>ryRegenterprises Const.*Fabrication* Supplies &Gen. Services17177Const. of Drainage along DaangMaharlika1st II 4.649 O 0.<strong>31</strong>0 0.157 0.100 0.030 0.044 0.200 84.10 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 144


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONRegional InfrastructureDevelopment Corporation26373Conc. of Zillovia Road Section alongTalacogon San Luis Road1st XIII 2.342 O 0.384 0.300 0.100 0.030 0.043 0.100 95.70 -Regional InfrastructureDevelopment Corporation26373Conc. of Zillovia Road Section alongTalacogon San Luis RoadFinal XIII 2.342 C 0.388 0.200 0.300 - - - 88.8092.94%OutstandingRegional InfrastructureDevelopment Corporation26373Concreting of Brgy. Marbon alongSecondary Road1st XIII 1.885 O 0.389 0.225 0.100 0.030 0.042 0.100 88.60 -Regional InfrastructureDevelopment Corporation26373Concreting of Brgy. Marbon alongSecondary RoadFinal XIII 1.885 C 0.299 0.300 0.300 - - - 89.9089.12%V.Satisfac<strong>to</strong>ryRegional InfrastructureDevelopment Corporation26373Concreting of Osmeña-Magkiangkang Road1st XIII 2.780 O 0.356 0.300 0.100 0.030 0.051 0.100 93.70 -Regional InfrastructureDevelopment Corporation26373Concreting of Osmeña-Magkiangkang RoadFinal XIII 2.780 C 0.234 0.300 0.300 - - - 83.4089.58%V.Satisfac<strong>to</strong>ryRegional InfrastructureDevelopment Corporation26373Concreting of Talacogon-DPWHRoad Section1st/Final XIII 2.330 C 0.365 0.200 0.300 - - - 86.5086.50%V.Satisfac<strong>to</strong>ryRegional InfrastructureDevelopment Corporation26373Const. of Mas-Omot Road,Prosperidad ARCFinal XIII 24.656 C 0.339 0.300 0.300 - - - 93.9091.34%OutstandingRegional InfrastructureDevelopment Corporation26373Res<strong>to</strong>ration of Andanan BankProtection & Installation of SpurDike along Agusan-Davao Road1st XIII 10.792 O 0.393 0.200 0.100 0.030 0.042 0.200 96.50 -Regional InfrastructureDevelopment Corporation26373Res<strong>to</strong>ration of Andanan BankProtection & Installation of SpurDike along Agusan-Davao Road2nd XIII 10.792 O 0.300 0.200 0.100 0.030 0.050 0.200 88.00 -Regional InfrastructureDevelopment Corporation26373Res<strong>to</strong>ration of Shore Protection,Afga Slip Agusan-Davao Road1st XIII 7.493 O 0.<strong>31</strong>3 0.300 0.100 0.022 0.023 0.100 85.80 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 145


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONRely Construction &SupplyRely Construction &SupplyRely Construction &SupplyRely Construction &SupplyRely Construction &SupplyRely Construction &SupplyRely Construction &SupplyRely Construction &Supply10433 Conc. of Bislig-Tren<strong>to</strong> Road 1st XIII 18.950 O 0.258 0.233 0.100 0.012 0.025 0.100 72.80 -10433 Const. of Bigaan Bridge 1st XIII 14.386 O 0.400 0.240 0.100 0.023 0.043 0.100 90.60 -10433 Const. of Bigaan Bridge 2nd XIII 14.386 O 0.307 0.300 0.100 0.022 0.050 0.100 87.90 -10433 Const. of Brgy. Roads Tubigon 1st XI 1.886 C 0.<strong>31</strong>9 0.225 0.100 0.010 0.030 0.100 78.40 -10433 Const. of Brgy. Roads Tubigon Final XI 1.886 C 0.379 0.060 0.300 - - - 73.9010433Const. of Pinagsapawan Bridge &Approaches, Tibanban-LaviganRoad76.60%Satisfac<strong>to</strong>ry1st XI 10.792 O 0.229 0.234 0.070 0.030 0.055 0.100 71.80 -10433 Impvt. of Cadalian-Baguio Road 1st XI 14.164 O 0.389 0.278 0.100 0.030 0.043 0.100 94.00 -10433Impvt./Rehab. of Dapnan-LambajonSection1st XI 9.607 O 0.300 0.300 0.100 0.023 0.042 0.100 86.50 -Rely Construction &Supply10433Impvt./Rehab. of Dapnan-LambajonSectionFinal XI 9.607 C 0.336 0.200 0.300 - - - 83.6085.34%V.Satisfac<strong>to</strong>ryRely Construction &Supply10433Rehab./Repair of Butuan City-MasaoPort Road1st/Final XIII 4.469 C 0.400 0.200 0.300 - - - 90.0090.00%V.Satisfac<strong>to</strong>ryRemigio GeneralConstruction2298Conc. Over Renolith Roads, MMSU-Bakukang Rd. Cangrunaan Rd. &Mabaleng RdFinal I 2.856 C 0.447 - 0.500 - - - 94.7093.08%OutstandingRemp Enterprises 25916Rene T. BayawaConstruction & HaulingServices20740Const. of Drainage System @Mercury St.Const. of 1 Unit 2 CL School Bldg. @Balok E/S1st III 0.465 O 0.<strong>31</strong>0 0.175 0.100 0.030 0.029 0.200 84.40 -1st/Final IX 0.757 C 0.275 0.214 0.300 - - - 78.90RENZ Const. & Trading 25605 Completion of Itbud Diversion Road 1st II 0.479 C 0.458 - 0.500 - - - 95.8078.90%Satisfac<strong>to</strong>ry95.80%OutstandingRevere Construction &Supply17426Const. of Multi-Purpose Bldg., @Bilibinwang1st/Final IV-A 0.336 C 0.364 0.207 0.300 - - - 87.1087.10%V.Satisfac<strong>to</strong>ryRevere Construction andSupplyRevere Construction andSupply17426 Asphalt Overlay of Brgy. Poblacion 1st/Final IV-A 1.147 C 0.490 - 0.500 - - - 99.0017426 Const. of 2 Cl @ Quiling E/S 1st/Final IV-A 0.770 C 0.265 0.300 0.300 - - - 86.5099.00%Outstanding86.50%V.Satisfac<strong>to</strong>ryRevere Construction andSupply17426Repair/Improvement of Lipa CityMuseum & Library1st IV-A 1.843 C 0.470 - 0.500 - - - 97.0097.00%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 146


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.Rex E. MoralesConstructionPROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.10017427 Const. of Multi-Purpose Pavement 1st/Final VIII 0.944 C 0.418 - 0.500 - - - 91.80Reydan Builders 13059 Const. of MPB @ Carpenter Hill 1st/Final XII 0.770 C 0.397 0.200 0.300 - - - 89.70<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTION91.80%Outstanding89.70%V.Satisfac<strong>to</strong>ryReydan Builders 13059Const. of Multi-Purpose Bldg., OpenWarehouse (Mini-Gym)Final XI 1.218 C 0.446 - 0.500 - - - 94.6062.12%FairReydan Builders 13059Const. of Multi-Purpose Building(Mini Gym)Final XI 1.418 C 0.394 0.251 0.300 - - - 94.5082.95%V.Satisfac<strong>to</strong>ryReydan Builders 13059Const. of Multi-Purpose Building(Mini Gym) PaliliFinal XI 1.422 C 0.369 0.300 0.300 - - - 96.9092.98%OutstandingReydan Builders 13059Const. of Multi-Purpose Building @Polomolok1st/Final XII 0.460 C 0.394 - 0.500 - - - 89.4089.40%V.Satisfac<strong>to</strong>ryReydan Builders 13059 Const. of Pedestrian Overpass 1st XI 4.718 O 0.389 0.300 0.100 0.030 0.050 0.100 96.90 -Reydan Builders 13059 Const. of Shadol I Bridge Final XII 4.308 C 0.381 0.293 0.300 - - - 97.4088.91%V.Satisfac<strong>to</strong>ryReyrose Construction 20748Conc. of Various Municipal andBrgy. Roads1st II 1.149 O 0.327 0.240 0.100 0.023 0.025 0.100 81.50 -RFN Construction andDevelopment Corporation8722Const. of Special Education Bldg.,(Additional 2Cl)1st NCR 1.444 C 0.290 - 0.500 - - - 79.0082.90%V.Satisfac<strong>to</strong>ryRGP Builders 20680 Concreting of Malvar-Punta FMR 1st IV-A 1.875 C 0.432 - 0.500 - - - 93.2093.20%OutstandingRGP Builders 20680Concreting of Unisan Seawall(Extension)1st IV-A 0.749 C 0.392 - 0.500 - - - 89.2089.20%V.Satisfac<strong>to</strong>ryRGP Builders 20680Const. of 3 Units School Buildingwith CRs1st IV-A 1.347 O 0.383 0.300 0.100 0.030 0.022 0.100 93.50 -RGP Builders 20680 Const. of Water Works System 1st/Final III 0.288 C 0.428 - 0.500 - - - 92.8092.80%OutstandingRGP Builders 20680Repair/Rehab. of Drainage Systemalong Gen. Luna-Catanauan Road1st/Final III 1.155 C 0.422 - 0.500 - - - 92.2092.20%OutstandingRGS Construction 14095Const. of Various Multi-PurposeBuilding1st/Final IX 0.<strong>31</strong>4 C 0.366 0.200 0.300 - - - 86.6086.60%V.Satisfac<strong>to</strong>ryRGS Construction 14095 Concreting of Purok 4, FMR 1st IX 0.180 C 0.425 - 0.500 - - - 92.5092.50%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 147


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONRGS Construction 14095Concreting/Widening of Dipolog-Aurora Road Sinaman1st IX 3.138 C 0.378 - 0.500 - - - 87.8087.80%V. Satisfac<strong>to</strong>ryRGS Construction 14095Const. of Two (2) S<strong>to</strong>rey Bldg. @Jose Rizal Memorial State CollegeFinal IX 1.368 C 0.399 0.200 0.300 - - - 89.9093.33%OutstandingRHH Construction 11467Conc. of Burgos-General AguinaldoNational Road1st II 18.329 O 0.349 0.300 0.100 0.030 0.037 0.100 91.60 -RHH Construction 11467 Conc. of Jct. National Potia Road 1st/Final II 10.697 C 0.381 0.200 0.300 - - - 88.1088.10%V.Satisfac<strong>to</strong>ryRHH Construction 11467Rhodamay ConstructionSupply25989Const. of Dalibubon Bridge(Remaining Works) and Approaches(Partial Const.)Const. of Multi-Purpose Bldg. SitioTina Brgy. Tagusao1st II 11.337 O 0.228 0.299 0.100 0.018 0.040 0.100 78.50 -1st IV-B 0.188 C 0.414 - 0.500 - - - 91.4091.40%OutstandingRhodamay ConstructionSupply25989Const. of Multi-Purpose Building,Brgy. PoblacionFinal IV-B 0.466 C 0.393 0.136 0.300 - - - 82.9087.52%V.Satisfac<strong>to</strong>ryRhodamay ConstructionSupply25989 Const. of Panacan River Control 1st IV-B 0.922 C 0.375 - 0.500 - - - 87.5087.50%V.Satisfac<strong>to</strong>ryRhodamay ConstructionSupply25989Const., of E/S Building Brgy.TaritienFinal IV-B 0.282 C 0.230 0.079 0.300 - - - 60.9063.21%FairRhodwill Parts andHardware18871Const. of Manikling Multi-PurposeBuildingFinal XI 1.606 C 0.361 0.300 0.300 - - - 96.1092.18%OutstandingRhodwill Parts andHardware18871Improvement of National Road alongBaganga-Cateel Section1st/Final XI 9.443 C 0.376 0.200 0.300 - - - 87.6087.60%V.Satisfac<strong>to</strong>ryRhodwill Parts andHardware18871Impvt./Rehab. of Manhoc-Ban-aoSection1st XI 9.605 O 0.298 0.300 0.100 0.030 0.060 0.100 88.80 -Rhodwill Parts andHardware18871Impvt./Rehab. of Manhoc-Ban-aoSection2nd XI 9.605 O 0.333 0.253 0.100 0.030 0.050 0.100 86.60 -Richmar Construction 18797Conc./Impvt. of Polangui Upland Rd.(Cepres-Itaran Section)1st/Final V 9.595 C 0.346 0.189 0.300 - - - 83.5083.50%V.Satisfac<strong>to</strong>ryRichmar Construction 18797Concreting of Irosin-BulusanAsphalt Road1st/Final V 3.276 C 0.344 0.208 0.300 - - - 85.2085.20%V.Satisfac<strong>to</strong>ryRichmar Construction 18797Construction of Checkgate, Canalwith Lining & Canal Structures(Muladbucad Grande CIP)1st/Final NIA 3.903 C 0.358 0.087 0.300 - - - 74.5074.40%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 148


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONRichmark Construction 14227Richpil Builders 30923Completion of Antiao BridgeApproachesWidening/Concreting of BinangonanDiversion Rd.Final VIII 3.209 C 0.461 - 0.500 - - - 96.101st IV-A 1.909 C 0.407 - 0.500 - - - 90.70Ricomar Construction <strong>31</strong>606 Sch. Bldg. Project (C.P.G. H/S) 1st VII 0.437 O 0.389 0.300 0.000 0.030 0.035 0.067 82.10 -R-II Builders / J.M.Rehab of Surigao-Davao CoastalLuciano/<strong>31</strong>0 Construction JV-01-041 Road, CW-RU-1.4C, Manay-Mati 1st IBRD 555.077 O 0.<strong>31</strong>2 0.284 0.050 0.030 0.051 0.033 76.00 -(JV)SectionR-II Builders / J.M.Rehab of Surigao-Davao CoastalLuciano/<strong>31</strong>0 Construction JV-01-041 Road, CW-RU-1.4C, Manay-Mati 3rd XI 555.077 O 0.354 0.300 0.000 0.030 0.070 0.100 85.40 -(JV)SectionR-II Builders Inc. 11235R-II Builders, Inc./J.M.Luciano Const./<strong>31</strong>0Const. (JV)JV-01-041Development of 50-HectareReserved Area, NBP Compound, Ph.IRehab. of Surigao-Davao CoastalRoad (Manay-Mati Section)70.06%Satisfac<strong>to</strong>ry90.70%Outstanding1st NHA NCR 155.771 O 0.380 0.300 0.100 0.024 0.047 0.100 95.10 -4th IBRD 555.077 O 0.363 0.300 0.100 0.030 0.065 0.100 95.80 -Comp. of Remaining Land Dev.R-II Builders,Inc./BauerConsortiu Works,Garbage Disposal,Const ofInt'l Phil./PhilEco Sysm STPs and Repair of PermanentCorp/Supermax Phils.,Inc.Housing1st NHA 217.993 D 0.374 0.300 0.000 0.018 0.019 0.000 71.1071.10%Satisfac<strong>to</strong>ryRim Construction 15938 Conc. of Bulanao-Paracelis Road 2nd CAR 3.199 C 0.393 - 0.500 - - - 89.3087.98%V.Satisfac<strong>to</strong>ryRitche-Nathalie Buildersand General Merchandise27501 Concreting <strong>to</strong> Tangub-Polao Road Final X 1.250 C 0.425 - 0.500 - - - 92.5095.02%OutstandingRitche-Nathalie Buildersand General Merchandise27501Const. of Seawall/Shore ProtectionNorthern Poblacion1st X 0.385 C 0.<strong>31</strong>5 - 0.500 - - - 81.5081.50%V.Satisfac<strong>to</strong>ryRitche-Nathalie Buildersand General Merchandise27501Rehab./Impvt. of Bonifacio-DonVic<strong>to</strong>riano National Road1st X 2.861 O 0.307 0.046 0.100 0.030 0.035 0.067 58.50 -Ritche-Nathalie Buildersand General Merchandise27501Repair/Rehab. of Multi-PurposeBldg.Final X 0.475 C 0.381 0.300 0.300 - - - 98.1085.10%V.Satisfac<strong>to</strong>ryRitz Commercial 19132Concreting of Dapdap East Brgy.Road1st IV-A 4.752 O 0.356 0.300 0.050 0.030 0.028 0.067 83.10 -Riva Construction 23820Cluster I- Const. of Various SchoolBldg.Final VII 10.280 C 0.363 - 0.500 - - - 86.3087.98%V. Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 149


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONRiver of Life EngineeringConstruction &Aggregates30516Const. of 2 S<strong>to</strong>rey 4 Cl Sch. Bldg. @Benguet NHS1st/Final CAR 1.640 C 0.302 0.2<strong>31</strong> 0.300 - - - 83.3083.30%V.Satisfac<strong>to</strong>ryRiver of Life EngineeringConstruction &Aggregates30516Impvt. Along Acop-Kapangan-Kibungan Road1st/Final CAR 4.775 C 0.335 0.202 0.300 - - - 83.7083.70%V.Satisfac<strong>to</strong>ryRKX OdiamarConstructionRLK Construction andBuilders16107 Const. of Seawall at Kinahulugan 1st V 0.183 C 4.160 - 0.500 - - - 466.0032194Const. of Sch. Bldg. @ Bakit-BakitE/S1st/Final I 0.385 C 0.365 0.300 0.300 - - - 96.5091.60%Outstanding96.50%OutstandingRMAJ Construction 18623 Const. of Mompong Flood Control 1st/Final IV-B 0.954 C 0.309 0.205 0.300 - - - 81.4081.40%V.Satisfac<strong>to</strong>ryRMS Builder and Supply 19490Rehab. of Farm-<strong>to</strong>-Market Road @Cangmohao1st VII 0.932 O 0.400 0.300 0.100 0.000 0.023 0.050 87.30 -RNV Construction 12570Const. of Odiongan Multi-PurposeBldg.1st IV-B 0.456 C 0.377 - 0.500 - - - 87.7087.70%V.Satisfac<strong>to</strong>ryRNV Construction 12570 Rehab. of Boliganay FMR 1st IV-B 0.901 C 0.352 - 0.500 - - - 85.2085.20%V.Satisfac<strong>to</strong>ryRoadtech Construction 17580 Conc.of Brgy. La Paz Road 1st I 1.927 O 0.309 0.183 0.100 0.024 0.037 0.100 75.30 -Roadtech Construction 17580 Conc.of Brgy. La Paz Road Final I 1.927 C 0.232 0.300 0.300 - - - 83.20Roadtech Construction 17580Const. of School bldg., at SanJacin<strong>to</strong> E/SFinal I 4.699 C 0.498 - 0.500 - - - 99.8078.46%Satisfac<strong>to</strong>ry94.62%OutstandingRoadtech Construction 17580Repair/Rehab. of Sinucalan Bridgealong Urd. Jct.-Dagupan RdFinal I 2.704 C 0.375 - 0.500 - - - 87.5092.48%OutstandingRobeth Gen. Mdse.,Const. & Supplies-IsulanBranchRobeth Gen. Mdse.,Const. & Supplies-IsulanBranchRobeth Gen. Mdse.,Const. & Supplies-IsulanBranchRobeth Gen. Mdse.,Const. & Supplies-IsulanBranch2<strong>31</strong>75Concreting of Jct. Kapaya Sectionalong Dukay-Sen. Ninoy Aquino-Lebak RoadFinal XII 7.199 O 0.392 - 0.500 - - - 89.20 -2<strong>31</strong>75 Const. of 3-Cl School Building 1st XII 1.146 O 0.<strong>31</strong>8 0.300 0.100 0.030 0.018 0.100 86.60 -2<strong>31</strong>75 Const. of Multi Purpose Bldg. 1st/Final XII 0.954 C 0.304 0.300 0.300 - - - 90.402<strong>31</strong>75Const. of Multi Purpose Bldg. atBrgy. Dansuli1st/Final XII 0.458 C 0.362 0.200 0.300 - - - 86.2090.40%Outstanding86.20%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 150


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONRobitan Construction 10553Concreting of Brgy. Rd., Brgy.Sapaan1st IV-A 0.471 C 0.366 - 0.500 - - - 86.6086.60%V. Satisfac<strong>to</strong>ryRocali Construction &Trading18779Const./Rehab./Impv't. of RoadDrainage1st NCR 0.932 C 0.450 - 0.500 - - - 95.0095.00%OutstandingRocks<strong>to</strong>ne ConstructionServices and Supply22702 Const. of MPB at Simsiman 1st XII 0.767 O 0.357 0.216 0.100 0.030 0.025 0.100 82.80 -Rockworld Industries 7582Const. of Drainage Sytem @ DaanMaharlika, Picas-Api<strong>to</strong>ng Road1st VIII 1.887 O 0.400 0.169 0.100 0.015 0.028 0.200 91.20 -Rockworld Indutries 7582Const. of Drainage Sytem @ DaanMaharlika, Picas-Api<strong>to</strong>ng RoadFinal VIII 1.930 C 0.280 0.300 0.300 - - - 88.0089.92%V.Satisfac<strong>to</strong>ryRockworld Indutries 7582 Road Conc.at Brgy. Lapay 1st/Final VIII 0.193 C 0.326 0.200 0.300 - - - 82.6082.60%V.Satisfac<strong>to</strong>ryRoda Construction &Gen. Supply19674Completion of Multi-PurposeBuilding1st/Final V 1.418 C 0.362 0.300 0.300 - - - 96.2096.20%OutstandingRoda Construction &Gen. Supply19674Completion of Multi-PurposeBuilding1st/Final V 0.236 C 0.303 0.232 0.300 - - - 83.5083.50%V.Satisfac<strong>to</strong>ryRoda Construction &Gen. SupplyRoda Construction &Gen. SupplyRoda Construction &Gen. SupplyRoda Construction &Gen. SupplyRoda Construction andGeneral Supply19674 Concreting of San Isidro FMR Final V 0.461 C 0.341 - 0.500 - - - 84.101967419674Const. of Allanosa National HighSchool Bldg. San PedroConst. of Ariman Seawall, Brgy.ArimanFinal V 1.375 C 0.437 - 0.500 - - - 93.701st V 0.183 C 0.433 - 0.500 - - - 93.3019674 Repair of Marok-Barok Spillway 1st/Final V 0.327 C 0.333 0.300 0.300 - - - 93.3019674 Completion of Public Market 1st/Final V 0.477 C 0.400 0.200 0.300 - - - 90.0087.22%V.Satisfac<strong>to</strong>ry77.60%Satisfac<strong>to</strong>ry93.30%Outstanding93.30%Outstanding90.00%V.Satisfac<strong>to</strong>ryRoda Construction andGeneral Supply19674Repair/Rehab. of Brgy. J.P. Laurelgoing <strong>to</strong> Inararan FMRFinal V 0.945 C 0.395 0.300 0.300 - - - 99.5070.16%Satisfac<strong>to</strong>ryRoim Builders &Construction Supply20226Concreting along Patin-ay-LaCaridad Road2nd XIII 1.846 O 0.366 0.300 0.070 0.015 0.032 0.067 85.00 -Roim Builders &Construction Supply20226Concreting along Patin-ay-LaCaridad RoadFinal XIII 1.846 C 0.192 0.300 0.300 - - - 79.2079.86%Satisfac<strong>to</strong>ryRoim Builders &Construction Supply20226Concreting of BAHBAH Road (RoadNetwork)2nd XIII 1.823 O 0.381 0.300 0.000 0.030 0.061 0.100 87.20 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 151


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONRoim Builders &Construction Supply20226Concreting of BAHBAH Road (RoadNetwork)Final XIII 1.823 C 0.199 0.300 0.300 - - - 79.9085.54%V.Satisfac<strong>to</strong>ryRoim Builders &Construction Supply20226Concreting of Barangay 1 MunicipalStreet1st XIII 1.864 O 0.353 0.300 0.070 0.015 0.025 0.067 83.00 -Roim Builders &Construction Supply20226Concreting of Barangay 1 MunicipalStreetFinal XIII 1.864 C 0.268 0.300 0.000 - - - 56.8072.52%Satisfac<strong>to</strong>ryRoim Builders andConstruction Supply20226Gravelling of Bitan-Agan-Das-AganRoadFinal XIII 1.832 C 0.400 0.200 0.300 - - - 90.0084.06%V.Satisfac<strong>to</strong>ryRol-Mar Developer andEnterprises26151Const. of Multi-Purpose Bldg.,Youth Council Bldg.2nd X 0.943 O 0.306 0.275 0.000 0.023 0.025 0.067 69.60 -Rol-Mar Developer andEnterprises26151Const. of Multi-Purpose Bldg.,Youth Council Bldg.Final X 0.943 C 0.333 0.300 0.000 - - - 63.3069.60%FairRomina Construction 24985 Const. of MPB at G. Perfec<strong>to</strong> H/S 1st NCR 2.989 O 0.361 0.180 0.100 0.015 0.032 0.100 78.80 -Ronwood Const. Supply 25<strong>31</strong>1Ronwood Const. Supply 25<strong>31</strong>1Const. of River Protection @Mambayaan Bridge II (Phase I)Slope Protection along Jct. Osmeña-Pilar Road1st X 4.720 O 0.367 0.160 0.100 0.015 0.042 0.200 88.40 -1st XIII 5.447 O 0.376 0.299 0.100 0.030 0.035 0.100 94.00 -Ronwood Const. Supply 25<strong>31</strong>1Slope Protection along Jct. Osmeña-Pilar RoadFinal XIII 5.447 C 0.343 0.300 0.000 - - - 64.3082.12%V.Satisfac<strong>to</strong>ryRonwood Construction &Supply25<strong>31</strong>1Cluster EQ: Rehabilitation of FMRPook,1st/Final X 0.951 C 0.321 0.300 0.300 - - - 92.1092.10%OutstandingRonwood Construction &Supply25<strong>31</strong>1 Clustered Conc. of Municipal Streets 1st XIII 1.130 C 0.474 - 0.500 - - - 97.4097.40%OutstandingRonwood Construction &Supply25<strong>31</strong>1 Conc.of FMR Brgy. Del Carmen 1st XIII 0.944 C 0.478 - 0.500 - - - 97.8097.80%OutstandingRonwood Construction &Supply25<strong>31</strong>1Concreting of Dapa-Sayak-Cancohoy Road, Sta. Fe. LobongonSect.Final XIII 6.112 C 0.404 - 0.500 - - - 90.4089.86%V.Satisfac<strong>to</strong>ryRonwood Construction &Supply25<strong>31</strong>1 Const./Regravelling of Rd. 1st XIII 0.940 C 0.427 - 0.500 - - - 92.7092.70%OutstandingRonwood Constructionand Supply25<strong>31</strong>1Improvement of Dapa-Del CarmenRoad (Slope Protection)1st/Final XIII 1.373 O 0.367 0.200 0.300 - - - 86.70 -Roprim Construction 8546 Const. of Cuartero Bridge, Phase II 1st VI 8.881 O 0.400 0.240 0.100 0.030 0.030 0.100 90.00 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 152


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONRoprim Construction 8546 Const. of Cuartero Bridge, Phase II Final VI 8.881 C 0.350 0.300 0.300 - - - 95.00Roprim Construction 8546Roprim Construction 8546Roprim Construction 8546Roprim Construction 8546Roprim Construction 8546Const. of <strong>Jan</strong>iuay-Badiangan Road,Km.36+320-Km.37+620Const. of <strong>Jan</strong>iuay-Badiangan Road,Km.36+320-Km.37+620Const. of Tumalalud Bridge (PhaseII)Const. of Tumalalud Bridge (PhaseII)Const. of Tumalalud Bridge (PhaseII)92.00%Outstanding1st VI 13.886 O 0.369 0.300 0.070 0.030 0.059 0.067 89.50 -Final VI 13.886 C 0.295 0.200 0.000 - - - 49.501st VI 9.861 O 0.377 0.240 0.100 0.023 0.043 0.100 88.30 -2nd VI 9.861 O 0.244 0.228 0.100 0.023 0.045 0.100 74.00 -Final VI 1.430 C 0.357 0.208 0.000 - - - 56.5069.72%Fair71.29%Satisfac<strong>to</strong>ryRosand Builders 15781Beautification of K-H Park, Brgy.West Kamias1st NCR 0.700 C 0.392 - 0.500 - - - 89.2089.20%V.Satisfac<strong>to</strong>ryRosand Builders 15781Const. of Sch. Bldg. @ UP Collegeof Music1st/Final NCR 0.946 C 0.390 0.300 0.300 - - - 99.0099.00%OutstandingRosvar Enterprises andGeneral Contrac<strong>to</strong>r17998 Const. of Farm-<strong>to</strong>-Market Road 1st/Final IV-A 0.570 C 0.266 - 0.500 - - - 76.6076.60%Satisfac<strong>to</strong>ryRosvar Enterprises andGeneral Contrac<strong>to</strong>r17998 Const. of Flood Control & Drainage 1st/Final IV-A 0.467 C 0.393 0.200 0.300 - - - 89.3089.30%V.Satisfac<strong>to</strong>ryRosvar Enterprises andGeneral Contrac<strong>to</strong>r17998Const. of Flood Control/DrainageSystem1st/Final IV-A 2.866 C 0.366 0.200 0.300 - - - 86.6086.60%V.Satisfac<strong>to</strong>ryRosvar Enterprises andGeneral Contrac<strong>to</strong>r17998Const. of FMR @ Municipalty ofVic<strong>to</strong>ria1st IV-A 0.934 C 0.4<strong>31</strong> - 0.500 - - - 93.1093.10%OutstandingRosvar Enterprises andGeneral Contrac<strong>to</strong>r17998 Const. of Multi-Purpose Hall 1st/Final IV-A 0.938 C 0.449 - 0.500 - - - 94.9094.90%OutstandingRovilla Construction 19514Const. of 2-CL S/B (Part of ClusterA)1st/Final VII 0.491 C 0.380 - 0.500 - - - 88.0088.00%V.Satisfac<strong>to</strong>ryRoyal Crown MonarchConst. & Supplies Corp.9036Concreting of Farm-<strong>to</strong>-Market RoadBuenlagFinal III 1.544 C 0.384 0.200 0.300 - - - 88.4088.10%V.Satisfac<strong>to</strong>ryRoyal Crown MonarchConst. & Supplies Corp.9036Concreting of Rizal-Caramutan-Dumarais Road1st/Final III 1.850 C 0.335 0.287 0.300 - - - 92.2092.20%OutstandingRoyal Sea BeesConstruction30099Widening/Regravelling incl. slopeprotection & drainag of Bon<strong>to</strong>c-Lubuagan-Tabuk RoadFinal CAR 4.787 C 0.326 0.237 0.300 - - - 86.3081.50%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 153


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONRPBJ Trading &Construction30006Const. of Drainage System alongNulatula1st VIII 2.046 C 0.354 - 0.500 - - - 85.4085.40%V.Satisfac<strong>to</strong>ryRPBJ Trading &Construction30006Const. of Multi-Purpose Bldg.,(Covered Court) at Brgy. 82 (PhaseII)Final VIII 0.950 C 0.398 - 0.500 - - - 89.8051.93%PoorRPBJ Trading &Construction30006Road Conc. of Brgy. Dagami-Pastrana Road1st/Final VIII 0.937 C 0.329 0.300 0.300 - - - 92.9092.90%OutstandingRREncabo Construc<strong>to</strong>rs& Traders14716 Fort Santiago Linear Park Project 1st PRRC 13.595 O 0.349 0.300 0.100 0.030 0.050 0.100 92.90 -RRN Construction 20228Const. of Concrete Lined Ditchalong Jct. A. H. Aglayan-KibangayRd. Poblacion Lantapan Sect.Final X 0.321 C 0.470 - 0.500 - - - 97.0095.44%OutstandingRSP Enterprises Inc. 16795Concreting of Road at Brgy.TagakpanFinal XI 0.940 C 0.333 - 0.500 - - - 83.3081.02%V.Satisfac<strong>to</strong>ryRSP Enterprises Inc. 16795Const. of Multi Purpose Pavement atBrgy. 7A1st XI 0.661 O 0.267 0.300 0.100 0.030 0.052 0.100 84.90 -RSP Enterprises, Inc. 16795Const. of 1-Cl, School Bldg. @ EliasLopez Memorial H/SFinal XI 0.330 C 0.309 - 0.500 - - - 80.9087.20%V.Satisfac<strong>to</strong>ryRTY Construction 10341Concreting of Balanacan FMRBalanacan1st/Final IV-B 0.239 C 0.013 0.300 0.300 - - - 61.3061.30%FairRuby Jade Construction 19202 Rehab. of Brgy. Road, Brgy. Salay 1st III 4.606 O 0.334 0.225 0.100 0.030 0.016 0.100 80.50 -Ruby Lim Const. &SuppliesRuby Lim Const. &Supplies11685Rumil Construction 13484Conc. of Cudamos Brgy. Road NewDagupan1st IV-B 0.366 C 0.449 - 0.500 - - - 94.9011685 Const. of Multi-Purpose Pavement 1st/Final V 0.364 C 0.332 0.100 0.300 - - - 73.20Const. of S/B @ Barobo NHS (Main),Package 194.90%Outstanding73.20%Satisfac<strong>to</strong>ry1st XIII 1.156 O 0.400 0.213 0.100 0.030 0.018 0.100 86.10 -Rumil Construction 13484Const. of S/B @ Barobo NHS (Main),Package 1Final XIII 1.156 C 0.369 0.200 0.300 - - - 86.9086.34%V.Satisfac<strong>to</strong>ryRusmen Builders &Development Corporation10674Rehab. of Banay-banay-CuencaRoad (San Jose Section)1st/Final IV-A 4.798 C 0.366 0.300 0.300 - - - 96.6096.60%OutstandingRusmen Builders &Development Corporation(Formerly: RusmenCorporation)10674 Const. of Multi-Purpose Building 1st IV-A 4.769 O 0.369 0.200 0.100 0.030 0.043 0.100 84.20 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 154


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONRusmen Builders & Dev't.Corp.10674Const of San Jose Market Brgy.Taysan1st IV-A 8.595 O 0.400 0.217 0.100 0.030 0.020 0.100 86.70 -Rusmen Builders & Dev't.Corp.10674Impv't. of Manila-Batangas By PassRoad Phase I1st IV-A 9.562 C 0.456 - 0.500 - - - 95.6095.60%OutstandingS & G Construction 11773 Const. of Tacurong Drainage Canal Final XII 6.624 C 0.323 - 0.500 - - - 82.3088.98%V.Satisfac<strong>to</strong>ryS & G Dconstruction andSupply11773S & K Builders, Inc. 24039S.A. Gomez Construction 6265S.J. Yu Construction 17048S.J. Yu Construction 17048Rehabilitation of Manin Canal (Sta.21+714-26+526)Const. of 5-CL School Building @Quezon NHSConst. of Malasag Eco-TourismFacilitiesRehabilitation of Various Building @CL Montelibano Regional HospitalRehabilitation of Various Buildings@ C.L. Montelibano RegionalHospitalFinalNIARegion I7.304 C 0.250 0.300 0.300 - - - 85.00 84.87%Final X 1.406 C 0.347 0.000 0.500 0.000 0.000 0.000 84.701stPTARegion X77.91%Satisfac<strong>to</strong>ry11.167 O 0.373 0.300 0.070 0.015 0.039 0.067 86.43 -2nd VI 4.725 O 0.373 0.273 0.100 0.022 0.035 0.100 90.30 -Final VI 4.090 O 0.361 0.195 0.000 - - - 55.60 -S.M. Castro Management& Construction Services18216 Const. of Capinahan Bridge Final VIII 3.9<strong>31</strong> C 0.452 - 0.500 - - - 95.2093.28%OutstandingS.R. Baldon Construction& Supply15405Concreting of Cabid-an Road(Seabreeze), Cabid-an1st/ Final V 0.920 C 0.268 0.000 0.500 0.000 0.000 0.000 76.8076.80%Satisfac<strong>to</strong>ryS.R. Baldon Construction& Supply15405Const. of Multi-Purpose Building,Madlawan1st/ Final V 0.240 C 0.372 0.000 0.500 0.000 0.000 0.000 87.2087.20%V.Satisfac<strong>to</strong>rySabutan Construction 5520Road Widening of Cangguman<strong>to</strong>ng-Poo-Lazi Interior Road1st VII 1.391 O 0.400 0.294 0.100 0.008 0.028 0.067 89.70 -Sabutan Construction 5520Road Widening of Cangguman<strong>to</strong>ng-Poo-Lazi Interior RoadFinal VII 1.391 C 0.400 0.193 0.300 - - - 89.3089.54%V.Satisfac<strong>to</strong>rySalidummay Gen.Construction21403Completion of Multi-PurposeBuilding1st/Final CAR 0.476 C 0.384 0.250 0.300 - - - 93.4093.40%OutstandingSalidummay Gen.Construction21403Const. of Multi-Purpose Building,Pinsao-Pilot Brgy.Final CAR 1.620 C 0.398 0.000 0.500 0.000 0.000 0.000 89.8063.34%FairSamjan Builders 27855Completion of Multi Purpose Bldg.At Campo Filipino Brgy.1st/Final CAR 0.953 C 0.345 0.300 0.300 - - - 94.5094.50%OutstandingSamjan Builders 27855Rehabilitation along Pico-LamtangRoadFinal CAR 2.173 C 0.383 0.000 0.500 0.000 0.000 0.000 88.3086.74%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 155


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONSamurai Construction 32214Const. of Multi Purpose Pavement @Brgy. Sarong1st/Final IVB 0.208 C 0.173 0.000 0.300 - - - 47.30San Fernando Builders 21295 Const. of Multi-Purpose Bldg. 1st/Final I 2.846 C 0.349 0.300 0.300 - - - 94.90San Fernando Builders 21295 Const. of Multi-Purpose Bldg. Final I 1.428 C 0.322 0.300 0.300 - - - 92.2047.30%Poor94.90%Outstanding84.85%V.Satisfac<strong>to</strong>rySan Fernando Builders 21295Const. of Multi-Purpose Structure atBrgy. Sili1st / Final I 0.187 C 0.303 0.000 0.500 0.000 0.000 0.000 80.3080.30%V.Satisfac<strong>to</strong>rySands<strong>to</strong>rm Construction 23411Const. of Flood Control System @Brgy. Zone 1<strong>31</strong>st / Final IV-A 0.471 C 0.374 0.300 0.300 - - - 97.4066.71%FairSands<strong>to</strong>rm Construction 23411Const. of Multi-Purpose Building atBrgy. Sta. Elena1st IV-A 0.477 C 0.450 - 0.500 - - - 95.0095.00%OutstandingSanlahi Group ofBuilders, Inc.11874Concreting of Baco-Puer<strong>to</strong> GaleraRoad (Phase II)Final IV-B 9.500 C 0.<strong>31</strong>4 0.300 0.300 - - - 91.4081.50%V.Satisfac<strong>to</strong>rySanlahi Group ofBuilders, Inc.11874Concreting of Brgy. Panikian Road,NaujanFinal IV-B 1.894 C 0.198 0.000 0.500 0.000 0.000 0.000 69.8071.96%Satisfac<strong>to</strong>rySanlahi Group ofBuilders, Inc.11874Const. of Drainage System (w/cover)Brgy. Tawiran-Sta. Isabel,Final IV-B 4.035 C 0.356 0.000 0.500 0.000 0.000 0.000 85.6085.60%V.Satisfac<strong>to</strong>rySanlahi Group ofBuilders, Inc.11874Const./Repair of Multi-PurposeBuilding, Masipit2nd IV-B 0.947 C 0.391 0.000 0.500 0.000 0.000 0.000 89.1089.10%V.Satisfac<strong>to</strong>rySanlahi Group ofBuilders, Inc.11874Widening of Libis-Lumangbayan-Sta. Isabel RoadFinal IV-B 6.441 C 0.378 0.300 0.300 - - - 97.8094.32%OutstandingSantech Builders 16797Concreting of Molimono-Pili Road,Cawayan (Phase VII)Final XIII 4.587 C 0.369 0.200 0.300 - - - 86.9084.86%V.Satisfac<strong>to</strong>rySantech Builders 16797Const. of Magtangale-Macopa Road,San FranciscoFinal XIII 2.651 C 0.366 0.000 0.500 0.000 0.000 0.000 86.6086.42%V. Satsifac<strong>to</strong>rySantech Builders 16797 Const. of Multi-Purpose Building 1st XIII 4.652 O 0.309 0.253 0.100 0.015 0.033 0.100 81.00 -Santech Builders 16797 Const. of Multi-Purpose Building Final XIII 4.652 C 0.274 0.300 0.300 - - - 87.4082.92%V.Satisfac<strong>to</strong>rySantech Builders 16797Const. of Rosita Bridge III, PSCG(Type IV-B)1st XIII 4.607 O 0.375 0.240 0.050 0.030 0.043 0.067 80.50 -Santech Builders 16797Const. of Rosita Bridge III, PSCG(Type IV-B)Final XIII 4.608 C 0.377 0.300 0.300 - - - 97.7087..38%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 156


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONSapdoy Enterprises 21995Completion of MPB @ BGHCompound1st/Final CAR 0.952 O 0.301 0.300 0.100 0.023 0.032 0.100 85.60 -Sarangani Rockmixer 6549Completion/Concreting of CrossingRubber-Tampakan RoadFinal XII 5.583 C 0.465 - 0.500 - - - 96.5096.44%OutstandingSarangani Rockmixer 6549Const. of GSC Circumferential Road,San Isidro Section, Brgy. San Isidro1st/ Final XII 4.698 C 0.435 0.000 0.500 0.000 0.000 0.000 93.5093.50%OutstandingSarangani Rockmixer 6549Sards Construction 15408Widening of Maka-Tupi-Marbel Road(Labangal-Apopong Section)Conc. (Concrete Reblocking) of1,220 lm Nat'l Road1st XII 7.150 O 0.392 0.233 0.070 0.015 0.032 0.033 77.50 -1st VI 9.411 O 0.340 0.220 0.070 0.008 0.028 0.067 73.30 -Sarex Builders 23734Completion of Gutalac PublicMarket, GutalacFinal IX 0.739 C 0.482 0.000 0.500 0.000 0.000 0.000 98.2088.20%V.Satisfac<strong>to</strong>rySarex Builders 23734Concreting of Road at MolaveStreet, Poblacion Carmen1st/ Final XII 1.878 C 0.345 0.000 0.500 0.000 0.000 0.000 84.5084.50%V.Satisfac<strong>to</strong>rySarex Builders 23734 Const. of MPB @ Brgy Ilbocean 1st/Final XII 0.330 C 0.330 0.300 0.300 - - - 93.00Sarex Builders 23734Const. of Multi-Purpose Bldg. @Brgy. Gen. Luna1st / Final XII 0.235 C 0.432 0.000 0.500 0.000 0.000 0.000 93.2093.00%Outstanding93.2%OutstandingSarex Builders 23734Const. of Water Supply / SpringDevelopment Brgy. MalitubogFinal XII 0.462 C 0.336 0.000 0.300 - - - 63.6079.56%Satisfac<strong>to</strong>rySarex Builders 23734Proposed Const. of Seawall ManilLeon Postigo1st / Final IX 0.779 C 0.416 0.000 0.500 0.000 0.000 0.000 91.6091.60%OutstandingSargasso Constructionand Development Corp.6587 Const. of Manggamnan Bridge 1st IV-B 13.332 O 0.267 0.240 0.000 0.023 0.035 0.067 63.20 -Sargasso Constructionand Dev't. Corp.6587Const./ Replacement ofManggamnan Bridge2nd IV-B 13.347 O 0.289 0.237 0.100 0.030 0.047 0.100 80.30 -Satrap ConstructionCompany, Inc.2526Asphalting of Shoulder along MNRSan IldefonsoFinal I 1.256 C 0.<strong>31</strong>7 - 0.500 - - - 81.7081.76%V.Satisfac<strong>to</strong>rySBB Construction andSupply<strong>31</strong>238Concreting of Road @ Dama deNocheFinal XI 0.462 C 0.303 - 0.500 - - - 80.3085.70%V.Satisfac<strong>to</strong>rySBB Construction andSupply<strong>31</strong>238Const. of 1CL 1 S<strong>to</strong>rey S/B at MintalE/S1st/Final XI 0.425 C 0.378 0.176 0.300 - - - 85.4085.40%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 157


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONSCP Construction 8797Const. of Barangay Cuarenta-LunaRoadSCP Construction 8797Const. of Brgy. Cuarenta-LunaRoad, San JoseSCP Construction 8797Const. of Brgy. Cuarenta-LunaRoad, San JoseSCP Construction /Const./ Impv't. of Bulua (Jct. ICBPersan Construction / G &JV-99-175 Road)P.N. Road-Lumbia (Jct. AirportP Builders, IncorporatedRoad)(JV)SCP Construction /Const./ Impv't. of Bulua (Jct. ICBPersan Construction / G &JV-99-175 Road)P.N. Road-Lumbia (Jct. AirportP Builders, IncorporatedRoad)(JV)4th XIII 12.884 O 0.<strong>31</strong>7 0.300 0.000 0.024 0.042 0.100 78.30 -5th XIII 13.026 O 0.309 0.300 0.000 0.023 0.025 0.033 69.00 -Final XIII 13.026 C 0.383 0.300 0.000 - - - 68.302nd X 121.472 C 0.342 0.300 0.050 0.030 0.055 0.067 84.40Final X 121.472 C 0.367 0.300 0.300 - - - 96.7072.98%Satisfac<strong>to</strong>ry84.40%V.Satisfac<strong>to</strong>ry93.19%OutstandingSCV Construction 14523 Const. of Multi-Purpose Building 1st X 0.933 O 0.341 0.225 0.100 0.000 0.008 0.100 77.40 -Segal Construction 17243Const. of Drainage System, NewLucban Brgy.1st CAR 0.959 C 0.399 - 0.500 - - - 89.9089.90%V.Satisfac<strong>to</strong>rySerra Ty Construction 7373Concreting of Road from Airport <strong>to</strong>Brgy. Awasian1st/ Final XIII 1.353 C 0.357 0.000 0.500 0.000 0.000 0.000 85.7085.70%V.Satisfac<strong>to</strong>rySerra Ty Construction 7373Rehab./Impvt. of Gamut-UnabanSection, along SCDR1st XIII 9.605 O 0.263 0.265 0.100 0.022 0.020 0.067 73.70 -Settlers Builder 21643 Const. of Libonan Bridge 1st VI 7.199 O 0.<strong>31</strong>1 0.300 0.100 0.030 0.030 0.100 87.10 -Settlers Builder 21643 Const. of Libonan Bridge Final VI 7.199 C 0.400 0.200 0.300 - - - 90.0088.26%V.Satisfac<strong>to</strong>rySeven Digit Construction& Supplies25471Raising of Grade of Puer<strong>to</strong> Princesa-Roxas, Taytay-El Nido RoadFinal IV-B 3.642 C 0.283 0.300 0.300 - - - 88.3089.62%V.Satisfac<strong>to</strong>rySeven Digit Construction& Supplies25471Rehab./Improvement of San VicenteAirport RunwayFinal IV-B 9.139 C 0.280 0.300 0.300 - - - 88.0083.86%V.Satisfac<strong>to</strong>rySeven Digits Construction& Supplies25471Rehabilitation of San Jose-PortBar<strong>to</strong>n RoadFinal IV-B 4.102 C 0.389 0.209 0.300 - - - 89.8085.66%V.Satisfac<strong>to</strong>rySeven Digits Construction& Supplies25471Repair/Rehab. & Const. of BagiongBayan Bebeladan FMRFinal IV-B 2.660 C 0.387 0.500 88.7085.76%V.Satisfac<strong>to</strong>rySeven Digits Construction& Supply25471Const. of Flood Control at BarangaySowangan1st/ Final IV-B 0.947 C 0.389 0.000 0.500 0.000 0.000 0.000 88.9088.90%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 158


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONSGB Concrete Products &General Merchandise20745Rehab./Impv't. of Antipolo-TukulanRoadFinal IVA 1.917 C 0.359 - 0.500 - - - 85.9091.00%OutstandingSGL Trading 27767Concreting of Agtangao-ManilaRoad, Benguet1st / Final CAR 0.452 C 0.344 0.000 0.500 0.000 0.000 0.000 84.4084.40%V.Satisfac<strong>to</strong>rySGSS Construction 27502 Const. of Multi-Purpose Building 1st/Final IVA 0.287 C 0.401 - 0.500 - - - 90.10Sheen-SheenConstructionSheen-SheenConstructionSheen-SheenConstructionSheen-SheenConstruction29015 Concreting of Soro-Soro Road 1st X 0.917 O 0.322 0.283 0.100 0.030 0.055 0.100 89.00 -29015 Concreting of Soro-Soro Road Final X 0.917 C 0.341 0.300 0.300 - - - 94.102901529015Const. of Agoho Multi-PurposeBuildingConst./Conc. of Sitio Vulcan Brgy.Naasag Road90.10%Outstanding91.04%Outstanding1st X 1.395 O 0.365 0.300 0.100 0.030 0.038 0.100 93.30 -1st X 0.921 O 0.348 0.200 0.100 0.000 0.032 0.100 78.00 -Sheen-SheenConstruction29015Const./Conc. of Sitio Vulcan Brgy.Naasag RoadFinal X 0.921 C 0.343 0.200 0.300 - - - 84.3080.52%V.Satisfac<strong>to</strong>ryShinsung Eng'g. &Construction Corp. Co.Ltd.Shinsung Eng'g. &Construction Corp. Co.Ltd.Shinsung Eng'g. &Construction Corp. Co.Ltd.SL2-SN-000402SL2-SN-000402SL2-SN-000402Contract Package 3, MonkayoTagum Section Compostella ValleyContract Package 3, Monkayo-Tagum Section Compostella ValleyContract Package 3, Monkayo-Tagum Section Compostella Valley8th PJHL 1,508.838 O 0.356 0.300 0.100 0.030 0.050 0.100 93.60 -4th PJHL 1,480.326 O 0.394 0.300 0.070 0.030 0.070 0.067 93.10 -5th PJHL 1,480.326 O 0.398 0.300 0.070 0.030 0.061 0.100 95.90 -Silk & Steel Construction 25<strong>31</strong>4Const. of 1-Unit, 2-Cl RM SchoolBuilding @ Brgy. Pinggan1st/Final VIII 0.856 C 0.272 0.279 0.300 - - - 85.1085.10%V.Satisfac<strong>to</strong>rySilliman AvenueConstruction & Supply22759 Completion of MPB 1st VII 0.870 O 0.391 0.153 0.100 0.015 0.018 0.100 77.70 -Silliman AvenueConstruction & Supply22759Const. of Provincial Road-Purok 2Sulop Cemetery1st XI 0.469 C 0.345 0.250 0.070 0.023 0.023 0.067 77.80 -Silliman AvenueConstruction & Supply22759Const. of Provincial Road-Purok 2Sulop CemeteryFinal XI 0.469 C 0.324 0.000 0.500 0.000 0.000 0.000 82.4079.64%Satisfac<strong>to</strong>rySilliman AvenueConstruction & Supply22759Const./Completion of San JosePublic Market (Phase II)1st/Final XIII 2.595 C 0.383 - 0.500 - - - 88.3088.30%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 159


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONSimplified Builders 20747Const. of 2 CL School Building @Solana North C/S1st/Final II 0.951 C 0.329 0.190 0.300 - - - 81.9081.90%V.Satisfac<strong>to</strong>rySixteen Enterprises 18187Sixteen Enterprises 18187Sixteen Enterprises -Calapan BranchConc. of Calapan South(Himpaparay-San An<strong>to</strong>nio Section),MansalayConst. of Bucayao River Control,Calapan CityFinal IV-B 4.020 C 0.396 0.000 0.500 0.000 0.000 0.000 89.60Final IV-B 4.749 C 0.442 0.000 0.500 0.000 0.000 0.000 94.2018187 Conc. of Pinamalayan Airport Road 1st/Final IV-B 9.464 O 0.308 0.256 0.100 0.023 0.043 0.100 83.00 -89.60%V.Satisfac<strong>to</strong>ry94.20%OutstandingSixteen Enterprises -Calapan Branch18187 Conc. of Pinamalayan Airport Road Final IV-B 9.464 C 0.290 0.292 0.300 - - - 88.2085.08%V.Satisfac<strong>to</strong>rySixteen Enterprises -Calapan Branch18187Const. of Bucayao-MagasawangTubig River Flood Control MitigationProjectsFinal IV-B 4.038 C 0.417 0.000 0.500 0.000 0.000 0.000 91.7089.60%V.Satisfac<strong>to</strong>rySixteen Enterprises -Calapan Branch18187 Const. of San Rafael Road Roxas 1st/ Final IV-B 1.897 C 0.4<strong>31</strong> 0.000 0.500 0.000 0.000 0.000 93.1093.10%OustandingSKI Const. Group, Inc.(Formerly: SummaKumagai, Inc.)3381NAIA Expressway and its RelatedRoads Project, Phase I, Package I,Sales Interchange Components5th URPO 179.970 O 0.392 0.300 0.000 0.030 0.037 0.033 79.20 -SNR Builder 14539 Const. of MPB @ Brgy. Ramos West Final II 0.956 C 0.493 0.000 0.000 0.000 0.000 0.000 49.30So Construction 17714Const. of Multi-Purpose Bldg., Brgy.Wenceslao1st/Final III 0.185 C 0.373 0.300 0.300 - - - 97.30So Construction 17714 Rehab. of MPB at Baler C/S 1st III 0.927 O 0.282 0.300 0.070 0.030 0.022 0.100 80.40 -74.33%Satisfac<strong>to</strong>ry97.30%OutstandingSo Construction 17714Rehab./Conc. of Road leading <strong>to</strong>Municipal HallFinal III 4.634 C 0.4<strong>31</strong> - 0.500 - - - 93.1085.96%V.Satisfac<strong>to</strong>rySocor ConstructionCorporation8020Impvt./Rehab. of Iligan-Cagayan deOro-Butuan Road (Initao-LugaitSection)1st/Final X 14.305 C 0.360 0.300 0.300 - - - 96.0096.00%OutstandingSocor ConstructionCorporation8020Rehab./Impvt. of Asphalt Pavementalong Sulat-Borongan Road Section1st/Final VIII 9.461 C 0.355 0.300 0.300 - - - 95.5095.50%OutstandingSocor ConstructionCorporation8020Repair/Rehab. of P. del Rosario St.(Sta. 2+007-Sta. 2+505)1st/Final VII 6.269 C 0.327 0.274 0.300 - - - 90.1090.10%OutstandingSocorro VillamorEnterprises1529Conc. of E. Rodriguez Ave. & Impvt.of Drainage1st/Final IVA 4.166 C 0.289 0.300 0.300 - - - 88.9088.90%V.Satisfac<strong>to</strong>rySocorro VillamorEnterprises1529Improvement of San Vicente Port,IvanaFinal II 0.942 C 0.433 0.000 0.500 0.000 0.000 0.000 93.3093.30%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 160


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONSolfio P. Jacin<strong>to</strong>Construction17799Solid Merchandising <strong>31</strong>609Concreting of Road in BrgyValdefuenteConst. of 3 Cl Sch. Bldg. @ ColongColong NHS1st III 3.260 O 0.356 0.300 0.100 0.030 0.022 0.100 90.80 -1st VI 1.085 O 0.333 0.272 0.100 0.030 0.029 0.100 86.40 -Solid North Constructionand DevelopmentCorporation8204Rehab. of Various Farm-<strong>to</strong>-MarketRoads1st/Final I 0.473 C 0.364 - 0.500 - - - 86.4086.40%V.Satisfac<strong>to</strong>rySolid Rock Construction 8958Concreting of Brgy. Road St.Anthony1st IV-A 1.910 C 0.456 - 0.500 - - - 95.6095.60%OutstandingSolid Rock Construction 8958Const. of Congressional AvenueExtension, Phase VFinal NCR 8.114 C 0.338 0.200 0.300 - - - 83.8091.18%OutstandingSolid Rock Construction 8958 Rehab. of MPB @ Brgy. Sta. Monica 1st NCR 1.439 O 0.377 0.300 0.100 0.030 0.032 0.100 93.90 -Solid Rock Construction 8958 Rehab. of MPB @ Brgy. Sta. Monica Final NCR 1.439 C 0.342 0.300 0.300 - - - 94.20Solid SquareConstructionSolid SquareConstruction2856628566Const. of Multi-Purpose Building @DugayongRepainting of Ipil Bridge alongDaang MaharlikaFinal II 0.476 C 0.397 0.300 0.000 - - - 69.701st/Final II 0.268 C 0.<strong>31</strong>1 0.300 0.300 - - - 91.1093.99%Outstanding47.90%Poor91.10%OutstandingSouth Builders andConstruction Supplies20238 Const. of FTM Road at Brgy. Laguan 1st IV-A 0.653 C 0.472 - 0.500 - - - 97.2097.20%OutstandingSouth Pacific BuildersCenter, Inc.24594Iloilo Flood Control Proj., Ph II,Package III (Road Network) Sooc,MandurriaoFinal VI 29.561 C 0.466 0.000 0.500 0.000 0.000 0.000 96.6093.00%OutstandingSouthern DawnDevelopment Company12294 Concreting of Barangay Road 1st/Final IVA 0.471 C 0.375 - 0.500 - - - 87.5087.50%V.Satisfac<strong>to</strong>rySouthern DawnDevelopment Company12294Const. of Multi-Purpose Building(Covered Court)1st/ Final IV-A 1.420 C 0.454 0.000 0.500 0.000 0.000 0.000 95.4095.40%OutstandingSoy Eng Construction 15533Soy Eng Construction 15533Soy Eng Construction 15533Completion/Repair ofWidening/Slope Protection alongRizal Shrine-Rizal Town CoastalLoop RoadConc. Paving of Rizal Shrine-RizalTown Coastal Loop Road, Banbanan-Guimputian Sect.Conc. Paving of Rizal Shrine-RizalTown Coastal Loop Road, Banbanan-Guimputian Sect.Final IX 2.788 C 0.359 0.300 0.300 - - - 95.9094.16%Outstanding1stFinal IX 1.782 O 0.283 0.236 0.100 0.020 0.042 0.100 78.10 -Final IX 1.782 C 0.<strong>31</strong>1 0.256 0.300 - - - 86.7081.54%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 161


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONSoy Eng Construction 15533Concrete Paving of Canlucani-Tag-Ulo Road, Canlucani Section1st/ Final IX 1.681 C 0.435 0.000 0.500 0.000 0.000 0.000 93.5093.5%OustandingSoy Eng Construction 15533Concreting of Rizal Shrine-RizalTown Coastal Loop Road (Talisay-Taguilon Section)Final IX 2.788 C 0.377 0.230 0.300 - - - 90.7090.58%OutstandingSoy Eng Construction 15533Const. of Multi-Purpose BuildingBrgy. Liyang E/SFinal IX 0.929 C 0.490 0.000 0.500 0.000 0.000 0.000 99.0090.60%OustandingSoy Eng Construction 15533Const./Completion of MultipurposeBldg. (Subanen Tribe), Jose RizalMemorial State College1stFinal IX 0.462 C 0.334 0.221 0.300 - - - 85.5085.50%V.Satisfac<strong>to</strong>rySoy Eng Construction 15533Spam EngineeringEnterprise14205Spectrum Builders 8124Const./Completion of MultipurposeBldg., Jose Rizal Memorial StateCollegeImpvt of NRJ Agusan-Misamis-R.Calo-Agusan Pequeno, Butuan City(Phase II)Impvt./Rehab. of Cuna-SitioMagkailaw Road Sitio MakailawCuna1stFinal IX 0.703 C 0.345 0.194 0.300 - - - 83.902nd XIII 6.260 C 0.444 - 0.500 - - - 94.4083.90%V.Satisfac<strong>to</strong>ry87.32%V.Satisfac<strong>to</strong>ryFinal X 2.245 C 0.323 0.242 0.100 0.030 0.048 0.100 84.30 -Speed MoversConstruction19206Completion of Del Rosario BridgeApproach (Tiaong Side)1st/ Final IV-A 2.046 C 0.392 0.000 0.500 0.000 0.000 0.000 89.2089.20%V.Satisfac<strong>to</strong>rySPNR Builders <strong>31</strong>329Completion of Concreting of Road &Drainage Canal @ Guinhawa1st III 3.796 O 0.235 0.300 0.100 0.022 0.044 0.067 76.80 -SPNR Builders <strong>31</strong>329Rehab. of Roman Expressway(Bilolo Section)1st/Final III 2.880 C 0.347 0.300 0.300 - - - 94.7094.70%OutstandingSpring Star Constructionand Supply20240Const. of S.B. Sen. Rene CayetanoScience & Technology Memorial H/S 1st/Final NCR 2.865 C 0.372 0.300 0.300 - - - 97.20 97.20%OutstandingSpringfield Construction 14097Const. of Multi-Purpose Bldg.,(Public Market)Final III 0.473 C 0.368 0.263 0.300 - - - 93.1088.06%V.Satisfac<strong>to</strong>rySpringfield Construction 14097 Const. of S<strong>to</strong>. Niño Public Market 1st/Final IV-B 1.800 C 0.344 0.300 0.300 - - - 94.40Square Cube TradingDivision and ConsructionDivisionSquare Cube TradingDivision and ConsructionDivision2512025120Completion of MPB @ del CarmenEsteConceting/Improvement of Loay andCarmenFinal VII 0.093 C 0.276 0.100 0.300 - - - 67.60Final VII 14.155 C 0.384 0.239 0.000 - - - 62.3094.40%Outstanding36.94%Poor71.66%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 162


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONSquare Cube TradingDivision and ConstructionDivision25120Const. of Farm-<strong>to</strong>-Market Road (Sta.0+000-Sta. 3+820) Brgy. Capt.Claudio2nd VII 9.439 O 0.<strong>31</strong>1 0.024 0.100 0.010 0.013 0.100 55.80 -St. Bernard Construction 28368Concreting of Brgy. Road, Brgy.Rebbron <strong>to</strong> Brgy. Lupi1st/ Final V 0.926 C 0.384 0.000 0.500 0.000 0.000 0.000 88.4088.40%V.Satisfac<strong>to</strong>rySt. BernardineConstruction18474Conc. of Barangay Road Brgy. SanJose-Alanao, Lupi1st/ Final V 0.458 C 0.194 0.000 0.500 0.000 0.000 0.000 69.4069.40%FairSt. BernardineConstruction18474Concreting of Sta. Lucia-MagaraoRoad, Sta. Lucia1st/ Final V 0.461 C 0.373 0.000 0.500 0.000 0.000 0.000 87.3087.30%V.Satisfac<strong>to</strong>rySt. BernardineConstructionSta. Cruz Construction 930118474 Const. of MPB at Brgy. Colacling 1st/Final V 0.468 C 0.385 0.100 0.300 - - - 78.50Concreting of Barangay Road, Brgy.Grijalvo, San Fernando1st/ Final V 0.459 C 0.246 0.000 0.500 0.000 0.000 0.000 74.6078.50%Satisfac<strong>to</strong>ry74.60%Satisfac<strong>to</strong>rySta. Isabel ConstructionCorporation26774Const. of Drainage System @ Brgy.Poblacion1st/Final IV-B 1.637 C 0.391 0.222 0.300 - - - 91.3091.30%OutstandingSta. Isabel ConstructionCorporation26774 Const. of Multi-Purpose Building 1st IV-B 0.472 O 0.365 0.211 0.100 0.010 0.013 0.100 79.90 -Stars & StripesConstructionStars & StripesConstruction2348423484Stay Construction 23323Stay Construction 23323Steel City Fabrica<strong>to</strong>rsCorporation27035Const. of 1 Unit - 2 CL School Bldg.@ Maras National High School,MarasRepair of 3 CL School BuildingMiputak East Central SchoolConst. of Buiguias NHS, Bo<strong>to</strong>anExtensionConst. of Buiguias NHS, Bo<strong>to</strong>anExtensionConst. of 1-CL Steeltek SchoolBuilding @ Laguindingan CESFinal IX 0.627 C 0.397 0.000 0.500 0.000 0.000 0.000 89.701st/ Final IX 0.730 C 0.418 0.000 0.500 0.000 0.000 0.000 91.8089.70%V.Satisfac<strong>to</strong>ry91.80%Outstanding2nd CAR 2.740 O 0.396 0.300 0.070 0.030 0.047 0.050 89.30 -Final CAR 2.633 C 0.343 0.032 0.300 - - - 67.501st / Final X 8.445 C 0.466 0.000 0.500 0.000 0.000 0.000 96.6071.25%Satisfac<strong>to</strong>ry96.6%OutstandingSteel City Fabrica<strong>to</strong>rsCorporation27035Const. of Various S/B (1-Cl S/B)Brgy. Garcia, TagoloanFinal X 0.<strong>31</strong>2 C 0.<strong>31</strong>9 0.000 0.500 0.000 0.000 0.000 81.9088.76%V.Satisfac<strong>to</strong>rySteven Construction andSupply21987Const. of 2 S<strong>to</strong>rey MPB (Phase I) @Brgy. GRSFinal V 0.940 C 0.396 0.100 0.300 - - - 79.6077.78%Satisfac<strong>to</strong>rySteven Construction andSupply21987Repair/Impv't. of DPWH Bldg., AlbayEngineering District1st/Final V 0.919 C 0.360 0.300 0.300 - - - 96.0096.00%OutstandingS<strong>to</strong>. Cris<strong>to</strong> Construction 26096Const. of Two (2) Cl Sch. Bldg. atSan Vicente-San Francisco NHS1st/Final III 0.822 C 0.287 0.300 0.300 - - - 88.7088.70%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 163


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONS<strong>to</strong>. Cris<strong>to</strong> Construction 26096Const./Repair/Completion of S<strong>to</strong>.Domingo Brgy. RoadFinal III 0.475 C 0.391 - 0.500 - - - 89.1088.44%V.Satisfac<strong>to</strong>ryS<strong>to</strong>. Niño Construction 4867S<strong>to</strong>. Niño Construction 4867Conc. of Provincial Road Jct. LowerDimaya-Pob.Conc. of Provincial Road Jct. LowerDimaya-Pob. Dinas Zamboanga DelSur2nd IX 10.264 O 0.368 0.238 0.100 0.030 0.047 0.100 88.30 -Final IX 10.264 C 0.202 0.188 0.300 - - - 69.0069.96%FairS<strong>to</strong>. Niño Construction 4867 Const. of MPB @ Brgy. 24 1st/Final X 0.943 C 0.386 0.200 0.300 - - - 88.6088.60%V.Satisfac<strong>to</strong>ryS<strong>to</strong>. Niño Construction 4867 Const. of Multi-Purpose Building 1st/Final IX 0.484 C 0.365 0.249 0.300 - - - 91.40S<strong>to</strong>. Niño Construction 4867S<strong>to</strong>. Niño Construction 4867S<strong>to</strong>. Niño Construction 4867Const. of River Control at MaclobBridgeImpvt./Conc. Paving along Jct.Kagawasan-Tabina Rd.Impvt./Conc. Paving along Jct.Kagawasan-Tabina Rd.1st/Final IX 1.667 C 0.223 0.200 0.300 - - - 72.3091.40%Outstanding72.30%Satisfac<strong>to</strong>ry1st IX 4.759 O 0.293 0.187 0.100 0.008 0.042 0.100 73.00 -Final IX 4.759 C 0.214 0.285 0.300 - - - 79.90S<strong>to</strong>. Niño Construction 4867 Rehab. of Bawang-Silupa Roads 1st/Final IX 0.954 C 0.186 0.300 0.300 - - - 78.6077.86%Satisfac<strong>to</strong>ry78.60%Satisfac<strong>to</strong>ryS<strong>to</strong>. Niño Construction 4867Repair/Rehab. of Brgy. Kauswagan,Diplahan, Zamboanga Sibugay1st/Final IX 0.941 C 0.460 - 0.500 - - - 96.0096.00%OutstandingS<strong>to</strong>. Niño Construction 4867Repair/Rehab. of Farm-<strong>to</strong>-MarketRoad, Diplo-Sanlagmanok RoadFinal IX 4.520 C 0.477 - 0.500 - - - 97.7095.60%OutstandingS<strong>to</strong>con ConstructionService26111Concreting of Cugman By PassRoadFinal X 1.412 C 0.359 0.273 0.300 - - - 93.2081.50%V.Satisfac<strong>to</strong>ryS<strong>to</strong>neline Construction 1<strong>31</strong>32S<strong>to</strong>neline Construction 1<strong>31</strong>32S<strong>to</strong>neline Construction 1<strong>31</strong>32S<strong>to</strong>neline Construction 1<strong>31</strong>32S<strong>to</strong>neline Construction 1<strong>31</strong>32Conc. of Western CircumferentialRoads (Purok Balas-Purok SaginganSect.)Conc. of Western CircumferentialRoads (Purok Balas-Purok SaginganSect.)Concrete Reblocking of Cotaba<strong>to</strong>-Alla-Marbel National RoadConst. of Road at Esteros Rosarioheights 9Const. of Road at Esteros Rosarioheights 91st XII 1.901 O 0.270 0.300 0.000 0.030 0.041 0.067 70.80 -Final XII 1.901 C 0.343 0.200 0.300 - - - 84.3076.20%Satisfac<strong>to</strong>ry1st XII 4.761 O 0.372 0.200 0.100 0.030 0.028 0.100 83.00 -1st XII 1.380 O 0.267 0.300 0.100 0.030 0.0<strong>31</strong> 0.100 82.80 -Final XII 1.380 C 0.200 0.200 0.300 - - - 70.0077.68%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 164


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONS<strong>to</strong>neline Construction(Formerly: AbubakarEngineering Exponent)1<strong>31</strong>32Concreting of SKC Lugay-LugayRoad1st XII 3.717 O 0.358 0.300 0.100 0.030 0.053 0.100 94.10 -Struktura TeknikaServices Company16646Const. of 2 S<strong>to</strong>rey RGR Type Sch.Bldg. Phase II1st IVA 5.752 O 0.363 0.257 0.100 0.030 0.022 0.100 87.20 -Struktura TeknikaServices Company16646Const. of 2 S<strong>to</strong>rey RGR Type Sch.Bldg. Phase IIFinal IVA 5.752 C 0.398 0.200 0.300 - - - 89.8087.98%V.Satisfac<strong>to</strong>ryStruktura TeknikaServices Company16646 Const. of MPB @ M. Naval St. Final NCR 5.682 C 0.399 0.300 0.300 - - - 99.9087.58%V.Satisfac<strong>to</strong>rySTX Enterprises 21547Const. / Improvement of MWCR,Balansay Section2nd IV-B 1.412 C 0.335 - 0.500 - - - 83.5080.92%V.Satisfac<strong>to</strong>rySubcon Corporation 25079Concreting of E-25th St. and 26th St.(Elicano St.,-Dead End) EastFinal III 1.302 C 0.377 0.200 0.300 - - - 87.7082.90%V.Satisfac<strong>to</strong>rySui Generis Construction 28174Sui Generis Construction 28174Const. of Lasti-Tadloc RiversideRoad (Phase I)Const. of Molino Blvd., Niog-Mambog-Molino Section, Sta. 0+510 -Sta. 7+770.29 (Intermittent Section)1st IVB 3.819 O 0.<strong>31</strong>8 0.300 0.100 0.023 0.028 0.100 86.90 -2nd IV-A 43.393 O 0.324 0.243 0.050 0.030 0.059 0.100 80.60 -Summa Kumagai,Incorporated3381NAIA Expressway & Its related Proj.,Phase I, Package I, SalesInterchange Component1st URPO 164.128 O 0.348 0.300 0.100 0.030 0.043 0.100 92.10 -Summa Kumagai,Incorporated3381NAIA Expressway and its RelatedRoads Project, Phase I, Package I,Sales Interchange Components3rd URPO 164.128 O 0.320 0.300 0.100 0.030 0.065 0.100 91.50 -Summercap Const. andAllied ServicesSummercap Const. andAllied ServicesSummercap Const. andAllied Services30787 Completion of Lengey MPB 1st CAR 2.279 O 0.353 0.226 0.100 0.008 0.019 0.100 80.60 -30787 Completion of Lengey MPB Final CAR 2.279 C 0.334 0.219 0.000 - - - 55.3030787Suns<strong>to</strong>ne Construction 11122Const. of Poblacion-Bulo-MagabtaFMRConc. of Road @ Brgy. CentralKatingawan1st/Final CAR 1.3<strong>31</strong> C 0.370 0.300 0.300 - - - 97.00Final XII 0.826 C 0.351 0.300 0.300 - - - 95.10Suns<strong>to</strong>ne Construction 11122 Const. of FTMR @ Barangiran 1st XII 0.428 C 0.442 - 0.500 - - - 94.2073.01%Satisfac<strong>to</strong>ry97.00%Outstanding75.06%Satisfac<strong>to</strong>ry94.20%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 165


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONSunwest Construction &Development Corporation15906 Lamoa Port Expansion Project 1st PPA 98.213 O 0.383 0.300 0.030 0.030 0.060 0.033 83.60 -Sunwest Construction &Development Corporation15906 Proposed Davao Port Expansion 1st PPA 396.089 O 0.400 0.300 0.100 0.024 0.065 0.100 98.90 -Sunwest Constructionand DevelopmentCorporation15906Const. of Bahi Seawall, RockCauseway & Access RoadFinal V 14.193 C 0.373 0.091 0.300 - - - 76.4088.28%V.Satisfac<strong>to</strong>rySunwest Constructionand DevelopmentCorporation15906Const. of Bahi Seawall, RockCauseway & Access RoadFinal V 47.945 C 0.450 0.500 - - - 95.0095.12%OutstandingSunwest Constructionand DevelopmentCorporation15906Repair/Impvt./Asphalt Overlay ofShoulders of Calayucay-Sula-Mosboron Road1st/Final V 11.415 C 0.389 0.200 0.300 - - - 88.9088.90%V.Satisfac<strong>to</strong>rySunwest Constructionand DevelopmentCorporation15906Widening / Improvement of NationalRoad, Bagamanoc-Pandan RoadFinal V 14.195 C 0.387 0.293 0.300 - - - 98.0096.62%OustandingSuperpower Construction 17149Const. of Pahinga Norte-Malabanban Sur Spillway1st/ Final IV-A 1.893 C 0.335 0.000 0.500 0.000 0.000 0.000 83.5083.50%V.Satisfac<strong>to</strong>rySY Construction 12333Rehabilitation/Res<strong>to</strong>ration of Farm<strong>to</strong>-MarketRoadFinal IV-A 1.924 C 0.389 0.300 0.000 - - - 68.9081.80%V.Satisfac<strong>to</strong>rySydglen Builders andEnterprises28848Const. of 1 Cl Sch. Bldg. @ AlangalangI C/S1st/Final VIII 0.507 C 0.359 0.300 0.300 - - - 95.9095.90%OutstandingSysmic Enterprises &Construction29697 Const. of Hernani Seawall, Hernani 1st / Final VIII 0.914 C 0.<strong>31</strong>2 0.000 0.500 0.000 0.000 0.000 81.2081.20%V.Satisfac<strong>to</strong>rySystem One Builders 26480Proposed Partial Const. of ZobelRoxas Extension Alabastro <strong>to</strong> OnyxSt.Final NCR 4.719 C 0.414 0.000 0.500 0.000 0.000 0.000 91.4081.14%V.Satisfac<strong>to</strong>ryT R Construction 11697Concreting of EM's Barrio Brgy.Road1st/ Final V 0.226 C 0.452 0.000 0.500 0.000 0.000 0.000 95.2095.20%OustandingT. Solomon Construction 10046 Const. of Road @ Brgy. Banjo East 1st/Final IV-A 0.963 C 0.298 0.300 0.300 - - - 89.8089.80%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 166


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONT.A.D. Construction 14098Const. of Brgy. Road at Brgy. SanRoque1st/Final IVA 0.381 C 0.370 0.300 0.300 - - - 97.0097.00%OutstandingT.A.D. Construction 14098Const. of MPB @ Quezon NationalAgricultural1st/Final IVA 1.929 C 0.327 0.300 0.300 - - - 92.7092.70%OutstandingT.A.D. Construction 14098Const. of Multi-Purpose Bldg. (BSP)@ Tayabas East (E/S)1st/Final IVA 4.810 C 0.454 - 0.500 - - - 95.4095.40%OutstandingT.A.D. Construction 14098Repair/Maintenance of Lined Canalalong Lucena Bdry.-Tayabas-LucbanRoad1st/Final IVA 0.289 C 0.232 0.300 0.300 - - - 83.2083.20%V.Satisfac<strong>to</strong>ryT.J. Velasco Constructionand Supply10560 Const. of 14 Core Housing Units FinalNHARegion I3.023 C 0.394 0.300 0.300 - - - 99.40 85.40%T.J. Velasco Constructionand Supply10560Const. of 14 Core Housing Units,San Carlos S/S Project1st NHA 3.133 D 0.398 0.300 0.000 0.020 0.009 0.067 79.40T.N.J. BuhongConstruction19687Impvt. along Ban-Hung-BenguetBdry. Road Alimit-Hiwang Sect.1st/ Final CAR 2.455 C 0.366 - 0.500 - - - 86.6086.60%V.Satisfac<strong>to</strong>ryT.N.J. BuhongConstruction19687Impvt. Along Jct. Potia-Mt. ProvinceBdry. Road, Pob. SectionFinal CAR 1.580 C 0.341 0.300 0.300 - - - 94.1081.44%V.Satisfac<strong>to</strong>ryT.N.J. BuhongConstruction19687Impvt. along Nueva Viscaya-Ifugao-Mt. Province Bdry. Road, Km.297+000-Km. 300+0001st / Final CAR 0.488 C 0.390 - 0.500 - - - 89.0089.00%V.Satisfac<strong>to</strong>ryTabs Construction &Construction Supplies10495Replacement of DeterioratedMacadam Road <strong>to</strong> PCCP alongDavao-Cotaba<strong>to</strong> Road (NORCIT-KPES Sect.)Final XII 5.217 C 0.472 - 0.500 - - - 97.2090.18%OutstandingTacolod Enterprises 10721Const. of One (1) Unit, 1-CL SchoolBdlg. @ Andulawan NHSFinal VI 0.357 C 0.462 - 0.500 - - - 96.2088.92%V.Satisfac<strong>to</strong>ryTaisei PhilippineConstructionIncorporated / Marubeni(JV)SL2-SN-000432Const. of Cebu South Coastal RoadProject-Segment 3B-1, offshorreRamps Section3rd MCDP 695.488 O 0.352 0.300 0.100 0.030 0.065 0.100 94.70 -Tango Romeo GeneralConstruction18926Conc./Widening of La Chesa @Brgy. Upper Tadiangan1st/Final CAR 2.782 C 0.298 0.300 0.300 - - - 89.8089.80%V.Satisfac<strong>to</strong>ryTango Romeo GeneralConstruction18926Concreting/Widening of Road,Trancoville Brgy.1st/ Final CAR 1.142 C 0.390 - 0.500 - - - 89.0089.00%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 167


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONTantuco Const. andTrading Corp.7255Rehab./Impvt. of Road at PurokPinag-isa, Brgy. CottaFinal IV-A 0.329 C 0.375 - 0.500 - - - 87.5087.50%V.Satisfac<strong>to</strong>ryTantuco Const. andTrading Corp. (Formerly:Tantuco Lumber & Const.Supply)7255Const. of Elevated Water Tank withPipelines1st/Final IV-A 0.944 C 0.352 0.300 0.300 - - - 95.2095.20%OutstandingTCAT Construction 20822 Const. of Municipal Hall Final VIII 0.961 C 0.479 - 0.500 - - - 97.9097.90%OutstandingTDR Construction &Supply8560 Conc. of Brgy. Road @ Brgy. Kawit 1st/Final IVA 0.470 C 0.275 0.300 0.300 - - - 87.5087.50%V.Satisfac<strong>to</strong>ryTeddie ConstructionDevelopment, Inc.6<strong>31</strong>3Const. of Bangayan Bridge andApproachesFinal IX 6.054 C 0.376 0.201 0.300 - - - 87.7084.46%V.Satisfac<strong>to</strong>ryTeddie ConstructionDevelopment, Inc.Teddie ConstructionDevelopment, Inc.Tessa Construction &TradingTessa Construction &TradingTessa Construction &Trading6<strong>31</strong>36<strong>31</strong>326437Impvt./Road Widening of SangaliNat'l RoadImpvt./Road Widening of SangaliNat'l RoadConcrete Paving of Brgy. MuñozWest Road1st IX 9.134 O 0.328 0.200 0.100 0.020 0.023 0.100 77.10 -2nd IX 9.134 O 0.273 0.217 0.100 0.022 0.035 0.100 74.70 -1st/Final II 0.944 C 0.259 - 0.500 - - - 75.9026437 Const. of Multi-Purpose Building 2nd II 1.889 O 0.365 0.300 0.070 0.015 0.027 0.067 84.40 -26437 Rehab./Const. of Road 1st II 1.889 O 0.330 0.294 0.100 0.030 0.055 0.100 90.90 -75.90%Satisfac<strong>to</strong>ryTessa Construction &Trading26437Repair/Rehab. of Multi-PurposeBuilding with CR, Brgy. Marulas1st / Final NCR 0.444 C 0.333 - 0.500 - - - 83.3083.30%V.Satisfac<strong>to</strong>ryThe Steadfast Builders 8176Const. of Drainage System at S<strong>to</strong>.Simona, Brgy. San Isidro1st/ Final IV-A 0.955 C 0.451 - 0.500 - - - 95.1095.10%OutstandingThe Steadfast Builders 8176Const. of Multi-Purpose Building(Dialysis)1st / Final NCR 2.812 C 0.459 - 0.500 - - - 95.9095.90%OutstandingThe Steadfast Builders 8176Const. of Two (2) S<strong>to</strong>rey, Six (6)ClassroomFinal IV-A 4.662 C 0.382 0.300 0.300 - - - 98.1060.75%FairThe Steadfast Builders 8176Maintenance by Contract Package I,CY-2003 R-10, Tayuman, Zaragosa,Moriones and Juan LunaFinal NCR 5,279 C 0.408 - 0.500 - - - 90.8083.30%V.Satisfac<strong>to</strong>ryThe Steadfast Builders 8176Rehab./Const. of MPB @ Zone 25,26, 29, 32, & 33Final NCR 1.827 C 0.384 0.300 0.300 - - - 98.4094.20%OutstandingThe Steadfast Builders 8176Upgrading/Concreting with DrainageImpv't. of Brgy. 118, Zone 91st/Final NCR 2.052 C 0.380 0.200 0.300 - - - 88.0088.00%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 168


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONThel Construction &Supplies17671 Const. of 1-Cl School Building 1st/Final XII 0.375 C 0.325 - 0.500 - - - 82.5082.50%V.Satisfac<strong>to</strong>ryThel Construction &SuppliesThree W Builders,IncorporatedThree W Builders,Incorporated17671 Const. of MPB @ Brgy. Sta. Cruz 1st/Final XII 0.282 C 0.320 0.300 0.300 - - - 92.001072210722Completion (conc.) of Ternate-Nasugbu Road, Balaytigue-Calayo-Looc SectionCompletion (conc.) of Ternate-Nasugbu Road, Balaytigue-Calayo-Looc Section92.00%Outstanding2nd IV-A 23.988 O 0.367 0.295 0.100 0.030 0.033 0.100 92.50 -Final IV-A 23.988 C 0.342 0.300 0.300 - - - 94.2091.17%OutstandingThree W Builders,Incorporated10722Const. of 2- S<strong>to</strong>rey, 4-CL SchoolBuildingFinal IV-A 2.784 C 0.393 - 0.500 - - - 89.3086.78%V.Satisfac<strong>to</strong>ryThrivelight Enterprises &Construction26842Const. of MPS @ Brgy.Ambangonan, Rosaario1st/ Final I 0.930 C 0.3<strong>31</strong> - 0.500 - - - 83.1083.10%V.Satisfac<strong>to</strong>ryThunder Construction 17247Rehabilitation of FMR @ VillaMercedesFinal CAR 0.468 C 0.284 0.200 0.300 - - - 78.4074.08%Satisfac<strong>to</strong>ryThunderheadsConstruction Corporation22420 Const. of Paclasan Seawall Final IV-B 0.875 C 0.396 - 0.500 - - - 89.6089.60%V.Satisfac<strong>to</strong>ryTibaraw Construction 22710 Const. of Multi-Purpose Building 1st VIII 0.878 O 0.308 0.247 0.000 0.015 0.027 0.067 66.40 -Tibaraw Construction 22710 Const. of Multi-Purpose Building Final VIII 0.878 C 0.214 0.200 0.000 - - - 41.40Tibaraw Construction 22710 Const. of Multi-Purpose Building Final VIII 1.702 C 0.370 0.200 0.300 - - - 87.0058.90%Poor85.71%V.Satisfac<strong>to</strong>ryTibaraw Construction 22710Const./Rehab. of FMR, Bagacay-Concord RoadFinal VIII 1.789 C 0.000 - 0.500 - - - 50.0040.00%PoorTitanium Builders Inc. 24921Concreting of Barangay Road, Brgy.PoblacionFinal X 0.964 C 0.337 0.300 0.300 - - - 93.7088.18%V.Satisfac<strong>to</strong>ryTitanium Builders, Inc. 24921Titanium Builders, Inc. 24921TKS Builders andSuppliesTKS Builders andSupplies23415Conc. of Purok Mutya-Brgy.Katipunan Road, VillanuevaConst. of Brgy Maputi FloodControl, NaawanConcreting of Roads at SitioBatulosa Bangkas Heights1st/ Final X 0.955 C 0.422 - 0.500 - - - 92.201st / Final X 0.239 C 0.445 - 0.000 - - - 44.501st XI 1.407 C 0.456 - 0.500 - - - 95.6023415 Const. of MPB at Camanchiles 1st XI 1.575 O 0.351 0.282 0.100 0.030 0.035 0.100 89.80 -92.20%Outstanding44.50%Poor95.60%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 169


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONTM Abad Construction 9302Completion/Conc. of Road @Panorama Hills, Etn. Brgy. Cupang1st/Final IV-A 0.4<strong>31</strong> C 0.290 0.244 0.300 - - - 83.4083.40%V.Satisfac<strong>to</strong>ryTM Abad Construction 9302 Const. of MPB @ J.P. Rizal E/S Final NCR 2.894 C 0.383 0.300 0.300 - - - 98.30TM Abad Construction 9302 Riprapping of Putting Kahoy Creek 1st/Final IV-A 1.050 C 0.375 - 0.500 - - - 87.5089.20%V.Satisfac<strong>to</strong>ry87.50%V.Satisfac<strong>to</strong>ryToa ConstructionFC-01-054/SLI-SN-004426Const. of the Agno River ControlProject, Phase II, Package I2nd MFCDP-II 708.981 O 0.296 0.200 0.100 0.024 0.059 0.200 87.90 -Tokwing Construction 9650 Repair/Rehab. of Ayala Bridge 1st NCR 42.322 O 0.400 0.230 0.100 0.015 0.041 0.100 88.60 -Tokwing Construction/ZMConstruction (JV)JV-05-006Const. of Maculcul Bridge &Approaches along Iba-South Road(Phase III)1st III 93.730 O 0.377 0.300 0.100 0.030 0.037 0.100 94.40 -Tokwing Construction/ZMConstruction (JV)SL1-SN-004749Const. of Maculcul Bridge (Phase II) 1st III 47.664 O 0.356 0.300 0.100 0.030 0.040 0.100 92.60 -Toledo Const. Corp./Advanced FoundationConst. System Corp. (JV)Toledo Const. Corp./Advanced FoundationConst. System Corp. (JV)JV-02-063JV-02-063NAIA Expressway & its RelatedRoad Proj. Phase I, Package 3,Skyway RampsNAIA Expressway & its RelatedRoad Proj. Phase I, Package 3,Skyway Ramps3rd URPO 414.099 O 0.355 0.256 0.100 0.030 0.065 0.100 90.60 -5th URPO 457.260 O 0.336 0.240 0.000 0.023 0.055 0.067 72.10 -Toledo ConstructionCorporation6349Sct. Ranger Housing Project, PhaseII1st NHA 51.242 O 0.400 0.300 0.100 0.030 0.046 0.100 97.60 -Tonka Construction 4064Upgrading/Asphalting of ManilaNorth Road (Mabalacat Section)1st/ Final III 4.697 C 0.470 - 0.500 - - - 97.0097.00%OutstandingTonn Builders (Phils.)Const., Inc.5815Const. of Lepote Bridge &Approaches (Phase I & II)1st IVA 22.899 O 0.366 0.237 0.100 0.022 0.033 0.100 85.80 -Top Most Developmentand MarketingCorporation13361Concreting of Lambunao-Po<strong>to</strong>tanNational Road1st VI 2.879 O 0.346 0.300 0.100 0.030 0.048 0.100 92.40 -Top Most Developmentand MarketingCorporation13361Concreting of Lambunao-Po<strong>to</strong>tanNational RoadFinal VI 2.879 C 0.269 0.200 0.300 - - - 76.9086.20%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 170


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONTop Most Developmentand MarketingCorporation13361Concreting of Lambunao-Po<strong>to</strong>tanRoad (Lambunao Poblacion Portion)Final VI 2.595 C 0.4<strong>31</strong> - 0.000 - - - 43.1071.45%Satisfac<strong>to</strong>ryTop Most Developmentand MarketingCorporationTop Tech Trading &ConstructionTop Tech Trading &ConstructionTop Tech Trading &ConstructionTop Tech Trading &ConstructionToreja's ConstructionSupply CorporationToreja's ConstructionSupply Corporation13361 Const. of Na<strong>to</strong> Bridge Final VI 3.304 C 0.434 - 0.500 - - - 93.402552225522Asphalt Overlay/Rehab. of Palico-Balayan-Batangas RoadConc. of Barangay Road @ Brgy.Gulod1st/Final IVA 4.995 C 0.366 0.300 0.300 - - - 96.601st/Final IVA 0.470 C 0.343 0.300 0.300 - - - 94.3025522 Concreting of FMR, Brgy. Dita 1st/ Final IV-A 0.473 C 0.433 - 0.500 - - - 93.3025522Const. of Drainage along Palico-Balayan-Batangas Road, LemerySection1st/Final IVA 1.102 C 0.413 - 0.500 - - - 91.3015453 Conc. of Road @ Brgy. Simlog 1st/Final IVA 4.744 C 0.333 0.281 0.300 - - - 91.4015453 Const. of Open Canal 1st/Final IVA 0.475 C 0.400 - 0.500 - - - 90.0072.70%Satisfac<strong>to</strong>ry96.60%Outstanding94.30%Outstanding93.3%Oustanding91.30%Outstanding91.40%Oustanding90.00%V.Satisfac<strong>to</strong>ryToreja's ConstructionSupply Corporation15453 Impvt./Rehab. of Lipa-Rosario Road 1st/Final IVA 4.817 C 0.340 0.200 0.300 - - - 84.0084.00%V.Satisfac<strong>to</strong>ryToyo Construction Co.Ltd.SL1-SN-004893Rehab./Enhancement of OrmocFlood Mitigation Structures1st MFCDP-II 121.513 O 0.380 0.200 0.100 0.030 0.070 0.200 98.00 -Toyo Construction Co.,LTDSL1-SN-004890Const. of Super Diversion Canal(Sta.26+600 <strong>to</strong> Sta. 29+240)1stNIARegion III506.085 O 0.373 0.200 0.100 0.024 0.047 0.200 94.40 -Toyo-Tobishima (JV)FC-06-034Const. of Package III, UrgentBridges Const. Projects for RuralDevt. (Borbocolan Bridge)1st IVB 23.577 O 0.281 0.241 0.100 0.030 0.051 0.100 80.30 -Toyo-Tobishima (JV)FC-06-034Tracsom Builders Inc. 5935Traffic Supplies andConstruction Corp.19584Const. of Package III, UrgentBridges Const. Projects for RuralDevt. (Langgang Bridge)Const. of School Building @Highway Hills E/SImprovement of Midsayap-Dulawan-Marbel Road (Sta. Km. 1776-Sta. Km.1793+000)1st IVB 14.949 O 0.367 0.286 0.100 0.030 0.047 0.100 93.00 -1st NCR 9.542 O 0.400 0.204 0.100 0.030 0.035 0.100 86.9 -1st/ Final XII 0.946 C 0.375 0.000 0.500 0.000 0.000 0.000 87.5087.50%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 171


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONTrans-AuroraConstruction11388Impvt./Conc. of Nat'l Road SLMACRoad, Wenceslao Section1st III 7.177 O 0.342 0.265 0.100 0.024 0.030 0.100 86.10 -Trans-AuroraConstruction11388Impvt./Conc. of Nat'l Road SLMACRoad, Wenceslao Section2nd III 7.177 O 0.370 0.287 0.070 0.015 0.023 0.100 86.50 -Trinnadel Const. & Supply 15801Asphalting of Access Road,Poblacion1st/Final III 4.681 C 0.200 0.300 0.300 - - - 80.0080.00%Satisfac<strong>to</strong>ryTrinnadel Const. & Supply 15801 Const. of Multi-Purpose Building 1st III 2.794 O 0.229 0.000 0.100 0.018 0.029 0.100 47.60 -Triparco DevelopmentCorporation23327Const. of Sangay-San Isidro FMR,Kitcharo1st/ Final XIII 1.804 C 0.<strong>31</strong>0 0.000 0.500 0.000 0.000 0.000 81.0081.00%V. Satsifac<strong>to</strong>ryTriple 8 Construction &Supply10684Concreting/Upgrading ofBustamante/M.H. del Pilar St.Final NCR 4,030 C 0.429 - 0.500 - - - 92.9085.64%V.Satisfac<strong>to</strong>ryTriple 8 Construction &SupplyTriple 8 Construction &SupplyTriple 8 Construction &Supply10684 Repair/Impvt. of Manila North Road 1st III 14.798 O 0.339 0.246 0.100 0.015 0.018 0.050 76.80 -10684 Widening of Ortigas Ave. Phase II 1st NCR 9.544 O 0.394 0.295 0.100 0.030 0.032 0.067 91.80 -10684 Widening of Ortigas Ave. Phase II Final NCR 9.544 C 0.<strong>31</strong>4 0.300 0.300 - - - 91.4091.64%OutstandingTriple 8 Construction &Supply10684Widening/Concreting with DrainageImprovement along M.H. Del Pilar St.1st/Final NCR 3.778 C 0.389 - 0.500 - - - 88.9088.90%V.Satisfac<strong>to</strong>ryTriple P Construction <strong>31</strong>616Const. of District IV MPB (ReservistPhase II)1st/Final II 0.747 C 0.400 0.240 0.300 - - - 94.00Triple P Construction <strong>31</strong>616 Const. of Mabulso MPB 1st/Final II 0.469 C 0.341 0.300 0.300 - - - 94.1094.00%Outstanding94.10%OutstandingTri-sons Constructionand Supply16890Const. of Gymnasium Bldg. @ Brgy.PaitanFinal XII 0.963 C 0.371 0.300 0.000 - - - 67.1062.20%FairTriumph Builders andSteel Inc.2272Const. of 12-classroom, 3-s<strong>to</strong>reySchool Building, Package 11st NHA 16.402 O 0.336 0.300 0.100 0.006 0.010 0.030 78.20 -TRM Construction &Dev't. Corp.30713Package IV-Concreting & DrainageRehab. of Sorsogon St., Brgy.Nayong Kanluran & EastRiverside/Aragon St.,1st/Final NCR 1.914 C 0.426 - 0.500 - - - 92.60TRPL Construction 14236 Const. of Pagduque-Rosario Road Final VI 2.376 C 0.354 - 0.500 - - - 85.40TSD BuildersConstruction and Supply22129Conc./Repair/Rehab. of TangubBridge I, along Bacolod-SouthKabankalan RoadFinal VI 1.569 C 0.291 0.300 0.300 - - - 89.1092.60%Outstanding70.04%Satisfac<strong>to</strong>ry88.26%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 172


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONTSD BuildersConstruction and Supply22129Widening of Bacolod-SouthKabankalan Road1st/Final VI 1.294 C 0.294 0.300 0.300 - - - 89.4089.40%V.Satisfac<strong>to</strong>ryT-Square Builders 14268T-Square Builders 14268T-Square Builders 14268T-Square Builders 14268T-Square Builders 14268Completion of Big Margus RCDGBridge along Sarangani-Davao delSur Coastal RoadConc. of Additional 2-lanes alongDigos Junction RoadConst. MPB @ Brgy. Poblacion(Municipal Hall)Const. of 1-Cl at Malibago E/S SitioCassavaConst./Widening of Digos JunctionRoad1st XII 4.716 O 0.347 0.225 0.050 0.010 0.006 0.067 70.50 -1st XI 2.581 O 0.354 0.300 0.100 0.030 0.055 0.100 93.90 -Final XII 4.751 C 0.361 0.300 - - - - 66.101st/Final VII 183.115 C 0.414 - 0.500 - - - 91.4077.09%Satisfac<strong>to</strong>ry91.40%Outstanding2nd XI 9.424 O 0.289 0.300 0.100 0.008 0.054 0.100 85.10 -T-Square Builders 14268Const./Widening of Digos JunctionRoadFinal XI 9.424 C 0.<strong>31</strong>8 0.200 0.300 - - - 81.8086.18%V.Satisfac<strong>to</strong>ryT-Square Builders 14268Package I-Concreting of VariousRoad with Lined Canal Brgy. SanIsidro1st/ Final XII 1.439 C 0.366 - 0.500 - - - 86.6086.60%V.Satisfac<strong>to</strong>ryTTK ConstructionCorporation<strong>31</strong>907Cluster II: Const. of Mu;ti-PurposeBldg.Final CAR 0.940 C 0.373 0.117 0.300 - - - 79.0087.26%V.Satisfac<strong>to</strong>ryTuchar Construction 13644Completion of Multi-PurposeBuilding at Strip 701st / Final NCR 0.609 C 0.435 - 0.500 - - - 93.5093.50%OutstandingTuchar Construction 13644Repair/Rehabilitation A. BonifacioAvenue1st/Final NCR 4.869 C 0.346 0.200 0.300 - - - 84.6084.60%V.Satisfac<strong>to</strong>ryTurquoise Construction 21801Upgrading of National Road SanFernando - LagundiFinal III 4.771 C 0.385 - 0.500 - - - 88.5088.50%V.Satisfac<strong>to</strong>ryTwin DragonConstruction11392Const. of Panique-Trangkalan Farm<strong>to</strong> Market Road1st/ Final IV-B 0.908 C 0.374 - 0.500 - - - 87.4087.40%V.Satisfac<strong>to</strong>ryTwin DragonConstruction11392Lining Ditches along Looc-FerrolRd., Km. 114+450 - 114+600Final IV-B 0.283 C 0.444 0.500 - - - 94.4094.40%OutstandingTwin DragonConstructionTwin DragonConstruction11392 Rep./Maint. of Bangon River Control 1st IV-B 0.656 O 0.376 0.000 0.100 0.015 0.019 0.200 71.00 -11392 Rep./Maint. of Bangon River Control 1st/Final IV-B 0.282 C 0.289 0.073 0.300 - - - 66.2066.20%FairTwin DragonConstruction11392 Repair of Odiongan Public Market 1st/Final IV-B 1.888 C 0.352 0.184 0.300 - - - 83.6083.60%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 173


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONTwina Builders andSupply23897Const. of Water Supply Brgy. Luna,KapalongFinal XI 0.754 C 0.350 - 0.500 - - - 85.0089.08%V.Satisfac<strong>to</strong>ryTwina Builders andSupply23897Rehab. of MPB (Cons. of Fire StationBldg. Phase V)1st XI 4.714 O 0.364 0.245 0.100 0.030 0.056 0.100 89.50 -Twina Builders andSupply23897Repair/Rehab. of MPB (Phase IV) @Brgy. New Pandan1st XI 1.880 O 0.340 0.240 0.100 0.020 0.041 0.100 84.10 -Twintech Builders &Developers, Inc.23511Const. of Multi-Purpose Building,DoloresFinal CAR 3.680 C 0.421 - 0.500 - - - 92.1075.72%Satisfac<strong>to</strong>ryTwintech Builders &Developers, Inc.23511Const. of Sinalang River IrrigationFlumeFinal CAR 3.749 C 0.397 - 0.500 - - - 89.7090.81%OutstandingTwo Aces Constructionand Supplies15413 Conc. of Lapucon Cemetery Road 1st/Final XIII 3.749 C 0.358 0.300 0.300 - - - 95.8095.80%OutstandingTwo Aces Constructionand Supplies15413Const. of Poblacion Drainage Canal,KitcharoFinal XIII 0.453 C 0.<strong>31</strong>9 - 0.500 - - - 81.9077.22%Satisfac<strong>to</strong>ryU & N EngineeringServices16743Concreting of Municipal Streets,Malabuyoc1st/ Final VII 1.893 C 0.386 - 0.500 - - - 88.6086.90%V.Satisfac<strong>to</strong>ryUGM Construction 22047Const. of Secondary Sch. Bldg.(3 Cl)1st/Final IVB 1.184 C 0.367 0.300 0.300 - - - 96.7096.70%OutstandingUKC Builders, Inc. 10759Const. of Cagayan de Oro City 3rdBridge & Approaches Phase IIFinal X 63.689 C 0.390 0.300 0.300 - - - 99.0092.64%OutstandingUlticon Builders, Inc. 17267Ulticon Builders, Inc. 17267Ulticon Builders, Inc. 17267Ulticon Builders, Inc. 17267Ulticon Builders, Inc. 17267Const. of Pundaquitan Bridge &Approaches Tibanban-LaviganRoad.Const. of Pundaquitan Bridge &Approaches Tibanban-LaviganRoad.Const. of Tubay-La Fraternidad-Binuangan FMRImpvt. of Mawab-Sawangan-MacoAlternate Road, Phase IIRehabilitation & Improvement ofDavao-Cotaba<strong>to</strong> Road1st XI 9.342 O 0.<strong>31</strong>8 0.255 0.100 0.023 0.048 0.100 84.40 -2nd XI 9.342 O 0.395 0.300 0.100 0.030 0.048 0.100 97.30 -Final XIII 2.746 C 0.397 0.295 0.300 - - - 99.20Final XI 9.400 C 0.422 - 0.500 - - - 92.2097.42%Outstanding92.53%Outstanding1st XI 18.869 O 0.399 0.300 0.000 0.008 0.043 0.067 81.70 -Ulticon Builders, Inc. 17267Rehabilitation & Improvement ofDavao-Cotaba<strong>to</strong> RoadFinal XI 18.869 C 0.330 0.205 0.300 - - - 83.5082.42%V.Satisfac<strong>to</strong>ryUltron ConstructionCorporation14<strong>31</strong>3Const. of San An<strong>to</strong>nio II FloodControlFinal IV-A 0.960 C 0.150 - 0.500 - - - 65.0075.86%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 174


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONUni Construction 1<strong>31</strong>98Concreting of Brgy. Road, SitioPaitanFinal V 0.916 C 0.337 0.220 0.300 - - - 85.7086.78%V.Satisfac<strong>to</strong>ryUnitec Builder, Inc. 4803Const. of Labason Bridge andApproachesFinal IX 14.626 C 0.343 0.200 0.000 - - - 54.3074.<strong>31</strong>%Satisfac<strong>to</strong>ryUnitec Builders, Inc. 4803Completion of Road Widening (GapSection) @ San Bernardino Bridge,Maria Clara Lobregat Highway1st IX 6.200 O 0.349 0.000 0.070 0.020 0.037 0.067 54.30 -Unitec Builders, Inc. 4803Completion of Road Widening (GapSection) @ San Bernardino Bridge,Maria Clara Lobregat Highway2nd IX 6.200 O 0.351 0.226 0.100 0.030 0.040 0.100 84.70 -Unitec Builders, Inc. 4803 Const. of MPB at San Roque 1st/Final VIII 0.946 C 0.<strong>31</strong>9 0.200 0.300 - - - 81.9081.90%V.Satisfac<strong>to</strong>ryUnitec Builders, Inc. 4803Impv't./Widening of Z.C. West Road(Caragasan Section) including theConst. of 1 Barrel RCBC w/ excep<strong>to</strong>f Caragasan BridgeFinal IX 12.112 C 0.336 0.200 0.300 - - - 83.6087.04%V.Satisfac<strong>to</strong>ryUrban InfrastructuresIncorporated16144Cluster III-Const. of School BuildingProjects-(E.B. Magalona NHS)Final VI 0.410 C 0.365 0.099 0.300 - - - 76.4081.51%V.Satisfac<strong>to</strong>ryUy Construction andDevelopment12558 Asphalting of Valencia-Baconf Road 1st/Final VII 1.163 C 0.415 - 0.500 - - - 91.5091.50%OutstandingUy Construction andDevelopment12336Concreting of Jct. S.H.- Banglud -Mailog-By Pass Road, MailagFinal X 4.439 C 0.470 - 0.500 - - - 97.0097.00%OutstandingUy Construction andDevelopment12558Const. of Canturing River Control(Bogo Section)1st/Final VIII 3.762 C 0.373 0.122 0.300 - - - 79.5079.50%Satisfac<strong>to</strong>ryUy Construction andDevelopment12336Const. of Weighbridge Station alongDNRFinal VII 2.793 C 0.400 - 0.500 - - - 90.0089.68%V.Satisfac<strong>to</strong>ryUy Construction andDevelopment12336Const./Repair/Rehab. of SchoolBldg. @ Buenavista E/SFinal VIII 0.378 C 0.346 0.300 0.300 - - - 94.6086.97%V.Satisfac<strong>to</strong>ryUy Construction andDevelopment12336Rehab./Impvt. of Pob. NRJ-NinoyAquino FMRFinal X 11.846 C 0.352 0.281 0.300 - - - 93.3077.10%Satisfac<strong>to</strong>ryUy Construction andDevelopment12336Widening/Asphalting-Overlay of BaisKabankalan Road includingReConst. of (2) Bridges-Cang-abok& CanlumbongFinal VII 22.<strong>31</strong>5 C 0.384 0.300 0.300 - - - 98.4094.98%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 175


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONV N Grande Builders &SupplyV.C. BautistaConstruction3223821114Const. of Road, Poblacion Ilaya <strong>to</strong>Maravilla St.Concreting of Barangay LebuegRoad, Laoac1st/Final VI 0.941 C 0.322 0.300 0.300 - - - 92.201st/ Final I 0.480 C 0.295 - 0.500 - - - 79.50V.C.P. Concrete Products 7713 Concreting of Bislig-Surigao Road Final XIII 4.651 C 0.189 0.277 0.000 - - - 46.60V.E. Solis Construction 30751Const. of 1 CL @ Cabubugan E/S(Spacial Plan)92.20%Outstanding79.50%Satisfac<strong>to</strong>ry71.98%Satisfac<strong>to</strong>ry1st VI 0.479 O 0.362 0.262 0.100 0.030 0.023 0.100 87.70 -V.E. Solis Construction 30751Const. of 1 CL @ Cabubugan E/S(Spacial Plan)Final VI 0.479 C 0.367 0.200 0.300 - - - 86.7087.40%V.Satisfac<strong>to</strong>ryV.F. Construction 10048Completion of Road, BarangaySalian, Abucay1st/ Final III 1.440 C 0.442 - 0.500 - - - 94.20V.F. Construction 10048 Const. of FMR, Barangay Sta. Isabel 1st / Final III 0.468 C 0.282 - 0.500 - - - 78.20V.F. Construction 10048 Const. of Gabon-<strong>Dec</strong>ena Road 1st/Final III 1.871 C 0.356 0.164 0.300 - - - 82.0094.20%Outstanding78.2%Satisfac<strong>to</strong>ry82.00%V.Satisfac<strong>to</strong>ryV.F. Construction 10048V.R. Duque Construction 22233Const. of Salian Farm-<strong>to</strong>-MarketRoadConst. of 2-Classroom SchoolBuilding @ Mabuhay E/SFinal III 1.868 C 0.300 - 0.500 - - - 80.001st IVB 0.953 C 0.268 0.300 0.100 0.008 0.033 0.100 80.90 -48.20%PoorV.R. Duque Construction 22233Const. of 2-Classroom SchoolBuilding @ Mabuhay E/SFinal IV-B 0.953 C 0.283 0.300 0.300 - - - 88.3083.12%V.Satisfac<strong>to</strong>ryV.R. Duque Construction 22233 Const. of MPB @ Ilaya 1st/Final IV-B 0.475 C 0.234 0.242 0.300 - - - 77.60V.R. Duque Construction 22233Rehabilitation of Multi-PurposeBldg., Brgy. Ilaya77.60%Satisfac<strong>to</strong>ry1st IV-B 0.474 O 0.<strong>31</strong>5 0.300 0.100 0.030 0.035 0.100 88.00 -V.R. Duque Construction 22233Rehabilitation of Multi-PurposeBldg., Brgy. IlayaFinal IV-B 0.474 C 0.3<strong>31</strong> 0.300 0.300 - - - 93.1089.53%V.Satisfac<strong>to</strong>ryV.R. Patron Builders &Developers13487Improvement of Quilo-Quilo Road,Padre Garcia Integrated ARC2nd IVA 6.550 O 0.347 0.250 0.100 0.030 0.040 0.100 86.70 -V.R. Patron Builders &Developers13487Improvement of Quilo-Quilo Road,Padre Garcia Integrated ARC3rd IV-A 6.550 O 0.395 0.200 0.100 0.030 0.042 0.100 86.70 -V.R. Patron Builders &DevelopersV.R. Patron Builders &DevelopersV.R. Patron Builders &Developers13487Impvt./Rehab. of Banay-banayMojon Jct. Road1st/Final IV-A 3.816 C 0.328 0.300 0.300 - - - 92.8013487 Repair/Rehab. of Municipal Hall Final IV-A 0.955 C 0.412 - 0.500 - - - 91.2013487 Road Conc. @ Brgy. Dalipit East 1st/Final IV-A 0.191 C 0.365 0.300 0.300 - - - 96.5092.80%Outstanding91.20%Outstanding96.50%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 176


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONV.R.D.J. Construction 19837 Repair/Rehab. of Pilitan E/S Bldg. 1st/Final II 0.094 C 0.400 0.200 0.300 - - - 90.0090.00%V.Satisfac<strong>to</strong>ryV.R.P. BuildersConstruction and Supply25056Concreting of FTM Road at Brgy.Malaya1st IV-A 0.764 C 0.447 - 0.500 - - - 94.7094.70%OustandingV.R.P. BuildersConstruction and Supply25056Const. of Two (2) School Building atPinagtung-Ulan NHS Pinagtung-Ulan 1st/ Final IV-A 0.955 C 0.477 - 0.500 - - - 97.70 97.70%OutstandingV4M Construction 3211 Const.of Canal @ Maloma 1st/Final III 0.477 C 0.267 0.300 0.300 - - - 86.7086.70%V.Satisfac<strong>to</strong>ryValley Construction &Aggregates14<strong>31</strong>5Cluster I a) Conc. of Dantay-SagadaRd., b) Conc. of Dantay-SagadaRd.,Ambasing Suyo Balili Rd.Final CAR 10.754 C 0.360 0.300 0.300 - - - 96.0092.70%OutstandingValley Construction &AggregatesVannie GeneralMerchandiseVans Turf ConstructionCorporation14<strong>31</strong>5Completion of MPB @ New LucbanBrgy.1st/Final CAR 1.904 C 0.332 0.300 0.300 - - - 93.2027335 Completion of Public Market Final VI 1.924 C 0.390 0.257 0.300 - - - 94.7010813 Const. of Multi-Purpose Building 1st/ Final IV-A 2.708 C 0.439 - 0.500 - - - 93.9093.20%Outstanding90.15%Outstanding93.90%OutstandingVans Turf ConstructionCorporation13778Const. of Multi-Purpose Building @Meycauayan1st/ Final III 2.837 C 0.483 - 0.500 - - - 98.3098.30%OutstandingVans Turf ConstructionCorporation13778Contruction of Multi-PurposeBuilding1st III 2.591 C 0.457 - 0.500 - - - 95.7095.70%OutstandingVanvi Construction 29387 Completion of MPB at Langub E/S 1st XI 0.752 O 0.393 0.300 0.100 0.020 0.045 0.100 95.80 -Vanvi Construction 29387 Completion of MPB at Langub E/S Final XI 0.752 C 0.382 0.300 0.300 - - - 98.20VAR Builders 20327 Sagay City Resettlement Project 1st/Final NHA 5.910 C 0.323 0.300 0.300 - - - 92.30Various Construction 26640Concreting of Upper Pinget Brgy.RoadFinal CAR 0.956 C 0.341 - 0.500 - - - 84.10VCD Construction 13949 Const. of Various Day Care Center 1st/Final I 0.329 C 0.291 - 0.500 - - - 79.10VCD Construction 13949VCD Construction 13949Rehabilitation of Ilocos NorteNational High SchoolRehabilitation of Ilocos NorteNational School96.52%Outstanding92.30%Outstanding62.20%Fair79.10%Satisfac<strong>to</strong>ry1st I 3.479 O 0.397 0.300 0.100 0.010 0.035 0.100 94.20 -Final I 3.827 C 0.298 0.300 0.300 - - - 89.8092.88%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 177


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONVCV Const. &Development Corp.VCV Const. &Development Corp.12575 Const. of MPB 1st/Final III 2.829 C 0.382 0.234 0.300 - - - 91.6012575 Const. of MPB @ Brgy. Pilar 1st/Final VIII 3.339 C 0.327 0.272 0.300 - - - 89.9091.60%Outstanding89.90%V.Satisfac<strong>to</strong>ryVCV Const. &Development Corp.12575 Const. of MPB at Bgry. Alas-Asin 1st/Final III 3.<strong>31</strong>0 C 0.381 0.215 0.300 - - - 89.6089.60%V.Satisfac<strong>to</strong>ryVen Ray Construction 18<strong>31</strong>0Concreting of P. Gicain St.,Pasamanos, Dawis Norte1st/Final VII 0.385 C 0.335 - 0.500 - - - 83.5085.50%V.Satisfac<strong>to</strong>ryVen Ray Construction 18<strong>31</strong>0Const. of 2-S<strong>to</strong>rey, 4-Cl ScienceHigh School1st/Final VII 4.469 C 0.388 0.240 0.300 - - - 92.8092.80%OutstandingVen Ray Construction 18<strong>31</strong>0Const. of Annex Bldg. of BogoPublic Market1st/Final VII 1.868 C 0.383 - 0.500 - - - 88.3088.30%V.Satisfac<strong>to</strong>ryVen Ray Construction 18<strong>31</strong>0Rehab./Conc. of Roads at BarangayPoblacionFinal VII 0.459 C 0.391 0.300 0.300 - - - 99.1092.62%OutstandingVenus Engineering &Construction18358Const. of MP Hall Realigned <strong>to</strong>Impvt. of MP Hall Brgy. BuenavistaFinal VIII 0.187 C 0.460 - 0.500 - - - 96.0079.55%Satisfac<strong>to</strong>ryVerca Const. Trading &Services14477Const. of Multi-Purpose Bldg. atTenejero E/S1st/Final III 0.610 C 0.381 0.300 0.300 - - - 98.10Vertical Builders 14029 Const. of 2 Cl @ FVR E/S 1st III 1.351 O 0.346 0.240 0.100 0.030 0.059 0.100 87.50 -98.10%OutstandingVertical Builders 14029 Datu Paglas Resttlement Project 1stNHARegion XII5.925 O 0.387 0.300 0.070 0.023 0.042 0.100 92.10 -VF Construction 10048Const. of Drainge Canal from RBMEnt. To ER Venzon Plant Brgy.Panillao & Brgy. Sta. Rosa1st/Final III 0.845 C 0.374 0.300 0.300 - - - 97.4097.40%OutstandingVF Construction 10048Impvt. of Multi-Purpose Pavement @Brgy. P<strong>to</strong>. Rivas1st/Final III 0.488 C 0.320 0.200 0.300 - - - 82.0082.00%V.Satisfac<strong>to</strong>ryVicente T. LaoConstruction7040CP MN - D3 (Katipunan-ManukanRoad)3rd ADB 462.152 O 0.376 0.291 0.000 0.030 0.047 0.100 84.40 -Vicente T. LaoConstruction7040CP MN-D (3-1) Nipaan -SindanganRd., Oroquieta-Sindangan Road1st ADB 184.345 O 0.366 0.277 0.100 0.024 0.070 0.100 93.70 -Vicente T. LaoConstruction7040Laguindingan Resttlement Project,Phase II1stNHARegion X38.798 O 0.383 0.297 0.000 0.018 0.047 0.067 81.16 -Vicente T. LaoConstruction7040Rehab./Impvt. (Asphalt Overlay) ofSarangani-Davao del Sur CoastalRoad, Gian Padidu Section1st XII 14.456 O 0.389 0.225 0.070 0.023 0.050 0.067 82.40 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 178


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONVicente T. LaoConstruction7040Rehab./Impvt. of National RoadOzamis City-Oroquieta City Road1st/Final X 14.366 C 0.200 0.300 0.300 - - - 80.0080.00%Satisfac<strong>to</strong>ryVicente T. LaoConstruction7040Upgrading/Impvt./Rehab. AlongDipolog By Pass Road Ph II (Supply& Installation of Guardrail)1st/Final IX 14.457 C 0.257 0.225 0.300 - - - 78.2078.20%Satisfac<strong>to</strong>ryVicmar Construction Inc. 28997 Conc. of Brgy. Road @ Poblacion 1st IV-A 1.416 O 0.300 0.300 0.100 0.030 0.035 0.067 83.20 -Vicmar Construction Inc. 28997 Const. of MPB @ Poblacion 1st IV-A 1.423 O 0.300 0.275 0.100 0.030 0.037 0.100 84.20 -Vicmar Construction Inc. 28997 Const. of Seawall @ Brgy. Wawa Final IV-A 0.476 C 0.450 - 0.500 - - - 95.00Vic<strong>to</strong>ria Trading 15717Const. of Multi-Purpose Building @Brgy. Calapacuan1st/Final III 0.606 C 0.273 0.200 0.300 - - - 77.3095.00%Outstanding77.30%Satisfac<strong>to</strong>ryVic<strong>to</strong>riano C. LimConstruction25<strong>31</strong>8Const. of Multi-Purpose Bldg.,(Public Market)Final X 9.3<strong>31</strong> C 0.341 0.300 0.300 - - - 94.1084.02%V.Satisfac<strong>to</strong>ryVic<strong>to</strong>riano C. LimConstruction25<strong>31</strong>8Const. of Multi-Purpose Building(Phase I), CalambaFinal X 1.445 C 0.439 - 0.500 - - - 93.9085.5%V.Satisfac<strong>to</strong>ryVic<strong>to</strong>riano C. LimConstruction25<strong>31</strong>8Const. of Ozamiz City Coastal ByPass Road @ Brgy.Malaubang1st X 9.259 O 0.329 0.300 0.100 0.010 0.038 0.100 87.70 -Vic<strong>to</strong>riano C. LimConstruction25<strong>31</strong>8Const. of Ozamiz City Coastal ByPass Road @ Brgy.MalaubangFinal X 9.260 C 0.251 0.228 0.300 - - - 77.9078.41%Satisfac<strong>to</strong>ryVic<strong>to</strong>riano C. LimConstruction25<strong>31</strong>8Gravelling of Guimad-Guingona-Trigos Road1st/Final X 2.826 C 0.<strong>31</strong>7 0.300 0.000 - - - 61.7061.70%FairVic<strong>to</strong>riano C. LimConstruction25<strong>31</strong>8Gravelling/Concreting of PavementOzamis By-Pass Circumferential-Bangkal Airport RoadFinal X 2.020 C 0.470 - 0.500 - - - 97.0097.00%OutstandingVic<strong>to</strong>riano C. LimConstructionVic<strong>to</strong>riano C. LimConstruction25<strong>31</strong>8 Impvt./Rehab. of Lagbas Creek 1st X 9.546 O 0.228 0.200 0.100 0.030 0.027 0.200 78.50 -25<strong>31</strong>8Regravelling of Litapan-Manaka-Gala RoadFinal X 2.822 C 0.381 - 0.500 - - - 88.1075.50%Satisfac<strong>to</strong>ryVic<strong>to</strong>riano C. LimConstruction25<strong>31</strong>8 Rehabilitation of Manaca-Gala Road Final X 1.903 C 0.395 0.2<strong>31</strong> 0.300 - - - 92.6088.64%V.Satisfac<strong>to</strong>ryVic<strong>to</strong>rino Baroña, Jr.Construction15166Const. of Sinalang Bridge &ApproachesFinal CAR 10.890 C 0.352 0.212 0.300 - - - 86.4085.80%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 179


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONVic<strong>to</strong>rino Baroña, Jr.Construction15166Impvt. of Abra-Kalinga Road, BaguioSection, Baay-Licuan1st / Final CAR 3.135 C 0.387 - 0.500 - - - 88.7088.70%V.Satisfac<strong>to</strong>ryVic<strong>to</strong>rino Baroña, Jr.Construction15166Impvt. of Denden-Callao Road,Villaviciosa ARCFinal CAR 15.862 C 0.334 0.300 0.300 - - - 93.4087.28V.Satisfac<strong>to</strong>ryVic<strong>to</strong>rino Baroña, Jr.Construction15166Rehabilitation of Abra-Ilocos NorteRoad1st/Final CAR 0.941 C 0.372 - 0.500 - - - 87.2087.20%V.Satisfac<strong>to</strong>ryVicvera Builders, Inc. 13903Const. of Three (3) S<strong>to</strong>rey, 12 CLSchool Bldg. at Alabang E/SFinal NCR 4.569 C 0.336 0.300 0.300 - - - 93.6085.34%V.Satisfac<strong>to</strong>ryVigan FortuneConstructionVigan FortuneConstructionVigan FortuneConstructionVigan FortuneConstructionVigan FortuneConstructionVigan FortuneConstructionVigan FortuneConstructionViguz ConstructionCorporationViguz ConstructionCorporation3887 Const. of Darapidap Seawall 1st I 3.775 C 0.309 0.300 0.300 - - - 90.903887388738873887Const. of Santa Seawall & FloodControlConst. of Santa Seawall & FloodControlContinuation of Const. of CandonCity HospitalContinuation of the Phil. ScienceHigh School Bldg. (PSHS) IlocosRegion Campus90.90%Outstanding1st I 9.493 O 0.283 0.218 0.050 0.023 0.035 0.067 67.60 -Final I 9.493 C 0.320 0.300 0.300 - - - 92.001st / Final I 4.744 C 0.358 - 0.500 - - - 85.80Final I 7.952 C 0.296 - 0.500 - - - 79.603887 Impv't. of Sta.Lucia-Salcedo Road Final I 4.002 C 0.272 - 0.500 - - - 77.203887S<strong>to</strong>ne Masonry of SabanganSeawall, Phase III, Sabangan,Santiago1st/ Final I 1.207 C 0.293 - 0.500 - - - 79.308178 Const. of Candi-is Bridge Final VIII 5.518 C 0.348 0.189 0.300 - - - 83.708178 Const. of Malirong Bridge 1st VIII 4.655 O 0.292 0.270 0.100 0.030 0.033 0.100 82.50 -77.36%Satisfac<strong>to</strong>ry74.10%Satisfac<strong>to</strong>ry72.53%Satisfac<strong>to</strong>ry58.12%Poor79.30%Satisfac<strong>to</strong>ry77.94%Satisfac<strong>to</strong>ryViguz ConstructionCorporation8178 Const. of Malirong Bridge Final VIII 4.655 C 0.381 0.180 0.300 - - - 86.1083.94%V.Satisfac<strong>to</strong>ryViguz ConstructionCorporation8178 Road Widening of Carigara Wharf 1st/Final VIII 1.424 C 0.353 0.200 0.300 - - - 85.3085.30%V.Satisfac<strong>to</strong>ryVijisi Construction 26643Impvt./Concrete Paving of DonFederico Sison St.1st/Final I 0.617 C 0.355 0.300 0.300 - - - 95.5095.50%OutstandingViking Construction andSupplies18129Completion of Bigbiga Multi-Purpose BuildingFinal I 0.759 C 0.385 0.287 0.300 - - - 97.2088.94%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 180


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONViking Construction andSuppliesVillaflor Construction andSuppliesVillaflor Construction andSupplies18129 Repair/Rehab. of MPB 1st/Final I 0.189 C 0.<strong>31</strong>8 0.300 0.300 - - - 91.80216<strong>31</strong>216<strong>31</strong>Const. of Multi-Purpose Hall, PhaseIIConst. of Multi-Purpose Hall, PhaseII91.80%Outstanding1st VI 2.753 O 0.364 0.300 0.070 0.015 0.038 0.100 88.70 -Final VI 1.439 C 0.363 0.210 0.300 - - - 87.3090.17%OutstandingVirac NRC Construction 11396Const. of Multi-Purpose Building(Phase I)1st/Final V 0.944 C 0.391 - 0.500 - - - 89.1089.10%V.Satisfac<strong>to</strong>ryVirginia Construction 12893Concreting of Farm-<strong>to</strong>-Market Brgy.Saang Bago1st / Final III 0.374 C 0.293 - 0.500 - - - 79.3079.30%Satisfac<strong>to</strong>ryVirlo Construction 5765Const/Rehab. of 4-CL, 2-S<strong>to</strong>rey S/B@ Central Lilo-An E/S PoblacionFinal VII 1.516 C 0.406 - 0.500 - - - 90.6090.60%OutstandingVirlo Construction 5765Repair/Impvt./Rehab. of Bonbon-Sinsin Road1st/Final VII 9.996 C 0.212 0.200 0.300 - - - 71.20Virlo Construction 5765 Repair/Rehab. of S. Osmena Blvd. Final VII 9.646 C 0.054 0.100 0.300 - - - 45.40Virlo Construction 5765Repair/Rehab. of S. Osmena Blvd.(Sta.4+737 - Sta.6+254 w/exceptions)71.20%Satisfac<strong>to</strong>ry72.16%Satisfac<strong>to</strong>ry1st VII 9.646 O 0.335 0.300 0.100 0.030 0.035 0.100 90.00 -Vites Construction &Development Corporation9444Rehab./Const. of Multi-PurposeBuilding @ Zone 38 (Brgy. 377)1st NCR 5.035 O 0.390 0.300 0.100 0.030 0.019 0.067 90.60 -Vites Construction &Development Corporation9444Rehab./Const. of Multi-PurposeBuilding @ Zone 38 (Brgy. 377)Final NCR 5.035 C 0.328 0.300 0.300 - - - 92.8091.26%OutstandingVTJ Construction &Supply11250Const. of Multi-Purpose Building atBrgy. Geronimo1st/ Final IV-A 0.964 C 0.459 - 0.500 - - - 95.9095.90%OutstandingVUC Engineering 7918Concreting of Dagupan-PalongkadaSection Kabugay-Pud<strong>to</strong>l-Luna RoadFinal CAR 7.692 C 0.425 - 0.500 - - - 92.5086.11%V.Satisfac<strong>to</strong>ryVUC Engineering 7918Const. of Lanna Retaining Wall,Lanna1st/Final CAR 0.873 C 0.352 0.300 0.300 - - - 95.2095.20%OutstandingVUC Engineering 7918Impvt./Conc. of Tabuk-TinglayanRoad (Bantay Section)1st CAR 4.777 O 0.299 0.300 0.100 0.023 0.063 0.100 88.50 -VUC Engineering 7918Rehabilitation & Concreting ofMagsaysay-Mapaway Road1st/Final CAR 7.615 C 0.353 - 0.500 - - - 85.3085.30%V.Satisfac<strong>to</strong>ryVUC Engineering 7918Road Impvt. of Dagupan-PalangkadaSection, Luna1st CAR 7.692 C 0.264 0.235 0.070 0.030 0.030 0.100 72.90<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 181


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONVUC Engineering 7918Vulcan DevelopmentConstructionVulcan DevelopmentConstruction1908019080Upgrading & Conc. of Tuguegarao-Tabuk-Tinglayan Road (Banat-Gonogon Section)Concreting of Jct. Milagros-AroroyRoadConst. of Circumferential Road @Brgy. Ibingay1st CAR 9.510 O 0.334 0.200 0.100 0.030 0.030 0.100 79.40 -1st V 9.592 O 0.321 0.240 0.100 0.023 0.037 0.067 78.80 -1st V 9.490 O 0.333 0.225 0.100 0.015 0.037 0.100 81.00 -Vulcan DevelopmentConstruction19080Const. of Circumferential Road @Brgy. IbingayFinal V 9.490 C 0.360 0.200 0.300 - - - 86.0083.00%V.Satisfac<strong>to</strong>ryVVER Construction 14122Completion of MPB (Day CareCenter) @ Brgy. Batinguel1st/Final VII 0.277 C 0.3<strong>31</strong> 0.200 0.300 - - - 83.1083.10%V.Satisfac<strong>to</strong>ryVVER Construction 14122Const. of 1-Unit, 3-Cl SchoolBuilding @ Olandao E/S2nd VII 1.033 O 0.369 0.240 0.070 0.030 0.029 0.067 80.50 -VVER Construction 14122 Const. of Cambagahan E/S 1st/Final VII 0.442 C 0.395 0.200 0.300 - - - 89.5089.50%V.Satisfac<strong>to</strong>ryVVER Construction 14122Const. of MPB/Center at Cang-Alwang1st VII 0.469 O 0.285 0.295 0.100 0.030 0.032 0.100 84.20 -VVER Construction 14122 Continuation of MPB at Sibulan 1st VII 0.917 O 0.323 0.250 0.100 0.015 0.038 0.100 82.60 -W. Palma Construction 11988Const. of 4 S<strong>to</strong>rey 12 Cl SecondarySch. Bldg. @ Roman DuterteMemorial NHS1st/Final VII 6.895 C 0.376 0.100 0.300 - - - 77.6077.60%Satisfac<strong>to</strong>ryW. Rivera Construction &Equipment Rentals<strong>31</strong>378Const. of 2 S<strong>to</strong>rey RGR Type Sch.Bldg. @ Sta. Maria & San Pedro E/SFinal IVA 9.546 C 0.376 0.246 0.300 - - - 92.2091.57%OutstandingW. Rivera Construction &Equipment Rentals(Formerly: W. RiveraConst.)<strong>31</strong>378Const. of 2 S<strong>to</strong>rey RGR Type Sch.Bldg. @ Sta. Maria & San Pedro E/S1st IVA 9.546 O 0.356 0.300 0.100 0.030 0.027 0.100 91.30 -W.S. Aniar Trading &Construction20471Const. of Multi Purpose Pavement @Brgy. Sapa1st/Final IV-B 0.208 C 0.244 0.000 0.300 - - - 54.4054.40%PoorWalter Ng LaoConstruction23739Concreting of Oroqueta-Calamba Mt.Rd.,2nd X 1.603 O 0.369 0.300 0.070 0.030 0.060 0.067 89.60 -Walter Ng LaoConstruction23739Concreting of Oroqueta-Calamba Mt.Rd.,Final X 1.603 O 0.351 0.300 0.000 - - - 65.10 -Wangjo Construction 29924 Const. of Hapid Bridge (Phase III) 1st CAR 1.601 O 0.337 0.284 0.100 0.030 0.025 0.100 87.60 -Wangjo Construction 29924 Const. of Hapid Bridge (Phase III) Final CAR 1.601 C 0.261 0.288 0.300 - - - 84.9086.52%V.Satisfac<strong>to</strong>ryWangjo Construction 29924 Installation of Tupaya Bridge 1st CAR 0.946 O 0.322 0.300 0.100 0.030 0.025 0.100 87.70 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 182


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONWangjo Construction 29924 Installation of Tupaya Bridge Final CAR 0.946 C 0.335 0.300 0.300 - - - 93.5090.02%OutstandingWBX Construction 28370Completion of 4 Cl 2 S<strong>to</strong>rey Bldg. @Bagbagin E/S1st/Final III 1.520 C 0.250 0.291 0.300 - - - 84.1084.10%V.Satisfac<strong>to</strong>ryWBX Construction 28370Const. of Brgy. Multi-Purpose Bldg.,Brgy. Andaya1st III 0.424 O 0.392 0.225 0.100 0.015 0.0<strong>31</strong> 0.100 86.30 -WBX Construction 28370Const. of Brgy. Multi-Purpose Bldg.,Brgy. AndayaFinal III 0.468 C 0.296 0.300 0.300 - - - 89.6087.29%V.Satisfac<strong>to</strong>ryWBX Construction 28370 Road Rehabilitation Pulang Gubat 1st/Final III 0.376 C 0.370 0.200 0.300 - - - 87.0087.00%V.Satisfac<strong>to</strong>ryWCS Construction Inc. 6516Const. of Multi-Purpose Hall-PhaseII1st/Final V 1.865 C 0.296 0.300 0.300 - - - 89.6089.60%V.Satisfac<strong>to</strong>ryWCS Construction Inc. 6516Development/Const. of Sula Seawall"A" and "B" and its Access Road1st V 9.355 O 0.351 0.286 0.100 0.030 0.028 0.100 89.50 -WCS Construction Inc. 6516Development/Const. of Sula Seawall"A" and "B" and its Access RoadFinal V 9.355 C 0.254 0.252 0.300 - - - 80.6085.94%V.Satisfac<strong>to</strong>ryWCS Construction Inc. 6516Improvement of Lidong-PolanguiRoad1st V 33.098 O 0.334 0.300 0.100 0.030 0.050 0.100 91.40 -WCS Construction Inc. 6516Improvement of Lidong-PolanguiRoadFinal V 33.052 C 0.304 0.200 0.300 - - - 80.4087.00%V.Satisfac<strong>to</strong>ryWCS Construction, Inc. 6516WCS Construction, Inc. 6516WDM Construction &SuppliesWDM Construction &SuppliesWDM Construction &SuppliesWDM Construction &SuppliesWee Eng Construction,Inc.18877Const. of MPB Covered Court(Phase I)Const. of MPB Covered Court(Phase I)Cluster EM: Concreting of FMRAgay-Ayan-Sitio Kulgao Rd.1st V 4.279 O 0.324 0.300 0.100 0.023 0.019 0.100 86.60 -2nd V 4.279 O 0.356 0.240 0.100 0.030 0.032 0.100 85.80 -1st/Final X 0.456 C 0.347 0.300 0.300 - - - 94.7018877 Concreting of FMR, Barangay 24 1st/Final X 0.477 C 0.385 0.300 0.300 - - - 98.50188771887716380Const. of FMR, Odiongan-Malinao-Sio-an Rd.Const. of Multi-Purpose Building(Initial)Const. of Reinforced Conc. BoxCulvert along Macalelon-MulanayRoad1st/Final X 0.953 C 0.347 0.300 0.300 - - - 94.70Final X 1.908 C 0.367 0.300 0.300 - - - 96.701st/Final IVA 0.816 C 0.373 0.300 0.300 - - - 97.3094.70%Outstanding98.50%Outstanding94.70%Outstanding91.<strong>31</strong>%Outstanding97.30%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 183


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONWee Eng Construction,Inc.16380Const. of SCDR Marihatag-BaroboSection (Conc. of Amontay-S<strong>to</strong>.Niño Section with Toril & AmontayBridges)1st XIII 122.015 O 0.289 0.300 0.070 0.024 0.025 0.067 77.50 -Welex Const. / GoldrockConst. & Dev. Corp.JV-03-004Soil Erosion Protection Project(Rehab. of Taytay-El Nido Road)5th SPIADP 898.994 O 0.390 0.300 0.100 0.030 0.051 0.100 97.10 -Welex Const. / GoldrockConst. & Dev. Corp.JV-03-004Soil Erosion Protection Project(Rehab. of Taytay-El Nido Road)6th SPIADP 898.994 O 0.323 0.300 0.100 0.030 0.050 0.100 90.30 -Welex Const. / GoldrockConst. & Dev. Corp.JV-03-004Soil Erosion Protection Project(Rehab. of Taytay-El Nido Road)Final SPIADP 898.994 C 0.342 0.294 0.300 - - - 93.6094.54%OutstandingWerr Corporation(International)14133Const. of 2-Cl, 2-S<strong>to</strong>rey S/B @Bangoy NHS2nd XI 0.683 O 0.189 0.250 0.000 0.015 0.018 0.033 50.50 -Werr Corporation(International)14133Const. of 4-CL, 2-S<strong>to</strong>rey S/B @Eulogio Rodriguez, Jr. E/S1st/Final IVA 5.550 C 0.368 0.300 0.300 - - - 96.8096.80%OutstandingWestan Construction andSupply243<strong>31</strong>Const. of Flood Control @ Brgy.Parparoroc1st I 4.689 O 0.354 0.106 0.100 0.023 0.030 0.133 74.60 -Westmin Enterprises andConstruction Services20989Conc. Paving along Rizal Shrine,Rizal Town Coastal Loop Road, Tagulo-GuimputlanSect.1st/Final IX 2.747 C 0.354 0.220 0.300 - - - 87.4087.40%V.Satisfac<strong>to</strong>ryWestmin Enterprises andConstruction Services20989Improvement/Concrete Paving alongRizal Shrine-Rizal Town CoastalRoad, Guimputlan-Banbanan-Carang Road Section (Guimputlan-Banbanan Sect.)Final IX 2.758 C 0.388 0.200 0.300 - - - 88.8091.92%OutstandingWestmin Enterprises andConstruction Services20989Impv't./Conc. Paving along RizalShrine, Rizal Town Coastal LoopRoadFinal IX 2.743 C 0.361 0.300 0.300 - - - 96.1090.34%OutstandingWestmin Enterprises andConstruction Services20989 Rehab. of Banbanan-Carang Road 1st IX 1.8<strong>31</strong> O 0.304 0.190 0.100 0.020 0.037 0.100 75.10 -Westmin Enterprises andConstruction Services20989 Rehab. of Banbanan-Carang Road Final IX 1.893 C 0.326 0.225 0.300 - - - 85.1079.10%Satisfac<strong>to</strong>ryWhee Bon Construction &Supply217<strong>31</strong>Repair//Rehab. of Classroom @Gumaca Nat'l. H/S1st/Final IV-A 0.094 C 0.400 0.000 0.335 - - - 73.5073.50%Satisfac<strong>to</strong>ryWilsam Construction &Dev. Corp.27046Continuation of Concreting ofBorongan Boulevard1st VIII 9.162 O 0.346 0.000 0.100 0.030 0.032 0.100 60.80 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 184


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONWinley Tan Construction 22368Completion of School Building withCR @ Siparok E/S1st/Final IX 0.182 C 0.387 0.200 0.300 - - - 88.7088.70%V.Satisfac<strong>to</strong>ryWinley Tan Construction 22368Const. of 1-Unit, Two (2) CL SchoolBldg. @ Roxas E/SFinal IX 0.719 C 0.379 0.200 0.300 - - - 87.9093.36%OutstandingWinley Tan Construction 22368Repair/Rehab. of Sch. Bldg. (ESPBldg.) @ JRMSC1st/Final IX 0.448 C 0.307 0.200 0.300 - - - 80.7080.70%V.Satisfac<strong>to</strong>ryWizard Enterprises 27504 Const. of Water Works System 1st/Final IV-A 0.964 C 0.343 0.300 0.300 - - - 94.3094.30%OutstandingWizard Trading andConstruction21921 Const. of MPB @ Namulandayan E/S Final III 1.264 C 0.335 0.300 0.300 - - - 93.5084.54%V.Satisfac<strong>to</strong>ryWorldwide Builders <strong>31</strong>408 Const. of Multi-Purpose Building 1st VII 0.957 O 0.343 0.240 0.100 0.010 0.041 0.100 83.40 -Worldwide Builders <strong>31</strong>408 Const. of Multi-Purpose Building Final VII 0.957 C 0.365 0.300 0.300 - - - 96.50WSR Enterprises 17589 Rehabilitation of Caugahan Bridge I 1st/Final V 0.755 C 0.250 0.300 0.300 - - - 85.0087.33%V.Satisfac<strong>to</strong>ry85.00%V.Satisfac<strong>to</strong>ryWT Construction, Inc. 5490Const. of CP MN-D2, Oroquieta-Sindangan Rd., Barcelona-Katipunan Section1st ADB 267.525 O 0.382 0.300 0.070 0.030 0.042 0.067 89.10 -WT Construction, Inc. 5490Const. of CP PY-C, Kalibo-NabasRoadFinal VI 208.009 C 0.375 0.300 0.300 - - - 97.5088.83%V.Satisfac<strong>to</strong>ryWTG Construction andDevelopment Corporation7494Concrerting of Road @ Brgy.Dacudao, Brgy. DacudaoFinal XI 1.880 C 0.280 0.300 0.300 - - - 88.0074.40%Satisfac<strong>to</strong>ryWTG Construction andDevelopment Corporation7494 Const. of Asturias Bridge 1st/Final VII 7.899 C 0.365 0.300 0.300 - - - 96.5096.50%OutstandingWTG Construction andDevelopment CorporationWTG Construction andDevelopment CorporationWTG Construction andDevelopment Corporation749474947494Const. of Bango Bridge &Approaches, Compostela-CateelRoadConst. of Mambusao Bridge &Approaches, Compostela-CateelRoadConst. of Mambusao Bridge &Approaches, Compostela-CateelRoad1st/Final XI 9.834 C 0.365 0.300 0.300 - - - 96.5096.50%Outstanding1st XI 6.670 O 0.349 0.300 0.100 0.023 0.047 0.100 91.90 -Final XI 6.669 C 0.395 0.300 0.300 - - - 99.5094.94%Outstanding<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 185


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONWTG Construction andDevelopment Corporation7494Naga-Toledo Road Project, Jct.Proog <strong>to</strong> Jct. Sangi, Sta. 20+504-Sta.32+000Final VII 91.674 C 0.285 0.261 0.300 - - - 84.6088.80%V.Satisfac<strong>to</strong>ryWTG Construction andDevelopment Corporation7494 Widening of Velez Bridge 1st/Final VII 12.301 O 0.369 0.100 0.100 0.030 0.048 0.100 74.70 -WTG Construction andDevelopment Corporation7494 Widening of Velez Bridge Final VII 12.301 C 0.338 0.300 0.300 - - - 93.8082.34%V.Satisfac<strong>to</strong>ryY.S. Construction 11928Yakal Construction 9685Const. of Sagbayan Multi-PurposeBuildingConc. of Toledo-Pinamingajan-Aloguinsan-Mantalongon Road(Bojo Section)Final VII 0.891 C 0.367 0.300 0.300 - - - 96.7092.36%Outstanding1st VIII 9.470 O 0.291 0.229 0.100 0.030 0.064 0.100 81.40 -Yakal Construction 9685 Const. of Balaquid Bridge Final VIII 3.649 C 0.360 0.300 0.300 - - - 96.0080.76%V.Satisfac<strong>to</strong>ryYakal Construction 9685Yakal Construction 9685Yakal Construction 9685Const. of Catbalogan DiversionRoad (Phase VI)Rehab. of Salog Bridge &Approaches along Tac-Ormoc-Baybay RoadRehab. of Salog Bridge &Approaches along Tac-Ormoc-Baybay-Maasin Rd.1st VIII 28.949 O 0.400 0.283 0.030 0.022 0.043 0.033 81.10 -1st VIII 6.085 O 0.320 0.225 0.100 0.030 0.040 0.100 81.50 -2nd VIII 6.085 O 0.341 0.240 0.100 0.030 0.070 0.100 88.10 -Yakal Construction 9685Rehab./Impv't. of Tagnipa-Batwan-Tomoy Tomoy FMRFinal VIII 14.467 C 0.383 0.300 0.300 - - - 98.3087.80%V.Satisfac<strong>to</strong>ryYakal Construction 9685 Rehabilitation of Roxas City Roads Final VI 4.736 C 0.340 0.300 0.300 - - - 94.0088.78%V.Satisfac<strong>to</strong>ryYap Mabuhay Enterprises,Inc.15540Completion of Multi-Purpose Bldg.,Brgy. BenitezFinal XII 0.943 C 0.376 0.300 0.300 - - - 97.6090.32%OutstandingYap Mabuhay Enterprises,Incorporated15540Completion of Multi-Purpose Bldg.@ Zone II1st XII 0.864 O 0.359 0.224 0.100 0.023 0.028 0.100 83.40 -YCT Builders Center Co. 23830YCT Builders Center, Co.Inc.YCT Builders Center, Co.Inc.Const. of 1 Cl Standard Sch. Bldg. atJimalalud NHS1st VII 0.406 O 0.<strong>31</strong>4 0.275 0.100 0.030 0.035 0.100 85.40 -23830 Const. of 2CL S/B @ Dungcan E/S Final VII 0.711 C 0.367 0.100 0.300 - - - 76.7023830Impvt. of Nat'l Road (Missing Link)along Vallehermoso-La CastellanaRoad1st/Final VII 2.454 C 0.330 0.149 0.300 - - - 77.9077.96%Satisfac<strong>to</strong>ry77.90%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 186


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONYCT Builders Center, Co.Inc. (Formerly YCTBuilders Center Co.)23830Impv't./Repair of DNR Sta. Cruz,TayasanFinal VII 0.886 C 0.321 0.290 0.300 - - - 91.1057.08%PoorYL Trading GeneralMerchandising22543Conc. of Iloilo-Antique Rd. alongPob. CulasiFinal VI 9.622 C 0.353 0.300 0.300 - - - 95.3093.29%OutstandingYL Trading GeneralMerchandising22543Conc. of Iloilo-Antique Rd. alongPoblacion Culasi, Antique NationalRoad ( w/ exception)1st VI 9.622 O 0.340 0.261 0.100 0.030 0.047 0.100 87.80 -YL Trading GeneralMerchandising22543Conc. of the Gap Portion of Iloilo-Antique Road, Culasi Section1st VI 4.814 O 0.365 0.225 0.100 0.023 0.037 0.100 85.00 -YL Trading GeneralMerchandising22543Yoyen Enterprises 15541Yoyen Enterprises 15541Concreting of 247.50 L.M. NationalRoadCompletion of Multi Purpose Hall @Brgy. JaenaConst. of Divisoria-Libertad-AntipoloMabini-Liong-Nabangig RoadFinal VI 2.886 C 0.345 0.115 0.300 - - - 76.0078.10%Satisfac<strong>to</strong>ry1st VIII 0.462 O 0.264 0.263 0.100 0.000 0.027 0.100 75.40 -1st V 3.673 O 0.272 0.225 0.100 0.015 0.014 0.100 72.60 -Yoyen Enterprises 15541 Const. of Farm-<strong>to</strong>-Market Road Final VIII 1.840 C 0.261 0.300 0.300 - - - 86.10Yoyen Enterprises 15541Yoyen Enterprises 15541Rehab./Deepening of Can-Un<strong>to</strong>gRiver ControlRepair/Res<strong>to</strong>ration of BuenavistaSlope Protection1st/Final VIII 9.461 C 0.381 0.275 0.300 - - - 95.601st/Final VIII 0.248 C 0.3<strong>31</strong> 0.300 0.300 - - - 93.1076.44%Satisfac<strong>to</strong>ry95.60%Outstanding93.10%OutstandingYS Construction 11928Conc. of Sta. Fe-Magtangtang RoadLeading <strong>to</strong> Francisco Dagohoy Cave1st VII 0.947 O 0.301 0.153 0.070 0.020 0.045 0.067 65.60 -YS Construction 11928Const. of Drainage Project (Outfall),Tagbilaran City-San Jose St.1st VII 9.380 O 0.298 0.192 0.100 0.030 0.042 0.200 86.20 -YSL Builders 19516Conc./Rehab. of Punta-Dansullan-Cogon-Sergio Osmena RoadFinal IX 2.706 C 0.251 0.193 0.300 - - - 74.4083.70%V.Satisfac<strong>to</strong>ryYSL Builders 19516Concreting of Liloy-Labason Road(Ganase-Patawag Sect.)Final IX 4.637 C 0.355 0.300 0.300 - - - 95.50YSL Builders 19516 Const. of MPB (Mini Gym) 1st/Final IX 1.079 C 0.383 0.000 0.300 - - - 68.3092.50%Outstanding68.30%FairYSL Builders 19516Proposed Concreting of Liloy-Labason Road (Patawag Section)Final IX 4.632 C 0.392 0.295 0.300 - - - 98.7096.78%OutstandingYu Construction 10470 Concreting of Corella-Sikatuna Road 1st VII 9.187 O 0.342 0.247 0.100 0.030 0.037 0.100 85.60 -<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 187


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONYU Construction - ARNBuilders joint ventureYU Construction - ARNBuilders joint ventureZ & L Construction &SuppliesJV-06-006JV-06-006Const. of Dam Embankment - PhaseIII, Talibon Small Resrvior IrrigationProjectConst. of Dam Embankment - PhaseIII, Talibon Small Resrvior IrrigationProject1st/Final1st/FinalNIARegion VIINIARegion VII14.799 O 0.293 0.300 0.300 - - - 89.30 -14.799 O 0.293 0.300 0.300 - - - 89.3025322 Const. of Multi-Purpose Bldg. Final X 0.681 C 0.396 0.259 0.300 - - - 95.5089.30%V.Satisfac<strong>to</strong>ry90.53%OutstandingZ.A.S. Construction 8971Concreting of Critical Portion alongJulita-Balaquid Road SectionFinal VIII 2.678 C 0.349 0.300 0.300 - - - 94.9072.97%Satisfac<strong>to</strong>ryZ.A.S. Construction 8971Const. of Multi-Purpose Building(Health Center)Final VIII 0.189 C 0.365 0.300 0.300 - - - 96.50Z.F. Construction 17676 Const. of 2-CL Building 1st/Final III 0.809 C 0.345 0.300 0.300 - - - 94.50Zabu Engineering <strong>31</strong>104Zabu Engineering <strong>31</strong>104Zet Construction 12615Completion of School Bldg., atSPED CenterConst./ Rehab./Impv't. ofAngngalipan FMR RoadDevelopment of Babak Port,Reclamation and Reconstruction ofRORO Ramp1st/Final CAR 0.293 C 0.362 0.300 0.300 - - - 96.20Final CAR 0.960 C 0.267 0.300 0.300 - - - 86.7093.42%Outstanding94.50%Outstanding96.20%Outstanding90.48%Outstanding1st PPA 46.636 O 0.400 0.300 0.100 0.030 0.050 0.100 98.00 -Zillion Builders 15655Completion of Marouy Multi-Purpose Building, DPWH Compound1st IVA 4.810 O 0.369 0.240 0.100 0.030 0.055 0.100 89.40 -Zion Construction(Formerly: MasterpieceConst. & Supply14881Const./Repair of Two (2) S<strong>to</strong>reyIndustrial Building At Badian NHS1st/Final VII 1.855 C 0.255 0.300 0.300 - - - 85.5085.50%V.Satisfac<strong>to</strong>ryZM Construction 9052Asphalt Overlay along Iba NationalRoad Candelaria Section1st/Final III 4.850 C 0.373 0.207 0.300 - - - 88.0088.00%V.Satisfac<strong>to</strong>ryZM Construction 9052 Concreting of Balacbac Brgy. Road Final III 0.933 C 0.479 - 0.500 - - - 97.9081.90%V.Satisfac<strong>to</strong>ryZMS Construction 10471Conc. of Imelda-Alicia Road,Guin<strong>to</strong>lan SectionFinal IX 4.810 C 0.238 0.208 0.300 - - - 74.6074.30%Satisfac<strong>to</strong>ryZMS Construction 10471Const. of Demorok Bridge &Approaches, Phase II, Josefina-Sergio Osmena Nat'l RoadFinal IX 4.499 C 0.155 0.300 0.300 - - - 75.5079.76%Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 188


CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT<strong>CPES</strong> <strong>Report</strong>s - On-going and Completed Projects from <strong>Jan</strong>uary 1, <strong>2005</strong> <strong>to</strong> <strong>Dec</strong>ember <strong>31</strong>, 2007NAME of CONSTRUCTOR LICENSENO.PROJECT NAMENO. ofVISITIMPL.AGENCYCONTRACTAMOUNT(Php, M)STATUSWMS MTL TIME FAC ESH RDR0.40/0.50 0.3000.10/0.5 0.030 0.070 0.100<strong>CPES</strong>RATINGFINAL RATING/QUALITATIVEDESCRIPTIONZMS Construction 10471Const. of Demorok Bridge &Approaches, Phase III, Josefina-Sergio Osmena Nat'l Road2nd IX 7.199 O 0.214 0.300 0.100 0.020 0.042 0.100 77.60 -ZMS Construction 10471ZMS Construction 10471ZMS Construction 10471Const. of Demorok Bridge &Approaches, Phase III, Josefina-Sergio Osmena Nat'l RoadImpv't./Concrete Paving of RoadPagadian-Buug Road Section,Segment II, Phase I along Pagadian-Ipil RoadImpv't./Concrete Paving of RoadPagadian-Buug Road Section,Segment II, Phase I along Pagadian-Ipil Road3rd IX 7.199 O 0.275 0.225 0.070 0.015 0.035 0.067 68.70 -1st IX 23.264 O 0.334 0.300 0.100 0.030 0.041 0.100 90.50 -Final IX 23.264 C 0.367 0.225 0.300 - - - 89.2089.98%V.Satisfac<strong>to</strong>ryZoniuq Enterprises 25223Improvement of Roads, Salasad(Brgy. Lumot-Mahipon)1st/Final IV-A 0.286 C 0.406 - 0.500 - - - 90.6090.60%OutstandingZota Trading andConstruction21424Const. of Multi-Purpose Building @Ceralde E/S1st/Final I 0.479 C 0.366 0.206 0.300 - - - 87.2087.20%V.Satisfac<strong>to</strong>ry<strong>CPES</strong> <strong>Report</strong> <strong>Jan</strong>uary 1, <strong>2005</strong> - <strong>Dec</strong>ember <strong>31</strong>, 2007.xls / Masterlist 6th <strong>CPES</strong> release Page 189