SCOPE OF WORK AND SPECIAL CONDITIONS OF CONTRACT(SCC)<br />
Special Conditions <strong>of</strong> Contract <strong>and</strong> <strong>scope</strong> <strong>of</strong> <strong>work</strong> shall be read in<br />
conjunction with the General Conditions <strong>of</strong> Contract (for consultancy<br />
services), specifications <strong>of</strong> <strong>work</strong>, Drawings, Schedule <strong>of</strong> Rates ( SOR) <strong>and</strong><br />
any other document forming part <strong>of</strong> this <strong>contract</strong> wherever the context<br />
so requires.<br />
Where any portion <strong>of</strong> the General Conditions <strong>of</strong> Contract is<br />
repugnant to or at variance with any provisions <strong>of</strong> the Special Conditions<br />
<strong>of</strong> <strong>contract</strong> unless a different intention appears, the provision <strong>of</strong> the<br />
Special Conditions <strong>of</strong> Contract shall be deemed to override the<br />
provisions <strong>of</strong> the General Conditions <strong>of</strong> Contract <strong>and</strong> shall to the extent<br />
such repugnancy or variations, prevail.<br />
Project Description:<br />
Implementation <strong>of</strong> up-gradation <strong>of</strong> existing fire water system as per OISD-214<br />
in Despatch Terminal at Vizag <strong>and</strong> Receiving Terminal, Cheralapalli <strong>of</strong> VSPL LPG<br />
Pipeline.<br />
Introduction<br />
<strong>GAIL</strong> (India) Limited is operating LPG pipeline net<strong>work</strong> starting from Vizag in<br />
Andhra Pradesh to Secunderabad in Andhra Pradesh State. The pipeline is<br />
called as VSPL <strong>and</strong> it is meant for supplying LPG to various clients en route<br />
such as IOCL, BPCL <strong>and</strong> HPCL. The total length <strong>of</strong> the pipeline (mainline &<br />
spur lines) is approximately 580 Kms. <strong>and</strong> to maintain required flow in the<br />
pipeline, there is LPG Pumping/Booster Stations at Vizag, TOT Vijayawada<br />
<strong>and</strong> Receipt terminal at Cheralapally( near Secunderabad , AP).<br />
Consultant’s Scope <strong>of</strong> Work:<br />
The Project Management Consultant (PMC) is being appointed for executing<br />
the project(augmentation <strong>of</strong> the fire fighting system which is necessitated due to<br />
change in OISD 116/117 to OISD 214/144 ) right from Design to<br />
Commissioning based on M/S Mecon Limited report NO.<br />
MEC/05/28/23MN/<strong>GAIL</strong>/06 &7 (enclose as annexure-1) on total <strong>and</strong> single<br />
point responsibility basis. The PMC Project Manager will be the “Engineer-In<br />
charge” for the said Project <strong>and</strong> from <strong>GAIL</strong> Vizag <strong>and</strong> <strong>GAIL</strong>- Cheralapally<br />
HOD(F&S) shall be coordinator for respective sites. The <strong>scope</strong> <strong>of</strong> <strong>work</strong> <strong>of</strong> the<br />
PMC is broadly
defined under the following heads but not limited to:<br />
i. Design & Detail Engineering as per M/S Mecon Limited report NO.<br />
MEC/05/28/23MN/<strong>GAIL</strong>/06 (enclose as annexure-1).<br />
ii. Planning & Scheduling<br />
iii. Tendering & Ordering including Purchase <strong>of</strong> all equipment <strong>and</strong> materials,<br />
award <strong>of</strong> <strong>work</strong>s <strong>contract</strong>s, Custom clearance <strong>of</strong> foreign supplied items if any &<br />
their Transportation from Indian port to site etc. Tendering & Ordering to be<br />
done as per <strong>GAIL</strong>’s C&P Procedure.<br />
iv. Inspection/ Expediting <strong>of</strong> equipment/Materials being manufactured by<br />
vendors including <strong>contract</strong>ors supplied items <strong>and</strong> inspection <strong>of</strong> <strong>work</strong>s being<br />
carried out by the <strong>work</strong>s <strong>contract</strong>or, Quality assurance <strong>and</strong> Quality control.<br />
v. Stores Management & material accounting during the project time.<br />
vi. Construction Management & Supervision<br />
vii. Project Commissioning/ Commissioning Assistance.<br />
viii. Project Cost Control, Management & Monitoring.<br />
ix. Project close out.<br />
The <strong>scope</strong> <strong>of</strong> <strong>work</strong> broadly includes followings:<br />
i) Installation /replacement <strong>of</strong> approximately 200 metre <strong>of</strong> various size<br />
pipe in Vizag <strong>and</strong> 25 metre <strong>of</strong> various size pipe in Cherapally.<br />
ii) Installation /replacement <strong>of</strong> various size valves, strainers, flanges,<br />
hydrants, monitors, pressure gauge, switch <strong>and</strong> other accessories in<br />
Vizag <strong>and</strong> Cherapally.<br />
iii) Installation <strong>of</strong> additional water spray system in Vizag <strong>and</strong> Cherapally.<br />
iv) Installation <strong>of</strong> two nos. each new diesel driven 616(m3/hr) Fire water<br />
pumps with associated accessories on the existing fire water<br />
pumps(410 m3/hr) foundation with the required modification<br />
(Preferably by back <strong>of</strong> existing pumps by the pump vendor).<br />
v) Associated Fire detection <strong>and</strong> alarm system.<br />
vi) Associated Electrical & instrumentation <strong>work</strong>s.<br />
vii) Associated Civil <strong>work</strong>s<br />
viii) Installation <strong>of</strong> pressure safety valves<br />
PMC deliverables:<br />
The PMC is required to submit all deliverables within the schedule time line as<br />
per the requirement mentioned in various sections <strong>of</strong> this document. The<br />
deliverables includes all documents, drawings, Plan, Schedule, Costing, Best<br />
Practices, Replies etc mentioned under various disciplines <strong>of</strong> the WBS<br />
elements. The deliverables are summarized as under but not limited to:<br />
a) All Periodic Reports, Daily Progress Reports during construction,<br />
Customized Reports, presentations, best practices/ international practices<br />
required for submission to Management / External Agencies.
) All documents related to engineering, tendering, ordering, manufacturing,<br />
delivery, construction, commissioning.<br />
c) Stage wise recommendations<br />
d) Design basis, Data sheets, P& IDs, Engineering Drawings<br />
e) Project Cost reports<br />
f) Various types <strong>of</strong> Plan, Manuals including Risk & Disaster Management<br />
Plan<br />
g) Documentation for OISD compliance<br />
h) Performance Evaluation Reports <strong>of</strong> vendors / <strong>contract</strong>ors<br />
i) Project Close out reports<br />
j) Any type <strong>of</strong> report required for obtaining Statutory permissions by the<br />
authorities.<br />
k) Any other deliverable not mentioned here but required elsewhere in<br />
tender.<br />
Both hard <strong>and</strong> editable s<strong>of</strong>t copies to be provided.<br />
Time Schedule:<br />
The <strong>contract</strong>ual time frame <strong>of</strong> completion <strong>of</strong> total Fire water up gradation job<br />
for the PMC shall be 15 months from the date <strong>of</strong> FOI.<br />
Note: (i)PMC is required to commission the project within 12 months from the<br />
date <strong>of</strong> FOI <strong>and</strong> close out all the project activities/<strong>contract</strong>s within next 3<br />
months. PMC is required to put manpower <strong>and</strong> resources accordingly. PMC is<br />
required to <strong>work</strong> simultaneously in various procurement/<strong>work</strong> packages <strong>and</strong><br />
make strong efforts to complete the project on or before the targeted date <strong>of</strong><br />
commissioning.<br />
(ii) The modifications to be carried such that the plant will be on running<br />
condition to the extent possible.
SPECIAL CO�DIO�S OF CO�TRACT(SCC)<br />
Terms <strong>of</strong> PMC payments<br />
i. All the relevant clauses <strong>of</strong> GENERAL CONDITIONS OF CONTRACT (for<br />
consultancy services), ITB & SPECIAL CONDITIONS OF CONTRACTS( SCC) shall be<br />
applicable.<br />
ii. Payment shall start only after signing <strong>of</strong> Contact Agreement .<br />
iii. Payments will be based on successful completion <strong>of</strong> milestone activities,<br />
as per the amount value quoted by the PMC through e-banking. The consultant<br />
shall raise fortnightly invoices for the milestones attained during the billing<br />
period. The PMC is required to m<strong>and</strong>atory fill all the columns against each<br />
milestone. The Cumulative amount quoted against the milestones will be<br />
considered for evaluation for award <strong>of</strong> job. The details <strong>of</strong> the milestones<br />
are as enclosed at Annexure- 2.<br />
iv. The PMC shall be responsible to submit the invoices with required<br />
documents <strong>and</strong> same will be processed through <strong>GAIL</strong> Bill Watch System<br />
(BWS) . An electronic receipt <strong>of</strong> the bill will send to vendor. Owner shall<br />
endeavour to release payments within 15 days for the bills raised by the PMC<br />
through e-banking.<br />
v. Payment shall be made to the bank account bearing the name <strong>of</strong> PMC in<br />
SBI/ICICI/HDFC to whom <strong>work</strong> order has been released by <strong>GAIL</strong>. The PMC<br />
should open account in India.<br />
vi. Close out <strong>of</strong> Project” in milestone list refers to:<br />
Mechanical completion <strong>of</strong> the project, subsequent commissioning <strong>of</strong> all<br />
facilities installed, closure <strong>of</strong> all purchase orders, <strong>work</strong> orders, <strong>contract</strong>s,<br />
submission <strong>of</strong> all as built drawings, operating manuals, documents etc from<br />
vendors/ <strong>contract</strong>ors to owner <strong>and</strong> receipt <strong>of</strong> all unused material from<br />
<strong>contract</strong>ors <strong>and</strong> return to owner after due material reconciliation,<br />
recommending penalties, recoveries if any for shortage, damages in goods <strong>and</strong><br />
submission <strong>of</strong> Project Close Out Report, Reconciliation with Customs etc.<br />
vii. Safety statutory requirements:<br />
The <strong>work</strong> is to be carried out in “Restricted Area” <strong>and</strong> the bidder shall have to<br />
obtain the necessary permission to <strong>work</strong> as per instructions <strong>of</strong> the EIC <strong>and</strong> shall<br />
start the job only after obtaining suitable <strong>work</strong> permit. Up gradation need to be<br />
carried out with all safety precautions for personnel <strong>and</strong> plant.<br />
Contractor has to obtain proper safety permit while carrying out any job. Proper<br />
safety arrangement is required for safety <strong>of</strong> personnel inside the premises <strong>and</strong><br />
while carrying out the job. While <strong>work</strong>ing at height for more than 1.3 metres<br />
<strong>contract</strong>or has to provide scaffolding for the <strong>work</strong>ing person. For
excavation/road cutting at any depth permit is to be obtained. Contractor is<br />
totally responsible for the safety <strong>of</strong> the personnel. Permission will not be given<br />
for the <strong>work</strong> if any unsafe condition prevails. All applicable statutory<br />
requirement to be complied by the <strong>contract</strong>or .Contractor shall be responsible<br />
for all safety equipment <strong>and</strong> personnel protection .If personal protective<br />
equipment is not found in place ,<strong>GAIL</strong> has right to provide the same <strong>and</strong> deduct<br />
the amount from the bill <strong>of</strong> the <strong>contract</strong>or.<br />
VIII. statutory requirements:<br />
The PMC <strong>and</strong> the execution <strong>contract</strong>ors shall bound to discharge statutory<br />
obligations as below <strong>and</strong> other relevant Acts, Rules & Regulations in force from<br />
time to time.<br />
1. It shall be the sole liability <strong>of</strong> the <strong>contract</strong>or (including the <strong>contract</strong>ing firm)<br />
or company should have independent PF Codes allotted by the PF Authorities<br />
under the employees Provident Funds <strong>and</strong> Miscellaneous Provision Act, 1952.<br />
2. The <strong>contract</strong>or shall also be bound to discharge obligations as provide under<br />
various statutory enactments including the employees provident fund <strong>and</strong><br />
Miscellaneous Provisions Act1952, ESI Act, 1948, Minimum Wages Act 1948,<br />
Payment <strong>of</strong> Bonus Act, Payment <strong>of</strong> Wages Act 1936, Workmen’s Compensation<br />
Act 1923, the Contract Labour (R&A) Act, 1970 the inter state Migrant<br />
<strong>work</strong>men (Regulation <strong>of</strong> employment <strong>and</strong> condition <strong>of</strong> service) Act, 1979 <strong>and</strong><br />
other relevant Act, Rules <strong>and</strong> regulations in force from time to time.<br />
3. The Contractor shall ensure that the Contractor / Contracting firm should<br />
have separate ESI Code allotted under the Employees’ State Insurance Act –<br />
1948 in case the <strong>work</strong> center / site <strong>of</strong>fice is covered under the said Act. In case<br />
the area where our <strong>work</strong> center is situated is not covered under the ESI. It<br />
must be ensured that the Contractor / Contracting firm should cover his/ its<br />
employees under suitable insurance coverage.<br />
The <strong>contract</strong>or to produce necessary EPF code before commencement <strong>of</strong> <strong>work</strong>.<br />
The <strong>contract</strong>or should produce necessary ESIC code before commencement <strong>of</strong><br />
<strong>work</strong> or <strong>work</strong>men who are not covered under ESI Act, the <strong>contract</strong>or should<br />
take appropriate <strong>work</strong>men compensation insurance policy <strong>and</strong> submit copy <strong>of</strong><br />
the same to <strong>GAIL</strong> before commencement <strong>of</strong> <strong>work</strong>.
4. The <strong>contract</strong>or shall be responsible for necessary contributions towards PF.<br />
Pension, ESIC or any other statutory payment to Government Agencies as<br />
applicable under the law in respect <strong>of</strong> the <strong>contract</strong> <strong>and</strong> personnel employed by<br />
the <strong>contract</strong>or for rendering services to <strong>GAIL</strong> <strong>and</strong> shall deposit the required<br />
amounts with the concerned authorities on or before due dates. The<br />
<strong>contract</strong>or shall also be responsible for payment <strong>of</strong> any administration /<br />
inspection charge there <strong>of</strong>, wherever applicable in respect <strong>of</strong> personnel<br />
deployed by him relating to the <strong>work</strong> <strong>of</strong> <strong>GAIL</strong>. The <strong>contract</strong>ors shall also submit<br />
the pro<strong>of</strong> <strong>of</strong> depositing the employees Provident fund contribution.<br />
5. The <strong>contract</strong>or shall regularly submit all relevant records / documents in this<br />
regard to <strong>GAIL</strong> representative for verification <strong>and</strong> upon such satisfactory only,<br />
<strong>GAIL</strong> shall make payment <strong>of</strong> monthly running account bills only to <strong>contract</strong>or.<br />
6. The <strong>contract</strong>or shall ensure <strong>and</strong> will be solely responsible for payment for<br />
wages <strong>and</strong> other dues latest by 7th <strong>of</strong> the following month to the personnel<br />
deployed by him. The <strong>contract</strong>or shall be directly responsible <strong>and</strong> indemnify<br />
the company against all charges, actions, suites,losses, claims, dues<br />
proceedings etc arising out <strong>of</strong> disputes relating to the dues <strong>and</strong> employment <strong>of</strong><br />
personnel deployed by him.<br />
7. The <strong>contract</strong>or shall indemnify the company against all losses or damages if<br />
any caused to it on account <strong>of</strong> acts <strong>of</strong> the personnel deployed by him.<br />
8. The <strong>contract</strong>or shall ensure regular <strong>and</strong> effective supervision <strong>and</strong> control <strong>of</strong><br />
the personnel deployed by him <strong>and</strong> gives suitable direction for undertaking the<br />
<strong>contract</strong>ual obligations.<br />
9.The <strong>contract</strong>or shall indemnify <strong>and</strong> keep the owner harmless <strong>of</strong> all claims,<br />
damages or compensation payable at law in respect or in consequence <strong>of</strong> any<br />
accident or damage arising under or by reason <strong>of</strong> this agreement or execution<br />
<strong>of</strong> <strong>contract</strong>.<br />
10. The <strong>contract</strong>or / <strong>contract</strong>ing firm shall issue proper identity cards to all the<br />
persons deployed for execution <strong>of</strong> <strong>work</strong>. The identity cards shall be signed by<br />
the <strong>contract</strong>or / <strong>contract</strong>ing firm or his authorized representative.<br />
11. The <strong>contract</strong>or shall not employ any person below eighteen (18) years <strong>of</strong><br />
age.
12. The persons to be deployed under the <strong>contract</strong>or shall be on the rolls <strong>of</strong><br />
the <strong>contract</strong>or/<strong>contract</strong>ing firm<br />
13. If due to any reason whatsoever ,<strong>GAIL</strong> is made liable to meet any obligation<br />
to pay the contribution towards PF/ESI or any other statutory payment, <strong>GAIL</strong><br />
shall be at liberty to recover such amount by deducting it from the security<br />
deposit/<strong>contract</strong> performance security or any sum due to the <strong>contract</strong> whether<br />
under this <strong>contract</strong> or otherwise.<br />
The PMC shall ensure <strong>and</strong> keep the owner harmless <strong>of</strong> all claims, damages or<br />
compensation payable at law in respect or in consequence <strong>of</strong> any accident or<br />
damage arising under or by reason <strong>of</strong> this agreement or execution <strong>of</strong> <strong>contract</strong>.<br />
ix. PRICES ,TAXES, DUTIES, OCTROI, LEVIES ETC.<br />
The quoted rates shall remain valid for the entire period <strong>of</strong> <strong>contract</strong> <strong>and</strong> no<br />
escalation whatsoever shall be permissible after award <strong>of</strong> the <strong>contract</strong>. The<br />
bidder shall make his own arrangement for the transportation, conveyance,<br />
lodging &boarding <strong>of</strong> his men <strong>and</strong> <strong>GAIL</strong> will have no obligation in this respect.<br />
The quoted rates shall be deemed to be inclusive <strong>of</strong> all taxes, duties, octroi ,<br />
levies, <strong>work</strong> <strong>contract</strong> tax, bonuses, statutory payments, etc. <strong>and</strong> excluding<br />
service tax till the completion <strong>of</strong> the <strong>contract</strong> <strong>and</strong> consultant shall not be eligible<br />
for any compensation on this account.<br />
Service tax: The quoted rates shall be inclusive <strong>of</strong> all taxes <strong>and</strong> duties applicable<br />
during the <strong>contract</strong> period except for service tax & education cess thereon.<br />
Service tax & cess thereon shall be paid extra, if applicable, on submission <strong>of</strong><br />
documentary evidence/ invoice(s).The bidder shall indicate in the bid the<br />
service tax registration number <strong>and</strong> in case the service tax registration number is<br />
not available, the bidder will give confirmation for obtaining registration with a<br />
copy <strong>of</strong> application for registration.<br />
The consultant liable to pay service tax for the <strong>work</strong>/ services rendered to<br />
<strong>GAIL</strong>, shall
specifically mention the service tax registration number in their invoices.<br />
Further, the amount <strong>and</strong> rate <strong>of</strong> service tax shall be separately <strong>and</strong> distinctly<br />
specified in the invoice. For payment <strong>of</strong> service tax, serially numbered invoice/<br />
bill shall be issued by service provider <strong>and</strong> should also specify the following:<br />
(i) The name, address <strong>and</strong> registration number <strong>of</strong> the service provider.<br />
(ii) The name <strong>and</strong> address <strong>of</strong> the recipient <strong>of</strong> the taxable service.<br />
(iii) Description, classification & value <strong>of</strong> taxable service provided <strong>and</strong>;<br />
(iv) The service tax payable on such services.<br />
X.TERMINATION OF CONTRACT<br />
A) <strong>GAIL</strong> may without prejudice to its right against the <strong>contract</strong>or in respect<br />
<strong>of</strong> any delay <strong>of</strong> otherwise or any claims for damage, in respect <strong>of</strong> any<br />
breach <strong>of</strong> the terms <strong>of</strong> the <strong>contract</strong> <strong>and</strong> without prejudice to any right or<br />
remedies under any <strong>of</strong> the provisions <strong>of</strong> this <strong>contract</strong> or otherwise, by<br />
notice in writing absolutely terminate the <strong>contract</strong> with immediate<br />
effect in nay <strong>of</strong> the following cases:<br />
In the even <strong>of</strong> the <strong>contract</strong>or going into liquidation or winding up his<br />
business or making arrangement with his creditors, <strong>GAIL</strong> shall have the right<br />
to terminate the <strong>contract</strong> without prejudice to any other right/remedies.<br />
In the event, if it is found that <strong>contract</strong> has been procured by submitting<br />
incorrect or incomplete statements by the <strong>contract</strong>or or by making any mis<br />
representation. If in the opinion <strong>of</strong> <strong>GAIL</strong>, the <strong>contract</strong>or has delayed or<br />
suspended the execution <strong>of</strong> <strong>work</strong>, the facilities <strong>and</strong> Vehicles etc., <strong>of</strong>fered by<br />
the <strong>contract</strong>or to be inadequate for effective completion <strong>of</strong> the job. In the<br />
event <strong>of</strong> any breach <strong>of</strong> the terms <strong>and</strong> <strong>conditions</strong> <strong>of</strong> the <strong>contract</strong> by the<br />
<strong>contract</strong>or or if the <strong>contract</strong>or is found to be indulging in activity subversive to<br />
<strong>GAIL</strong>’s interest or activity prejudicial to the interest <strong>of</strong> <strong>GAIL</strong> <strong>and</strong> for any other<br />
good or sufficient reasons. Up to such termination <strong>of</strong> the <strong>contract</strong> the security<br />
Deposit/Bank Guarantee are liable to be forfeited / invoked to satisfy the<br />
outst<strong>and</strong>ing claims <strong>of</strong> <strong>GAIL</strong>.<br />
Notwithst<strong>and</strong>ing anything contained above, <strong>GAIL</strong> may, as its sole discretion,<br />
terminate this <strong>contract</strong> by giving the <strong>contract</strong>or 30 days written notice to the
effect, without assigning any reasons whatsoever. The <strong>contract</strong> shall be<br />
deemed to have expired on expiry <strong>of</strong> the original period unless extended.<br />
B) SUMMARY OF TERMINATION OF CONTRACT DUE TO SUBMISSION OF FALSE<br />
DOCUMENTS:<br />
Bidders are required to furnish the complete <strong>and</strong> correct information /<br />
documents required for evaluation <strong>of</strong> their bids. If the information /<br />
documents forming basis <strong>of</strong> evaluation is found to be false/forged, the same<br />
shall be considered adequate group for rejection <strong>of</strong> the Bids <strong>and</strong> forfeiture <strong>of</strong><br />
Earnest Money Deposit( EMD not applicable for this <strong>contract</strong>).<br />
In case, the information/documents furnished by the <strong>contract</strong>or forming basis<br />
<strong>of</strong> evaluation <strong>of</strong> his bid is found to be false/forged after the award <strong>of</strong> the<br />
<strong>contract</strong>, <strong>GAIL</strong> shall have full right to terminate the <strong>contract</strong> immediate <strong>and</strong> get<br />
the remaining job executed at the risk & cost <strong>of</strong> such <strong>contract</strong>or without any<br />
prejudice to the other rights available to <strong>GAIL</strong> under the <strong>contract</strong> such as<br />
forfeiture <strong>of</strong> Security Deposits, withholding <strong>of</strong> payments etc.<br />
In the case the issue <strong>of</strong> submission <strong>of</strong> false document comes to the notice after<br />
execution <strong>of</strong> the <strong>work</strong>, <strong>GAIL</strong> shall have full right to forfeit any amount due to<br />
the <strong>contract</strong>or along with forfeiture <strong>of</strong> Security Deposit furnished by the<br />
<strong>contract</strong>or. Further, such <strong>contract</strong>or/bidder shall be blacklisted for future<br />
business with <strong>GAIL</strong>.<br />
XI. ABNORMALLY HIGH RATED ITEMS (AHR ITEMS):<br />
In items rate <strong>contract</strong> where the quoted rates for the items exceed 50% <strong>of</strong> the<br />
owners/estimated rates, such items will be considered as Abnormally High<br />
Rates Items (AHR) <strong>and</strong> payment <strong>of</strong> AHR items beyond the SOR stipulated<br />
quantities shall be made at the least <strong>of</strong> the following rates:<br />
(I) Rates as per SOR, quoted by the <strong>contract</strong>or.<br />
(II) Rate <strong>of</strong> the item, which shall be derived as follows:<br />
Based on rates <strong>of</strong> machine <strong>and</strong> labour as available from the <strong>contract</strong> (which<br />
includes <strong>contract</strong>or's supervision, pr<strong>of</strong>it, overheads <strong>and</strong> other expenses).
In case rates are not available in the <strong>contract</strong>, rates will be calculated based on<br />
prevailing market rates <strong>of</strong> machine, material <strong>and</strong> labour plus 15% to cover<br />
<strong>contract</strong>or's supervision pr<strong>of</strong>it, overhead & other expenses.<br />
XII:PRICE REDUCTION SCHEDULE<br />
The Price Reduction Schedule <strong>of</strong> this <strong>contract</strong> shall be same as specified in the General<br />
Conditions <strong>of</strong> Contract (for consultancy services) Clause no.3.12.<br />
XIII.DEFECT LIABILITY PERIOD (DLP): DLP for PMC shall be applicable till The<br />
Defect Liability <strong>of</strong> main execution <strong>contract</strong>or.<br />
XIV.RIGHT TO GET SERVICES CARRIED OUT THROUGH OTHER AGE�CIES:<br />
<strong>GAIL</strong> has the right to accept similar services from other agencies at its discretion at the cost<br />
& risk <strong>of</strong> the PMC, if it fails to provide the services as per terms <strong>and</strong> <strong>conditions</strong> <strong>of</strong> tender<br />
documents.
Annexure 2<br />
SCHEDULE OF MILE STONE VS PAYMENT<br />
SL NO. MILE STONE DESCRIPTION PERCENTAGE OF<br />
PAYMENT FOR<br />
VIZAG<br />
1 AWARD OF COMPOSITE WO<br />
FOR UP GRADATION PROJECT<br />
SITE EXECUTION CONTRACT<br />
2 AWARD OF POS FOR PUMPS<br />
FOR UP GRADATION<br />
3 AWARD OF POS FOR ALL<br />
MATERIALS (other than pumps)<br />
FOR UP GRADATION<br />
4 MECHANICAL COMPLETION OF<br />
UPGRADATION<br />
5 COMMISIONING OF<br />
UPGRADATION PROJECT IN<br />
TOTALITY<br />
10% 10%<br />
10% 10%<br />
5% 5%<br />
15% 15%<br />
5% 5%<br />
6 PROJECT CLOSE OUT 5% 5%<br />
PERCENTAGE OF<br />
PAYMENT FOR<br />
CHERAPALLY<br />
REMARKS
Full Postal<br />
Address<br />
<strong>and</strong><br />
phone nos<br />
<strong>of</strong> Client<br />
& Name<br />
<strong>of</strong> Officerin-Charge<br />
Description <strong>of</strong><br />
<strong>work</strong><br />
PRESENT COMMITMENTS OF THE BIDDER<br />
Date <strong>of</strong> Commencement<br />
<strong>of</strong> Work<br />
Scheduled<br />
Comp.<br />
Period<br />
Note: This list must be a full list <strong>of</strong> all type <strong>of</strong> <strong>work</strong>s in h<strong>and</strong><br />
%Age<br />
Comp. as<br />
on Date<br />
Expected<br />
Date <strong>of</strong><br />
Completion<br />
Remarks<br />
SEAL SIGNATURE OF BIDDER
Descr<br />
iptio<br />
n <strong>of</strong><br />
<strong>work</strong><br />
Location<br />
<strong>of</strong> the<br />
<strong>work</strong><br />
DETAILS OF SIMILAR WORK DONE DURING PAST FIVE YEARS<br />
Full Postal<br />
Address <strong>and</strong><br />
phone nos <strong>of</strong><br />
Client & Name <strong>of</strong><br />
Officer-in-Charge<br />
Value <strong>of</strong><br />
Contract<br />
Date <strong>of</strong><br />
Commen<br />
-cement<br />
<strong>of</strong> Work<br />
Scheduled<br />
Completion<br />
Time(Months)<br />
Date<br />
<strong>of</strong><br />
Actual<br />
Compl<br />
etion<br />
Note: Copies <strong>of</strong> Letter <strong>of</strong> awards <strong>and</strong> Completion certificate for the above <strong>work</strong>s to be enclosed<br />
The Work completed earlier than three years need to be indicated here<br />
The list <strong>of</strong> <strong>work</strong>, not <strong>of</strong> similar nature need to be indicated here<br />
Failing to comply aforementioned instructions may lead to rejection <strong>of</strong> bid.<br />
BIDDER<br />
Reasons for<br />
delay in<br />
project<br />
completion, if<br />
any<br />
SEAL AND SIGNATURE OF