11.07.2015 Views

Annual Report 2007 - Global Energy Development

Annual Report 2007 - Global Energy Development

Annual Report 2007 - Global Energy Development

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

06 Vice Chairman and Managing Director’s review<strong>Global</strong> <strong>Energy</strong> <strong>Development</strong> PLC<strong>Annual</strong> report <strong>2007</strong>Vice Chairman and Managing Director’s review continuedAerial viewof the PaloBlancoproductionfacilities withinthe Alcaravancontract inColombiaProductionfacilities at thePalo Blancofield within theAlcaravancontract inColombiaOverview of contracts and activitiesThe Company currently holds five contracts in Colombia, onecontract in Peru and one contract in Panama. The Company iscurrently fully compliant with the terms of each of thesecontracts.During <strong>2007</strong>, the Company undertook drilling at the ColombianLuna Llena contract. The first well, Luna Llena 1, tested freshformation water with small traces of hydrocarbons. While thesecond well, Luna Llena 2, proved the existence of a productivehorizon and possibly significant reserves, an independenttechnical study indicated that a major portion of these reserveswere located underneath or in close proximity to the Meta Rivermeaning a very capital intensive work programme would beneeded to potentially realise these reserves and that commercialdevelopment would be very high risk. Although the Companyexceeded the capital investment obligations for the initial phaseof the contract, the complications resulting from the location ofthe reserves and potential environmental restrictions, theunexpected additional capital requirement and very restrictiverainy season resulted in the Company not being able to meet allof the specific work commitments within the time periodprovided for under the contract. As a result, as at 31 March 2008the Company no longer held the contract. The Luna Llenacontract, however, accounted for no reserves within the <strong>2007</strong>Reserve <strong>Report</strong> and only 341,000 BOE of 3P reserves in the2006 Reserve <strong>Report</strong>.During <strong>2007</strong>, the Colombian Los Sauces contract was alsoterminated and relinquished to the National HydrocarbonsAgency of the Republic of Colombia (“ANH”) as the Companywas unable to secure a rig due to industry-wide equipmentavailability constraints and therefore unable to complete its workobligations under the contract. The Los Sauces contractaccounted for none of the Company’s reserves in either the2006 or <strong>2007</strong> Reserve <strong>Report</strong>s.Drilling equipment for the Boral 1 wellwithin the Rio Verde contract in Colombia

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!