12.07.2015 Views

Slipway quote to Specification AME - Royal Yacht Club of Victoria

Slipway quote to Specification AME - Royal Yacht Club of Victoria

Slipway quote to Specification AME - Royal Yacht Club of Victoria

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1. The demolition cost includes the removal <strong>of</strong> the existing slipway <strong>to</strong> the northern edge <strong>of</strong> theTraverser. It does not include the dredging2. The quantity <strong>of</strong> dredging assumes a 3m wide trench with 1 in 5 side slopes in the s<strong>of</strong>tmaterial. The cost <strong>of</strong> disposal <strong>to</strong> land fill <strong>of</strong> contaminated material Type B has just beenincreased <strong>to</strong> a reported $1000/t. Testing is required <strong>to</strong> confirm this rate3. The piled slipway will comprise prefabricated steel modules 12m long and includes 40kg/mrail, 250UC rail beams and 200UC crossbeams and bracing. At this stage the piles are 327diameter with a 12mm wall. All members are painted for a longer life. The length <strong>of</strong> piles iscalculated from the underside <strong>of</strong> beams <strong>to</strong> the basalt.4. For the new western wall we adopted a galvanised 310UC with 2.4m precast concrete panelsslotted down in between. The wall is tied back with a capping beam and slab back <strong>to</strong> theexisting hardstand. The slab is suitable for a 40t travelift. It should be noted that there is avoid under the slab and with EPA approval we may be able <strong>to</strong> place some dredged spoil atthis location. This has not been included in the costs at this stage.5. Waste water capture facility has been estimated for both the hardstand and thecradle/maintenance area south <strong>of</strong> the traverser. As was the case at SYC, the EPA requiresthat all the waste from maintenance <strong>of</strong> boats must be captured and processed. Withoutknowing the current drainage system it is difficult <strong>to</strong> identify what works are required <strong>to</strong>improve the drainage <strong>of</strong> the areas <strong>to</strong> EPA requirements.6. Any modifications <strong>to</strong> the cradles that may be required because <strong>of</strong> the change <strong>to</strong> the gradien<strong>to</strong>f the slipway have not been addressed in the attached estimate7. The capacity and condition <strong>of</strong> the existing winch has not been considered at this stage. Anominal cost <strong>of</strong> $50,000 has been included <strong>to</strong> bring it up <strong>to</strong> capacity8. We have also applied a nominal structural steel rate <strong>to</strong> estimate the cost <strong>of</strong> a new traverserSummaryIn order <strong>to</strong> progress the estimate <strong>to</strong> a more accurate level the following additional information isand preliminary designs for the major structural members are required.Hydrographic and <strong>to</strong>pographic surveyContamination testing <strong>of</strong> material <strong>to</strong> be dredgedDiscussions with EPA regarding alternative disposal methods <strong>of</strong> dredged materialPreliminary designs and drawings for the new slipway, western wall and traverserCondition assessment <strong>of</strong> existing drainage systems <strong>to</strong> hardstand area and maintenance yardCondition assessment for existing winchAssessment <strong>of</strong> any cradle modifications if requiredBased on the information available and the RYCV Scope <strong>of</strong> Works, the preliminary cost for replacingthe slipway <strong>to</strong> EPA requirements is $1,959,612 including a 20% contingency which is appropriate atthis level <strong>of</strong> investigation. A breakdown <strong>of</strong> the costs is shown on the attached estimate sheet.2 Atkins Maritime Engineers Pty Ltd, PO Box 646 Black Rock VIC 3193 phone 61 3 9585 8185, 61 (0) 401 718 248


RYCV Replacement <strong>Slipway</strong>Preliminary Cost Estimate(Not for budget purposes)Bill <strong>of</strong> Quantity based on 96m length <strong>of</strong> slipwayItem Description size cost1 Demolition $ 30,000.002 Dredging (Contaminated)Marine 50m X 2.75m2 14000 Survey requiredLand 50m X 0.45m2 900Tip fees260000 TBC-Testing requiredSub Total 2749003 Piled <strong>Slipway</strong>Piles 327dia 12 @ 4m bents 60000Drive piles Total length 320m 150000Crossheads 16 X 200UC X 3m $ 22,500.00Rail Beams 2 X 250UC $ 85,440.00Bracing 64 X 64 $ 11,880.00Steel protection Interzone 951 $ 35,000.00Rails 2 X 96m $ 23,040.00Concrete Aprons 25m X 7m X .2m $ 43,200.00Transverse pathway 25m X 7m X .3m $ 63,600.00Lighting Overhead flood lights $ 5,000.00Sub Total $ 499,660.004 Extension <strong>of</strong> western hardstand and new 50m wallWestern wall concrete panels 2.4m X 0.2 X Length varies $ 27,500.00Install concrete panels $ 21,000.00Western wall galv piles 310UC $ 60,000.00Install piles $ 22,000.00Extension <strong>of</strong> hardstand slab 50m X 5m X 0.3 $ 90,000.00Fill behind new wall 50m X 4m2 $ 10,000.00Guard rail $ 5,000.00Sub Total $ 235,500.005 Renovate Wash down area <strong>to</strong> EPA Standard<strong>Slipway</strong> areaDrainage <strong>of</strong> wash down and maintenance yard 40m X 35m 140000 Civil worksBunding 150m X 0.03m2 11250Separation trap for first flush60000 MechanicalTripple intercep<strong>to</strong>r trapincluded aboveTravelift hardstand areaDrainage <strong>of</strong> hardstand and washdown 34m X 48m 163200 Civil worksBunding 164m X 0.03m2 12500Separation trap for first flush60000 MechanicalTripple intercep<strong>to</strong>r trapincluded aboveSub Total 4469506 Cradle Modifications Not included7 Remedial work on existing winch Plug cost 500008 New Traverser 32t load 96000$ 1,633,010.00Contingency 20% $ 326,602.00$1,959,612.00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!