11.07.2015 Views

GROUND ARRAY INSTALLATION MANUAL June, 2010

GROUND ARRAY INSTALLATION MANUAL June, 2010

GROUND ARRAY INSTALLATION MANUAL June, 2010

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>GROUND</strong> <strong>ARRAY</strong> <strong>INSTALLATION</strong> <strong>MANUAL</strong> <strong>June</strong>, <strong>2010</strong>3. Build two pairs of batterboards to hold the mason’s lines: one pair for front posts and other for rear posts.4. Measure the post heights and cut the posts :• Insert each post to hole and mark the post heights for cutting‐off.• Cut the posts to the marked kdlengths: the maximum allowable high h differences between all postsper row is 1.0”. Pipe Cap Kit can be adjusted upon to 1.0”.<strong>2010</strong> by Sunmodo Corp. All rights reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!