project for 400 kv interconnection between power systems of ...
project for 400 kv interconnection between power systems of ...
project for 400 kv interconnection between power systems of ...
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Study <strong>for</strong> Optimization <strong>of</strong> Connection Point <strong>of</strong> new <strong>400</strong> kV Interconnection to SerbiaTransmission capacitiesIn calculation <strong>of</strong> transmission capacities, the exchange <strong>of</strong> energy can be simulated <strong>between</strong>following areas:– TBC <strong>for</strong> northern Macedonian interface[BUL + SER + MN] ↔ [MKD + GRE +ALB]– TBC <strong>for</strong> southern Macedonian interface[MKD + BUL + SER + MN] ↔ [GRE +ALB]ROBIHSRMNBGMKALGRFigure 8. Definition <strong>of</strong> import/export areas <strong>for</strong> TBC calculationIn most <strong>of</strong> the cases, during calculation <strong>of</strong> transmission capacities, critical event is outage <strong>of</strong> onecircuit <strong>of</strong> double circuit <strong>400</strong> kV line S<strong>of</strong>ia West – C. Mogila, which leads to overloading <strong>of</strong> the secondcircuit. Only in calculation <strong>of</strong> transmission capacities <strong>of</strong> the southern interface in variants 3a and 3b, outage<strong>of</strong> the new <strong>400</strong> kV <strong>interconnection</strong> Filippi (Greece) – Maritza East (Bulgaria) can cause overloading <strong>of</strong> theplanned <strong>400</strong> kV <strong>interconnection</strong> Kexru (near to Filippi, Greece) – Babaeski (Turkey).Analyses show that bottlenecks <strong>of</strong> the cross border transmission are located in the eastern parts <strong>of</strong>the regional transmission network. Building new <strong>interconnection</strong>s will strengthen the network and the majorpart <strong>of</strong> the transits will be drawn in the middle part, through Macedonian network. Consequently, flows onoverloaded critical lines are reduced and transmission capacities <strong>of</strong> the network are increased.Variant 3b has the smallest influence on increasing TBC, in reference to basic network topology.Variant 3a has the biggest growth <strong>of</strong> TBC on the northern interface <strong>of</strong> 259 MW. This variant causes thebiggest increase <strong>of</strong> the capacity <strong>for</strong> the whole region also, <strong>for</strong> over 500 MW. Variant 2 causes the biggestincrease <strong>of</strong> the capacity on the southern interface <strong>for</strong> over 187 MW.10