Bachwinkl: 0.12 MW hydropower plant<br />
>> In spring 1905 the community of Saalfelden ordered the building of the power station.<br />
At the end of the same year, the plant was launched.<br />
>> 800 bulbs, four irons and a 10-HP- engine have been energised.<br />
>> In 1954 the power station was taken over by the “SAFE”.<br />
>> Reconstructions were made in the year 1992.<br />
Key Data<br />
www.<strong>water</strong><strong>service</strong><strong>group</strong>.com<br />
appendix<br />
select. project<br />
description<br />
>> Project name: Diverted flow power station Bachwinkl (Saalfelden)<br />
>> Technology: 1 dual-trace Peltonturbine with horizontal spindle<br />
>> Catchment area: 3.6 km²<br />
>> Average annual production: 520 MWh<br />
>> Nominal capacity: 120 kWel<br />
>> Gross head: 116.15 m<br />
>> Contracted <strong>water</strong> quantity: 0.14 m³/s<br />
>> Start-up: 1905<br />