12.07.2015 Views

Meeting Minutes - March 5, 2013 - Green Line Extension Project

Meeting Minutes - March 5, 2013 - Green Line Extension Project

Meeting Minutes - March 5, 2013 - Green Line Extension Project

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

May 8, <strong>2013</strong>Page 6 of 6Q: Where can one find studies of existing baseline noise levels and projected increase?A: Those studies are available on the project website, www.greenlineextension.org.Q: Will the new pipe be connected to old pipe?A: The old pipe is to remain in place until the new pipe is ready for connections and then it will befilled.Q: When are you going to start to dig up Winchester St?A: The middle of April.Mayor McGlynn wrapped up the meeting by assuring everyone that the concerns they have arelegitimate, but that almost everything can be worked out through communication with the <strong>Project</strong> Teamor the Mayor’s Office.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!