12.07.2015 Views

Approval and Partial Denial of Permit Modification Request to ...

Approval and Partial Denial of Permit Modification Request to ...

Approval and Partial Denial of Permit Modification Request to ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Wa.(LC l~olaL i! 1I1 1'ilclL l'lanlHiV,ordnuS Wa.'LC I'Cmlit"'- " r.. ,~. ¥ll~b"IIII" ~I "til4.6.1. Geomechanical Moni<strong>to</strong>ring4.6. I .1. Implementation <strong>of</strong> Geomechanical Moni<strong>to</strong>ring ProgramThe <strong>Permit</strong>tees shall implement a geomechanical moni<strong>to</strong>ring program ineach Underground HWDU as specified in Pennit Attachment A2. SectionA2-Sb(2), "Geomechanical Moni<strong>to</strong>ring" <strong>and</strong> as required by 20.4.1.500NMAC (incorporating 40 CFR §264.602).4.6.) .2. Reporting RequirementsThe <strong>Permit</strong>tees shall submit <strong>to</strong> the Secretary an annual report in Oc<strong>to</strong>berevaluating the geomechanical moni<strong>to</strong>ring program <strong>and</strong> shall includegeomechanical data collected from each Underground HWDU during theprevious year, as specified in Pennit Attachment A2. Section A2-5b(2)."Geomechanical Moni<strong>to</strong>ring", <strong>and</strong> shall also include a map showing thecurrent status <strong>of</strong> HWDU mining. The Pennittees shall also submit at thattime an annual certification by a registered pr<strong>of</strong>essional engineercertifying the stability <strong>of</strong> any explosion-isolation walls. The Pennitteesshall post a link <strong>to</strong> the geomechanicai moni<strong>to</strong>ring report transmittal letteron the WIPP Home Page <strong>and</strong> infonn those on the e-mail notification listas specified in <strong>Permit</strong> Section J . 11 .4.6.1.3. Notification <strong>of</strong> Adverse ConditionsWhen evaluation <strong>of</strong> the geomechanical moni<strong>to</strong>ring system data identifiesa trend <strong>to</strong>wards unstable conditions which reqUires a decision whether <strong>to</strong>tenninate waste disposal activities in any Underground HWDU, thePennittees shall provide the Secretary with the same report provided <strong>to</strong>the WIPP Operations Manager within seven calendar days <strong>of</strong> its issuance.as specified in <strong>Permit</strong> Attachment A2. Section A2-5b(2)(a). "Description<strong>of</strong> the Geomechanical Moni<strong>to</strong>ring System". The <strong>Permit</strong>tees shall post alink <strong>to</strong> the adverse condition notice transmittal letter on the WIPP HomePage <strong>and</strong> inform those on the e-mail notification list as specified in<strong>Permit</strong> Section l.ll.4.6.2. Reposi<strong>to</strong>ry Volatile Organic Compound Moni<strong>to</strong>ring4.6.2.1. Implementation <strong>of</strong> Reposi<strong>to</strong>ry VOC Moni<strong>to</strong>ringThe <strong>Permit</strong>tees shall implement reposi<strong>to</strong>ry VOC moni<strong>to</strong>ring as specifiedin <strong>Permit</strong> Attachment N (Volatile Organic Compound Moni<strong>to</strong>ring Plan)<strong>and</strong> as required by 20.4.I.Soo NMAC (incorporating 40 CFR §264.602<strong>and</strong> §264.60I(c» . The Permillees shall implement reposi<strong>to</strong>ry VOCmoni<strong>to</strong>ring until the certified closure <strong>of</strong> all Underground HWDUs.PERMIT PART 4Page 4-8 <strong>of</strong> IS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!