11.07.2015 Views

project for 400 kv interconnection between power systems of ...

project for 400 kv interconnection between power systems of ...

project for 400 kv interconnection between power systems of ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Study <strong>for</strong> Optimization <strong>of</strong> Connection Point <strong>of</strong> new <strong>400</strong> kV Interconnection to SerbiaTransmission capacitiesIn calculation <strong>of</strong> transmission capacities, the exchange <strong>of</strong> energy can be simulated <strong>between</strong>following areas:– TBC <strong>for</strong> northern Macedonian interface[BUL + SER + MN] ↔ [MKD + GRE +ALB]– TBC <strong>for</strong> southern Macedonian interface[MKD + BUL + SER + MN] ↔ [GRE +ALB]ROBIHSRMNBGMKALGRFigure 8. Definition <strong>of</strong> import/export areas <strong>for</strong> TBC calculationIn most <strong>of</strong> the cases, during calculation <strong>of</strong> transmission capacities, critical event is outage <strong>of</strong> onecircuit <strong>of</strong> double circuit <strong>400</strong> kV line S<strong>of</strong>ia West – C. Mogila, which leads to overloading <strong>of</strong> the secondcircuit. Only in calculation <strong>of</strong> transmission capacities <strong>of</strong> the southern interface in variants 3a and 3b, outage<strong>of</strong> the new <strong>400</strong> kV <strong>interconnection</strong> Filippi (Greece) – Maritza East (Bulgaria) can cause overloading <strong>of</strong> theplanned <strong>400</strong> kV <strong>interconnection</strong> Kexru (near to Filippi, Greece) – Babaeski (Turkey).Analyses show that bottlenecks <strong>of</strong> the cross border transmission are located in the eastern parts <strong>of</strong>the regional transmission network. Building new <strong>interconnection</strong>s will strengthen the network and the majorpart <strong>of</strong> the transits will be drawn in the middle part, through Macedonian network. Consequently, flows onoverloaded critical lines are reduced and transmission capacities <strong>of</strong> the network are increased.Variant 3b has the smallest influence on increasing TBC, in reference to basic network topology.Variant 3a has the biggest growth <strong>of</strong> TBC on the northern interface <strong>of</strong> 259 MW. This variant causes thebiggest increase <strong>of</strong> the capacity <strong>for</strong> the whole region also, <strong>for</strong> over 500 MW. Variant 2 causes the biggestincrease <strong>of</strong> the capacity on the southern interface <strong>for</strong> over 187 MW.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!