12.07.2015 Views

Generating carbon credits from the Kenyan dairy industry: A pilot study

Generating carbon credits from the Kenyan dairy industry: A pilot study

Generating carbon credits from the Kenyan dairy industry: A pilot study

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Generating</strong> <strong>carbon</strong> <strong>credits</strong><strong>from</strong> <strong>the</strong> <strong>Kenyan</strong> <strong>dairy</strong><strong>industry</strong>: A <strong>pilot</strong> <strong>study</strong>Simon Fraval,ILRI


Global AgendaandPayment forEnvironmentalServices


C sequestration project in China• Population increase• Reduced animalmovementsincreased animalnumbersOvergrazingClick to edit Master text stylesSecond levelThird levelLand degradationFourth levelFifth level• ClimatechangeReduced livestockproductivity• Income losses• Food• Reduced biomassproduction• Carbon losses• Biodiversity erosion• Disrupted water cycles


Payment forEnvironmentalServicesand<strong>the</strong> efficiencygap


Pilot project objectives• Feasibility assessment• Methodology development- Link efficiency gains to reductions inGHG emission intensity• Funding mechanism


Project conceptIncreased productivitygenerates lessemissions per unit ofmilk•Feeding for milk yield•Feed additives for emissionreduction•Waste management•Herd management.Including: milkerreplacement and retirement,genetics, and animal healthMeasuring reductionsin emissions andmeeting a buyer’sneeds•Site selection•Developing methodology•Baseline studies•Verifying emissions•Advertising to buyersFunds supportfarmers’ efforts todecrease emissionsthrough productivitygains•Providing credit for inputprocurement•Funding for extensionofficersAfter <strong>pilot</strong> project completion, assessviability for o<strong>the</strong>r sites


Efficiency gains as GHG mitigationMove <strong>from</strong> A to B:improve productivityand generate Carbon<strong>credits</strong>


Progress to-date• Scoping <strong>study</strong> and country selection• Forming a partnership between FAO, MLDand ILRI.• Stakeholder workshop with <strong>Kenyan</strong> ministriesand development partners• Site selection Shortlisting• Methodology development


Site selection


Focus geographical areas• Bomet, Kericho, western Nakuru, sou<strong>the</strong>rn Keiyo-marakwet, Uasin-Gishu, Nandi andwestern Nyandarua.


Active hubs for assessmentEADD hubNon-EADD hub


Hub selectionResources:• Existing data on 17 EADD hubs• Primary data collection <strong>from</strong> non-EADD hubsNon-EADD sites: 39Interviewed: 13


Hub selection ShortlistSelected hubO<strong>the</strong>rs


Hub selection – screeningsummary“Management <strong>the</strong>re can bedifficult to work with, <strong>the</strong>yhave to check everything with<strong>the</strong>ir less progressive board.”“They purchased acooler prematurely,this hub is financiallyconstrained.”


Hub selection – shortlist1) Kabiyet2) Tanykina3) Onesimus4) Ol Kalou5) Siongiroi6) ChepkorioThe opportunity to host <strong>the</strong> <strong>pilot</strong> project will betendered out by <strong>the</strong> Ministry of Co-operativeDevelopment


From selectionto <strong>pilot</strong>


Project conceptIncreased productivitygenerates lessemissions per unit ofmilk•Feeding for milk yield•Feed additives for emissionreduction•Waste management•Herd management.Including: milkerreplacement and retirement,genetics, and animal healthMeasuring reductionsin emissions andmeeting a buyer’sneeds•Site selection•Developing methodology•Baseline studies•Verifying emissions•Advertising to buyersFunds supportfarmers’ efforts todecrease emissionsthrough productivitygains•Providing credit for inputprocurement•Funding for extensionofficersAfter <strong>pilot</strong> project completion, assessviability for o<strong>the</strong>r sites


Next stepsSite selectionJan Feb Mar Apr May Jun Jul Aug Sept Oct Nov DecFeasibility <strong>study</strong>Methodology developmentBaseline <strong>study</strong>Buyer NegotiationsInterventionStakeholder workshop.29/1/2013Monitoring and evaluationPilot reviewCompletedTo be completedSite selectioncommenced September,2012Goal: Methodology and transfer mechanismavailable to global stakeholders


Thank you

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!