12.07.2015 Views

CSU CIVE 539 Guest Lecture - Big Thompson Watershed Forum

CSU CIVE 539 Guest Lecture - Big Thompson Watershed Forum

CSU CIVE 539 Guest Lecture - Big Thompson Watershed Forum

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Our MissionTo protect and improvewater quality in the <strong>Big</strong><strong>Thompson</strong> River<strong>Watershed</strong> throughcollaborative, monitoring,assessment, educationand restorationprograms….


COOP Monitoring Program• 15 (historically 20) flowing water sites are included in thisprogram (natural flowing waterbodies and canals).• Samples are collected 10x year, monthly, February- November.• Three extra nutrient samples also collected at 5 sites; May,June, July.• Canals are flowing water sites associated with the Colorado <strong>Big</strong><strong>Thompson</strong> Project (C-BT) and are now monitored by NorthernWater.• <strong>Forum</strong> partners monitor the major lakes and reservoirs in thewatershed: Boyd, Carter, Estes, Horseshoe, Horsetooth &Loveland.• 27 chemistry parameters & 5 physical parameters are collectedby USGS at each site in addition instantaneous dischargemeasurements.


Volunteer Monitoring Program• 12 flowing water sites are included in this program to address gapsin the <strong>Forum</strong>'s Cooperative Monitoring and Assessment Program andwaters east of I-25.• Samples collected 8x year, monthly, April – November.• 10 Volunteers and BTWF staff conduct all field work.• USEPA 8 WQL does all analyses.• 26 chemistry parameters & 5 physical parameters are collected ateach site.• QAPP with USEPA 8 and WQL directs monitoring.


Water Quality Variables AnalyzedNutrients• Ammonia• Ammonia plus organic nitrogen• Nnitrite+Nitrate nitrogen• Total nitrogen• Orthophosphate• Total phosphorus• TKNMicrobiology• Escherichia coli (E. Coli.)• Total coliformNP STORET Access DatabaseMetals• Dissolved Metals• Total Recoverable MetalsGeneral Water Quality Variables• Alkalinity• Hardness• Chlorophyll a• Dissolved oxygen• Specific conductance• Temperature• Salinity• pH• Turbidity• Total organic carbon


USGS Sample Site M10Rocky Mountain National Park at Moraine Park


# Site Water Body DescriptionCooperative Monitoring Program1 T10 North Fork of <strong>Big</strong> T. Upstream of confluence with <strong>Big</strong> <strong>Thompson</strong> River2 T20 Buckhorn Creek Upstream of confluence with <strong>Big</strong> <strong>Thompson</strong> River3 M10 <strong>Big</strong> <strong>Thompson</strong>Downstream of Moraine Park – USGS Benchmark Site;coincides with volunteer program site 7954 M20 <strong>Big</strong> <strong>Thompson</strong> Upstream of Estes Park Sanitation District Outfall5 M30 <strong>Big</strong> <strong>Thompson</strong> Downstream of Estes Park Sanitation District Outlet6 M40 <strong>Big</strong> <strong>Thompson</strong>Downstream of Olympus Dam/Upstream of Upper <strong>Thompson</strong>Sanitation District Outfall7 M50 <strong>Big</strong> <strong>Thompson</strong> Downstream of Upper <strong>Thompson</strong> Sanitation District Outfall8 M60 <strong>Big</strong> <strong>Thompson</strong> Drake, upstream of confluence with North Fork9 M70 <strong>Big</strong> <strong>Thompson</strong> Upstream of Dille Tunnel Diversion10 M90 <strong>Big</strong> <strong>Thompson</strong>Upstream of Loveland Drinking Water Plant Intake; coincideswith volunteer program site M5011 M130 <strong>Big</strong> <strong>Thompson</strong> Upstream of Loveland Wastewater Outfall (St. Louis St.)12 M140 <strong>Big</strong> <strong>Thompson</strong> Downstream of Loveland Wastewater Outfall (Co. Rd. 9E)13 M150 <strong>Big</strong> <strong>Thompson</strong>14 C10 Adams Tunnel East Portal - Adams Tunnel15 C20 Olympus Tunnel Tunnel Outlet of Lake EstesI-25 (last BTWF station on <strong>Big</strong> <strong>Thompson</strong> River network forthe Coop Program)


# Site Water Body DescriptionVolunteer Monitoring Program1 VM05 <strong>Big</strong> <strong>Thompson</strong>Last station on <strong>Big</strong> <strong>Thompson</strong> before entering the South PlatteRiver near Milliken.2 VM10 <strong>Big</strong> <strong>Thompson</strong>Outlet of <strong>Big</strong> <strong>Thompson</strong> before confluence with Little<strong>Thompson</strong>.3 VM20 <strong>Big</strong> <strong>Thompson</strong> Upstream of proposed permitted wastewater discharge.4 VM30 <strong>Big</strong> <strong>Thompson</strong> Below the Mariano Exchange Ditch.5 VM40 <strong>Big</strong> <strong>Thompson</strong> Above the Mariano Exchange Ditch.6 VM50 <strong>Big</strong> <strong>Thompson</strong> Site split with Cooperative Monitoring Program (M90)7 VT05 Little <strong>Thompson</strong>Contribution from the Little <strong>Thompson</strong> watershed;downstream of the Johnstown WWTP.VT10 Little <strong>Thompson</strong> County Road (CR) 19 (discontinued in 2008)8 VT15 Little <strong>Thompson</strong>CR 3; downstream of Berthoud WWTP; lower reach9 VT20 Little <strong>Thompson</strong>CR 15a; upstream of Berthoud WWTP-old bridge; middlereach.VT30 Little <strong>Thompson</strong> County Line Road (discontinued in 2011)10 794 Glacier Creek Outlet of upper watershed major tributary to <strong>Big</strong> <strong>Thompson</strong>.11 NFBT10 North Fork <strong>Big</strong> <strong>Thompson</strong>12 FR05 Fall RiverUpper to central system site to measure impacts from upperreach tributaries; to compliment site T10 in the Coop Program.Contribution from Fall River <strong>Watershed</strong>; located in northern partof Town of Estes Park just before confluence with the <strong>Big</strong><strong>Thompson</strong> River.


Little <strong>Thompson</strong> River VT30 (DNS)


Little <strong>Thompson</strong> River VT30 (UPS)


Little <strong>Thompson</strong> River VT30


Little <strong>Thompson</strong> River VT20 (DNS)


Little <strong>Thompson</strong> River VT20 (UPS)


Little <strong>Thompson</strong> River VT20


Little <strong>Thompson</strong> River VT15 (UPS)


Little <strong>Thompson</strong> River VT15


Little <strong>Thompson</strong> River VT15


Little <strong>Thompson</strong> River VT10 (DNS)


Little <strong>Thompson</strong> River VT10 (UPS)


Little <strong>Thompson</strong> River VT10


Little <strong>Thompson</strong> River VT05 (DNS)


Little <strong>Thompson</strong> River VT05 (UPS)


Little <strong>Thompson</strong> River VT05


CFU / 100 ml600Little <strong>Thompson</strong> River - BTWF Site VT30E. Coli Results 2001-20111,120 1,400500400300E.ColiE.Coli Std.2001000Date


CFU / 100 ml26002400Little <strong>Thompson</strong> River - BTWF Site VT20E. Coli Results 2001-201216,000 9,1002200200018001600140012001000E.ColiE.Coli Std.8006004002000Date


CFU / 100 ml2600Little <strong>Thompson</strong> River - BTWF Site VT15E. Coli Results 2010-201224002200200018001600140012001000E.ColiE.Coli Std.8006004002000Date


CFU / 100 ml2600Little <strong>Thompson</strong> River - BTWF Site VT10E. Coli Results 2001-200724002200200018001600140012001000E.ColiE.Coli Std.8006004002000Date


CFU / 100 ml1800Little <strong>Thompson</strong> River - BTWF Site VT05E. Coli Results 2008-20121600140012001000800E.ColiE.Coli Std.6004002000Date


CFU / 110 ml1800Little <strong>Thompson</strong> River - All SitesE. Coli Results 2001-20121600140012001000VT05VT10VT15800600VT20VT30E.Coli Std.4002000Date


mg/LLittle <strong>Thompson</strong> Sites - Total Nitrogen - 20129.008.007.006.00VT05 TN5.00VT15 TN4.00VT20 TN3.00TN Criteria2.001.000.00Date


mg/LLittle <strong>Thompson</strong> Sites - Total Phosphorus - 20121.101.000.900.800.700.600.50VT05 TPVT15 TPVT20 TPTP Criteria0.400.300.200.100.00Date


I have this one and the farm day camp.....Thank You Zack Shelley<strong>Big</strong> <strong>Thompson</strong> <strong>Watershed</strong> <strong>Forum</strong>970-613-6163zshelley@btwatershed.org

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!