11.07.2015 Views

Videos bring sustainability to life BG Australia Chairman ... - QGC

Videos bring sustainability to life BG Australia Chairman ... - QGC

Videos bring sustainability to life BG Australia Chairman ... - QGC

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project UpdateUpstream Project Direc<strong>to</strong>rTheo RoderburgAcross the Upstream, teamsare working hard <strong>to</strong> deliverthe equipment, infrastructureand construction we need <strong>to</strong>produce first LNG in 2014.Safety remains our priority.Our One Team of <strong>QGC</strong> staffand contrac<strong>to</strong>rs has a systemof observing workplaces andbehaviours and speaking upand intervening when we thinkhealth and safety performancecould be improved.In 2013 we have completedmore than 4,000 observationsand interventions andI am encouraging teams <strong>to</strong>keep putting safety first.<strong>QGC</strong> regularly holds safetytraining for supervisors andWorleyParsons and Toll at theMiles supply base. The purposeis <strong>to</strong> ensure our approach isaligned with our contrac<strong>to</strong>rs.Project wise, we are makinggood progress. Well-siteinstallations are a critical par<strong>to</strong>f delivering the UpstreamProject and we’re upping thepace on this work. April saw47 well sites reach mechanicalcompletion, a great effort bythe team.Construction of our fieldcompression stations isprogressing <strong>to</strong> plan.On the opposite page you canread about a way of workingwe recently piloted at the Davidfield compression station. Itwas a successful trial of frontloading<strong>QGC</strong> and contrac<strong>to</strong>rresources <strong>to</strong> complete theDavid site in eight weeks.Other Southern region fieldcompression stations areprogressing well.At the Ruby Jo site all civilworks are completed,major equipment has beeninstalled and hydrotestinghas commenced.At the Harry site the flare stackhas been installed along witha metering skid and InterimLocal Equipment Room switchrooms are in place at bothHarry and Broadwater fieldcompression stations.In addition <strong>to</strong> the relocatablewater treatment plant nowrunning 24 hours a day atKenya, water was pumpedfor the first time through thereverse osmosis system at thelarger Kenya water treatmentplant on 1 May.The water was pumpedmanually and work is nowcontinuing <strong>to</strong> fine tune theau<strong>to</strong> sequence.The Kenya water treatmentplant is expected <strong>to</strong> becompleted in the third quarterof this year.Work on our camps is movingahead swiftly <strong>to</strong> provide acomfortable base for our siteworkers. Permanent water,power and sewage servicesare now in place at the RubyJo main camp.This facility has more than660 beds and recently passeda miles<strong>to</strong>ne inspection.Plus, an additional 240 bedsare now ready for use atthe Ruby Jo constructioncamp and a further 150 bedshave come online at theJordan camp.Across the Upstream, crewshave been working hard <strong>to</strong>:• complete strength testing ongathering lines as part of theoperation <strong>to</strong> complete theDavid field compression site• get the pad ready for pilingat the Bellevue centralcompression station• complete all structuralsteel at the WoleebeeCreek substation• place the instrumentrooms at Broadwater fieldcompression stationThe Chinchilla OperationsCentre is now up and runningin Taylor Street, giving theUpstream Projects teama direct operations andcommand link <strong>to</strong> colleaguesin Brisbane and sites acrossthe Surat Basin.At the Ruby Jo site all civil works are completed, major equipment has been installed and hydrotesting has commencedour business JUNE 2013Page 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!