2011<br />
AIR CONDITIONING &<br />
MECHANICAL VENTILATION<br />
DESIGN BRIEF<br />
WOOLWORTHS LIMITED<br />
This document is prepared as a guide for the design and installation of Air Conditioning &<br />
Mechanical Ventilation for a Woolworths Supermarket.<br />
This document shall be read in conjunction with the other elements of the issued Design Brief<br />
Kit prepared by Woolworths Limited and the standard drawings.<br />
Amendments<br />
Description By Date<br />
General Issue MR 14/2/2011<br />
Page 1 of 157
TABLE of CONTENTS<br />
1.0 SCOPE ............................................................................................................... 5<br />
1.1 INTENT .............................................................................................................. 5<br />
1.2 DRAWING REVIEW ........................................................................................... 5<br />
1.3 NOMINATED DESIGNERS ............................................................................... 5<br />
1.4 CONTRACTOR/TENDERER ............................................................................. 6<br />
1.5 DEFINITIONS ..................................................................................................... 6<br />
1.6 EXTENT OF HVAC SYSTEMS .......................................................................... 7<br />
1.7 DESIGN .............................................................................................................. 8<br />
1.8 WORK BY OTHERS .......................................................................................... 9<br />
1.9 DEFECTS LIABILITY PERIOD ........................................................................ 10<br />
1.10 MAINTENANCE DURING DEFECTS LIABILITY PERIOD .............................. 10<br />
1.11 TECHNICAL DOCUMENTS ............................................................................. 11<br />
1.12 GUARANTEES ................................................................................................. 11<br />
1.13 REGULATIONS ................................................................................................ 11<br />
1.14 OCCUPATIONAL HEALTH AND SAFETY ...................................................... 12<br />
1.15 DESIGNER RESPONSIBILITIES .................................................................... 17<br />
1.16 INSURANCE .................................................................................................... 18<br />
1.17 CONSTRUCTION PROGRAM ......................................................................... 18<br />
1.18 CONSTRUCTION NOISE ................................................................................ 18<br />
1.19 SITE ACCESS .................................................................................................. 18<br />
1.20 SITE INSPECTION .......................................................................................... 18<br />
1.21 PROVISION OF SAMPLES FOR APPROVAL ................................................ 19<br />
1.22 APPROVAL ...................................................................................................... 19<br />
1.23 QUALITY ASSURANCE .................................................................................. 19<br />
1.24 NON CONFORMANCE TO THE SPECIFICATION ......................................... 19<br />
2.0 DESIGN CONDITIONS .................................................................................... 20<br />
2.1 GENERAL ........................................................................................................ 20<br />
2.2 DESIGN CONDITIONS .................................................................................... 20<br />
2.3 NOISE LEVELS ................................................................................................ 22<br />
3.0 GENERAL DESIGN REQUIREMENTS ........................................................... 24<br />
3.1 AIR DISTRIBUTION SYSTEM ......................................................................... 24<br />
3.2 REFRIGERATION CABINETS ......................................................................... 24<br />
3.3 ACTIVE HUMIDITY CONTROL (SUPERMARKETS ONLY) ........................... 24<br />
3.4 HEATING ......................................................................................................... 24<br />
3.5 OUTSIDE AIR CONTROL ................................................................................ 25<br />
3.6 ECONOMY CYCLE .......................................................................................... 25<br />
3.7 COLD AISLE RETURN AIR (SUPERMARKETS ONLY) ................................. 25<br />
4.0 SYSTEM FORMS ............................................................................................. 26<br />
4.1 GENERAL ........................................................................................................ 26<br />
4.2 CENTRAL PLANT (PLANTROOM) .................................................................. 26<br />
4.3 CUSTOM PACKAGE UNITS ........................................................................... 29<br />
4.4 ROOF TOP PACKAGE SYSTEMS .................................................................. 30<br />
4.5 VRV / VRF SYSTEMS..................................................................................... 30<br />
4.6 POLYVALENT SYSTEM (REVERSE CYCLE CHILLED WATER) .................. 31<br />
4.7 MECHANICAL VENTILATION ......................................................................... 32<br />
5.0 SYSTEM APPLICATIONS ............................................................................... 35<br />
5.1 TRADING AREAS ............................................................................................ 35<br />
5.2 OFFICE & AMENITIES AREAS AIR CONDITIONING SYSTEMS .................. 35<br />
6.0 EQUIPMENT .................................................................................................... 37<br />
6.1 REFRIGERANTS ............................................................................................. 37<br />
6.2 CORROSION PROTECTION .......................................................................... 37<br />
6.3 AIR HANDLER UNITS ..................................................................................... 37<br />
6.4 FAN-COIL UNITS ............................................................................................. 38<br />
6.5 VRV OR REVERSE CYCLE SPLIT DX SYSTEMS ......................................... 38<br />
6.6 COOLING COILS ............................................................................................. 39<br />
Page 2 of 157 2
6.7 HEATING COILS .............................................................................................. 40<br />
6.8 COMPRESSORS ............................................................................................. 41<br />
6.9 AIR COOLED CONDENSERS ......................................................................... 41<br />
6.10 DRY FLUID WATER COOLED CONDENSERS ............................................. 43<br />
6.11 VIBRATION ISOLATION AND FIXING ............................................................ 46<br />
6.12 LIQUID RECEIVERS ........................................................................................ 46<br />
6.13 PUMPS ............................................................................................................. 47<br />
6.14 FANS ................................................................................................................ 47<br />
6.15 CHILLERS ........................................................................................................ 52<br />
6.16 PIPING, VALVES AND FITTINGS ................................................................... 52<br />
6.17 DAMPERS ........................................................................................................ 59<br />
6.18 VARIABLE SPEED DRIVES ............................................................................ 60<br />
6.19 ELECTRIC DUCT HEATERS .......................................................................... 61<br />
6.20 BASES AND PLINTHS..................................................................................... 61<br />
6.21 EQUIPMENT EXTERNAL NOISE MEASUREMENT ...................................... 61<br />
6.22 DOWN DUCT NOISE ....................................................................................... 62<br />
6.23 BOILERS .......................................................................................................... 62<br />
6.24 FILTERS ........................................................................................................... 63<br />
7.0 DUCTWORK .................................................................................................... 66<br />
7.1 SCOPE ............................................................................................................. 66<br />
7.2 DUCTWORK CONSTRUCTION AND INSTALLATION ................................... 66<br />
7.3 DIFFUSERS, REGISTERS, GRILLES AND LOUVRES .................................. 71<br />
8.0 ELECTRICAL ................................................................................................... 74<br />
8.1 GENERAL ........................................................................................................ 74<br />
8.2 REQUIREMENTS ............................................................................................ 74<br />
8.3 INTERRUPTION TO SUPPLY ......................................................................... 74<br />
8.4 DIAGRAMS ...................................................................................................... 74<br />
8.5 INCOMING SUB-MAIN .................................................................................... 75<br />
8.6 SWITCHBOARDS ............................................................................................ 75<br />
8.7 FIELD WIRING & CABLING INSTALLATION .................................................. 80<br />
8.8 VSD INSTALLATION – FIELD WIRING ........................................................... 81<br />
8.9 CONDUITS, CABLE TRAY & LADDERS ......................................................... 81<br />
8.10 CONDENSERS & OIL COOLERS ................................................................... 83<br />
8.11 COMMISSIONING ........................................................................................... 83<br />
8.12 DEFECTS LIABILITY & MAINTENANCE ........................................................ 83<br />
8.13 RESIDUAL CURRENT DEVICES (RCD’S) ..................................................... 83<br />
9.0 CONTROLS ..................................................................................................... 84<br />
9.1 GENERAL ........................................................................................................ 84<br />
9.2 TEMPERATURE / HUMIDITY CONTROL ....................................................... 84<br />
9.3 ENERGY MANAGEMENT ............................................................................... 84<br />
9.4 REFRIGERATION PLANT CONTROLS .......................................................... 86<br />
9.5 COMPRESSORS ............................................................................................. 89<br />
9.6 CONDENSER FAN CONTROL ....................................................................... 89<br />
9.7 OFFICE, AND AMENITIES AREA AIR CONDITIONING UNITS..................... 90<br />
9.8 MECHANICAL VENTILATION ......................................................................... 90<br />
10.0 PAINTING AND LABELLING .......................................................................... 93<br />
10.1 GENERAL ........................................................................................................ 93<br />
10.2 PAINT COLOURS ............................................................................................ 93<br />
10.3 LABELLING ...................................................................................................... 93<br />
11.0 COMMISIONING, TESTING, MAINTENANCE AND SERVICE ..................... 94<br />
11.1 COMMISSIONING ........................................................................................... 94<br />
11.2 CONTROL SCHEDULE ................................................................................... 94<br />
11.3 TEST WITNESSING ........................................................................................ 96<br />
11.4 PUTTING INTO OPERATION .......................................................................... 96<br />
11.5 MAINTENANCE AND SERVICE ...................................................................... 96<br />
12.0 OPERATING AND MAINTENANCE ............................................................... 99<br />
12.1 GENERAL ........................................................................................................ 99<br />
12.2 INCLUSIONS ................................................................................................... 99<br />
Page 3 of 157 3
12.3 PLANT MAINTENANCE LOG BOOK .............................................................. 99<br />
12.4 METAL BOX ................................................................................................... 100<br />
12.5 DISTRIBUTION .............................................................................................. 100<br />
13.0 REFURBISHMENT WORKS ......................................................................... 101<br />
14.0 APPENDIX A – STANDARD ELECTRICAL COMPONENTS ...................... 102<br />
15.0 APPENDIX B: SCHEDULE OF TECHNICAL DATA ................................... 104<br />
15.1 GENERAL ...................................................................................................... 104<br />
15.2 AIR HANDLING UNIT CASING ..................................................................... 104<br />
15.3 REFRIGERANT .............................................................................................. 104<br />
15.4 COOLING COIL ............................................................................................. 104<br />
15.5 SUPPLY AIR FAN .......................................................................................... 104<br />
15.6 AIR FILTERS .................................................................................................. 105<br />
15.7 COMPRESSORS ........................................................................................... 105<br />
15.8 CONDENSERS .............................................................................................. 105<br />
15.9 AIR COOLERS - DRY .................................................................................... 105<br />
15.10 CHILLER SET ................................................................................................ 106<br />
15.11 AUXILIARY FANS .......................................................................................... 106<br />
16.0 APPENDIX C: TEST DATA SCHEDULE ..................................................... 107<br />
16.1 AIR QUANTITIES ........................................................................................... 107<br />
16.2 REFRIGERATION SUPERHEAT ................................................................... 107<br />
16.3 PLANT CAPACITY ......................................................................................... 107<br />
16.4 CONTROLS ................................................................................................... 108<br />
16.5 PLANT OPERATING CONDITIONS .............................................................. 108<br />
16.6 ELECTRICAL ................................................................................................. 108<br />
16.7 NOISE LEVELS .............................................................................................. 109<br />
17.0 APPENDIX D: APPROVED SUPPLIERS & EQUIPMENT .......................... 110<br />
17.1 MECHANICAL CONTRACTORS ................................................................... 110<br />
17.2 SWITCHBOARD MANUFACTURES ............................................................. 111<br />
17.3 COMPRESSORS ........................................................................................... 111<br />
17.4 CONDENSERS .............................................................................................. 111<br />
17.5 HEAT EXCHANGERS.................................................................................... 111<br />
17.6 PUMPS ........................................................................................................... 111<br />
17.7 VRF UNITS .................................................................................................... 112<br />
17.8 ROOF TOP PACKAGE UNITS ...................................................................... 112<br />
17.9 FANS .............................................................................................................. 112<br />
17.10 AIR CURTAINS .............................................................................................. 112<br />
17.11 CHILLERS ...................................................................................................... 112<br />
17.12 VARIABLE SPEED DRIVES .......................................................................... 113<br />
17.13 BOILERS ........................................................................................................ 113<br />
18.0 APPENDIX E - SCHEDULE OF DRAWINGS ............................................... 114<br />
18.1 GENERAL ...................................................................................................... 114<br />
19.0 APPENDIX F - CONTROLS APLICATION MANUAL (CPC) ....................... 131<br />
19.1 EXECUTIVE SUMMARY ............................................................................... 131<br />
19.2 CONTROL STRATEGY OVERVIEW ............................................................ 132<br />
19.3 WIRING / POWERING ................................................................................... 136<br />
19.4 CONTROL STRATEGY ................................................................................. 141<br />
19.5 GENERIC NAMING CONVENTION .............................................................. 153<br />
19.6 GENERIC PARTS .......................................................................................... 154<br />
19.7 PRE COMMISSIONING SIGN OFF SHEET .................................................. 155<br />
19.8 SENSOR LOCATIONS .................................................................................. 156<br />
19.9 POWER MONITORING ................................................................................. 157<br />
Page 4 of 157 4
1.0 SCOPE<br />
1.1 INTENT<br />
The intent of this Air Conditioning and Mechanical Ventilation Design Specification is to<br />
define the air conditioning and mechanical ventilation services requirements for the<br />
following Woolworths Limited retail businesses:<br />
• Woolworths Supermarkets<br />
• Woolworths Liquor<br />
• Dan Murphy’s<br />
• BWS<br />
• Dick Smith<br />
• Progressive Enterprises (NZ)<br />
This Design Brief forms part of and shall be read in conjunction with current Design Briefs,<br />
the Standard Drawings and the Control Plan applicable to Woolworths Retail Business<br />
mentioned above.<br />
This Design Brief shall be used as the basis for a complete design and for:-<br />
• The preparation of a complete Air Conditioning and Mechanical Ventilation<br />
Scope of works.<br />
• The preparation of Design and Working drawings.<br />
• Supply, delivery and installation of all plant, equipment and system to suit the<br />
project.<br />
• Commissioning and testing of all the installed plant, equipment and system.<br />
• Preparation of Operating and Maintenance Manuals covering all of the installed<br />
plant, equipment and system.<br />
• Preparation of “as built” drawings covering all of the installed plant, equipment<br />
and system.<br />
• Maintenance of all of the installed plant, equipment and system during the<br />
Defects Liability Period.<br />
1.2 DRAWING REVIEW<br />
The following information shall be submitted to Woolworths Senior Mechanical Engineer<br />
for comments and/or review on completion of the design work and prior to the<br />
commencement of equipment ordering and construction:<br />
• Cooling/heating load calculations (Camel data required)<br />
• Technical schedules indicating equipment selection<br />
• Drawing indicating extent of air distribution system (including supply, exhaust<br />
fresh and make up air volumes)<br />
Any comments given by Woolworths shall not relieve the Designer and/or Contractor of<br />
any real or intended contractual obligation for providing a complete, accurate and correct<br />
installation; complying with all relevant rules, regulations, Building Code of Australia<br />
(BCA) (including the latest applicable amendments) and Australian Standards,<br />
appropriate and relevant to the project. Particular attention shall be given the Section J of<br />
the BCA and its implications to the design of the Air Conditioning system.<br />
The Designer and/or Contractor shall be responsible for verifying all dimensions on site<br />
and to coordinate with all site conditions and services.<br />
1.3 NOMINATED DESIGNERS<br />
In the interest of uniformity the list of Design and Construct Contractors has been<br />
included hereunder to form the basis for competitive tendering. No other Design and<br />
Construct Contractors shall be used.<br />
Page 5 of 157 5
A Consulting Engineer may be engaged for the preparation of a site specific<br />
specifications and full design but only with the prior approval of Woolworths and only after<br />
the proposed Consultant has been fully briefed by Woolworths.<br />
It is mandatory that the proposed Consultant be conversant with Woolworths'<br />
requirements and that the Consultant be fully briefed by Woolworths before the<br />
commencement of documentation.<br />
The Consulting Engineer or Design and Construct Contractor, hereinafter called<br />
Designer, shall be responsible for the preparation of a complete design satisfying ALL<br />
requirements of this Specification.<br />
When a Consulting Engineer is engaged, the Consulting Engineer shall be responsible<br />
for the preparation of tender drawings and specification, calling of tenders, analysing the<br />
tender submissions and recommending the successful tenderer for acceptance. The<br />
Consulting Engineer shall check and approve workshop drawings, as-installed drawings,<br />
operating and maintenance manual.<br />
The lessor/developer engaging the Consulting Engineer shall pay all Consulting<br />
Engineer's fees and costs.<br />
The Consulting Engineer shall ensure that only the Design and Construct Contractors<br />
nominated herein are invited to submit a <strong>Tender</strong> Submission for the works. No other<br />
mechanical contractor shall perform the mechanical services works.<br />
The Consulting Engineer shall, during the course of the project, carry out not less than six<br />
(6) site inspections and issue inspection and progress reports to Woolworths ; namely 3<br />
evenly spaced during construction, 1 at handover, 1 at 6th month and 1 at one month<br />
before end of defects liability period. The consulting Engineer must ensure that all defects<br />
noted during the inspections are rectified by the mechanical contractor. The final report<br />
shall be forwarded to Woolworths Senior mechanical Engineer.<br />
Where Design and Construct Contractor is used, on completion of the works, a Certificate<br />
shall be submitted to Woolworths stating that the installation complies with this Design<br />
Specification.<br />
1.4 CONTRACTOR/TENDERER<br />
The Design and Construct Contractor or the successful <strong>Tender</strong>er will be required to<br />
become a Subcontractor to the Builder. In which case the appointed <strong>Tender</strong>er/Contractor<br />
shall abide by the subcontract conditions determined by the Builder.<br />
1.5 DEFINITIONS<br />
The following definitions shall apply in the interpretation of this Specification.<br />
Woolworths Woolworths Limited including:<br />
• Woolworths Supermarkets<br />
• Woolworths Liquor<br />
• Dan Murphys<br />
• BWS<br />
• Dick Smith<br />
• Progressive Enterprises (NZ)<br />
Designer The Consulting Engineer or Design and Construct Contractor responsible<br />
for the preparation of a complete design based on this Design<br />
Specification.<br />
Page 6 of 157 6
Contractor The successful tenderer selected to perform the works described in the<br />
Consulting Engineers specification or the selected Design and Construct<br />
Contactor.<br />
Builder The person or company responsible for carrying out the general building<br />
works and who shall also determine subcontractor conditions for the<br />
Contractor, if required.<br />
Developer The person or company developing the site.<br />
Site The actual site where the project is being erected.<br />
Approved Shall mean approved in writing by Woolworths.<br />
1.6 EXTENT OF HVAC SYSTEMS<br />
This section summarises the HVAC requirements for each of the different areas within<br />
the store. These are a minimum requirement and do not override or replace any<br />
additional code, standard or regulatory requirements.<br />
1.6.1 TRADING FLOOR<br />
It is a requirement that the entire trading floor area be provided with conditioned air<br />
to ensure adequate cooling in summer and heating in winter. The type of airconditioning<br />
system used to serve this area is defined later in this specification.<br />
Particular care needs to be taken in areas where refrigerated cases are present, to<br />
ensure that there are no draughts blowing into the refrigerated cases.<br />
The air conditioning system serving area where fresh food is displayed also<br />
requires specific requirements to be incorporated into the design to ensure the<br />
required humidity levels are maintained.<br />
1.6.2 BACK-OF-HOUSE OFFICE AREAS<br />
Air conditioning systems shall be supplied and installed to serve the following<br />
areas:<br />
• Systems office.<br />
• Cashiers office.<br />
• General office.<br />
• Communications Room. (Cooling only required)<br />
• Staff Training.<br />
• Staff dining and lounge areas.<br />
• Female Locker Room.<br />
• Male Locker Room.<br />
• Managers Office.<br />
• Any other back-of-house similar area shown on the drawings.<br />
For any other areas that are not specifically mentioned in the previous sections,<br />
the contractor is to highlight this and bring it to the attention of the Woolworths<br />
Senior Mechanical Engineer.<br />
1.6.3 GENERAL GUIDANCE<br />
If a central air conditioning plant is used, it is usual for the following areas to be<br />
served from this unit.<br />
For Supermarkets:<br />
• Trading areas<br />
• Deli preparation area<br />
• Dairy or Service Deli area<br />
• F&V preparation area - spot cooling if open area<br />
Page 7 of 157 7
• Bakery and cake wrap (where applicable)<br />
• Cold Aisle return air system to suit refrigeration cabinet layout<br />
complete with fan<br />
Generally:<br />
• Security area (where applicable)<br />
• Public toilet locker rooms (where applicable)<br />
1.6.4 AREAS SPECIFIC TO SUPERMARKETS<br />
1.6.4.1 MEAT PREP AREA<br />
If this area is enclosed then this area shall be provided with a<br />
fresh air supply (from main A/C or separate filtered O/A supply)<br />
with temperature control (in the form of a wall mounted FCU) to<br />
this area being provided by the Commercial Refrigeration<br />
contractor.<br />
1.6.4.2 PRODUCE PREP AREA<br />
If this area is enclosed then area shall be air conditioned. Air<br />
conditioning shall be provided from VRF condenser unit serving<br />
offices. If this area is open to the stock room then no air<br />
conditioning or mechanical ventilation is required.<br />
1.6.4.3 KITCHEN EXHAUST SYSTEMS<br />
Kitchen exhaust systems shall be supplied to all cooking and<br />
kitchen equipment as required by AS 1668.2 including chicken<br />
cookers, bakery ovens; donut cooker and dishwasher (refer to<br />
Section 4.7.7).<br />
1.6.4.4 FISH SERVERY & PREP AREA<br />
Fish servery and preparation areas shall be provided with an<br />
exhaust system (refer to Section 4.7.8)<br />
1.6.5 LIQUOR AREA<br />
A separate split ducted or packaged air conditioning unit shall be supplied and<br />
installed to serve this area. The liquor cool room temperature control is by others.<br />
1.6.6 TOILETS & CLEANERS ROOMS<br />
An exhaust system shall be supplied and installed to serve this area (refer to<br />
section 4.7.2).<br />
1.6.7 MSB ROOM<br />
An exhaust or air conditioning system shall be supplied and installed to serve this<br />
area (refer to Section 4.7.4).<br />
1.6.8 STOCK AREA<br />
An exhaust system shall be supplied and installed to serve this area (refer to<br />
Section 4.7.3).<br />
1.6.9 SMOKE EXHAUST<br />
Smoke Spill and/or Smoke Exhaust systems, Car Parking area and Loading Dock<br />
exhaust or ventilation systems may be required by any statutory or regulating<br />
authority. Refer to section 4.7.6 for details.<br />
1.7 DESIGN<br />
This design specification defines the quality and configuration of the required air<br />
conditioning and mechanical ventilation equipment.<br />
Page 8 of 157 8
Deviations from the quality and configuration specified and shown on the drawings will<br />
not be accepted unless any such proposed deviations are submitted to Woolworths for<br />
approval prior to acceptance of any tender. No deviations shall be carried out without<br />
Woolworths’ approval.<br />
1.8 WORK BY OTHERS<br />
The following works associated with the air conditioning and mechanical ventilation<br />
systems shall be carried out by others:<br />
1.8.1 BY BUILDER<br />
• Provision of combined services drawings for Woolworths approval.<br />
• Provision of access to existing services necessary for the alteration<br />
and/or extension of these services.<br />
• Provision of openings and access hatches in the roof and plasterboard<br />
ceilings.<br />
• Provision of access doors in all plant room walls and service ducts.<br />
• Provision of plantroom enclosures as shown on the drawings.<br />
• Provision of acoustic sealing of all pipe, duct and cable penetrations<br />
through acoustically significant walls, floors and ceilings.<br />
• Provision of pipe droppers in walls and partitioning where required.<br />
• Provision of temporary protection to all walls, panels, ceilings, floors,<br />
doors and fittings during construction.<br />
• Provision of temporary fire services during construction<br />
• Provision of weatherproof and vermin proof outside air plant room<br />
ventilation intake louvres complete with bird wire and burglar bars.<br />
• Provision of independent roofing and structural steel arrangement over<br />
the plant room to facilitate equipment entry in the plant room through the<br />
roof.<br />
• Provision of roof mounted structural supports for air conditioning units,<br />
condensers and condensing units.<br />
• Provision of access for truck and mobile crane to a point adjacent to the<br />
building and plant location areas.<br />
• Forming and/or cutting and making good of openings in roofs, ceilings,<br />
slabs, beams, walls and partitions for the passage of ducts, pipes and<br />
conduits and for the installation of fans, outlets and grilles.<br />
• Installation only of door air transfer grilles in offices and amenities areas.<br />
(All air transfer grilles to be provided by the Contractor) in locations<br />
required in the design.<br />
• Provision of roof up-stands and under-flashing of roof penetrations.<br />
• Painting of exposed ductwork and equipment other than those in plant<br />
rooms and outside the building.<br />
• Provision of toilet facilities and temporary power for hand tools and<br />
lighting, during the construction period.<br />
• Provision of roof insulation complete with a continuous, sealed, vapour<br />
barrier on the warm side of all air-conditioned spaces in accordance with<br />
the Architects’ Specification.<br />
• Making good of fire wall or floor penetrations including 'fire rated' packing<br />
material having a fire rating not less than the fire rating of the walls or<br />
floor, except for fire dampers.<br />
• Provision and installation of refrigeration equipment plant room supply<br />
and exhaust ventilation fans. Burglar bars are to be fitted to plant room<br />
ventilation fans and safety mesh.<br />
• 75 mm deep return air plenum shall be provided by refrigeration<br />
contractor between each multi-tiered cabinet line-up in centre of store.<br />
1.8.2 BY HYDRAULICS CONTRACTOR<br />
• Provision of cold water supply and waste to chilled water and heating hot<br />
water plant.<br />
Page 9 of 157 9
• Provision of one (1) 25 mm valved cold water supply and condensate<br />
tundish outside of AHU and two (2) 100 mm floor wastes in the air<br />
conditioning plant room. The floor waste must be located outside of the<br />
air handling plant. The floor of the plantroom shall be graded so that all<br />
water drains to the floor wastes provided.<br />
• Wall mounted condensate tundish adjacent to separate offices ceiling fan<br />
coil units (if required)<br />
• Wall mounted condensate tundish adjacent to separate MSB /<br />
Communications room wall mounted fan coil units.<br />
• Provision of one (1) 19 mm valved cold water supply adjacent the<br />
condenser deck.<br />
1.8.3 BY SPRINKLER & FIRE ALARM CONTRACTOR<br />
• Provision of sprinkler fire alarm wiring to mechanical services<br />
switchboard for system fan or natural gas shut-off.<br />
• Provision of 'Fire Trip' control wiring (via sprinkler protection/smoke<br />
detection/thermal detection systems, singularly (when one system is<br />
installed) or in conjunction with each other where more than one system<br />
is installed.) connected to the air conditioning switchboard by the Fire<br />
Protection /Electrical contractors (as appropriate).<br />
• Wiring to smoke exhaust fans ESP from Centre mains<br />
1.8.4 BY ELECTRICAL CONTRACTOR<br />
• Provision of incoming 415V, 3 phase, 50 Hz 4 wire sub-main cables of<br />
adequate capacity to new mechanical switchboards.<br />
• Provision and connection of labelled on-off switches for all (bakery,<br />
donut, chicken cooker & dishwasher) exhaust and make up air fans.<br />
Isolator IP56 3 phase to be provided for chicken exhaust fan.<br />
• Interlock between the operations of the bakery and chicken ovens and<br />
their respective and exhaust and make up fans.<br />
• Electrical Switchboard with Fire Rated sub main.<br />
• Electrical contractor to supply and install relay box at a/c board & wire to<br />
engraved light switch in Fish area for fish prep exhaust system.<br />
• Doughnut, dishwasher, bakery and chicken hood wall mounted control<br />
switch to be provided and wired by the electrical contractor. Mechanical<br />
contractor to provide cabling to be wired.<br />
1.8.5 BY REFRIGERATION CONTRACTOR<br />
• Provision and control of refrigeration plantroom ventilation fans.<br />
• Provision of general office interface PC<br />
• Provision of control system communication ’hub’.<br />
1.9 DEFECTS LIABILITY PERIOD<br />
Defects Liability Period for the air conditioning and mechanical ventilation installation<br />
shall be sixty (60) weeks from the date of practical completion or the date on which the<br />
plant is put into commercial operation, whichever is earlier. In any event, the Defects<br />
Liability Period will expire fifty two (52) weeks from the date of store opening.<br />
1.10 MAINTENANCE DURING DEFECTS LIABILITY PERIOD<br />
During the Defects Liability Period the Contractor shall, in addition to attending to any<br />
operational defects and breakdown fully maintain the plants and carry out twelve (12)<br />
preventative maintenance services on the installed equipment fully complying with<br />
Manufacturers’ recommendation and requirements and all relevant regulations. The<br />
maintenance service work may be carried out by an agent appointed by the Contractor,<br />
subject to prior approval by Woolworths.<br />
Note: Maintenance shall include cleaning of all filters including exhaust hood filters.<br />
Page 10 of 157 10
Warranty service to include 24 hours per day, 7 days per week emergency service.<br />
Contractor to provide 24 hr contact details to Woolworths EMS Dept.<br />
Provide maintenance performance sheets detailing all activities and frequency when<br />
activities will be carried out. The proposed schedule shall be approved by Woolworths.<br />
Completed monthly maintenance sheet must be signed by the Store Manager. The<br />
original must be left with the Store manager, with a copy forwarded to the relevant<br />
Woolworths State Asset Services Manager for record.<br />
1.11 TECHNICAL DOCUMENTS<br />
Electronic copies of the operating and maintenance instructions, built drawings (including<br />
schematic electrical drawings) & Camel heat load data/calculations shall be forwarded to<br />
Woolworths Senior Mechanical Engineer at the hand-over of the project.<br />
In addition, copies of schematic electrical and control drawings encased in clear plastic<br />
folders shall be mounted on the air conditioning plantroom wall.<br />
1.12 GUARANTEES<br />
The Contractor shall guarantee the performance of the installation and in addition provide<br />
a separate guarantee stating that:<br />
The refrigerant saturated suction temperature at full load conditions will not be less than<br />
the design value(s) shown in the documentation submitted and as approved by<br />
Woolworths.<br />
In the event of the design values, so stated, not being achieved the Contractor shall<br />
make all necessary alterations to obtain the conditions as approved. All costs, including<br />
design and consultancy fee associated with any modifications required to achieve the<br />
design values are to be borne by the developer or contractor(s).<br />
The contractor shall have a QA system in place. Details to be submitted to Woolworths<br />
for record. This system shall be consistent with the builder.<br />
1.13 REGULATIONS<br />
The Contractor shall, throughout the execution of the works, comply with the<br />
requirements of all Statutory Regulations, Local Government By-Laws, Workplace Health<br />
& Safety Acts and Regulations, as appropriate, The Building Code of Australia, National<br />
Standard for Plant and all Authorities having jurisdiction at the site.<br />
The Contractor shall exercise Duty of Care throughout the Works and shall carry out a<br />
Risk Assessment and identify all hazards.<br />
In addition the Designer shall ensure that all moving parts are adequately protected in<br />
accordance with the Regulations and for the prevention of reasonably foreseeable harm.<br />
The Contractor shall also comply with the requirements of all relevant Australian<br />
Standards and Codes of Practice applicable to the works.<br />
The Contractor shall obtain all certificates, pay all fees and obtain all approvals, including<br />
Registration of Plant and Design Registration necessary to enable the work to proceed.<br />
Certificates of ownership, when required shall be completed by the Contractor.<br />
Copies of all approvals and certificates shall be forwarded to Woolworths, for record<br />
purposes.<br />
A Certificate of Practical Completion will be withheld pending receipt of all certificates and<br />
approvals.<br />
Page 11 of 157 11
1.14 OCCUPATIONAL HEALTH AND SAFETY<br />
At all times, the contractor shall comply with Woolworths’ Occupational Health and Safety<br />
(OHS) programs, state based OHS Regulations and Legislative Requirements. This is<br />
described in the Woolworths Code of Conduct. All Contractors shall have completed the<br />
Woolworths Pegasus safety requirements and be registered as a preferred contractors to<br />
Woolworths.<br />
At all times the contractor shall comply with any directions given by a Woolworths<br />
representative, make available any relevant paperwork or documentation and assist in<br />
reviews and investigations as requested.<br />
The Contractor shall assume a Duty of Care to prevent foreseeable harm resulting from<br />
or associated with the plant or any activity undertaken. The Contractor shall comply with<br />
the requirements of the national standard for plant (NOHSC:1010), all state based<br />
Occupational Health and Safety Acts, Regulations, Codes of Practice Safety Handbooks<br />
for Construction as well as other legislative requirements and shall apply the principles of<br />
Risk Management defined therein to all phases of the work executed under the Contract.<br />
1.14.1 GENERAL WORKPLACE INDUCTIONS<br />
It is expected all personnel (whether management, supervisory, tradespersons,<br />
etc) entering any Woolworths project site (regardless of the type of site) have<br />
attended an OHS General Health & Safety Induction Training Course and receive<br />
certification of their attendance and successful completion required by local<br />
authority (e.g. Green Card, Blue Card, Red Card, etc).<br />
All personnel are required to produce certification of aforementioned course when<br />
requested by Woolworths Representative (which also includes the Woolworths<br />
nominated Principal Contractor) and may be asked to leave site should they be<br />
unable to produce acceptable certification.<br />
1.14.2 SITE SPECIFIC INDUCTIONS<br />
All personnel shall undertake a site specific safety induction as directed by<br />
principal contractor and landlord. The contractor shall allow for any costs<br />
associated with personnel attending site inductions within their submission.<br />
1.14.3 TOOLBOX TALKS<br />
It is expected contractors undertake a program of task specific toolbox talks at<br />
regular intervals throughout each project. Records of attendance at toolbox talks,<br />
topics discussed and signatures of all attendees shall be kept on site and be made<br />
available to Woolworths’ personnel upon request.<br />
1.14.4 DOCUMENTATION & SAFETY PLANS<br />
Before the date of the first site meeting, the contractor (and selected subcontractors)<br />
shall submit as follows, Site Specific Safety Plan (SSSP) and<br />
associated documentation.<br />
Principal Contractor: 2 x hard copies + electronic copy<br />
Woolworths Project Manager & Refrigeration Engineer: electronic copy<br />
The SSSP shall outline the contractors’ own safety program and include all Safe<br />
Work Method statements (SWMS), Job Safety Analysis (JSA), Safe Work<br />
Procedure (SWP) and certificates of currency.<br />
1.14.5 PERSONAL PROTECTIVE EQUIPMENT (PPE)<br />
It is Woolworths policy for all personnel entering a Woolworths project site<br />
(regardless of the type of site) to wear PPE as follows:<br />
• Hard Hat<br />
Page 12 of 157 12
• ‘High Vis’ shirt or vest<br />
• Safety Goggles (Standard prescription eyewear are not deemed<br />
safety glasses)<br />
• Steel Capped Safety Footwear (covered shoes/boots not thongs<br />
or sports shoes)<br />
• Gloves.<br />
Note: Project Managers, visitors, suppliers and guests are not required to wear<br />
gloves if their attendance is for observation only and no manual tasks are being<br />
undertaken.<br />
1.14.6 LICENSES<br />
Personnel shall not operate any plant or equipment unless training has been<br />
completed and the operator holds (and is in possession of) the appropriate<br />
certification.<br />
Copies of current and valid licences are to be made available to the Site<br />
Manager/Supervisor or Woolworths Project Manager and or nominated<br />
representatives upon request, at any time including:<br />
Work Permits<br />
• Plumbing<br />
• Gas fitting<br />
• Electrical work (A Grade Licence)<br />
• Structural Maintenance work (Builders Licence)<br />
• Carpentry/minor maintenance (Carpenters Trade Qualification)<br />
• Refrigeration and Air Conditioning<br />
• Forklift<br />
• Elevated Work Platform<br />
• The following work permits are in use at Woolworths:<br />
• Hot Work Permit<br />
• Working at Heights Permit<br />
• Electrical Work Permit<br />
• Gas Work Permit<br />
• Fire Impairment Permit<br />
• Confined Space Entry Permit (Contractor to supply and complete),<br />
and<br />
• Restricted Access Permit<br />
All permits must be authorised by the Principal Contractor or Main Contractors Site<br />
Manager, or Site Supervisor prior to the commencement of any work. A Permit to<br />
Work can be obtained from the Site Manager or Site Supervisor and are only valid<br />
for a 12 hour period.<br />
1.14.7 HOT WORKS PERMIT (HWP)<br />
When undertaking any activity that may be classified as hot works, the Contractor<br />
shall apply to the Woolworths Limited FM Global Hot Works Permit requirements.<br />
Hot work is defined as grinding, welding, soldering, thermal cutting, oxygen cutting<br />
or heating and other related heat producing or spark producing operations. A hot<br />
work area is defined as anywhere within a 15-metre radius of the ignition<br />
source(s). A Hot Work Permit form will be completed by the contractor and Site<br />
Manager / Supervisor / Store Manager (when undertaking works outside of<br />
Construction Period), detailing the hazard controls to be implemented according to<br />
the work to be done and prior to any work commencing. The person conducting<br />
Page 13 of 157 13
the hot work must be informed of the location of the fire fighting equipment and be<br />
competent in its operation.<br />
A four (4) hour fire watch must be maintained after the work is completed (1 hour<br />
by Contractor; further 3 hours by Site Manager / Supervisor / Store Manager).<br />
The following actions are required when conducting hot work on Woolworths’<br />
premises:<br />
Isolate the following:<br />
• Within a 4 metre radius around the source - floors swept; removal<br />
of pallets; wall & floor openings covered; shields in place; etc<br />
• Within an 11-metre radius around the source - relocate any<br />
flammable liquids & aerosols;<br />
• Within a 15-metre radius around the source - relocate dangerous<br />
goods and combustible materials.<br />
• Coordinate with the Store/Duty Manager to relocate Woolworths<br />
owned gas powered forklifts and gas cylinders away from the<br />
source.<br />
• Coordinate with the Store/Duty Manager that no recharging of<br />
batteries is to take place whilst hot work is in progress.<br />
• The ignition source(s) are to be screened using fire-resistant<br />
materials.<br />
• Approved barricades and signage indicating the hot work area are<br />
to be erected.<br />
• The work area is to be adequately ventilated. This may require<br />
opening of doors/ roller doors, or conducting the works outside.<br />
• The work area must have safe entry and exit areas, and these are<br />
to be documented on the Permit to Work.<br />
• Within a 10 metres radius of the source suitable fire extinguishers<br />
should be available for emergency situations.<br />
• Contractor's LPG and Acetylene gas cylinders are to be stored<br />
upright and chained to a mobile trolley equipped with a personal<br />
fire extinguisher for fall prevention and emergency situations.<br />
• Where available, Automatic Fire Protection must be in-service.<br />
• If Automatic Fire Protection Service has been isolated the Site<br />
Manager/Supervisor must notify the Store/Duty Manager prior to<br />
any Hot Works commencing on site.<br />
Personal Protective Equipment will be provided by the Contractor performing the<br />
work which will include some or all of the following as per the control measures<br />
outlined in their SWMS:<br />
• Non flammable clothing<br />
• Mask<br />
• Apron<br />
• Safety boots<br />
• Gloves<br />
• Eye protection<br />
• Hearing protection<br />
• Protective overalls.<br />
It is the Site Managers/ Supervisors responsibility to inform all relevant<br />
Woolworths Site/Duty Managers and staff of any work impacting their areas of<br />
responsibility.<br />
Page 14 of 157 14
1.14.8 ELECTRICAL SAFETY<br />
1.14.8.1 GENERAL<br />
• All contractors shall inspect their electrical equipment including<br />
portable leads before use.<br />
• Inspection tags must be fitted on all leads and tools.<br />
• When connecting or disconnecting power, make sure the power<br />
switch is OFF before inserting or pulling out a power cord.<br />
• Only authorised people are permitted to open electrical<br />
•<br />
enclosures.<br />
Working on live electrical equipment must only be considered for<br />
testing and commissioning, and then only when an adequate,<br />
documented risk assessment has been undertaken by the<br />
Contractor.<br />
• A Permit to Work form shall be completed by the Site<br />
Manager/Supervisor and the Contractor detailing the hazard<br />
controls to be implemented according to the work to be done and<br />
prior to commencement of work.<br />
• The circuit may only be re-energised by the person who<br />
performed the isolation.<br />
• All ladders used on site are to be constructed of non-conductive<br />
material.<br />
• It is the contractors’ responsibility to ensure that all portable<br />
equipment and leads used on site by the store, his employees and<br />
Sub-Contractors are tested and tagged in accordance with AS<br />
3760 and all the applicable workplace Occupational Health and<br />
Safety authorities’ requirements.<br />
• Prior to the Contractor commencing work on site he shall submit a<br />
signed copy of his own company’s site and trade specific<br />
workplace Occupational Health and Safety Plan to the Builder and<br />
Project Manager for approval.<br />
• The Contractor shall carry out the installation works strictly in<br />
accordance with Woolworths Limited Requirements for Health and<br />
Safety – Major Works.<br />
• The contractor is not to work on a “Live” switchboard. If the<br />
electrician must work under live conditions, safe procedures and<br />
approval SHALL be obtained from site Principal and/or<br />
•<br />
Woolworths Engineer prior to the commencement of the works.<br />
The contractor shall ensure that circuit breaker lock-out devices<br />
are used when work on those specific circuits is carried. The<br />
contractor shall provide circuit breaker lock out devices suitable<br />
for circuit breakers specified by Woolworths Limited.<br />
• When working on switchboards, warning notices shall be<br />
positioned at the plantroom entry.<br />
• Portable leads must be elevated off the ground and are not<br />
permitted to run across walkways.<br />
1.14.8.2 LOCKOUTS<br />
The Refrigeration Electrical Contractor shall be deemed as<br />
responsible for ensuring all electrical circuits are adequately<br />
‘locked out’ when undertaking any work on electrical circuits<br />
where upstream power may be present.<br />
The only accepted method of electrical circuit lockout shall be by<br />
key-lockable isolators. All lockouts shall be supplied by the<br />
individual working on the circuit.<br />
Page 15 of 157 15
1.14.9 WORKING AT HEIGHTS<br />
1.14.9.1 LOCKOUTS<br />
• Unless a risk assessment establishes an alternative safe work<br />
practice, fall protection shall be provided for all persons exposed<br />
to a fall of 2 metres (3 metres in New Zealand) or greater.<br />
• The use of safety harnesses, lanyards and inertia reel equipment<br />
is mandatory when working within 3 metres of any roof edge with<br />
an edge to ground in excess of 2 metres (3 metres in New<br />
Zealand).<br />
• Prior to beginning any works involving work at heights, a Permit to<br />
Work will be completed.<br />
• Unless a risk assessment exists to the contrary, the following<br />
works will require fall protection procedures and equipment:<br />
• Work near unprotected open edges of floors and roofs<br />
• Work near unprotected penetrations or openings in roofs, floors<br />
and walls<br />
• Work near unguarded shafts or excavations<br />
• Work from unstable structures (temporary or permanent)<br />
• Work on or near fragile or brittle surfaces (e.g. cement sheeting<br />
roofs, fibreglass sheeting roofs and skylights)<br />
• Areas below must be made safe by erecting barriers, men at work<br />
signs etc.<br />
• Materials and scrap must not be dropped to lower levels without<br />
the area being made secure by erecting barricades, men at work<br />
signs and a person posted on the lower level supervising the area.<br />
1.14.9.2 LADDERS<br />
Ladders are not a fall protection measure; they are a means of<br />
providing access/egress to a work area. Ladders complying with<br />
AS/NZ 1892 must only be used.<br />
Ladders are only to be used where it can be shown that other risk<br />
control measures are not practicable to remove or reduce the risk<br />
of falling.<br />
Where ladders are used in areas near pedestrians, forklifts, pallet<br />
jacks etc permits should specify what system will be used to<br />
prevent the ladder being knocked over.<br />
For example:<br />
• Safety Cones<br />
• Approved barricade system<br />
• Person to hold ladder and ensure access to area is restricted.<br />
Contractors will not use Ladders:<br />
• In access areas or within the arc of swinging doors;<br />
• When the work involves restricted vision or hot work i.e. welding;<br />
• On scaffolding to gain extra height;<br />
• Where it is possible for the ladder or the user to come into contact<br />
with electrical power lines;<br />
• In very windy or wet conditions;<br />
• Over other people<br />
• Performing a task that requires over-reaching (belt buckle within the<br />
stiles of the ladder);<br />
• Allowing anyone else to be on the ladder at the same time;<br />
• Placed near the edge of an open floor or penetration where, if the<br />
ladder toppled, a person could fall over the edge.<br />
Page 16 of 157 16
Contractors will use Ladders:<br />
• Placed at a slope of 4 (vertical) to 1 (horizontal) & be secured at the<br />
top;<br />
• Supported on a firm, level, non-slip surface in the fully opened<br />
position;<br />
• Fitted with safety feet and tied off while in use and inspection tags<br />
fitted;<br />
• Perform all work facing the ladder;<br />
• Placing their feet no higher than 900mm from the top of the ladder<br />
(2 rungs from the top rule);<br />
• Always having two hands free to ascend and descend the ladder,<br />
transporting all material and tools which cannot be safely secured<br />
to the worker's belt independently;<br />
• Only using tools which are easily operated with one hand;<br />
• Electrically approved for electrical work;<br />
• Always maintaining 3 points of contact (2 hands & 1 leg OR 1 hand<br />
& 2 legs).<br />
1.14.9.3 FALL PROTECTION<br />
Some engineering methods of fall protection include:<br />
• Guard railing<br />
• Working platforms<br />
• Scaffold<br />
• Elevated work platforms (cherry pickers, scissor lifts)<br />
• Travel restriction devices (harnesses and lanyards)<br />
• Fall arrest systems<br />
• Catch platforms<br />
• Safety nets<br />
The Contractor should be providing one or more of these fall<br />
protection methods if the Contractor's feet are more than 2 metres<br />
(3 metres in New Zealand) from the ground. This is to be detailed<br />
on the Permit to Work.<br />
1.14.9.4 BARRICADES<br />
When undertaking work at heights (i.e. on elevated work<br />
platforms), the Contractor shall erect barricades in accordance<br />
with Woolworths requirements. The use of safety tape shall not<br />
be considered as an acceptable barricade.<br />
1.15 DESIGNER RESPONSIBILITIES<br />
This Design brief defines Woolworths requirements for air conditioning and mechanical<br />
ventilation systems.<br />
The Designer shall interpret these requirements and translate them into a complete<br />
design.<br />
The Designer will identify individual equipment selections making up the plant, their<br />
design conditions and duty.<br />
The Designer shall provide layout drawings showing the size and location of all air<br />
distribution systems, plant and equipment, and co-ordinate with all other services on the<br />
project. The Designer shall include a complete air conditioning refrigeration pipework<br />
schematic, including all pipe sizes, valves and fittings.<br />
The full electrical diagram showing all power and control wiring shall be prepared. The<br />
Designer shall determine the Electrical Maximum Demand of each submain and identify<br />
Page 17 of 157 17
equired submain capacities and minimum circuit breaker and HRC fuse ratings and<br />
provide this information for inclusion in the Building Electrical Design.<br />
The Designer shall provide mass, equipment locations and duct suspension loads for<br />
inclusion in the structural design.<br />
The Designer shall identify the location of any cold water supply and drain points required<br />
for inclusion in the plumbing design.<br />
The Designer shall coordinate the supply air ductwork, supply air grilles and return air<br />
grilles to suit the trading area decor and lighting layout.<br />
The designer shall provide details about any door grilles that need to be installed to the<br />
builder so that door penetrations can be provided.<br />
A/C refrigeration piping schematic diagram must be prepared and submitted (See also<br />
Woolworths standard drawing SD 27).<br />
The Designer shall liaise with the Commercial Refrigeration Contractor for a co-ordinated<br />
common plant room and condenser deck layouts.<br />
The Designer shall complete APPENDIX B - SCHEDULE OF TECHNICAL DATA at the<br />
rear of this design specification and submit the completed form to Woolworths on<br />
completion of design work and prior to accepting any tender<br />
1.16 INSURANCE<br />
The Designer must provide a copy of the current Professional Indemnity Insurance cover<br />
to the value of $5,000,000 before commencing work.<br />
The Designer must ensure that the following insurance policies are carried by the<br />
Contractor and to provide certification of such policies on demand to Woolworths:<br />
• Public Liability - not less than $20,000,000 cover.<br />
• Contractors All Risks - total contract value covering materials in store, in transit<br />
and on site.<br />
• Workers Compensation - un<strong>limited</strong> common law cover.<br />
1.17 CONSTRUCTION PROGRAM<br />
The Contractor shall ensure that the Construction Program is so arranged to ensure that<br />
the air conditioning and mechanical ventilation systems are completed with a permanent<br />
electrical supply connected to the switchboard(s) at handover.<br />
1.18 CONSTRUCTION NOISE<br />
The contractor shall take all due care to minimise the noise of installation. Restrictions<br />
imposed by the builder with respect to noise levels and the time of use of particular<br />
equipment must be observed. Note that this requirement will be particularly relevant<br />
during after hours and weekends.<br />
1.19 SITE ACCESS<br />
Parking will be restricted to those areas nominated by the builder. The restrictions<br />
regarding parking must be observed.<br />
1.20 SITE INSPECTION<br />
Designers are advised that an inspection of the site prior to the completion of the tender /<br />
design is strongly recommended. No variation in the contract sum will be accepted for<br />
additional work which could have been foreseen during a site inspection.<br />
Page 18 of 157 18
1.21 PROVISION OF SAMPLES FOR APPROVAL<br />
Samples of proposed ceiling outlets, door grilles and all other visible fittings shall be<br />
provided for approval and acceptance to the senior Engineer or appointed representative,<br />
prior to the installation of any fittings.<br />
1.22 APPROVAL<br />
The specification and drawings prepared by the Consulting Engineer (or Workshop<br />
drawings prepared by the Design and Construct (D&C) contractor) shall be submitted to<br />
Woolworths or appointed representative for approval at least two weeks prior to calling of<br />
tenders (or ordering of equipment or commencement of manufacturing, if D&C contractor<br />
is used). Contracts shall not be let prior to approval of the documentation.<br />
Any comment or directive by Woolworths or their representative shall not relieve the<br />
designer of the systems of any real or contractual obligation for providing a complete and<br />
fully operational system.<br />
1.23 QUALITY ASSURANCE<br />
The installation of the mechanical services shall be performed at all times using skilled<br />
and experienced tradesman. Commissioning and testing shall only be carried out by<br />
appropriately trained and qualified persons.<br />
1.24 NON CONFORMANCE TO THE SPECIFICATION<br />
All works and equipment that are deemed by Woolworths not to comply with this<br />
specification shall be corrected to Woolworths satisfaction by the Mechanical Contractor<br />
at no cost to Woolworths. Corrective works shall not interfere with the proposed opening<br />
date of the store or interrupt store trading (i.e. all works to be complete outside of the<br />
stores trading hours). Woolworths reserves the right to peruse the mechanical contractor<br />
for damages due to the non conformance that have a direct or indirect negative impact on<br />
energy consumption, store sales or any extra cost borne by the store to conduct<br />
business.<br />
Page 19 of 157 19
2.0 DESIGN CONDITIONS<br />
2.1 GENERAL<br />
The design criteria shown below must be used as the basis for preparing the air<br />
conditioning and mechanical ventilation systems design.<br />
The occupancy level for the trading area shall be calculated using the gross store area<br />
and the occupancy density shown in clause hereunder.<br />
The use of exhaust ventilation in stock rooms is preferred. However, some regulatory<br />
authorities may require an alternative form of ventilation. In any case the Designer shall<br />
check with the local authority, at the earliest possible date, and obtain all approvals<br />
necessary.<br />
Direct relative humidity control (dehumidification only) shall be provided (55% RH Max).<br />
Comfort heating in winter will not be required in stores in locations where the winter<br />
outside design ambient condition is greater than 15° C, as defined herein. However, with<br />
the need for RH control, provision for sub-cool and reheat to achieve the specified store<br />
design conditions, heating using both heat re-claim via the Refrigeration system as well<br />
as heating coils must be provided. Heating capacities designed to suit store design<br />
heating loads. The Designer must advise the Refrigeration contractor the air flow, coil<br />
size, handing and heating capacities so that the heat re-claim coil(s) can be supplied by<br />
Refrigeration contractor, and installation of the same by the mechanical sub-contractor.<br />
(Allow minimum 70kW of available heat reclaim).<br />
Note: Humidity control only required for Supermarkets.<br />
2.2 DESIGN CONDITIONS<br />
2.2.1 INSIDE DESIGN CONDITIONS<br />
2.2.1.1 FOOD & LIQUOR RETAIL STORES (i.e. Supermarkets, Liquor,<br />
BWS & Dan Murphy’s)<br />
Conditions are to be based on Critical Process (0800-1800) as published in AIRAH<br />
DA09 application manual. For locations not included in DA09 approval of design<br />
temperatures shall be sought from Woolworths Senior Mechanical Engineer.<br />
Trading floor area<br />
Summer 24°C DB (+/- 1 o C) 50% RH (Max)<br />
Winter 21°C DB (+/- 1 o C) 55% RH (Max)<br />
Note: Air moisture content shall not exceed 10g/Kg<br />
The trading floor area requires particular attention to be paid to the humidity<br />
control. This area does not only have simple comfort air-conditioning but requires<br />
active humidity control to be incorporated into the air conditioning system design.<br />
Back of house offices<br />
Summer 23°C DB (+/- 1 o C) 60% RH<br />
Winter 21°C DB (+/- 1 o C) 60% RH<br />
These areas are classified as requiring comfort air-conditioning and no specific<br />
humidity control needs to be included.<br />
Loading dock<br />
Page 20 of 157 20
No specific temperature control is required<br />
Meat preparation area<br />
If this area shall have temperature control provided by the commercial refrigeration<br />
contractor with fresh air to be supplied by Mechanical Contractor.<br />
Coolrooms, cold rooms and freezer rooms<br />
These areas have temperature control provided by the commercial refrigeration<br />
contractor.<br />
2.2.1.2 GENERAL MERCHANDISE, HARDWARE & ELECTRONICS<br />
RETAIL STORES (i.e. Dick Smiths)<br />
Conditions are to be based on Comfort Process (0800-1800) as published in<br />
AIRAH DA09 application manual. For locations not included in DA09 approval of<br />
design temperatures shall be sought from Woolworths Senior Mechanical<br />
Engineer.<br />
Trading floor area<br />
Summer 24°C DB (+/- 1 o C) 60% RH (Max)<br />
Winter 21°C DB (+/- 1 o C)<br />
Back of house offices<br />
Summer 24°C DB (+/- 1 o C) 60% RH<br />
Winter 21°C DB (+/- 1 o C) 60% RH<br />
Loading dock<br />
No specific temperature control is required<br />
2.2.2 LIGHTING<br />
All areas - 22 W/m²<br />
2.2.3 ELECTRICAL EQUIPMENT<br />
Refer to control plan indicating location and quantity of equipment.<br />
Computer heat load = n x 700w<br />
Printer head load = n x 300w<br />
TV heat load = n x 600w<br />
Note: n = to quantity of units (refer to Control Plan)<br />
Where other miscellaneous equipment is shown on the control plan, heat load<br />
shall be acquired from the nominated electrical engineer.<br />
2.2.4 OCCUPANCY DENSITY<br />
Trading area (Gross area) 7.0m²/person<br />
Offices 7.5m²/person<br />
Lunch Room 1.5m²/person<br />
2.2.5 OUTSIDE AIR RATE<br />
Trading Areas<br />
Page 21 of 157 21
Fresh air rate shall be the greater of:<br />
- Minimum fresh air as determined by maximum allowable CO2 level for<br />
a habitable space. For design purposes Woolworths has determined<br />
that this level is 600 ppm.<br />
- Fresh air rate shall be greater than the sum of the exhaust systems<br />
and lost air plus half an air change per hour, that is ½ the air<br />
conditioned volume changed per hour.<br />
Office and Amenities areas<br />
- Outside air as determined by AS 1668.2<br />
2.2.6 INFILTRATION ALLOWANCE<br />
An infiltration load shall not be allowed. Infiltration shall be offset by the half air<br />
change per hour.<br />
2.2.7 ROOF/CEILING HEAT TRANSFER COEFFICIENT<br />
Refer to Architectural Drawings.<br />
2.2.8 REFRIGERATION CABINETS<br />
The indicative cooling allowance for a typical store is as indicated below. Actual<br />
cooling load allowance should be confirmed with refrigeration Engineer for each<br />
specific store as quantity of refrigeration varies between stores.<br />
2.3 NOISE LEVELS<br />
Model Store Sensible<br />
Latent<br />
kW<br />
kW<br />
2000 12 10<br />
2500 15 13<br />
3200 19 16<br />
3800 23 18<br />
4200 25 20<br />
4800 28 22<br />
2.3.1 GENERAL<br />
Noise levels within the air conditioned spaces shall not exceed NR45 (50dB(A)).<br />
Noise levels in ventilated occupied spaces (i.e. Stock Area) shall not exceed NR50<br />
(55dB(A)), taking into consideration noise levels from exhaust systems.<br />
All measurements shall be taken 1.5 metres above the floor level and 1.5 metres<br />
away from hoods or other equipment.<br />
In any event the noise level measured adjacent to each of the cooking hoods must<br />
not be greater than 5dB (A) above background noise level. The background level<br />
shall be established by measurement at the centre of Trading Area with only airconditioning<br />
plant operating and all hood exhausts switched off.<br />
It is required that the air conditioning and all mechanical ventilation systems be<br />
designed and installed to ensure that noise transmitted to the outside of the<br />
building at boundaries be kept within the limits specified by the appropriate SAA<br />
code and/or as directed by the Local Authorities.<br />
Page 22 of 157 22
Designer to pay particular attention to duct borne noise and duct break out<br />
noise in areas close to equipment.<br />
2.3.2 EQUIPMENT EXTERNAL NOISE MEASUREMENT<br />
Sound Pressure levels shall be the maximum of any measurement made one<br />
meter away from any face of the unit under semi free filed conditions and worst<br />
case operating conditions.<br />
2.3.3 DOWN DUCT NOISE<br />
All equipment shall produce no objectionable pure tones within the occupied areas<br />
and no atypical noise levels in the frequency bands outside those specified.<br />
Page 23 of 157 23
3.0 GENERAL DESIGN REQUIREMENTS<br />
3.1 AIR DISTRIBUTION SYSTEM<br />
The air distribution system must be designed so that the total system losses do not<br />
exceed 550 Pa (dirty). The Store must be positively pressurised relative to the ambient.<br />
(I.e. Total outside air supply in the store must be greater that total exhaust air by at least<br />
5%).<br />
3.2 REFRIGERATION CABINETS<br />
No air is to be supplied or aimed directly onto the refrigeration cabinets. Cold aisle return<br />
air shall be provided via void underneath and behind refrigerated cabinets (only open<br />
multi deck type) that form aisle configuration.<br />
3.3 ACTIVE HUMIDITY CONTROL (SUPERMARKETS ONLY)<br />
The system shall incorporate active humidity control to maintain the maximum space<br />
relative humidity.<br />
The system shall not actively reheat a cooled air path by more than 7°K as per<br />
requirements outlined in the BCA Section J.<br />
Mechanical dehumidification shall be controlled by the humidistat sensor energising steps<br />
of cooling to bring the air below dew point then reheated via heat reclaim coils first then<br />
heating coils (gas fired hot water coils or heat pump) to increase the dry bulb<br />
temperature.<br />
The use of desiccant wheel technology may be used as an alternate method of<br />
dehumidification with the written approval of Woolworths Senior Mechanical Engineer.<br />
3.4 HEATING<br />
3.4.1 GENERAL<br />
Heating shall be provided for both comfort and RH control.<br />
The heating capacity shall be designed for an early morning warm-up period of 2<br />
hours without the assistance of lighting and equipment.<br />
Comfort heating in winter is not required in stores in locations where the winter<br />
outside design ambient condition is greater than 15° C, as defined in the design<br />
conditions.<br />
For Supermarkets the heat reclaim coil shall not provide greater than 50% of the<br />
total building comfort heating requirement and the heating capacity must be<br />
designed assuming no heat reclaim is available. Heating other than heat reclaim<br />
from the refrigeration system shall not be engaged outside of store trading hours<br />
with the exception of morning warming.<br />
3.4.2 HEAT RECLAIM<br />
The Designer must advise the Refrigeration contractor of the air flow, dimensions<br />
and heating capacities so that the heat re-claim coil(s) can be supplied by the<br />
Refrigeration contractor and installation of the same by the mechanical contractor.<br />
(Allow minimum available heat reclaim of 70kW for stores greater than 3500 m 2<br />
and 45kW for stores less than 3500m 2 .<br />
A static pressure allowance of 70 Pa shall be made for the refrigeration heat<br />
reclaim coils.<br />
Page 24 of 157 24
3.4.3 STRATIFICATION<br />
The air distribution system shall be designed so that stratification of air during<br />
heating mode is minimised. Methods to reduce stratification include but are not<br />
<strong>limited</strong> to:<br />
• Use of swirl type diffusers.<br />
• Low level return air if space/design permits<br />
• Use of jet diffusers that are engaged during heating mode<br />
3.5 OUTSIDE AIR CONTROL<br />
The outside air supplied to the store shall comply with requirements outlined in AS1668.2<br />
(refer to version in current BCA). A performance approach (ref AS1668.2 1991 Section<br />
G) to outside air control is required where the maximum level of CO2 is <strong>limited</strong> to 600<br />
ppm.<br />
The system shall be designed to monitor the operation of the exhaust hoods, sum the<br />
exhaust air quantities (less make up air) and set the minimum outside air (low level limit)<br />
at the total exhaust rate plus at least 5% ensuring positive pressure within the store.<br />
Note: Also refer to section 9.3.2 regarding air distribution strategy<br />
3.6 ECONOMY CYCLE<br />
An economy cycle shall be provided on all air conditioning systems as outlined in the<br />
BCA Section J. The exclusion of the economy cycle from the design may be approved by<br />
the Woolworths Mechanical Engineer where it can be demonstrated that the economy<br />
cycle will provide “no psychometric benefit” (thus no savings in energy), based on<br />
standard 24 hour weather data for the location.<br />
Note: Also refer to section 9.3.2 regarding air distribution strategy.<br />
3.7 COLD AISLE RETURN AIR (SUPERMARKETS ONLY)<br />
Cold air from the ‘Cold Aisle’ shall be returned to the return air system via linear vent at<br />
base of refrigerated case (supplied by case manufacturer); void underneath and behind<br />
refrigerated case and connecting duct work.<br />
Return air rate shall be 50l/s per linear metre of refrigerated case and shall apply to all<br />
open deck cases that form an aisle (back to back configuration).<br />
Total cold aisle return air shall not be greater than 50% of the total system supply air<br />
volume.<br />
All exposed duct work shall be of the same dimension and shall be equi-spaced along the<br />
length of the case run. The cold isle return duct shall be boxed in and painted (refer to<br />
finishes schedule) by others.<br />
All plenums and duct work above shall be internally insulated (minimum 50 mm) so to<br />
prevent any condensation forming internally or externally to duct.<br />
In BCA climate Zones 1 & 2 additional 50 mm of external insulation shall be applied to all<br />
duct work above within the ceiling space.<br />
Design Note:<br />
Air within cold aisle return air system shall always be above dew point. RA from the<br />
general store space shall be mixed with the cold aisle return air such that the temperature<br />
of the mixed air is always above dew point.<br />
Page 25 of 157 25
4.0 SYSTEM FORMS<br />
4.1 GENERAL<br />
Depending on the store location, design and layout, a number of different forms of airconditioning<br />
system may be allowed.<br />
� Central Pant – (Plant Room Required)<br />
� Custom Package Units - (Roof Top Mounted)<br />
� Roof Top Package Units (Reverse Cycle)<br />
� VRF (VRV) Systems<br />
� Multi Head Polyvalent System (Reverse Cycle Chilled Water)<br />
Note: The standard air conditioning layout drawing shows the typical routing of the supply<br />
and return air ductwork. This typical layout may vary due to architectural and/or structural<br />
limitations on each installation.<br />
The Designer shall check the working drawings in each case and allow for any variation.<br />
The ductwork configuration shown for the trading area is the typical ductwork arrangement<br />
and shall not be altered significantly without the express approval of Woolworths.<br />
The actual position of each duct run, however, shall be coordinated with the trading area<br />
decor, refrigerated cases (from return air system), gondola layout, lighting, signage, fire,<br />
refrigeration and electrical services, in every case.<br />
4.2 CENTRAL PLANT (PLANTROOM)<br />
This air conditioning plant shall be a single zone draw through conditioner located in the<br />
plant room, either direct expansion or chilled water cooling coils, heat reclaim coils, hot<br />
water coils, dry media deep bed filters, ‘scroll’ or ‘plug’ type supply air fan and a low<br />
pressure ductwork system.<br />
Fresh air shall be ducted from outside the building and be free from contamination<br />
including condenser discharge air; minimum 6 metres separation from any exhaust or<br />
objectionable discharge as per AS 1668.2<br />
Central main plant generally comprises the following:<br />
1. Walk in air handler unit housing pre assembled and located on condenser deck (or<br />
assembled on site, within the plantroom), and containing the following<br />
components.<br />
a. Insulated Panels<br />
b. Cooling coils.<br />
c. Heating coils. A single hot water heating coil shall be provided. (or Heat<br />
Pump condenser coil in air handler)<br />
d. Heat reclaim coil(s). Heat reclaim coil(s) shall be provided by the<br />
refrigeration contractor but shall be installed within the AHU by the<br />
mechanical contractor. All refrigerant piping from this coil to the<br />
refrigeration system shall be by the refrigeration contractor. This coil shall<br />
always be installed upstream of the main heating coils.<br />
e. Filters.<br />
f. Supply air fan.<br />
g. Motorised outside air damper for economy cycle and CO2 Outside air<br />
volume control.<br />
h. Lighting<br />
Page 26 of 157 26
2. Mechanical services switchboard including controller.<br />
Depending on the cooling and heating options, the following may also be included:<br />
3. Air cooled condensers located on the condenser deck<br />
4. Chilled water unit located on the condenser deck<br />
5. Reverse cycle chilled water unit located on the condenser deck<br />
6. Hot water boiler located in the plant room or on condenser deck.<br />
7. Compressors either located within the plantroom or as an integral part of<br />
condenser set.<br />
4.2.1 DIRECT EXPANSION<br />
The following two types of systems shall apply:<br />
− Cooling only DX with hot water heating and refrigeration system<br />
reheat<br />
Compressors: shall be of either semi hermetic (screw or reciprocating) or<br />
hermetic scroll design. Generally screw compressors should only be used<br />
where the compressor cooling capacity is greater than 250kW. Below<br />
250kW, reciprocating or scroll compressors should be used.<br />
Each installation shall have a minimum of two compressors which may be<br />
combined onto one refrigeration circuit, preference. The compressor sets<br />
must be mounted in the plant room outside of the AHU.<br />
See also section 6.8<br />
Condensers: Either one or two air cooled condensers shall be sized for<br />
compressor duty. These shall be located on the condenser deck.<br />
See also section 6.9<br />
Heating: The first stages of heating shall be made available from a heat<br />
reclaim coil providing waste heat from the stores refrigeration plant, Coil<br />
shall be located upstream from additional heating coils.<br />
The final stage of heating shall be provided by gas fired boilers where<br />
town mains gas is available. Where no gas is available a heat pump or hot<br />
water from reverse cycle chiller. These may be located in either the plant<br />
room or on the condenser deck depending on site conditions.<br />
− Reverse Cycle<br />
Compressors: Each installation shall have a minimum of four scroll (410a)<br />
compressors with each compressor having a separate refrigerant circuit.<br />
The compressors shall be sized so that at two compressors are dedicated<br />
for cooling, one compressor reverse cycle and the remaining compressor<br />
dedicated for heating.<br />
Evaporators: The ‘cooling only’ and reverse cycle evaporators shall be<br />
installed in parallel configuration forming a bank of coils. The ‘heating only’<br />
and refrigeration heat reclaim shall form a coil bank being in a parallel<br />
configuration. The ‘cooling only’ and reverse cycle coil bank shall be<br />
upstream from the ‘heating only’/ heat reclaim coil bank.<br />
Condensers: A minimum of two air cooled condensers shall be provided.<br />
These shall be either ‘V Block’ or horizontal configuration located on the<br />
Page 27 of 157 27
condenser deck. Compressors shall be incorporated into the condensing<br />
unit.<br />
Heating: Heating shall be achieved by reverse cycle operation of the<br />
system. In addition a heat reclaim coils shall be provided from the<br />
dedicated cooling system. This heat reclaim shall be used when heating is<br />
required for dehumidification.<br />
Note: The system shall be capable of both simultaneous heating and<br />
cooling to ensure adequate humidity control is achieved.<br />
4.2.2 CHILLED WATER COOLING<br />
If the cooling is provided by a chilled water source then the following applies.<br />
a) Chilled water supplied by others:<br />
General: A source of chilled water will be made available ‘by others’ at the<br />
plantroom. Flow and return chilled water lines shall be terminated at the<br />
plantroom ‘by other’ with shut off valve, including flow and return<br />
thermometer wells and flow measurement device. The mechanical<br />
contractor shall provide all necessary piping to connect the AHU coils to<br />
this piping.<br />
Cooling: Minimum of two chilled water coils shall be installed in parallel<br />
complete with modulating by-pass control by-pass valves.<br />
Heating: The first stage of heating shall be made available from a heat<br />
reclaim coil from the stores refrigeration plant. This coil shall be located<br />
upstream from additional heating coils.<br />
The second stage of heating shall be provided by gas fired boilers where<br />
town mains gas is available or a heat pump where no gas is available.<br />
These may be located in either the plant room or on the condenser deck<br />
depending on site conditions.<br />
b) Chilled & Hot water supplied by mechanical contractor<br />
i. Chiller and Gas Boiler: If town mains gas is available then the<br />
chilled water shall be provided by an air cooled chiller located on<br />
either the condenser deck or in a plantroom and heating shall be<br />
provided by a gas fired boiler.<br />
Cooling: Minimum of two chilled water coils shall be installed in<br />
parallel complete with modulating control valves.<br />
Heating: The first stage of heating shall be made available from a<br />
heat reclaim coil from the stores refrigeration plant. This coil shall<br />
be located upstream from additional heating coils.<br />
The second stage of heating shall be provided by gas fired boilers<br />
where town mains gas is available or a heat pump where no gas<br />
is available. These may be located in either the plant room or on<br />
the condenser deck depending on site conditions.<br />
Condensers: Condensers shall be air cooled and located on the<br />
condenser deck.<br />
Note: If there is an existing condenser water loop available within<br />
the centre, then the option of using a water cooled chiller shall be<br />
allowed.<br />
Page 28 of 157 28
4.3 CUSTOM PACKAGE UNITS<br />
ii. Reverse Cycle Chiller: If no town mains gas is available, then<br />
both chilled water and hot water shall be supplied by an air cooled<br />
reverse cycle chiller located either on the condenser deck or<br />
within a plantroom. This shall be a four pipe system capable of<br />
simultaneous heating and cooling.<br />
Cooling: Minimum of two chilled water coils shall be installed in<br />
parallel complete with VSD modulated pumps.<br />
Heating: The first stage of heating shall be made available from a<br />
heat reclaim coil from the stores refrigeration plant this coil shall<br />
be located upstream from additional heating coils.<br />
The second stage of heating shall be provided by heated water<br />
from the reverse cycle chiller to the heating coil.<br />
Chillers: Compressors, controls, and pumps shall be incorporated<br />
into the one packaged unit located on the condenser deck.<br />
Note: If there is an existing condenser water loop available within<br />
the centre, then the option of using a water cooled chiller shall be<br />
allowed.<br />
4.3.1 GENERAL<br />
This unit shall be a complete factory assembled unit, including air handling unit,<br />
MSSB, compressors and condensers. The larger cooling capacity (greater than 200<br />
kW) units shall be a walk in modular unit whilst the smaller cooling capacity units<br />
(less than 200kW) may be modular with access doors into the various modules of<br />
the unit.<br />
The system shall comprise a single zone draw through air handling unit with either<br />
direct expansion or chilled water cooling coils, heat reclaim coils, hot water coils, dry<br />
media deep bed filters and backward curved centrifugal or ‘plug’ type supply air fan.<br />
Fresh air louvres may be part of the AHU.<br />
Specifically the unit shall include:<br />
a. Weather proof insulated panel housing with suitable access doors.<br />
b. Cooling coils.<br />
c. Heating coils.<br />
d. Heat reclaim coil. A single heat reclaim coil shall be provided by the<br />
refrigeration contractor but shall be installed within the AHU by the<br />
mechanical contractor. All refrigerant piping from this coil to the<br />
refrigeration system shall be by the refrigeration contractor.<br />
e. Filters.<br />
f. Supply air fan.<br />
g. Mechanical Services Switch Board (MSSB).<br />
h. Motorised outside air damper for economy cycle and CO2 Outside air<br />
volume control.<br />
4.3.2 DIRECT EXPANSION COOLING<br />
Refer to section 4.2.1<br />
4.3.3 CHILLED WATER COOLING<br />
Refer to section 4.2.2<br />
Page 29 of 157 29
4.4 ROOF TOP PACKAGE SYSTEMS<br />
General: This system shall comprise of a roof top package (RTP) unit with dedicated<br />
supply and return duct work incorporating fresh air supply to a filter plenum box which is<br />
separate to the RTP. Unit shall be mounted on a platform built to the same specification<br />
as the condenser platform.<br />
Energy Rating: RTP shall be tested for energy efficiency with the declaration of the units<br />
EER. If required by legislation a MEPS rating shall also be provided.<br />
Approve Manufactures: shall be as nominated in section 17.8 or equivalent approved by<br />
Woolworths Senior Mechanical Engineer.<br />
Controls: Unit controls shall be interfaced with the main CPC controller which shall be<br />
located in the MSSB. Controls shall include:<br />
− Compressor Start/Stop/Fault<br />
− Reversing valve control<br />
− O/A damper control<br />
− S/A fan control/fault<br />
− Condenser fan control<br />
MSSB: Submains for RTP shall be feed from MSSB located in the main plantroom<br />
Compressors: shall be scroll (410a) type of a Woolworths approved manufacture. A<br />
minimum of 3 compressors shall be used per unit with the lead compressor being<br />
complete with variable speed control.<br />
Condenser Fans: shall be EC type of either EBM Papst or Ziehl Abegg make (or<br />
equivalent approved by Woolworths Senior Mechanical Engineer).<br />
Supply Air Fan: shall be a Plug type fan of Ziehl Abegg make (or equivalent approved by<br />
Woolworths Senior Mechanical Engineer).<br />
Heating: The first stage of heating shall be made available from a heat reclaim coil from<br />
the stores refrigeration plant this coil shall be located upstream from the heating and<br />
cooling coils in the filter box plenum (down-stream of the filter bank). The second stage of<br />
heating shall be achieved by reverse cycle. Where the RTP is an excessive distance from<br />
the refrigeration plantroom an alternate design for incorporating heat reclaim may be<br />
submitted to the Woolworths Senior Mechanical Engineer for approval.<br />
Dehumidification: If the RTP system is unable to achieve the required humidity level<br />
(given the sensible load) in the space then additional mechanical or desiccant systems<br />
shall be used to condition the fresh and return air as required.<br />
4.5 VRV / VRF SYSTEMS<br />
MEPS and EER shall be provided for each system. This information shall be documented<br />
with the required Mechanical documentation.<br />
4.5.1 BACK OF HOUSE & OFFICE AREAS<br />
Back of house office areas shall be air-conditioned using a variable refrigerant<br />
volume system. This shall comprise a number of indoor units connected to one or<br />
more reverse cycle external condenser units. The system shall be capable of<br />
simultaneously providing heating and cooling to different indoor units.<br />
Air Handling:<br />
− The indoor units shall be either cassettes or in ceiling ducted units. Units shall be<br />
supplied with filtered fresh air.<br />
Page 30 of 157 30
− For in ceiling units, the location of the unit shall be such that it is easy to access<br />
the unit for servicing. In set ceilings, the mechanical contractor shall ensure that a<br />
suitable access panel is provided to service the unit.<br />
− Where more than one cassette type unit serves the same area, multiple units shall<br />
be controlled from one controller only.<br />
4.5.2 TRADING AREAS<br />
Trading area shall be air-conditioned using a variable refrigerant volume system.<br />
This may comprise either a single or multiple of indoor units connected to one<br />
reverse cycle external condenser unit. The system shall be capable of<br />
simultaneously providing heating and cooling to different indoor units.<br />
Air Handling: The indoor units shall be in ceiling ducted units. Units shall be<br />
supplied with filtered fresh air. The location of the unit shall be such that it is easy<br />
to access the unit for servicing. In set ceilings, the mechanical contractor shall<br />
ensure that a suitable access panel is provided to service the unit.<br />
Dehumidification: If dehumidification capability is required then one or more<br />
dedicated fan coil units shall be configured to dehumidify. This shall be achieved<br />
by using two FCU’s connected to the same supply air duct simultaneously heating<br />
and cooling supply air.<br />
Use of Heat-Reclaim from Refrigeration Plant: Additional hot water coils (from<br />
refrigeration heat reclaim) may be installed to provide heating and dehumidification<br />
capacities. Hot water shall be sourced from a heat reclaim plate heat exchanger<br />
(supplied by the refrigeration contractor) sourcing waste heat from the stores<br />
refrigeration system. Where heat reclaim is used it shall always be designated as<br />
the first stage of heating with the polyvalent chiller providing the second stage of<br />
heating.<br />
Design Approval: Final design of the system to be submitted to the Woolworths<br />
Senior Mechanical Engineer for approval.<br />
4.6 POLYVALENT SYSTEM (REVERSE CYCLE CHILLED WATER)<br />
Chilled/heated water shall be supplied by an approved reverse cycle chiller capable of<br />
simultaneously providing chilled and hot water to the air handling unit (AHU) or fan coil<br />
units (FCU). This unit shall be a complete factory assembled unit, including controls,<br />
pumps, compressors and condensers.<br />
Air Handling: The air handling system may comprise of a single AHU or multiple FCU’s.<br />
Dehumidification: System shall be capable of dehumidification requirement if specified as<br />
a system requirement (refer section 2.2.1). Dehumidification shall be achieved by first<br />
cooling then reheating supply air facilitated by a FCU designed with both heating and<br />
cooling coils. Simultaneous heating and cooling is acceptable provided that the warm and<br />
cool air is adequately mixed before being distributed into conditioned space. In addition<br />
outside air may be dehumidified by an approved mechanical dehumidifying unit.<br />
Use of Heat-Reclaim from Refrigeration Plant: Additional hot water coils (from<br />
refrigeration heat reclaim) may be installed to provide heating and dehumidification<br />
capacities. Hot water shall be sourced from a heat reclaim plate heat exchanger<br />
(supplied by the refrigeration contractor) sourcing waste heat from the stores refrigeration<br />
system. Where heat reclaim is used it shall always be designated as the first stage of<br />
heating with the polyvalent chiller providing the second stage of heating.<br />
Design Approval: Final design of system (including heat load calculations) to be<br />
submitted to the Woolworths Senior Mechanical Engineer for approval.<br />
Page 31 of 157 31
4.7 MECHANICAL VENTILATION<br />
4.7.1 GENERAL REQUIREMENTS<br />
Exhaust systems shall be fitted with roof mounted, low profile, vertical discharge<br />
centrifugal fans.<br />
Fans shall be of Fantech, Heritage series construction; Ziehl Abegg, EBM Papst or<br />
approved equal, fitted with bird-mesh protection.<br />
Motors to be mounted out of air stream.<br />
Where discharge is above roof, opening is to be fitted with ‘bird-mesh’ protection.<br />
4.7.2 TOILETS & CLEANERS ROOMS<br />
The staff toilets and cleaners rooms shall have an exhaust rate as required by AS<br />
1668.2.<br />
4.7.3 STOCK ROOM EXHAUST<br />
For stores where the roof over the stock area is sheet metal, the stock room exhaust<br />
ventilation system shall consist of not less than two roof mounted propeller type fans.<br />
For stores where the stock area ventilation system has to be ducted, a single exhaust<br />
fan will be allowed.<br />
The fans shall be of sufficient capacity to provide a minimum of ten air changes per<br />
hour based on the total space volume (Excluding the volume of the cool, freezer or<br />
store rooms).<br />
Provision of make-up air to the stock room exhaust ventilation system must be<br />
considered (via perforated loading dock shutters or if not practical due to location, or<br />
adjacent refuse bins, then low level louvres shall be installed into stockroom<br />
perimeter wall).<br />
4.7.4 MSB ROOM VENTILATION / CONDITIONING<br />
Roof mounted exhaust fan shall be provided complete with bird wire mesh, and wall<br />
mounted thermostat set at 28°C, with low level wall mounted air intake grille complete<br />
with panel filter. Design for 10 ACH.<br />
Note 1: Fire dampers may be required if fire rated walls and ceilings are required.<br />
Note 2: In BCA climate zones 1 & 2 the MSB room shall be air conditioned using<br />
VSV/R ducted system. Evaporator shall not be contained within or above room with<br />
condensate tray/lines shall be external to room.<br />
In stores where the exhaust is at roof level, a roof mounted exhaust fan shall be<br />
provided. In other instances, an inline axial fan may be used.<br />
4.7.5 GENERATOR ROOM<br />
If a separate generator room is required then this room shall be provided with<br />
sufficient natural or mechanical ventilation to maintain the generator within its<br />
designed operating temperature. Note: Generator will be required to operate<br />
continuously in an emergency situation<br />
Page 32 of 157 32
4.7.6 SMOKE EXHAUST SYSTEM<br />
Smoke Spill and/or Smoke Exhaust systems, Car Parking area and Loading Dock<br />
exhaust or ventilation systems as required by any statutory or regulating authority are<br />
not included within the scope of this design brief. All such systems, when and if<br />
required, shall be provided by the developer to meet the requirements of and to the<br />
approval of any authority having jurisdiction at the Site<br />
The developer may submit a ‘Fire Engineered Solution’ to comply with the<br />
performance based criteria of the BCA; all subject to the approval of the local<br />
authority having jurisdiction over the works & Woolworths. The fire engineer engaged<br />
for the project must be accredited and approved by the relevant authority having<br />
jurisdiction over the works and Woolworths. A copy of the Fire Engineered report<br />
must be submitted to Woolworths for information and record.<br />
Smoke Spill and/or Smoke Exhaust system shall be roof mounted fans over the<br />
trading area located in positions approximately as shown on the Standard<br />
Woolworths Air Conditioning Layout Drawing No. 9. Details of alternative fan<br />
locations must be submitted to Woolworths prior to the completion of the design work<br />
and before the acceptance of any <strong>Tender</strong>.<br />
Note:<br />
Smoke spill and/or smoke exhaust systems shall operate and run independently of<br />
any Air conditioning system and equipment.<br />
The use of smoke barriers below the ceiling line in the trading area shall be avoided.<br />
Where authorities require that smoke exhaust fans be installed, it is the developer’s<br />
responsibility to have a separate fire rated submain (MIMS or Radox only) installed<br />
from the Centre Main electrical switchboard to a separate essential services 'Smoke<br />
Spill Fans' control panel located in the A/C Plantroom in a fire rated enclosure.<br />
All wiring required for connection between essential services control panel (ESP) and<br />
smoke exhaust fan and Fire Indicator Panel must be included in the above works.<br />
Smoke exhaust fans Fire Brigade’s manual over ride switches on ESP shall be of the<br />
'lockable type'.<br />
Roof mounted smoke exhaust fans local isolating switches are to be locked in the<br />
"on" position as per AS 1668.1 In any event.<br />
4.7.7 KITCHEN EXHAUST - CHICKEN COOKER, DOUGHNUT, DISHWASHER &<br />
BAKERY<br />
Each exhaust/make up air system shall be separately ducted to outside. The joining<br />
of any exhaust duct from any system to another will not be accepted.<br />
Exhaust systems shall be interlocked to its make up air system and respective<br />
kitchen equipment so that exhaust and make up systems only operate when kitchen<br />
equipment is in operation. Current sensing relay may be used to detect if kitchen<br />
equipment is operating (i.e. difference between standby and operating current). A<br />
15min run on timer shall also be incorporated so that exhaust will continue to operate<br />
15min after kitchen equipment is turned off.<br />
When winter outside design ambient conditions are below 10°C make up air system<br />
shall stop with additional fresh air supplied to main air handling unit.<br />
Make-up air system fans shall be installed above the roof.<br />
Each exhaust and make up air system shall be interlocked to the main air<br />
conditioning plant so that when exhaust systems are not running the fresh air quantity<br />
to the main A/C plant is balanced so to maintain design pressure within retail space.<br />
Page 33 of 157 33
All exhaust hoods shall be welded construction manufactured from 1.2 mm thick<br />
stainless steel, grade 304 having a No. 4 finish. All corners shall be radiused filled<br />
and ground smooth.<br />
Design hood face velocity shall not be less than 0.5 m/s for chicken cooker, doughnut<br />
cooking unit and dishwasher and 0.3 m/s for bakery ovens. The Designer shall<br />
comply with the requirements of the local authority and AS 1668.2.<br />
The standard hood sizes shown on the detail drawings (refer to Section ) shall be<br />
used. Alternative designs that provide improved energy savings may be considered<br />
providing that approval is given by Woolworths Senior Mechanical Engineer, the<br />
hoods comply with AS1668.2 and a Certificate of Conformity is provided.<br />
Note: Approved alternate makes are Halton (available from Stoddart) and Britannia<br />
(available from HRC Alliance)<br />
a) The chicken cooker unit shall be fitted with an exhaust hood complete with<br />
grease filters, fan and ductwork. A make up air supply system shall also be<br />
installed complete with fan, ductwork and filters. Make up air to the hood<br />
shall comprise of an internal jet that assist in capturing effluent and low<br />
velocity outlet located in the front of the hood vertically (refer to sections<br />
18.1.1 & 18.1.2).<br />
Note: Make up are shall not interfere with air distribution within the deli area.<br />
b) The doughnut cooking unit shall be fitted with an exhaust hood complete with<br />
grease filters, fan and ductwork.<br />
c) The bakery oven shall be fitted with an exhaust hood, fan and ductwork.<br />
(Grease filters shall also be supplied and installed if required by the local<br />
authorities). A make up air supply system shall also be installed complete<br />
with fan, ductwork, filters and outlet registers adjacent and to the rear of the<br />
exhaust hood.<br />
When the bakery oven is gas fired additional provision shall be made within<br />
or adjacent to the hood to accommodate gas flue. (Refer to oven<br />
manufactures details)<br />
Note: When winter outside design ambient conditions are below 10°C<br />
make up air shall be turned off.<br />
d) The dishwashing unit shall be fitted with an exhaust hood complete with fan<br />
and ductwork.<br />
4.7.8 FISH SERVICE & PREPARATION AREAS EXHAUST (IF APPLICABLE)<br />
The fish preparation area shall be provided with a roof mounted fan system of<br />
sufficient capacity to give an exhaust rate not less than 160L/sec each exhaust outlet<br />
(3 off) or fifteen (15) air changes per hour of total volume, whichever is greater.<br />
Page 34 of 157 34
5.0 SYSTEM APPLICATIONS<br />
5.1 TRADING AREAS<br />
This section describes under what conditions the various system designs are to be<br />
considered.<br />
The type of airconditioning system used is dependant on the size of the store and its<br />
geographic location.<br />
Store Type/Size 1<br />
Tropical<br />
Supermarket<br />
(Greater than<br />
3800m 2 )<br />
Supermarket (2000-<br />
3800 m 2 )<br />
Supermarket (1500-<br />
2000 m 2 )<br />
Supermarket – Small<br />
Format (Less than<br />
1500 m 2 )<br />
2 & 3<br />
Sub Tropical<br />
BCA Climate Regions<br />
4<br />
Arid<br />
5 & 6<br />
Warm<br />
Temperate<br />
7 & 8<br />
Temperate<br />
Central Plant Central Plant Central Plant Central Plant Central Plant<br />
Custom Custom Custom Custom Custom<br />
Package Unit Package Unit Package Unit Package Unit Package Unit<br />
RTP Unit RTP Unit RTP Unit RTP Unit RTP Unit<br />
VRF Unit or<br />
Multi Head<br />
Polyvalent<br />
VRF Unit or<br />
Multi Head<br />
Polyvalent<br />
VRF Unit or<br />
Multi Head<br />
Polyvalent<br />
VRF Unit or<br />
Multi Head<br />
Polyvalent<br />
VRF Unit or<br />
Multi Head<br />
Polyvalent<br />
Dan Murphys RTP Unit RTP Unit RTP Unit RTP Unit RTP Unit<br />
Wooloworths Liquor RTP Unit or RTP Unit or RTP Unit or RTP Unit or RTP Unit or<br />
VRF Unit VRF Unit VRF Unit VRF Unit VRF Unit<br />
BWS VRF Unit VRF Unit VRF Unit VRF Unit VRF Unit<br />
Dick Smith (Greater<br />
than 500 m 2 )<br />
Dick Smith (Less<br />
than 500m 2 )<br />
RTP Unit RTP Unit RTP Unit RTP Unit RTP Unit<br />
RTP Unit or<br />
VRF Unit<br />
RTP Unit or<br />
VRF Unit<br />
RTP Unit or<br />
VRF Unit<br />
RTP Unit or<br />
VRF Unit<br />
RTP Unit or<br />
VRF Unit<br />
Note: - Where chilled water is available RTP and VRF units are interchangeable with chilled water<br />
FCU’s.<br />
- All VRF units to be of ducted configuration.<br />
- Climate Zones for New Zealand shall use equivalent to Australian zones.<br />
5.2 OFFICE & AMENITIES AREAS AIR CONDITIONING SYSTEMS<br />
Reverse cycle air cooled split air conditioning systems (Variable Refrigerant Flow/Volume<br />
type only) shall be supplied and installed to serve the following areas:<br />
Page 35 of 157 35
a) Systems Office<br />
b) Cashiers Office<br />
c) General Office<br />
d) Communications Room<br />
e) MSB Room ( BCA climate zones 1 & 2)<br />
f) Staff Training<br />
g) Staff dining and lounge areas<br />
h) Female Locker Room<br />
i) Male Locker Room<br />
Note:<br />
• All areas nominated above shall be controlled individually using wall mounted thermostat<br />
located within each space.<br />
• Ceiling mounted fan coil units must be isolated from the building elements and located to<br />
ensure service access clearances are sufficient to allow unrestricted access to all<br />
components within the fan coil unit, to filters, safety trays and condensate drains.<br />
• All systems shall be supplied with fresh air as per AS 1668. Both return air and fresh air shall<br />
be filtered as per AS 1668<br />
• Noise levels of equipment must comply with section 2.3.<br />
• All roof mounted air cooled condensers shall have passivated fins.<br />
• Systems shall be wired from the MSSB located in the main plantroom.<br />
• All systems shall be linked with the main air conditioning system controller (CPC) so<br />
temperature set points and On/Off schedule can be controlled centrally.<br />
• The capacity of each air conditioning unit shall be sufficient to meet the total of the building<br />
load, outside air load, people occupancy load, light load and computer equipment loads as<br />
above.<br />
Page 36 of 157 36
6.0 EQUIPMENT<br />
6.1 REFRIGERANTS<br />
All air conditioning systems and all associated condensing units shall be designed to<br />
operate using an environmentally friendly refrigerant such as R134a, R410a or approved<br />
alternative.<br />
Note:<br />
• The use of CFC and HCFC Refrigerants shall not be permitted.<br />
• The use of R407c & R22 is not permitted.<br />
• All air conditioning systems shall be designed using air cooled heat rejection<br />
equipment.<br />
• THE USE OF OPEN ATMOSPHERIC WATER COOLING SYSTEMS SUCH AS<br />
COOLING TOWERS AND EVAPORATIVE CONDENSERS WILL NOT BE<br />
PERMITTED.<br />
• As a minimum all equipment shall comply with the energy efficiency requirements<br />
of the Building Code of Australia. Particular note should be taken of sections J5<br />
and J7 as these sections are directly applicable to Air conditioning and<br />
Ventilation systems.<br />
6.2 CORROSION PROTECTION<br />
The installation shall use materials which resist corrosion (i.e. 2000 hrs salt spray test). In<br />
particular, care shall be taken with all equipment located externally to ensure maximum<br />
corrosion protection.<br />
The design and installation of the mechanical services shall take into account standard<br />
acceptable procedures to minimise corrosion. As far as possible, dissimilar metals shall<br />
not be in contact to avoid the possibility of electrolytic corrosion which may occur in such<br />
cases.<br />
Where unlike metals are in connected, those metals shall be in close proximity on the<br />
galvanic series. Where fixings are used which may result in materials of lesser surface<br />
area being in contact with parent materials of considerably larger surface area, the parent<br />
material shall be lower on the galvanic series than the material of the fixing, in order to<br />
avoid rapid failure of the fixing.<br />
All steel items, including brackets and fixings (including screws, nuts and bolts) shall be<br />
hot dip galvanised after fabrication. Non galvanised, painted steel items are not<br />
acceptable on any part of the installation.<br />
6.3 AIR HANDLER UNITS<br />
6.3.1 BUILT UP AIR HANDLING UNIT (AHU) HOUSING<br />
The air handling unit shall be fabricated from refrigeration type cold room<br />
sandwich panels with a minimum of 75mm FM Global approved (PIR) core (i.e.<br />
EPS is not approved) with 0.5 mm colour bond pressure bonded skins, on all sides<br />
and with 75 mm ceiling and floor.<br />
A separate walk in compartment shall be provided between the air filter and<br />
cooling coils/ heat reclaimed coils as well as between outside air and return air<br />
plenums and fan chamber. Fluorescent (T5) lighting must be provided in each of<br />
the compartments as per AS 1677..<br />
A separate 550mm x 1500mm hinged access door shall be provided to each<br />
separate compartment. Access doors shall have chrome plated hardware with<br />
quick release catches, and shall be ‘Bullock’ design or approved equal. Direction<br />
of opening of doors shall be arranged to ensure that the door gasket is assisted in<br />
closing against the pressure difference over the door.<br />
Page 37 of 157 37
A stainless steel condensate tray shall be provided under each cooling coil with a<br />
minimum 32mm diameter drain from each condensate tray. Fall to drain point shall<br />
be a minimum of 1:100. Tray to extend to the heating coil bank.<br />
A common condensate drain shall pass through the AHU unit housing, be suitably<br />
trapped and be of sufficient height to overcome the systems pressure difference<br />
and discharge with an air break into a floor waste outside the air handling unit.<br />
Sufficient space shall be allowed within the housing to accommodate a hot water<br />
coil and hot refrigerant gas heat reclaim coil (from the commercial refrigeration<br />
installation). Heat reclaim coil to be supplied by the commercial refrigeration<br />
contractor, installed by the mechanical sub-contractor.<br />
All floors in walk in compartments shall be protected with stainless steel checker<br />
plate flooring.<br />
6.3.2 MODULAR CONSTRUCTION AIR HANDLING UNIT (AHU) HOUSING<br />
Generally the type of AHU has the same specification as the ‘Built Up Plant’ AHU<br />
(refer to section 6.3.1), except that this type of AHU is specifically designed to be<br />
located external to the plantroom (i.e. on the condenser deck). The following<br />
addition requirements shall apply.<br />
• The AHU shall be completely weather proof.<br />
• Roof of AHU shall have a fall of not less than 3 degrees.<br />
• Roof Fall shall not be towards side of AHU with access panels<br />
• A weather guard shall be installed 150mm above all access panels. Guard<br />
shall protrude 50mm off vertical face of AHU and shall have a formed<br />
safety edge on all edges.<br />
• Switchboard shall be completely enclosed within the structure so that it is<br />
not effected by weather.<br />
6.3.3 SUPPLY AIR FAN & FILTERS<br />
Refer to section 6.14.2<br />
6.4 FAN-COIL UNITS<br />
6.4.1 GENERAL<br />
Return and outside air mixing plenums shall be installed on all fan-coil units. Filters<br />
shall be provided and all gaps and spaces which allow air bypass around filters<br />
shall be filled and sealed to prevent bypass.<br />
6.4.2 FABRIC COUPLINGS<br />
Supply and install on both supply and return air ducts, approved fabric couplings.<br />
These couplings shall have a minimum extended dimension of 75mm and shall be<br />
installed to ensure that they are air tight and free to function correctly without being<br />
taut or restricting air flow. Where these couplings are exposed to the weather, they<br />
shall be protected with appropriate covers.<br />
6.5 VRV OR REVERSE CYCLE SPLIT DX SYSTEMS<br />
This section describes the requirements for mid-wall, high-wall, ceiling cassette or small<br />
in-ceiling fan-coil units for use in back of house areas.<br />
The system shall generally comprise an air cooled condenser unit connected to a number<br />
of indoor fan coil units. Each indoor unit shall be sized to meet the cooling or heating<br />
requirements of the room being served.<br />
Page 38 of 157 38
The system shall use inverter driven or digital scroll technology and be able to offer<br />
simultaneous heating and cooling to different indoor units connected to the same outdoor<br />
unit. There shall also be heat recovery operation possible.<br />
The system shall have a minimum energy efficiency ratio that complies with Section J of<br />
the latest version of the Building Code of Australia.<br />
The outdoor unit shall be a factory assembled unit, housed in a sturdy weatherproof<br />
casing constructed from rust proofed mild steel panels coated with a baked enamel finish.<br />
The outdoor unit shall be modular in design and should be designed to allow for side by<br />
side installation.<br />
The noise levels for both the indoor and outdoor units shall meet the requirements as set<br />
out in the noise level specification section.<br />
All indoor units used shall be capable of accepting the outside air supply directly into the<br />
return air of the unit.<br />
Cassettes and mid wall units shall be provided with integral condensate pumps.<br />
The refrigerant circuit shall include liquid gas shut off valves and a solenoid valve. The<br />
system shall be fitted with all necessary safety devices to ensure safe operation of the<br />
system.<br />
Units shall be equipped with an oil recovery system to ensure stable operation with long<br />
refrigerant pipe runs.<br />
Each fan coil unit shall be of the ducted medium or high static type and be fitted with<br />
appropriate filter. See filter section. The filters may be fitted in the return air duct.<br />
The system shall incorporate a proprietary control system that can be controlled by a<br />
single all-in-one unit located in the general office. It will be necessary for the proprietary<br />
control system to be able to communicate with the Emerson mechanical control system.<br />
All temperature set points and alarm notifications shall be accessible from the Emerson<br />
system.<br />
Approved brands are nominated in section 17.7 or equal approved by Woolworths Senior<br />
Mechanical Engineer.<br />
6.6 COOLING COILS<br />
All coil configurations shall be designed to allow for condensate to flow away from the coil<br />
easily without being drawn through the coil into the air stream or water logging the coil.<br />
Coils shall be copper tube with aluminium fins, copper headers and aluminium casing.<br />
Tube lengths and fins shall be free from joints. Coils shall be arranged in slide racks for<br />
ease of removal. No non ferrous parts shall be in contact with any ferrous part.<br />
All coils shall have ARI 410 certification for performance verification.<br />
6.6.1 DIRECT EXPANSION<br />
Coils shall be a minimum of six (6) rows deep and shall be parallel refrigerant - air<br />
flow with loop back onto the air entering face.<br />
For areas with design wet bulb temperatures equal or over 27°C WB; 8 row coils<br />
shall be used.<br />
Coil suction piping connections must be taken from the lowest point in each<br />
suction header, with oil risers on each suction line.<br />
Page 39 of 157 39
Coils shall be single circuit to maximise latent cooling and for multi-circuit systems,<br />
there shall be an individual coil for each circuit.<br />
If coils are installed one above the other a stainless steel condensate tray shall be<br />
installed under each coil section.<br />
Maximum Face Velocity: 2.50 m/s<br />
Minimum SST: 6.0°C<br />
Minimum Coil Superheat: 9K<br />
Minimum Refrigerant Velocity: 5.0 m/s<br />
Maximum Refrigerant Pressure Drop 80 kPa<br />
Maximum Fin Density 400 f/m<br />
6.6.2 CHILLED WATER<br />
Coils shall be arranged no more than two coils high and a stainless steel<br />
condensate tray shall be fitted under each coil.<br />
Chilled water cooling coils shall have a minimum of six rows in direction of air flow.<br />
Maximum Air Velocity 2.5 m/s<br />
Designed Water Temp In 7°C<br />
Designed Water Temp Out 12°C<br />
Maximum Fin Density 400 fp/m<br />
Coil Pressure Drop (Water Side) 25 kPa<br />
6.6.3 REVERSE CYCLE DX COILS<br />
All evaporator and condenser coil configurations shall be designed to allow for<br />
condensate to flow away from the coil easily without being drawn through the coil<br />
into the air stream or water logging the coil. This is particularly important in heating<br />
mode when the “condenser coil” is acting as the evaporator. The condenser coils<br />
shall be in a vertical or V-block configuration.<br />
When a coil is in cooling mode, the coil specification shall meet the requirements<br />
as set out in the direct expansion coil section above.<br />
When the coil is in heating mode, the coils shall meet the above requirement plus<br />
the following additional requirements.<br />
Maximum coil refrigerant temperature difference: 10 °K<br />
6.7 HEATING COILS<br />
Heating coils shall be a minimum of two rows deep<br />
6.7.1 DIRECT EXPANSION<br />
Maximum Face Velocity: 2.50 m/s<br />
Maximum Air Pressure Drop: 50 Pa<br />
Maximum Refrigerant Pressure Drop 50 kPa<br />
Maximum Fin Density 400 f/m<br />
6.7.2 HOT WATER<br />
Maximum Face Velocity: 2.50 m/s<br />
Maximum Air Pressure Drop: 50 Pa<br />
Maximum Pressure Drop 50 kPa<br />
Maximum Fin Density 400 f/m<br />
Page 40 of 157 40
6.7.3 REFRIGERATION HEAT RECLAIM COIL (BY OTHERS)<br />
6.8 COMPRESSORS<br />
6.8.1 GENERAL<br />
Labels to be provided with compressor indicating type of refrigerant gas, charge,<br />
date entered into service and type of lubrication oil to be used (in compliance with<br />
the relevant Statutory/Regulatory requirements).<br />
Reciprocating compressors shall have single stage compression and be selected<br />
to match the design duty when operating at the evaporator and condensing<br />
temperatures specified herein.<br />
All electric driving motors shall be suitably protected against an overload condition<br />
(by thermal overloads and phase failure protection) and shall include thermistor<br />
protection.<br />
All compressors shall be fitted with sufficient electrically controlled capacity control<br />
steps to satisfy cooling load variations and shall have pressure lubrication, oil<br />
strainer, suction discharge shut-off valves, discharge mufflers, suction<br />
accumulator, vibration isolation mounts, pipework vibration eliminators, crank case<br />
heaters, manual reset HP/LP and oil safety switches.<br />
All control lines from compressor to ‘control manifold’ to be in approved<br />
refrigeration flexible lines.<br />
Note: Sump oil drain valve shall be fitted to semi hermetic compressors.<br />
6.8.2 APPROVED COMPRESSORS<br />
Refer to section 17.3<br />
Note: All compressors may be the manufacturers’ standard unit provided that the<br />
unit complies with all the requirements of this design brief.<br />
6.9 AIR COOLED CONDENSERS<br />
6.9.1 APPROVED CONDENSERS<br />
Condensers shall be of the type and make nominated in section 17.4 (or as otherwise<br />
approved in writing by the Woolworths Senior Mechanical Engineer) and shall comply<br />
with the design conditions set out within this specification.<br />
The nomination of any manufacturer's equipment shall not imply any preference or<br />
order of selection of any brand.<br />
6.9.2 LOCATION & POSITIONING<br />
Unless otherwise indicated the condenser shall be mounted on galvanized steel deck<br />
or structural supports provided by others.<br />
All condensers shall be located so as to be above the compressor sets and liquid<br />
receivers.<br />
The Designer shall nominate the number of air cooled condensers required and<br />
coordinate the positioning of the condenser(s) on the roof platform with the<br />
commercial refrigeration contractor and the builder.<br />
Location of condensers shall ensure adequate air flow across the condenser and<br />
comply with acoustic requirements for the building site.<br />
Page 41 of 157 41
6.9.3 CONDENSER FANS<br />
Air cooled condensers shall be provided with air circulating fans of the propeller type.<br />
Each condenser shall have not less than two (2) fans, offering three (3) stages of<br />
capacity control (0 Fans/1 fan/2 fans). The fans shall be each direct coupled to totally<br />
enclosed electric driving motors suitable for operation on three phase 50 cycles<br />
electric supply.<br />
Each fan motor shall be factory wired to individual isolation switches located in an<br />
adequately protected terminal box with waterproof conduit entry. The terminal box<br />
shall be made of UV stabilised material and be IP56 rated. The terminal box shall be<br />
easily accessible by technicians with minimum free clearance of 600mm to allow<br />
installation and servicing.<br />
Electrical components for condensers shall be located in the main refrigeration<br />
switchboard in the plantroom. No such components at the condenser will be<br />
accepted.<br />
6.9.3.1 AXIAL (AC) FAN MOTOR SELECTION<br />
When selecting a condenser with standard AC motors, preference<br />
shall be given to energy efficient 8-pole motors. The make of fans<br />
shall be as nominated in section 17.4.1 or equivalent approved by<br />
Woolworths Senior Engineer.<br />
6.9.3.2 EC FAN SELECTION<br />
When selecting a condenser with Electrically Commutated (EC)<br />
fans, the make shall be as nominated in section 17.4.1 or<br />
equivalent approved by Woolworths Senior Engineer.<br />
Fans shall be capable of achieving 1080RPM operational speed.<br />
Condensers shall be selected at standard 8-pole (high-speed)<br />
condition. Fans shall be capable of achieving full speed operation<br />
as required by the Electronic Alarm & Control system.<br />
6.9.4 CONSTRUCTION<br />
Condenser coil protection shall be by epoxy treatment of fins prior to manufacture of<br />
condenser. The ‘dipping’ of condenser coil block shall not be accepted as a form of<br />
corrosion protection. All condensers offered shall be subject to a 2000hr salt spray<br />
test in accordance with ASTMB117 and ASDTMB287. Results of such testing shall<br />
be made available to Woolworths upon request.<br />
Condensers shall be constructed of copper pipe expanded into epoxy coated<br />
aluminium fins. The fins shall be spaced at not more than 472 per metre and the<br />
coils may incorporate a ‘floating ‘ coil arrangement or be expanded into galvanised<br />
steel tube plates and assembled within a galvanised steel / aluminium casing<br />
complete with supporting legs.<br />
All air-cooled condensers shall be not less than four (4) rows deep in direction of air<br />
flow. The condenser coils shall be arranged to enable cleaning of the coils.<br />
Discharge and return lines to Condensers are not to be insulated, and shall be fixed<br />
using pipe clamps and painted. Pipe clamps and fasteners shall be galvanized or<br />
stainless steel separated from copper piping with insulating material.<br />
All air-cooled condensers shall have a horizontal coil, with vertical air discharge<br />
unless ‘V Block’ type condensers are used<br />
At the time of commissioning all fins shall be demonstrably free of damage caused by<br />
transporting, unloading and erecting the equipment.<br />
Page 42 of 157 42
Any steel casing shall have a galvanised finish and shall be finished with first quality<br />
powder coat finish to 80 micron thickness.<br />
The condenser coils may be multi-circuited and suitably headed with brazed<br />
connections.<br />
The liquid outlet shall be not less than 300mm above the top of the liquid receiver.<br />
6.9.5 CONDENSER SELECTION<br />
The condensing temperature of all refrigeration systems shall not exceed<br />
temperature differences above the ambient temperature as outlined in Section 2.2.<br />
Air cooled condensers shall be selected to maintain a temperature difference<br />
between the design ambient dry bulb and the condensing temperature, as follows:<br />
Ambient °C Temp Diff °K Condensing °C<br />
(SCT)<br />
32 13 45<br />
33 12 45<br />
34 11 45<br />
35 11 46<br />
36 11 47<br />
37 10 47<br />
38 10 48<br />
39 10 49<br />
40 9 49<br />
41 8 49<br />
42 8 50<br />
If a single condenser is selected to match the total heat rejection requirements then<br />
the condenser shall incorporate two (2) separate refrigerant circuits.<br />
In the case of two (2) condensers being selected to match the total heat rejection<br />
requirements then each condenser shall form part of a separate refrigerant circuit.<br />
6.10 DRY FLUID WATER COOLED CONDENSERS<br />
May be considered for stores where the distance between the plantroom and condenser<br />
deck is excessive and the resulting increased refrigerant charge presents an increased risk<br />
to system integrity and operation.<br />
This option shall be fitted with a mechanically cleanable shell and tube condenser and<br />
condenser water pump connected with piping to a remote mounted dry (water-to-air) heat<br />
exchanger.<br />
In all instances the condenser water circuit shall be a closed circuit and not open to external<br />
contamination at any point within the cycle.<br />
Shell & Tube condensers shall be as nominated in section 17.5.1 or as otherwise approved<br />
in writing by the Woolworths Senior Mechanical Engineer<br />
Page 43 of 157 43
Shall be mechanically cleanable and designed into a system with fouling factor of 0.178<br />
m²K/kW when meeting the system design total heat of rejection. Control of system head<br />
pressure shall be by bypassing condenser water flor around shell and tube condenser via<br />
the use of a 3-way modulating valve, controlled by the electronic control system. Condenser<br />
water temperature to be maintained by switching (or speeding) of dry-cooler fans.<br />
Components within the condenser water piping circuit shall be flanged to allow the removal<br />
of the condenser end covers without disturbing the condenser mountings.<br />
Ancillary equipment and detail to be Included when employing a water-cooled condenser<br />
Installation as follows:<br />
• Air Purge Ports:<br />
Automatic air vents shall be provided at system high points complete with shut off valves<br />
to clear pipework of air and to prevent air locks. Careful consideration shall be given to<br />
the positioning of air vents to ensure satisfactory operation of the whole system.<br />
• Chemical Water Treatment<br />
The Mechanical contractor shall add corrosion and bacterial inhibitor to the water<br />
system on initial charge and again at the end of Defects Liability Period. The Contractor<br />
shall provide evidence and details of water dosing to Woolworths personnel at both<br />
times.<br />
• Condenser Water Circuit:<br />
Water piping between the shell and tube condensers and the dry cooler shall be in<br />
copper. The piping system shall include isolating valves to enable isolation of each<br />
piece of equipment, balancing valves and control valves. The pipework shall be graded,<br />
preferably in the direction of flow with air purge ports at each high point.<br />
• Condenser Water Pumps:<br />
Two (2) equally sized condenser water pumps shall be supplied with each capable of<br />
delivering 100% duty. Pumps shall be installed in parallel and be automatically switched<br />
every seven (7) days to equalise run-time or started if the other pump fails to operate.<br />
An alarm shall be raised on pump run failure. A water flow switch shall be installed<br />
immediately after each pump.<br />
A mechanically cleanable strainer shall be incorporated in the water pipe prior to each<br />
pump. Flexible couplings shall be installed at the inlet and outlet of each pump.<br />
Each pump shall comply with the following specification:<br />
• Globe Valves<br />
• Make: As nominated in section 17.6 or equivalent approved.<br />
• Type: End suction. Open drive centrifugal.<br />
• Construction: Cast iron casing, bronze impeller, stainless steel shaft<br />
and packed gland.<br />
• Motor and Coupling: 4 pole high efficiency 1450rpm non overloading<br />
- direct coupled.<br />
Globe Valves for water flow balancing shall be installed with each shell & tube<br />
condenser and also dry cooler to ensure accurate water balancing throughout the<br />
system.<br />
• Drip Wells<br />
Page 44 of 157 44
A drip well shall be incorporated under the pump shaft gland. The well shall be drained<br />
to the nearest floor waste in 15mm diameter copper pipe.<br />
• Dry Fluid Cooler(s):<br />
Shall be of similar construction to air-cooled condensers as per section 6.9. If multiple<br />
dry-coolers are to be employed, these shall be identically sized and circuited to ensure<br />
equal fluid flow.<br />
• Flanged Connections:<br />
Each piece of equipment shall be fitted with flanged type valves to allow its removal and<br />
reinstatement without the need to introduce heat.<br />
• Isolation Valves:<br />
Immediately before and after each piece of equipment, the contractor shall install gate<br />
type valve to isolate the flow of water so that the piece of equipment can be removed<br />
and reinstated without the need to drain the entire condenser water circuit.<br />
• Make-up Tank:<br />
A make up tank shall be provided for the close water circuit. The tank shall be of 20<br />
gauge copper sheet or stainless steel approx. 610 mm diameter by 457mm high with<br />
removable lid and be complete with:<br />
o 19 mm mains water stop valve connected to 19mm float valve.<br />
o Rectangular 20 gauge copper or stainless steel drain pan 150 mm deep.<br />
o 38 mm one flow to tray.<br />
o 19 mm valved drain to tray.<br />
o 32 mm copper drain pipe from tray to adjacent drain waste.<br />
o 32 mm copper pipe connection to the condenser water pump suction pipe.<br />
The tank shall be suitably supported in a convenient position adjacent to the fluid<br />
coolers.<br />
• Modulating Valves:<br />
Shall be Siemens or Belimo manufacture and be selected so the speed of the<br />
modulating actuator can be adjusted to achieve stable head pressure. Control shall be<br />
via a 0-10V signal provided by the Electronic Control System.<br />
• Operating Temperature:<br />
The dry cooler shall be selected to maintain, in conjunction with the shell and tube<br />
condenser, operating temperatures as follows:<br />
• Thermometer Pockets<br />
Ambient<br />
Water Outlet<br />
Temperature Temperature<br />
Up to and<br />
Ambient Temp<br />
Including<br />
34°C<br />
+1 Deg C<br />
Over 34°C Ambient Temp<br />
+2 Deg C<br />
Condensing<br />
Temperature<br />
Water Outlet +<br />
7.5K<br />
Water Outlet +<br />
7.5K<br />
Page 45 of 157 45
Thermometer pockets shall be provided in the flow and return lines at inlet and outlet of<br />
dry-cooler for controller probes so accurate control of the water temperature can be<br />
maintained.<br />
6.11 VIBRATION ISOLATION AND FIXING<br />
6.11.1 CONDENSERS<br />
Condensers shall have a minimum of one layer of nominal 10mm thick waffle pad<br />
installed between each foot and the surface in which it is being positioned. The<br />
Contractor shall ensure the pad used is selected taking into account the actual<br />
operational weight of the equipment.<br />
Where condensers are located on a mesh deck, the Contractor shall supply a<br />
2.0mm thick galvanized steel plate between the mesh and the waffle pad to protect<br />
against damage when the weight of the condenser is applied to the waffle pad.<br />
Regardless of the mounting surface, the Contractor shall ensure the condenser is<br />
securely bolted down using minimum 12mm bolts at all ‘foot’ locations.<br />
6.11.2 COMPRESERS<br />
Compressors mounting frame shall have a vibration isolation mechanism that<br />
eliminates vibration from compressor through to the plantroom floor. The design<br />
should consist of one-piece (Embleton or otherwise approved in writing) anti vibration<br />
mounts designed for the specific weight of the rack. A minimum of four (4) mounts<br />
are required for each individual compressor rack frame. Mounts shall be spread<br />
evenly across the base of each frame.<br />
Waffle pads are not acceptable as vibration elimination devices for compressors..<br />
The contractor shall ensure that all piping is isolated from vibration that would<br />
otherwise cause fatigue or fracture.<br />
6.12 LIQUID RECEIVERS<br />
Each refrigeration circuit shall be fitted with a liquid receiver of sufficient capacity to hold<br />
the entire pump down refrigerant charge plus twenty percent (20%) reserve capacity.<br />
The liquid receiver shall be manufactured in accordance with the Australian Standard for<br />
Refrigerating Systems and be fitted with a pressure relief device. The relief device shall<br />
be vented externally to plant enclosure.<br />
Note: A manufacturer’s certificate shall be provided in accordance with AS 3920.1.<br />
The liquid receivers shall be mounted below the air cooled condenser liquid outlet. The<br />
vertical distance between the condenser liquid outlet and the inlet to the receiver shall be<br />
of sufficient height to overcome any line and valve pressure drop.<br />
The liquid drain line from the condenser to the receiver shall be sized for a liquid velocity<br />
not exceeding thirty metres per minute (30m/min) to allow gravity flow of the refrigerant<br />
through the condensate line from the condenser outlet to the liquid receiver inlet. Note<br />
this requirement applies whether or not the option is taken to valve the receiver out of the<br />
normal refrigeration circuit.<br />
The receiver shall be shaded from the direct effect of the sun and free from the effects of<br />
any external heat source. Preferred location is within the plantroom.<br />
Page 46 of 157 46
Connection to receiver shall match incoming pipe.<br />
6.13 PUMPS<br />
6.13.1 GENERAL<br />
Pumps shall be selected with the characteristic curves having continuously rising<br />
static head with decrease in water flow and be non overloading over the expected<br />
operating range.<br />
The pump and motor shall be selected to deliver the required water quantity<br />
against the resistance of the system.<br />
6.13.2 CHILLED, HOT AND CONDENSER WATER<br />
6.14 FANS<br />
Each pump shall comply with the following specification:<br />
• Make: As nominated in section 17.6 or equivalent approved.<br />
• Type: Open drive centrifugal, End suction<br />
• Construction: Cast iron casing, bronze impeller, stainless steel shaft and<br />
mechanical seal.<br />
• Motor and Coupling: 4 pole high efficiency 1450rpm non overloading - direct<br />
coupled.<br />
Note: Ensure all water ways are finished to a smooth surface. Statically and<br />
dynamically balance the impeller and shaft assembly. Provide flanged<br />
connections for replaceable casings.<br />
6.14.1 GENERAL<br />
Select mechanical seals suitable for the application and the fluid being<br />
pumped.<br />
A mechanically cleanable strainer shall be incorporated in the water pipe prior<br />
to each pump. Flexible couplings shall be installed at the inlet and outlet of<br />
each pump.<br />
Assemble pump and motor on a bedplate fabricated from rolled steel angle<br />
on channel sections with accurately machined facings for the pump and<br />
motor feet. Treat the bedplate with Dimet or Zincolate. Fully paint the<br />
pump unit prior to delivery on site. Support the complete assembly from the<br />
concrete plinth or inertia base and vibration isolators.<br />
Provide chilled water pumps with an integral copper drip tray and copper<br />
drain pipe running to nearest floor waste. Install tray to extend beyond<br />
uninsulated pump flanges to capture all condensate drips.<br />
Fans shall be selected for maximum efficiency, i.e., minimum kW input to meet the<br />
required duty. Fans shall be capable of delivering the required air quantities<br />
against the resistance of the system as installed while ensuring that space noise<br />
levels are not exceeded.<br />
Drives and motors shall be selected such that a 10% increase in duty is attainable<br />
without changing the motor.<br />
Fans shall be factory statically and dynamically balanced.<br />
Page 47 of 157 47
Connect fans to ductwork with flexible connectors. Where fans are located within<br />
the occupied space or in areas where the noise can be transmitted to the occupied<br />
space, provide acoustic treatment to flexible connectors to minimise noise breakout.<br />
All reference to speed controllers, motors and drives refer to the Electrical Section.<br />
Fans designated as smoke spill fans shall comply with the requirements of<br />
AS/NZS 1668 Part 1.<br />
Bearings:<br />
• SKF or as otherwise approved by Woolworths.<br />
• All bearings shall be 100,000 hour with grease relief.<br />
• All bearings shall be self aligning roller type.<br />
• All bearing housings shall be dowelled and be fitted with grease pipes and<br />
nipples mounted in an accessible position.<br />
Electric Motor:<br />
The motor shall be selected to satisfy the starting torque and full load duty of<br />
the fan, with reserve capacity to allow for a 10% increase in air flow capacity<br />
and corresponding increase in static pressure. The motor shall be three<br />
phase, 24 rps TEFC suitable for continuous duty.<br />
Motors to be High Efficiency type and compliant to the current MEPS at the<br />
time of commissioning of fan.<br />
Mounting:<br />
The fan and motor shall be mounted on a fully welded steel base and the<br />
whole assembly shall be supported on spring vibration isolators. The spring<br />
isolators shall be sized for a vibration isolation efficiency of 95%.<br />
The spring isolators shall be mounted on ribbed rubber pads and when loaded<br />
they shall have a length approximately equal to their diameter.<br />
When installing the fan on site each support point shall be shimmed to ensure<br />
that the fan assembly is not distorted.<br />
Fan Location:<br />
Fan shall be located at a sufficient distance from the last coil so that an even<br />
velocity is achieved over the entire coils face area.<br />
6.14.2 CENTRIFUGAL TYPE<br />
6.14.2.1 Fans with flow rate greater than 2000 l/s<br />
Fans shall be as nominated in section 17.9.2 or equivalent<br />
approved.<br />
Large central plant fans shall generally be backward-curved<br />
centrifugal airfoil DIDW and shall be supplied complete with an<br />
approved VSD.<br />
The fan shall be selected to suit the system resistance. In any<br />
event the system static pressure shall not exceed 550Pa including<br />
the dirty filter pressure drop<br />
Page 48 of 157 48
6.14.2.2 Fans with flow rate less than or equal to 2000 l/s<br />
Fans shall be as nominated in section 17.9.1 or equivalent<br />
approved.<br />
Fans shall generally be backward-curved centrifugal airfoil SISW,<br />
however forward curved fans are acceptable.<br />
The fan shall be selected to suit the system resistance. In any<br />
event the system static pressure shall not exceed 400Pa including<br />
the dirty filter pressure drop.<br />
6.14.2.3 Construction<br />
Fan housing shall be galvanised mild steel<br />
Shaft - HT steel shafting.<br />
Seal welded laminar impeller.<br />
Provide a drain in the lowest point of the casing<br />
Note: The fan and motor shall be mounted on a common steel<br />
channel base with appropriate anti-vibration mounting.<br />
6.14.2.4 V Belts:<br />
Provide and fit matched sets of vee belts and correctly aligned<br />
pulleys for all centrifugal fans except those which are direct<br />
coupled.<br />
Secure all pulleys attached to motor and fan shafts and all fan<br />
impellers by means of a straight parallel key secured by a<br />
setscrew.<br />
"B" Section - selected for 150% of motor torque.<br />
6.14.2.5 Safety<br />
Safety guards to be fitted to fan blades/shafts and drives.<br />
To each vee belt driven centrifugal fan provide and fit an approved<br />
substantial drive guard generally as follows:<br />
• 15 mm to 20 mm open wire mesh supported by angle iron<br />
or round rod frame.<br />
Provide an open bottom to facilitate removal and allow thrown or<br />
broken belts to fall free of pulleys.<br />
Provide apertures in the guard at the prolongation of shafts to<br />
permit speed measurement.<br />
Size the guard to permit full belt adjustment and attach by means<br />
of wing nuts for quick removal.<br />
Danger Sign to be on A.H.U access door as per Australian<br />
Standards (i.e. Caution Moving Parts).<br />
6.14.2.6 Supply Air Transition<br />
Page 49 of 157 49
Supply air duct work connected to the AHU shall incorporate a<br />
transition that shall minimise static pressure losses. Transition<br />
shall start with a velocity of 3 m/s.<br />
6.14.3 PLUG TYPE<br />
6.14.3.1 General<br />
Backward-curved centrifugal airfoil direct drive ‘Plug’ fan shall be<br />
as nominated in section 17.9.5 equivalent approved by<br />
Woolworths Senior Engineer.<br />
The supply air fan shall be selected to suit the system resistance.<br />
In any event the system static pressure shall not exceed 550Pa.<br />
(Allow for 150Pa for dirty filter condition).<br />
6.14.3.2 VSD / EC Motors<br />
An approved VSD shall be used to operate the fan at the required<br />
speed to achieve the design duty (refer to section 6.18). As an<br />
alternative an EC motor may be used.<br />
6.14.3.3 Safety:<br />
A person entering the AHU shall not be able to come in contact<br />
with the moving fan impeller. The may be achieved by:<br />
6.14.3.4 Construction<br />
a) Provision of an operation and maintenance manual for the<br />
AHU including instruction for the safe operation. Testing and<br />
maintenance.<br />
b) Signage on AHU doors acceding the fan warning.<br />
“DANGER ROTATING MACHINERY”<br />
And either of the following c) or d):<br />
c) - Lockable access handle to areas of the AHU that<br />
have access to the fan.<br />
- Electrical interlock circuits on AHU fan access<br />
doors to trip the circuit breaker and isolate power<br />
supply to fans.<br />
d) Provision of galvanised wire fan guard.<br />
• Plug fan wheels shall include the following<br />
construction features as a minimum:<br />
• Welded steel design.<br />
• Surface protection by powder coating.<br />
• Nameplate with indication of hub size, permissible<br />
maximum speed and quality of balancing.<br />
• Arrow showing direction of rotation.<br />
• Balancing weights in steel / stainless steel.<br />
• Impeller designed for continuous operation S1.<br />
• Short dynamic profiled Inlet cones manufactured from<br />
Zincalume steel and fitted with pressure tapping point<br />
for measurement of volume flow.<br />
Page 50 of 157 50
6.14.4 AXIAL FANS<br />
All steel axial flow fans shall be as nominated in section 17.9.3 or equivalent<br />
approved. All fans offered shall be of the same make for standardisation.<br />
Casings shall be hot dip galvanised and fitted into adjoining ductwork using<br />
matching angle flanges.<br />
Provide bolted inspection opening in fan casing or alternately an inspection panel<br />
incorporating sash fasteners in the adjoining ductwork.<br />
Where axial fan motors require grease lubrication, extend grease lubrication nipple<br />
to casing exterior. Motor terminal boxes shall be mounted externally on casing.<br />
Impeller blades shall be of die cast aluminium.<br />
Maximum fan speed shall not exceed 24 rps.<br />
6.14.5 ROOF MOUNTED EXHAUST FANS<br />
Fans shall be direct drive axial or centrifugal type. Make shall be as nominated in<br />
section 17.9.7 or equivalent approved. All fans offered shall be of the same make<br />
for standardisation.<br />
Fan casing shall be hot dip galvanised construction. A bolted inspection opening<br />
shall be provided to the housing.<br />
Adjustable pitch impeller blades shall be aluminium.<br />
Where axial fan motors require grease lubrication, extend grease lubrication nipple<br />
to casing exterior. Motor terminal boxes shall be mounted externally on casing.<br />
Roof mounted smoke exhaust fans housing shall be of galvanised steel<br />
construction with powder coat finish and shall be fitted with butterfly shutters, and<br />
vermin proof mesh.<br />
6.14.6 KITCHEN HOOD EXHAUST FANS<br />
Kitchen exhaust fan shall be direct drive vertical discharge axial or centrifugal type,<br />
galvanised steel construction suitable for direct duct mounting.<br />
Fan shall be as nominated in section 17.9.6 or equivalent approved.<br />
6.14.7 IN-LINE CENTRIFUGAL FANS<br />
In-line centrifugal fans shall be as nominated in section 17.9.1 and 17.9.2, or<br />
equivalent approved, with spigots suitable for connection to ductwork.<br />
Impeller shall be backward curved, direct coupled to an external rotor motor, with<br />
sealed for life bearings.<br />
6.14.8 IN-LINE MIXED FLOW FANS<br />
In-line mixed flow fans shall be as nominated in section 17.9.4 or equivalent<br />
approved equal. Casings shall be of epoxy coated steel or reinforced injected<br />
moulded plastic.<br />
6.14.9 AIR CURTAINS<br />
Air curtains shall be as nominated in section 17.10 or equivalent approved by<br />
Woolworths Senior Mechanical Engineer. Width of air curtain shall be greater or<br />
equal to width of door way opening this may require more than one unit installed<br />
Page 51 of 157 51
over a door way. Operation of the air curtains shall be <strong>limited</strong> to the trading hours<br />
of the store being controlled by the CPC Emerson mechanical control system.<br />
6.15 CHILLERS<br />
The chiller set shall be as nominated in section 17.11. Chillers shall be air cooled unit, or<br />
similar designed for external roof mounting and with two independent refrigerant circuits.<br />
The chillers shall be a reverse cycle system with total heat recovery capable of<br />
producing chilled and hot water simultaneously.<br />
The unit shall be supplied, installed and connected with all necessary piping to make a<br />
complete installation.<br />
The unit selected shall have sufficient capacity to provide the designed cooling load under<br />
the design ambient conditions specified herein while maintaining a temperature difference<br />
between the design ambient and condensing temperature as noted in section 6.9.5.<br />
6.16 PIPING, VALVES AND FITTINGS<br />
6.16.1 SCOPE<br />
This section sets out the requirements for the installation of piping, valves and<br />
fittings and is concerned with materials and standards of construction for air<br />
conditioning systems.<br />
Piping must comply with:<br />
• AS 1571 ‘Seamless copper tubes for use in refrigeration’;<br />
• AS 4041 ‘Pressure Piping’<br />
• AS/NZS 1571 ‘Copper - Seamless tubes for air conditioning and<br />
refrigeration’<br />
• AS 1677 pt 1 & 2 ‘ Refrigeration Systems”<br />
• AS 1432- ‘Copper tubes for plumbing, gas fitting and drainage<br />
applications’<br />
6.16.2 GENERAL<br />
All piping before delivery to site and pending erection shall be sealed against dirt<br />
and moisture.<br />
Before erection, pipes and fittings shall be cleaned of scale, burrs or other<br />
obstructions.<br />
Welded or brazed joints shall be made by experienced and fully qualified<br />
tradesmen and in accordance with best trade practice. Dry nitrogen shall be used<br />
in all instances.<br />
Each part of the system of piping shall be complete in all detail and provided with<br />
all control valves and fittings necessary for satisfactory operation.<br />
The piping shall be accessible for repairs and provided with sufficient flanged<br />
and/or flared fitting joints for disconnecting and removing equipment.<br />
Where piping is exposed and liable to damage, it shall be suitably protected with<br />
well braced 1.6mm zincanneal sheet metal covers or heavier section if necessary.<br />
PVC pipes and fittings shall not be in direct contact with any surface whose<br />
temperature is likely to exceed 50° C. Direct exposure to sunlight shall be avoided.<br />
Page 52 of 157 52
Provision shall be made in the piping to minimise the effect of vibration and to<br />
ensure no joints fatigue when the plant is put into operation.<br />
The Contractor shall provide a certificate for liquid receiver issued by an<br />
accredited Boiler Inspector. Certificates shall be framed under glass and fixed in<br />
an approved location close to the pressure vessel.<br />
Short radius elbows and very short straight sections after elbows, onto pump<br />
connections will not be accepted under any circumstances.<br />
6.16.3 PRESSURE AND VACUUM TESTING<br />
After testing, as explained below, defective material shall be replaced and leaks<br />
properly repaired. Caulking, taping or other temporary measures will not be<br />
permitted.<br />
The plant shall be tested for leaks 8 weeks after it has been passed for<br />
commercial operation and again at the end of the maintenance period.<br />
6.16.3.1 PRESSURE VESSELS<br />
All pressure vessels shall be manufactured in accordance with the<br />
AS/NZS1677:1998 (and subsequent amendments). Refrigeration<br />
Code of Practice and to the satisfaction of the department having<br />
jurisdiction to whom the design of all pressure vessels to be used<br />
shall be submitted. The approved plans shall be filed by the<br />
Contractor for reference by the Purchaser if required.<br />
When utilising low pressure refrigerant (R134a), the pressure<br />
vessel shall be designed, constructed and tested to a minimum<br />
design pressure of 3000kPa.<br />
The Contractor shall provide a certificate issued by a qualified<br />
Boiler Inspector where applicable for each vessel after installation.<br />
These certificates shall form part of the operation and<br />
maintenance manuals.<br />
6.16.3.2 PIPEWORK<br />
All pipework before lagging is applied over joints, shall be<br />
pressure and vacuum tested as specified in AS/NZS1677-1998.<br />
Specified test pressures shall be maintained for 48 continuous<br />
hours.<br />
Approved vacuum and pressure gauges shall be used.<br />
Note: The use of CFC’s as a trace element will not be permitted.<br />
A double evacuation test to 500 microns shall then be carried out<br />
and held for a minimum of 8 continuous hours.<br />
The first evacuation shall be broken with nitrogen and the system<br />
brought back to atmospheric pressure.<br />
The second evacuation shall be broken with nitrogen and the<br />
system charged. After charging, the system shall again be<br />
checked for leaks.<br />
The contractor shall retain records of pressure tests and supply<br />
details of pressure tests to the Purchaser as requested. Copies of<br />
pressure tests shall be included in the ‘As Built’ documentation.<br />
Page 53 of 157 53
6.16.4 PIPE SIZING<br />
Prepare a schematic layout of the system and refer to recognised industry<br />
application data such as Carrier Piping Design Manual Part 3 to establish all pipe<br />
sizes and configuration.<br />
Refrigerant piping shall be such as to give no greater than the following pressure<br />
drops including all valves and fittings.<br />
Suction Lines Equivalent to 1.2°K temperature drop for the total length.<br />
Discharge Lines maximum 35 kPa for total length except liquid lines from<br />
condenser to a receiver which shall be sized for a maximum liquid velocity to 30<br />
metres per minute.<br />
Liquid Line maximum13 kPa (receiver to evaporator)<br />
6.16.5 GRADING OF PIPES<br />
6.16.5.1 Refrigerant Piping<br />
Refrigerant piping shall be graded where necessary and in<br />
accordance with recognised trade practice to provide satisfactory<br />
operation of the refrigeration plant under all load conditions<br />
Sufficient traps and equalising lines shall be provided and pipe<br />
lines shall be selected to achieve the following conditions:<br />
Refrigerant Oil shall not be returned to the compressor in such<br />
quantities as to cause damage.<br />
Refrigerant Oil shall not accumulate in the evaporator coils or<br />
elsewhere in system. Suction pipework connection shall be taken<br />
from the side of the coil suction header as close to the bottom of<br />
the header as practicable with suction ‘P’ traps at base of suction<br />
riser.<br />
Effective drainage of the condenser coils to the liquid receiver<br />
shall be provided.<br />
Refrigerant Oil shall be returned in a proper manner to the<br />
compressor(s) sump(s).<br />
Discharge refrigerant piping from compressors to remote<br />
condensers shall be sloped away from the oil separator and shall<br />
be either trapped adjacent to it and an inverted trap installed at the<br />
top of the riser.<br />
Careful sizing of vertical discharge risers is required with<br />
compressors fitted with unloaders.<br />
Size pipework on minimum compressor capacity step for a<br />
minimum gas velocity of 5.5 m/s for vertical pipework and 2.8 m/s<br />
for horizontal pipework. Do not exceed gas velocity of 20 m/s on<br />
full capacity for noise and vibration control.<br />
Liquid return piping from a remote condenser shall be sloped<br />
towards the receiver and shall not incorporate any liquid traps.<br />
Page 54 of 157 54
Where more than one evaporator is connected to the one<br />
common suction, connection to the main suction pipe shall be<br />
from above. Tee junctions shall sweep with the vapour flow and all<br />
such joints shall be staggered.<br />
6.16.5.2 Condensate Piping<br />
All pipe work shall be graded as required by the duty. Condensate<br />
pipework shall be graded to ensure that condensate moves<br />
towards the appropriate trap. Heating hot water lines shall be<br />
graded to ensure that pocketing does not occur and to facilitate<br />
venting. Drain lines shall be graded to waste. Suitable traps shall<br />
be installed at all air handling units sized to maintain a water seal<br />
under operating pressures.<br />
6.16.6 FLOOD BACK PROTECTION<br />
6.16.6.1 Refrigerant Piping<br />
Prevention of liquid flood back must be ensured by the following:<br />
Proper setting of refrigerant expansion devices effectively sized to<br />
limit refrigerant liquid from entering suction lines beyond the<br />
evaporator outlet connection in addition to installation of liquid line<br />
solenoid valves.<br />
Note: Minimum superheat of 6 o K required.<br />
Where the adjustment of the TX valve effectively reduces the<br />
ability to utilise the complete coil surface area or where suction<br />
line length is less than 10m overall from evaporator outlet to<br />
compressor inlet, additional flood back protection shall be<br />
provided by the use of a suitably sized suction accumulator.<br />
Suction piping shall be sized so that the gas velocity shall not be<br />
less than 2.8m/sec in horizontal lines and not less than 5.5m/sec<br />
in vertical lines. An oil trap loop shall be installed at the bottom of<br />
all vertical risers and horizontal lines shall be sloped towards the<br />
direction of the compressor.<br />
Particular care shall be taken in systems employing any form of<br />
capacity reduction to ensure that suction gas velocities are<br />
maintained at all times commensurate with restrictions within the<br />
nominated line pressure drop. Where difficulties are discovered in<br />
this regard double pipe vertical risers shall be installed.<br />
6.16.7 PIPEWORK INSULATION<br />
6.16.7.1 GENERAL<br />
This section sets out the requirements for lagging of pipelines and<br />
fittings and the treatment of pipe and conduit penetrations in cool<br />
room.<br />
6.16.7.2 DEFINITION<br />
Insulation is required to all refrigerant pipe work in accordance<br />
with the following guidelines. Refrigerant lines shall be defined<br />
and grouped as follows:<br />
Page 55 of 157 55
All suction lines shall be insulated and vapour sealed for the full<br />
length of pipe.<br />
Other forms of insulating may also be used at the approval of the<br />
Woolworths Senior Refrigeration Engineer. In any event the<br />
thickness and insulating values of any insulation shall be taken<br />
into account to ensure sweating does not occur. Insulation shall<br />
be applied to all suction lines fittings and valves regardless of<br />
location.<br />
6.16.7.3 INSULATION TYPES<br />
TYPE A : EXPANDED RUBBER<br />
Pipes shall be encased with proprietary closed cell expanded<br />
rubber, sized to fit pipe diameter with wall thickness as outlined<br />
below.<br />
Insulation shall be self extinguishing with and subjected to the<br />
tests as specified in AS1530.3-1999. Results of testing as<br />
determined in the aforementioned document shall comply with the<br />
following requirements:<br />
Ignitability 0<br />
Flame Propagation 0<br />
Heat Evolved 0<br />
Smoke Developed 3<br />
Application BCA BCA<br />
Regions 1-3 Regions 4-8<br />
Sub Cooled Liquid 25mm 25mm<br />
Suction Gas 19mm 19mm<br />
Discharge Pipework<br />
(Oil Separator to Heat Reclaim Coil)<br />
13mm 13mm<br />
Fix according to manufacturer’s instructions, being glued with<br />
taped joints. All joints shall be sealed to maintain a continuous<br />
vapour barrier on the outside of the insulation. The ends of the<br />
insulation shall be sealed to the pipe.<br />
Wherever possible, the insulation shall be applied without<br />
‘splitting’ along the length of the tube. Where insulation is ‘split’,<br />
the installer shall ensure that, along the length of the insulation,<br />
the vapour barrier is restored by application of glue and rubber<br />
tape in accordance with the manufacturers’ guidelines. Installers<br />
shall pay particular care to the type of glue used so that the<br />
aforementioned smoke fire indices are not compromised.<br />
Type A insulation may only be used if sweating is not likely to be a<br />
problem. It shall be the responsibility of the Contractor to ensure<br />
that insulation does not condensate.<br />
Insulation is not to be crushed and must have sleeves installed.<br />
Where type ‘A’ insulation is installed outside of the building<br />
structure, the insulation shall be protected from UV degradation<br />
and bird attack with metal sheathing or similar.<br />
TYPE B: BARE COPPER<br />
Page 56 of 157 56
Type B installation shall be for pipe work that has no chance of<br />
condensation forming. Discharge (other than lines between oil<br />
separator and heat reclaim coil), Liquid Return and non-subcooled<br />
liquid pies are applicable for this application.<br />
6.16.7.4 Chilled water piping<br />
Insulation shall be of FM Global approved material, of a thickness<br />
to meet the requirements of the Building Code of Australia 2009.<br />
Where<br />
6.16.7.5 Hot water piping<br />
Insulation shall be fibreglass with external lagging, of a thickness<br />
to meet the requirements of the Building Code of Australia 2009.<br />
6.16.8 LP GAS PIPES<br />
By others<br />
6.16.9 VALVES AND FITTINGS<br />
6.16.9.1 General<br />
Refrigerant piping, fitting and valves shall be in accordance with<br />
AS/NZS 1677-Parts 1&2 and all the amendments current at the<br />
date of tendering.<br />
Under no circumstances shall a hand operated stop valve be fitted<br />
in any main liquid line (or any section of the plant) which could<br />
cause any section of the system to be isolated. Reductions in<br />
piping, tee joints, 90° and bends shall only be commercially<br />
available fittings.<br />
Schwaged joints shall not be used in a non accessible position.<br />
Compressor pipework shall be such that only 90° elbows are used<br />
as the first fitting.<br />
Balancing and throttling valves shall be Tour and Anderson STA-T<br />
or STA-F or equal approved.<br />
Water valves and fittings up to and including 50mm in diameter<br />
may use screwed connections using appropriate components and<br />
a sealing agent and Teflon tape as appropriate. Valves and fittings<br />
over 50mm in diameter shall use approved machined flanges of<br />
the correct material. Flanges shall generally be to AS 2129.<br />
6.16.9.2 Piping and Fittings<br />
The piping shall be securely fixed with saddle clamps (or<br />
equivalent approved) to Unistrut, which shall be fixed to ceilings or<br />
walls. Saddle clamps and fasteners shall be either galvanised or<br />
stainless steel.<br />
6.16.9.3 Valves<br />
All valves shall be of globe type, key operated c/w sealed caps.<br />
Where valves do not have direct capillary joint to the pipe, care<br />
shall be taken to prevent distortion of the valve or power element<br />
by heat.<br />
Page 57 of 157 57
Valves in pipelines smaller than 25 mm shall be supported<br />
independently of the line.<br />
6.16.9.4 Sight Glass & Dryer<br />
A Sporlon "Catch-All" dryer or as approved, and "See-All"<br />
moisture and flow indicator with isolating stop valves shall be<br />
installed in the liquid line from and adjacent to each liquid receiver.<br />
6.16.9.5 Charging Valve<br />
A charging valve shall be fitted between the receiver and liquid<br />
line dryer.<br />
6.16.9.6 Thermostatic Expansion Valve<br />
An Emerson EX type (or equivalent approved) electronic<br />
thermostatic expansion valve shall be installed into the<br />
refrigeration circuit prior to each evaporator. Valve shall be<br />
selected to match the evaporator design capacity.<br />
Emerson EC3 superheat controller shall be installed in conjunction<br />
with each EX valve. EC3 shall be wired in such a manner to<br />
ensure valve automatically closes in event of power or control<br />
failure. Pressure transducer, temperature probes shall be<br />
installed on each refrigerant circuit to ensure correct operation of<br />
valve at all load conditions.<br />
6.16.9.7 Pressure Tappings<br />
To ensure that liquid suction lines pressure drop maybe<br />
adequately measured suitable pressure tapping points shall be<br />
installed as follows;<br />
� Liquid line after liquid receiver in the Plant Room<br />
� Suction line adjacent to each evaporator coil<br />
� Compressor suction and discharge service valves<br />
� Discharge line at each condenser consisting of packed<br />
and capped valve.<br />
Note: Schrader valve shall not be used.<br />
6.16.10 PIPE SLEEVES<br />
Sleeves shall be placed in floors and walls (uninsulated) through which pipe lines<br />
pass and extend 25 mm on each side. They shall provide a minimum clearance of<br />
6 mm around the pipe or insulation.<br />
Sleeves may be of pipe or formed from 1.6 mm gauge zincanneal sheet metal.<br />
6.16.11 DRAIN PIPES<br />
Drain pipes shall be run in copper tube or rigid P.V.C. from all equipment to floor<br />
wastes provided by others. They shall be sized for their particular application but in<br />
no case shall they be less than 32 mm.<br />
Drains crossing floors shall be cast in the floor where applicable or chased in the<br />
floor.<br />
Page 58 of 157 58
6.16.12 PIPE IDENTIFICATION<br />
Pipework and valves shall be clearly labelled and identified to AS 1345-1995.<br />
Lettering on piping 50 mm in diameter, and smaller, shall be 13 mm high, and all<br />
lettering on larger diameter piping shall be 20 mm high. Direction of flow shall be<br />
clearly marked below each pipe label.<br />
6.16.13 PIPE PRESSURE TESTING<br />
Water and Gas Pipes<br />
Pipework shall be tested as the project requires to ensure that no section<br />
becomes inaccessible prior to a satisfactory test. All pipework shall be<br />
hydrostatically tested unless otherwise specified. Hydrostatic testing shall be<br />
carried out at 2.5 times the nominal operating pressure, or to 200 kPa. The<br />
pressure set out shall be maintained for a minimum period of 24 hours, allowing a<br />
tolerance for temperature fluctuations as necessary.<br />
6.17 DAMPERS<br />
At the end of the test, the piping shall be thoroughly drained and purged.<br />
Refrigerant Pipes<br />
After testing, as explained below, defective material shall be replaced and leaks<br />
properly repaired. Caulking, taping or other temporary measures will not be<br />
permitted.<br />
The plant shall be tested for leaks 8 weeks after it has been passed for<br />
commercial operation and again at the end of the maintenance period.<br />
6.17.1 VOLUME DAMPERS<br />
Volume dampers shall be fitted to all branches, take-offs and where shown on the<br />
drawings for proper balancing of supply, return and exhaust air systems.<br />
Single Blade Volume Dampers:<br />
Volume dampers in ducts up to 350 mm deep shall be of single blade butterfly<br />
type.<br />
Construction of single blade dampers shall conform to latest edition of SMACNA<br />
Duct Construction Standards.<br />
Multiblade Volume Dampers:<br />
Volume dampers in ducts over 350 mm deep shall be of the opposed blade type.<br />
Dampers shall be manufactured from extruded marine grade aluminium, and shall<br />
be suitable for velocity and pressure classification of ductwork systems.<br />
6.17.2 NON RETURN DAMPERS<br />
Non return dampers shall be manufactured from marine grade aluminium<br />
complete with sealing strips, and shall be designed for rattle-free operation.<br />
6.17.3 FIRE DAMPERS<br />
Provide and fit fire dampers as required by all authorities having jurisdiction over<br />
the works. Unless otherwise indicated fire dampers shall be minimum two hours<br />
rated.<br />
Page 59 of 157 59
The construction and fixing of fire dampers are to comply with AS 1682 and<br />
AS/NZS 1668 Part 1.<br />
Provide evidence that the prototype of the proposed fire damper has been tested<br />
to the requirements of Section 5 “Testing” of AS 1682, Part 1.<br />
Provide a thermally released link set for fire dampers to operate at 68°C and<br />
located in accordance with AS 1682. Ensure easy access to the link for resetting.<br />
Damper shall close in the direction of airflow.<br />
6.17.4 BUTTERFLY VALVES<br />
Butterfly valves used in air handling ductwork shall be lugged type with cast iron<br />
body, stainless steel stem and disc, and EPDM liner and nylon bushing.<br />
6.17.5 MOTORISED DAMPERS<br />
Motorised damper motors shall be Belimo or equal approved by Woolworths<br />
Senior mechanical Engineer<br />
6.18 VARIABLE SPEED DRIVES<br />
6.18.1 GENERAL<br />
Variable speed drives shall be as nominated in section 17.12 or approved equal<br />
specifically designed for HVAC pump and fan applications.<br />
All variable speed drives shall be fitted with suitable chokes and / or sinusoidal<br />
wave filters to suppress RFI / electrical “noise” and be capable of suppressing the<br />
electrical “noise” generated within the fans.<br />
The units shall be suited for modulating control of the rotary speed for pumps and<br />
fans driven by standard asynchronous three-phase current motors.<br />
Variable speed drive controllers shall be of the electronic variable frequency type<br />
suitable for the control of three phase squirrel cage induction motors, having<br />
operating characteristics compatible with the motor application.<br />
The output shall be variable frequency of 1 to 50 Hz proportional to input signal to<br />
an accuracy of 1%. The voltage/frequency ratio shall provide the highest efficiency<br />
possible for a centrifugal load.<br />
When operating at 50 Hz controller efficiency shall not be less than 95% and shall<br />
not cause an increase in motor losses of more than 1.5%.<br />
Wiring associated with the variable speed drives shall be steel wired armoured<br />
cable.<br />
Controllers shall be capable of operating at 50ºC and 90% RH (non condensing).<br />
Radio interference of starters and generated supply power harmonics shall not<br />
exceed limits allowed by the relevant authorities.<br />
Controllers or associated contactors shall accept an input signal for thermistor<br />
protection of the motor.<br />
The following features shall be provided:<br />
• Semi-conductor fuse protection (including spare fuses)<br />
• Over temperature trip<br />
Page 60 of 157 60
• Phase loss trip<br />
• Power interruption (or power restoration) shall not damage the starter<br />
• Controllers shall be capable of starting motors which are rotating<br />
• LED indicators shall be provided for ON and RUN and for each type of trip<br />
incorporated<br />
• Motor current protection<br />
• Over voltage trip<br />
• Under voltage trip<br />
• Remote trip through volt free contacts<br />
• Speed control inputs through either 4 - 20 mA or 0 - 10V signals<br />
Acceleration and deceleration times shall be adjustable between 1 to 150<br />
seconds.<br />
Where specified in the site specific scope of works, variable speed drives shall be<br />
incorporated into system design. Drives shall be capable of full connectivity to<br />
refrigeration controller via inbuilt communication protocol (MODBUS / 485 network<br />
etc) including the following functionality as a minimum:<br />
• Programming;<br />
• Status (including fault, run, alarm, output etc);<br />
• Control;<br />
• Visibility through dial-in access;<br />
Drives shall be installed into dedicated cubicles offering IP protection as specified<br />
by the manufacturer of the drive. Additional components (contactors, overloads<br />
etc) may be incorporated into the VSD cubicle at the discretion of the installing<br />
contractor, however, the extent of this shall be at the approval of the Woolworths<br />
Engineer.<br />
6.18.2 WIRING<br />
Refer to Section 8.8<br />
6.19 ELECTRIC DUCT HEATERS<br />
The use of electric duct heaters will not be permitted.<br />
6.20 BASES AND PLINTHS<br />
Bases shall be provided for all vibration-isolated equipment.<br />
Bases shall:<br />
• Have a rolled steel section frame.<br />
• Have sole plates welded to the frame.<br />
• Extend at least 100mm beyond the extremities of the equipment support pedestals.<br />
• Be supported by vibration isolating mountings.<br />
Concrete shall have a steel trowelled finish. Drilling of structural concrete for fixings shall<br />
comply with the structural engineers directions.<br />
6.21 EQUIPMENT EXTERNAL NOISE MEASUREMENT<br />
Sound Pressure levels shall be the maximum of any measurement made one meter away<br />
from any face of the unit under semi free filed conditions and worst case operating<br />
conditions.<br />
Page 61 of 157 61
6.22 DOWN DUCT NOISE<br />
All equipment shall produce no objectionable pure tones within the occupied areas and<br />
no atypical noise levels in the frequency bands outside those specified.<br />
6.23 BOILERS<br />
6.23.1 GENERAL<br />
This section covers the supply and installation of a new heating hot water system<br />
to serve air conditioning system appliances, comprising:<br />
• All new piping, valves and fittings to reticulate heating water to heating<br />
coils in air handling plant, as appropriate.<br />
• New heating water circulation pump.<br />
• Expansion tank and auto refill unit<br />
• Venting of the system and individual components to atmosphere where<br />
required or necessary.<br />
• Automatic controls and electrics.<br />
• Any other component or system necessary to ensure the safe proper and<br />
efficient operation of both new and existing systems.<br />
• Boiler to be located on condenser deck if external type unit<br />
6.23.2 HHW BOILER – INTERNAL / EXTERNAL<br />
HHW boiler shall be as nominated in section 17.14 or equivalent equal approved<br />
complete with:<br />
• Electronic modulating control<br />
• Bronze headers<br />
• Copper tubes<br />
• Pressure and temperature gauges<br />
• All necessary pressure and temperature safety controls including high limit<br />
thermostat<br />
• Valved drain<br />
• Insulated casing<br />
• Draft diverter<br />
6.23.2.1 Efficiency<br />
Boiler efficiency shall be not less than:<br />
Rated capacity (kWheating) Minimum gross thermal<br />
efficiency (%)<br />
Less than 90 75<br />
Greater than 90 80<br />
6.23.3 BOILER FLUE – ATMOSPHERIC<br />
Supply and install stainless steel grade 304 boiler flue 1 mm thick for the internal<br />
HHW boiler. Provide a discharge cowl in accordance with Gas Authority<br />
requirements.<br />
The flue shall be thermally insulated with 25 mm thick high-temperature glasswool<br />
insulation and be externally sheathed with 1 mm thick aluminium.<br />
Provide all necessary flue supports, strays and fixings and weatherproof flashing<br />
collar at penetration through roof.<br />
Page 62 of 157 62
6.23.4 EXPANSION TANK AND AUTO REFILL UNIT - CLOSED<br />
Supply and install a closed cell expansion tank of "Pneumatex" or equal approved<br />
make adjacent to the pump. Tank capacity shall be sized for the total expansion<br />
of the system installed, between mean operating temperature and 15°C, with a 5%<br />
safety margin.<br />
The tank shall be flexibly supported.<br />
Supply and install a back flow prevention and refill unit of "Autoheet" manufacture<br />
adjacent to the expansion tank to provide isolation of chemically treated water<br />
from the domestic cold water system. The unit shall be installed and piped strictly<br />
in accordance with Local Water regulations.<br />
6.23.5 HHW EXPANSION VESSEL<br />
All closed loop heating hot water loops shall be fitted with a closed steel expansion<br />
vessel, factory sealed, with a butyl rubber liner and be Pneumatex, Zilmet or<br />
approved equivalent. The vessel shall be installed complete with insulated makeup<br />
water line, air vent, isolating valve, check valve, pressure relief valve, strainer, air<br />
bleed and drain line.<br />
6.24 FILTERS<br />
6.24.1 GENERAL<br />
Design of filters shall be in accordance with AS 1324 Part 1. Testing of filters shall<br />
comply with AS 1324 Part 2. NATA certified test results shall be supplied for all filters<br />
offered.<br />
Attention is drawn to the requirement in the Maintenance Section for the provision of<br />
spare filter media for replacement purposes during the currency of the maintenance<br />
period.<br />
Select the cell bank frame dimensions to suit the equipment or ductwork in which the<br />
unit is to be fitted and provide an airtight sheet steel diaphragm where necessary.<br />
Provide filter gauges across each set of filters, Filter Gauges shall be manual read<br />
type with a range of 0 to 250 Pa or 0 to 500 Pa depending on required duty. These<br />
shall be Magnahelic or equal. These shall have a digital output that is proportional to<br />
the pressure drop and shall be connected to the control system for central monitoring.<br />
Filter banks shall be made up of even filter panel numbers, in banks of 2 x 1, 2 x 2,<br />
3 x 2, 3 x 3, 3 x 4 etc. Where uneven numbers of panels occur, provide an additional<br />
panel.<br />
Housings shall be installed in the air handler such that no air bypasses the filter.<br />
Filter frames shall be epoxy coated to resist corrosion and to protect media from<br />
snagging when being replaced during maintenance.<br />
Note: Panel filters shall be provided to the outside air and return air ductwork.<br />
The filters must be located in the AHU for ease of service and maintenance.<br />
Filter media shall be:<br />
• Moisture resistant up to 100% relative humidity.<br />
• Fire Class F1 (self extinguishing) to DIN 53438 (or equivalent).<br />
• Supported to prevent collapse.<br />
• Replaceable without the use of special tools.<br />
Page 63 of 157 63
• Resistant to fungal and bacterial attack<br />
• Made so that it does not shed fibres into the air stream<br />
Fibreglass media is not acceptable.<br />
Each filter shall be sized so that they are capable of filtering the design air quantity at<br />
the maximum effective face velocity specified and its performance characteristics<br />
shall meet the requirements specified hereafter for the specific filter type.<br />
Filters shall be installed in accordance with manufacturer's recommendations<br />
complete with all accessories necessary for their proper performance. All filter<br />
connections to adjoining equipment, panelling or support framing shall be sealed<br />
airtight to prevent any air bypassing the filter media.<br />
Filters shall be provided with front or rear access holding frames where insufficient<br />
side access is available. Where more than two filters are required to be positioned<br />
side by side in a filter bank a sliding channel may be provided only where the above<br />
criteria does not apply.<br />
Where possible filters should be “Sucked” onto the support frame to improve the seal<br />
between filter and support frame.<br />
6.24.1.1 TYPE 1 FILTERS<br />
(Pleated type for specified Roof Top Packaged Air Conditioning<br />
Unit, Air Handling Unit & Duct-Mounted Filters)<br />
Filter banks shall achieve the following criteria when handling the<br />
design air quantity:<br />
• Initial resistance not greater than 50 Pa, measured across<br />
the filter bank as installed (i.e. including the effects of any<br />
surrounding blanking plates).<br />
• Filter bank face velocity not greater than 2.5 m/s.<br />
• Minimum average efficiency 40% F5(EN779).<br />
• Minimum dust holding capacity at 125 Pa: 300g per<br />
600mm square module.<br />
6.24.1.2 TYPE 2 FILTERS<br />
(Deep bed type for specified Air Handling Units)<br />
Filters shall be extended surface disposable dry media selfsupporting<br />
wedge shaped pocket type (i.e. without wire media<br />
supports). The filter media shall be sealed effectively to the filter<br />
frame.<br />
Filters shall be supplied complete with a two piece stainless steel<br />
or equivalent corrosion-resistant holding frame.<br />
600 MM DEEP, MEDIUM EFFICIENCY<br />
Filter banks shall achieve the following criteria when handling the<br />
design air quantity:<br />
• Initial resistance not greater than 50 Pa, measured across<br />
the filter bank as installed (i.e. including the effect of any<br />
surrounding blanking plate).<br />
• Filter bank face velocity not greater than 2.5 m/s.<br />
• Minimum average efficiency 60% or F6 (EN 779).<br />
• Minimum dust holding capacity at 125 Pa: 800 g per 600<br />
mm square module.<br />
Page 64 of 157 64
6.24.1.3 TYPE 3 FILTERS<br />
(Metal Viscous - Kitchen Extract)<br />
Filters shall be modular, in frames complete with handles, to allow<br />
easy removal for cleaning.<br />
Grease filter banks shall achieve the following criteria when<br />
handling the design air quantity:<br />
• Initial resistance not greater than 30 Pa.<br />
• Filter face velocity not greater than 2.5 m/s.<br />
• Final resistance: 40 Pa.<br />
6.24.1.4 TEMPORARY FILTERS<br />
Provide temporary filter material over all filter banks to protect<br />
permanent filters from soiling during construction and simulate<br />
dirty filter condition during commissioning.<br />
6.24.2 FILTER PERFORMANCE<br />
All air-conditioning units shall be fitted with filters to remove particulate matter from<br />
the air stream. The performance of the filters shall meet the following minimum<br />
requirements.<br />
6.24.2.1 Built up AHU’s<br />
All units shall be fitted with Type 2 filters.<br />
6.24.2.2 Package and Fan Coil units<br />
All units shall be fitted with Type 1 filters.<br />
6.24.3 PRE FILTERS<br />
20mm roll-media or similar pre-filters shall be installed to protect the main filters<br />
during construction. These shall be removed when all construction and external<br />
site works are completed.<br />
The pre filter shall have a performance rating equivalent to the old F4 (AS 1324.1).<br />
Page 65 of 157 65
7.0 DUCTWORK<br />
7.1 SCOPE<br />
All air handling system including ductwork, acoustic and thermal insulation and fire<br />
dampers, shall comply with AS/NZS 1668 and all applicable statutory requirements.<br />
As a general rule ductwork shall NOT be painted internally, where visible through grilles<br />
paint matt black internally.<br />
All ductwork systems shall be complete with transitions, bends, tees, supports, dampers, ofsets,<br />
flexible connections, take-offs and similar fittings necessary for the balancing and full<br />
operation of the air distribution system.<br />
The ductwork shall be designed to ensure the overall static pressure of the system and its<br />
components does not exceed 550Pa at the main supply air fan.<br />
7.2 DUCTWORK CONSTRUCTION AND INSTALLATION<br />
7.2.1 GENERAL<br />
Construction and installation of ductwork shall comply with AS 4254 - ‘Ductwork<br />
for Air-handling Systems in Buildings’.<br />
Duct velocity for supply, return and minor exhaust air:<br />
3m/s behind side blow registers on exposed ductwork, the greater of;<br />
7.5m/s and 1.0 Pa/m for riser ducts,<br />
6m/s and 1.0 Pa/m for branch ducts<br />
4m/s and 1.0 Pa/m for small take-off ducts mounted within the ceiling.<br />
Duct velocity for kitchen exhaust: 9 to 10m/s.<br />
Insulating locations of ductwork:<br />
Insulation shall generally be as per BCA section J deemed to satisfy requirements.<br />
Additional insulation shall be required cold aisle return air.<br />
7.2.2 MATERIAL<br />
Unless specified otherwise (for special systems) ductwork material shall be prime<br />
quality lock forming galvanised steel, Grade G2 or G3 to AS 2338 with Z275<br />
coating to AS 1397.<br />
All sheet metal ductwork shall be manufactured from lock forming quality Lysaght<br />
Galvabond sheet steel or equal. Galvanising shall be: 380gms/m2.<br />
7.2.3 DUCT SEALING<br />
Unless specified otherwise, ducts shall be sealed in accordance with Table 2.2.1<br />
of AS 4254.<br />
Ductwork below 500 Pa classification shall also meet Seal Class C.<br />
Leakage rates of unsealed ducts shall not exceed the rates indicated in Table<br />
2.2.2 of AS 4254.<br />
Ductwork systems at Pressure Class 750 and less shall be leak tested by hand<br />
feel and audio checking of all joints. All obvious leaks shall be sealed with<br />
appropriate and approved sealant.<br />
Page 66 of 157 66
7.2.4 DUCTS EXPOSED TO WEATHER<br />
Ducts exposed to weather shall be fabricated using the next metal thickness.<br />
Horizontal Exhaust ventilation ductwork exceeding 800 mm wide shall be crossbroken<br />
each 1200 mm length to ensure the rain water does not collect on the top<br />
surface of the duct. All circumferential and longitudinal joints to be sealed air and<br />
water tight; using sealing compounds not affected by direct sunlight. Standing<br />
flanged type circumferential joints are to have hat sections riveted over the top and<br />
side joints and sealed as for the all the joints above.<br />
Horizontal supply and return air conditioning ductworks (continued) exceeding 800<br />
mm wide are to be internally insulated 25 mm thickness greater than specified for<br />
within the ceiling space and covered on top and sides with separate G.I. cover<br />
spaced 50 mm minimum from duct external face and pitched on the top cover from<br />
centre of duct to edge to ensure water does not collect on top of cover. All<br />
circumferential and longitudinal joints to be sealed air and water tight; using<br />
sealing compounds not affected by direct sunlight.<br />
Flexible connections shall be protected by weather covers.<br />
7.2.5 ROUND DUCTS<br />
Construction of round ducts shall be in accordance with Table 2.4 of AS 4254.<br />
Unless otherwise indicated, all branch take-offs shall be 45° lateral fitting complete<br />
with volume dampers, flexible duct connections shall be 90° tee fitting complete<br />
with volume damper.<br />
7.2.6 OVAL DUCTS<br />
Construction of oval ducts shall be in accordance with Table 2.5 of AS 4254.<br />
Exposed oval ducts shall have neat appearance with internal reinforcement.<br />
7.2.7 VERTICAL DISCHARGE OR INTAKES<br />
Vertical discharge or intake ducts that are exposed to the weather shall be<br />
internally drained with a copper drain line to the nearest drain point.<br />
All such ducts shall be graded to the drain point and shall have all joints and<br />
seams sealed watertight.<br />
7.2.8 KITCHEN/DISHWASHER EXHAUST DUCTS<br />
Ductwork construction shall comply with AS/NZS 1668.<br />
Unless otherwise indicated, duct material shall be minimum 1.2 mm thick<br />
galvanised steel for kitchen exhaust ducts, 1.0 mm stainless steel for dishwasher<br />
exhaust ducts.<br />
Access panels shall be provided as per AS/NZS 1668.<br />
7.2.9 TOILET EXHAUST DUCTWORK<br />
Ductwork construction shall comply with AS/NZS 1668.<br />
All toilet exhaust ductwork must be treated with a suitable sealing compound to<br />
ensure that the duct is air tight and leak proof.<br />
Page 67 of 157 67
7.2.10 DUCT HANGERS AND SUPPORTS<br />
Duct hangers and support systems shall be in accordance with AS 4254. Where<br />
required provide seismic restraints in accordance with AS 1170.4.<br />
Hanger straps (only used where approved) shall be galvanised steel.<br />
Hanger rods, trapeze angles, channels, brackets and fasteners shall be<br />
galvanised steel.<br />
Trapeze angles, channels and brackets shall be cut from full length sections.<br />
Short lengths of sections welded together to form a longer length shall not be<br />
used.<br />
Exposed duct supports shall be treated and painted with an approved colour.<br />
(Refer Painting Section of this specification).<br />
Fixing the support systems to building structure shall be approved. Generally:<br />
Fixing to structural steel shall be by beam clamps or similar fixing. No drilling or<br />
welding is allowed.<br />
Fixing to masonry or concrete shall be by masonry anchors.<br />
Fixing materials shall be galvanised steel.<br />
All exposed hangers and supports shall be manufactured corrosion resistant hot<br />
dip galvanised sections.<br />
7.2.11 FLEXIBLE DUCTS<br />
Flexible ducts shall conform to AS 4254 and the BCA.<br />
Unless otherwise indicated, flexible ducts shall have acoustic lining comprising<br />
50 mm thick thermally bonded polyester with an R 1.0 rating (tested to AS 4859.1)<br />
or equal internal insulation wrapped around block permeable fabric core and<br />
covered with aluminium laminate. Insulation shall comply with the requirements of<br />
section J of the Building Code of Australia.<br />
Ducting shall have a fire test rating of 0,0,0,3 to AS 1530.3.<br />
Flexible duct lengths shall not be more than 3 metres. Over 3 metres, galvanised<br />
circular ductwork shall be inserted, with no more than 2 metres of flexible duct at<br />
the end joining the galvanised circular duct to the terminal device (ceiling outlet,<br />
intake etc.).<br />
Connections of flexible ducting to spigots shall be held in place by duct ties applied<br />
directly over the duct helix and under the insulation.<br />
Flexible ducting shall be supported every 2 meters for ducts over 2 meters long<br />
using 50mm wide strap hangers securely fixed.<br />
Minimum bend radius shall be as per the manufacturers recommendation but in all<br />
instances should not be less than twice the diameter.<br />
7.2.12 DUCT THERMAL MOVEMENT AND VIBRATION<br />
All ducts shall be carefully designed and provided with all necessary anchoring<br />
and flexible connections to prevent damage to either the ducts or the building<br />
structure due to thermal expansion and/or contraction of the ducts and to obviate<br />
Page 68 of 157 68
transmission or vibration from any motive or noise generating equipment such as<br />
fans, air handling units and mixing boxes.<br />
All anchor points and flexible connections shall be shown on the shop drawings<br />
and specific approval shall be obtained from appropriate authority before<br />
proceeding with the installation of any anchors or fixings to the building structure.<br />
7.2.13 FLEXIBLE CONNECTIONS<br />
Flexible connections shall be air-tight, water-tight and comply with the<br />
requirements of the relevant sections of AS/NZS 1668, Part 1, Fire Precautions in<br />
Buildings with air-handling systems.<br />
The flexible material shall be securely attached to galvanised strip for ease of<br />
application.<br />
Flexible connections shall be fitted to isolate vibrating equipment from ductwork.<br />
The connections shall be arranged to permit the removal and replacement of the<br />
connection without disturbing the ductwork or plant.<br />
The metal parts of connected equipment shall be separated by not less than<br />
100 mm and be installed with sufficient slack to compensate for free movement of<br />
fans on spring vibration isolators.<br />
7.2.14 CLEANING AND PROTECTION<br />
All ductwork shall be fabricated under cover, delivered to site and stored in a<br />
weatherproof and dry area. Open ends of duct sections shall be covered with<br />
plastic sheet or tarpaulins until required for installation. Special care shall be given<br />
to internally insulated ducts, silencers etc. for protection against dust and moisture.<br />
Ductwork shall not be installed unless adequate cover and protection is available<br />
to protect it from possible construction damage and the elements.<br />
Prior to and during installation, ducts shall be thoroughly cleaned out and shall<br />
have all ends covered in an approved manner to prevent ingress of dust and<br />
general building debris.<br />
7.2.15 PITOT TUBE OPENINGS<br />
Provide test openings in the ducts in the following locations:<br />
• Adjacent to the inlet and discharge of all fans.<br />
• Downstream of all balancing dampers.<br />
• Upstream and downstream of all heating coils<br />
Locate the holes such that the air flow across the duct is sufficiently even to<br />
enable accurate temperature and flow measurements to be taken to permit correct<br />
balancing and adjustment.<br />
Test holes shall be 25 mm dia. and be fitted with a rubber plug. Provide one spare<br />
rubber plug for each test hole.<br />
Where the duct is externally insulated ‘cone’ down the insulation around the test<br />
hole. Where the insulation has a vapour barrier seal the barrier to the duct around<br />
the test hole.<br />
The number and positions of Pitot tube openings to be provided at each location<br />
shall be as follows:<br />
Page 69 of 157 69
For all ducts having diagonal dimensions or diameters up to 300 mm provide one<br />
opening at the centre-line of the duct.<br />
For all ducts having diagonal dimensions or diameters more than 300 mm but less<br />
than 600 mm provide two openings at 1/4 points on either side of the duct centre<br />
line.<br />
For all ducts having diagonal dimensions or diameters 600 mm or larger, provide<br />
four openings at 1/8 points on either side of the duct centre line and on each side<br />
of the duct.<br />
7.2.16 SEALING AND FLASHING<br />
All ducts protruding through walls and floors and exposed to view shall be<br />
provided with neat galvanised steel sealing frames fixed to ducts and walls or<br />
floors as appropriate.<br />
All external installations and roof penetrations shall conform to Section 3 of<br />
AS 4254.<br />
7.2.17 SMOKE DETECTORS<br />
Refer to fire services drawings for location of duct mounted smoke detectors.<br />
Cut openings in ductwork where required to facilitate installation of smoke<br />
detectors to these units and seal openings afterwards.<br />
Supply and install minimum 300 mm x 200 mm access panels in the ducts<br />
adjacent to each smoke detector to facilitate future servicing.<br />
7.2.18 DUCT ACCESS PANELS<br />
No part of the panel shall project into airstream and when it is shut shall be flush<br />
with the inside surface of the duct.<br />
Access panels shall be provided where required for inspection and service<br />
purposes. Access panels will be provided for but not <strong>limited</strong> to heating elements,<br />
dampers, controls and for general maintenance and inspection purposes.<br />
All access panels shall be clearly labelled to indicate services served.<br />
7.2.19 ACCESS DOORS<br />
Access doors shall be complete with hinges and handles.<br />
Access doors shall be provided for air handling unit, including fan, plenums, filter<br />
housing(s) and mixing sections and where shown on the drawings.<br />
Provide doors with a minimum of three hinges and lockable quick release catches<br />
with handles providing easy operation (sash catches, bolts, piano hinges or<br />
catches requiring a screw driver for operation will be rejected)<br />
Provide doors with air tight gasket seals. If lift-off panels are proposed, D-handles<br />
shall be fitted to facilitate removal.<br />
7.2.20 BURGLAR BARS AND BIRD SCREENS<br />
Bird screens shall be fitted to all fresh air intake ducts, all louvres and all relief and<br />
exhaust fan and air openings supplied under this Contract that occur in the<br />
external fabric of the building.<br />
The bird screen shall be 12 mm x 12 mm x 1.6 mm diameter galvanised woven<br />
wire mesh in rigid galvanised frames or similar approved.<br />
Page 70 of 157 70
In addition to the bird screens, burglar bars (by Builder) shall also be fitted to<br />
external openings having a clear opening of 300 mm x 300 mm and larger.<br />
On all exhaust and smoke exhaust fans, the burglar bars shall be located below<br />
the fans to maintain service access.<br />
The burglar bars shall be manufactured from 10 mm diameter galvanised rods<br />
spaced at not more than 150 mm centres.<br />
The burglar bars shall be welded into a support frame and be securely fixed to the<br />
building fabric, either on inside face of wall or just below roof line.<br />
7.2.21 PLENUM BOXES (CUSHION HEAD BOXES)<br />
Unless otherwise indicated, all supply air diffusers shall be mounted on plenum<br />
(cushion head) boxes or equal approved.<br />
Where insulated plenum boxes or cushion heads are specified, raw edges of<br />
insulation shall be fully sealed. Insulation shall be thermally bonded polyester<br />
32 kg/m3 density (min) and shall be black faced with an R value to match the<br />
supply air ducting insulation.<br />
7.2.22 REFLECTIVE SURFACES<br />
Reflective surfaces visible to view, behind supply air outlets, return air grilles and<br />
the like shall be painted matt black.<br />
7.2.23 INSULATION<br />
All materials used in the installation of insulation shall have the following<br />
resistance properties when tested to AS 1530 Part 3 "Test for Early Fire Hazard<br />
Properties of Materials".<br />
Ignitability Index 0<br />
Spread of Flame Index 0<br />
Heat Evolved Index 0<br />
Smoke Developed Index 2<br />
Where air mixing and filter plenums are accessible for filter changing, the plenum<br />
floor insulation shall be covered with 1.2 mm thick galvanised steel sheet<br />
sufficiently reinforced and supported for rigid construction. The plenum walls and<br />
ceiling insulation shall be faced with perforated galvanised steel sheet.<br />
Cold aisle return air duct work shall have a minimum of 50 mm internal insulation.<br />
Where required additional external insulation shall be applied to ductwork located<br />
within the ceiling space.<br />
Ductwork insulation shall comply with Section J of the BCA.<br />
7.3 DIFFUSERS, REGISTERS, GRILLES AND LOUVRES<br />
Supply and install all diffusers, registers and grilles shown on the drawings.<br />
All diffusers, registers and grilles shall be of extruded aluminium and shall have durable<br />
powder coat finish, with the colour directed by Woolworths. All internal surfaces shall be<br />
painted matt black.<br />
Provide butterfly dampers with locking quadrants on duct take offs except for areas with<br />
solid plasterboard ceilings.<br />
Page 71 of 157 71
Provide face operated volume adjustment dampers on all diffusers except where a ductmounted<br />
volume control damper is installed upstream of the individual diffuser or register.<br />
Outlet velocity, net airway, and design of the diffusers shall be such as to give<br />
satisfactory air distribution without draughts or noise nuisance.<br />
Diffusers, registers and grilles shall be as noted on the drawings.<br />
All diffusers, registers and grille sizes shown are based on the above manufacturer’s<br />
data. Any alternative equipment offered should be checked against this data to ascertain<br />
if the peculiarities of such equipment make them suitable for use.<br />
Diffusers registers and grilles shall be as follows:<br />
7.3.1 CEILING DIFFUSERS<br />
Ceiling diffusers manufactured from extruded aluminium shall be installed, as<br />
required, and may be 1 way, 2 way, 3 way or 4 way as appropriate and shall be<br />
louvred core style to give required direction of blow as appropriate, with ‘draftless’<br />
air distribution without noise.<br />
Louvre faced type with OBD (when required) and insulated cushion heads above.<br />
Note: ‘Swirl’ type diffusers may be used as an alternative to achieve improved<br />
mixing of air in heating mode.<br />
7.3.2 SIDE BLOW REGISTERS<br />
All side blow registers, whether supply, return or exhaust shall be double<br />
deflection type unless noted otherwise.<br />
The register frame and core shall be such that no screw heads are visible on the<br />
face or the register after fixing.<br />
7.3.3 EXHAUST GRILLES<br />
All exhaust grilles shall be aluminium egg crate type unless noted otherwise.<br />
The grille frames and cores shall be such that no screw heads are visible on the<br />
face or the grilles after fixing.<br />
“Non-Rattling” balancing dampers shall be installed behind grilles as required.<br />
7.3.4 RETURN AIR GRILLES ON VERTICAL SURFACES<br />
All return air grilles mounted of vertical surfaces shall be ½-chevron blade type<br />
unless noted otherwise.<br />
The grille frames and cores shall be such that no screw heads are visible on the<br />
face or the grilles after fixing.<br />
7.3.5 RETURN AIR GRILLES ON HORIZONTAL SURFACES<br />
All return air grilles on horizontal surfaces shall be egg crate type, unless noted<br />
otherwise.<br />
The grille frames and cores shall be such that no screw heads are visible on the<br />
face or the grilles after fixing.<br />
Details of all changes in size and type of outlet shall be noted on the tender<br />
documents and stated in the tender submitted.<br />
Where egg crate grilles are used on the return air of small in-ceiling fan coil units,<br />
the egg crate grille shall be mounted in a hinged frame with the filter media fixed to<br />
the back of the grille. This is to allow for easy filter cleaning during maintenance<br />
without having to access the ceiling space.<br />
Page 72 of 157 72
7.3.6 EXTERNAL AIR INTAKE & EXHAUST LOUVRES<br />
Supply and install horizontal blade weatherproof air intake and exhaust louvres<br />
where shown on the drawings. Louvres shall be single or two-stage type as<br />
indicated on the drawings.<br />
Louvres shall be manufactured from extruded aluminium with natural anodised<br />
finish.<br />
Intermediate supports and stiffeners shall be provided to prevent blades from<br />
vibrating and from sagging.<br />
Fix vermin proof corrosion resistant screens to the internal face of all air intake and<br />
exhaust louvres.<br />
7.3.7 LINEAR SLOT DIFFUSERS<br />
Diffusers shall be Holyoake or approved equal. Each length shall be completed<br />
with mitred corner end-caps and made up of active and inactive sections, butting<br />
together with hairline cracks between sections. Inactive sections shall be blanked<br />
off.<br />
7.3.8 ROUND DIFFUSERS<br />
Diffusers shall be Holyoake or approved equal.<br />
Page 73 of 157 73
8.0 ELECTRICAL<br />
8.1 GENERAL<br />
This section covers the supply and installation of all necessary electrical equipment,<br />
including starters, thermal overloads, circuit breakers, switches, control gear and all<br />
wiring for the safe and satisfactory operation the electrical plant and equipment<br />
associated with the air conditioning, ventilation, and mechanical services systems.<br />
This section should be read in conjunction with the standard electrical drawings,<br />
switchboard layouts and label schedule found in the appendix section of this<br />
specification.<br />
Any person or persons engaged on the electrical installation shall hold a current electrical<br />
contractor's license, or an electrician's license under the Electrical Contractors and<br />
Electricians Licensing Regulations.<br />
8.2 REQUIREMENTS<br />
All equipment supplied and all work done shall be in accordance with this specification<br />
and the S.A.A. Wiring Rules and any other S.A.A. publications covering design,<br />
manufacture or installation of electrical equipment and to the requirements of the local<br />
Electricity Supply Authority. The latest issue or amendment of the relevant S.A.A.<br />
publication shall be used.<br />
All electric motors shall conform to the requirements of Australian or New Zealand<br />
standards.<br />
The switchboard manufacturers are to be selected from the approved list as outlined in<br />
the section 8.6.5.<br />
The switchboard manufacturer shall have a type test certificate in addition to Part Type<br />
Test Assembly certificate from switchgear supplier to which the design, manufacture and<br />
performance of the switchboard shall conform. The installation Contractor shall have an<br />
Electrical Contractors license and employ only licensed electricians on Site.<br />
Uniformity of type and manufacture of each item of equipment, fitting or accessory shall<br />
be maintained throughout the plant.<br />
The electrical contractor shall ensure that electrical loads are balanced across all supply<br />
phases to within 5%.<br />
8.3 INTERRUPTION TO SUPPLY<br />
Should the work require shutting down of any part of the electrical equipment or the<br />
whole plant, this shall be done at such times as are designated by the Purchaser.<br />
8.4 DIAGRAMS<br />
The electrical system shall be designed in line with the intent of the electrical drawings at<br />
the rear of this specification. It shall be deemed as the responsibility of the contractor to<br />
ensure the design of the electrical system is completed in a manner so the plant operates<br />
to the requirement of Woolworths.<br />
On completion of the installation a diagram of the complete installation and wiring circuit<br />
shall be supplied to site as follows:<br />
Page 74 of 157 74
• One (1) laminated copy to be mounted on the wall of the plantroom in a manner that<br />
allows personnel to review the design. Drawings shall be A2 size;<br />
• One (1) copy placed inside the door of the switchboard;<br />
• One (1) copy included in the operating and maintenance manual;<br />
• Electronic (PDF and DWG) copy supplied with the Mechanical ‘AS Built CD’;<br />
8.5 INCOMING SUB-MAIN<br />
Sub-mains of sufficient size shall be brought and connected directly to mechanical<br />
switchboard.<br />
‘Standard Kit’ circuit breaker at the Main Switchboard shall be sized as follows:<br />
• 1 off 400A – 3 Phase<br />
The Mechanical Services contractor shall confirm to the Woolworths Project Manager<br />
within one week of being awarded the project, the required isolator size and the mains<br />
size that shall be brought to the Main Distribution Board. Termination into the Main<br />
Distribution Board shall be by others.<br />
8.6 SWITCHBOARDS<br />
This section outlines the manufacture of electrical Switchboard Control Assembly (SCA)<br />
for the housing of mechanical services electrical and control equipment, including<br />
starters, thermal overloads, circuit breakers, switches, control gear and associated wiring<br />
for the reliable operation of equipment associated with the air conditioning, ventilation,<br />
and mechanical services systems.<br />
It is the intention of this section of the specification that all new SCA is based on a<br />
generic design as detailed within this document – this is to ensure a consistent<br />
installation and a common standard throughout the Woolworths network.<br />
For new installations, the SCA shall be supplied and shall conform to this section of the<br />
Mechanical Services Specification. For store refurbishments the supply shall conform to<br />
Woolworths tender request.<br />
The switchboard/control assembly shall comprise four sections:-<br />
• Main Switch Section: is for termination to the segregated main isolator is Form 2<br />
construction in accordance with AS3439:2002.<br />
• Distribution Section: houses distribution circuit breakers with its chassis behind an<br />
escutcheon.<br />
• Contactors and Overload Section: The control panel section housing all contactors,<br />
protective devices, relays etc for the individual operation of each mechanical-system<br />
and alarm panel.<br />
• Electronic Controller Section: Is for housing proprietary system controllers, I/O cards,<br />
associated transformers and associated components.<br />
The S.C.A. shall comply in all respects with this specification, AS3439:2002 (and<br />
subsequent amendments) (previously AS1136) and the accompanying drawings and to<br />
the following characteristics:-<br />
• Test voltage for switchgear and control gear assemblies - 1000 V.A.C. Indoor<br />
stationary cubicle type;<br />
• Form 2;<br />
• Rated short-time with stand current 25KA for 1 sec;<br />
• Degree of protection IP54;<br />
• Designed for a supply voltage 415 volts A/C;<br />
• Rated input current to be full load of connected equipment;<br />
Proof of performance of the board shall be substantiated by switchboard manufacturers’<br />
submission of a type test certificate from a qualified testing laboratory.<br />
Page 75 of 157 75
The design shall provide for full discrimination and cascading of the circuit protective<br />
devices.<br />
The section for switching of sub-system, circuitry shall be labelled 'Authorised Personnel<br />
Only", this section shall not allow any person operating switches and circuit breakers to<br />
come into contact with live parts.<br />
All other sections of the SCA shall be labelled as indicated on switchboard drawings and<br />
labelling details shown in section 18.1.14 & 18.1.15 .<br />
The electrical supply for all air conditioning and mechanical services equipment shall<br />
emanate from the MSSB.<br />
8.6.1 MAIN SWITCH SECTION<br />
Main isolator circuit breaker. This breaker shall be provided with bus-bar flags on the<br />
line-side for the connection of the sub-mains. The bus-bars shall be supported by<br />
substantial insulated brackets and spaced to allow ease of termination of the submain<br />
and to meet the requirements as previously specified.<br />
A main neutral link to which the sub-main neutral shall be connected and each<br />
system neutral.<br />
An approved power monitoring device to be fitted to each incoming submain to the<br />
SCA, capable of remote monitoring through the alarm monitoring system (see also<br />
9.4.4.4).<br />
8.6.2 DISTRIBUTION SECTION<br />
A distribution section with a bus-bar, rated to suit the full load current of the S.C.A and<br />
to meet the requirements as previously specified, to connect to the circuit breakers<br />
protecting the refrigeration systems control equipment.<br />
Cabling from the circuit breakers shall be run between the switchboard section and<br />
the control cubicle to conform to the requirements of this specification and AS3439<br />
(and subsequent amendments).<br />
Circuit breakers and RCD’s for each system for short circuit and overload protection<br />
of all motors, defrost heaters, sump heaters, drain heaters, fans, head fans, lighting<br />
and control circuits.<br />
8.6.3 CONTACTOR & MOTOR CONTROL SECTION<br />
Equipment to provide phase failure protection, sequential starting and delayed<br />
starting after overload, oil failure or safety pressure, cut-out, re-set.<br />
Motor Start Fuses (on existing projects), D.O.L. contactor, overload unit and having<br />
under voltage and a phase failure relay for the control of each compressor motor.<br />
Phase asymmetrure monitoring shall be provided on incoming mechanical services<br />
submain (one off for overall mechanical system) and shall stop operation of all threephase<br />
motors including compressors and condenser fans on detection of phase<br />
failure event. Corresponding indication of Phase Failure shall be indicated by<br />
electronic control and alarm system.<br />
In the section labelled 'Authorised Personnel Only' the circuit breakers protecting<br />
items of equipment shall be labelled with permanently affixed labels to indicate<br />
connected equipment. .<br />
Page 76 of 157 76
Where reduced voltage (part wind) start is incorporated into system design, the<br />
Contractor shall ensure that two overload devices are installed per compressor.<br />
All other relays and equipment for the proper functioning of the plant as specified.<br />
8.6.4 DESCRIPTION OF EQUIPMENT<br />
• Major equipment shall be selected in accordance with items shown in section<br />
14.0.<br />
• Contactors shall be manual reset operation.<br />
• All relays and control switchgear should be rated and operated at 240Volts<br />
except where required for safety reasons as in case of Trax Oil level switches<br />
etc. Preferred control voltage for extra low voltage circuits is 24V AC. Probes<br />
and sensors are to be operated and rated as per respective electronic control<br />
supplier requirements. Relay bases shall be of the totally enclosed, moulded<br />
type.<br />
• All electrical equipment to be installed shall be of sufficient amperage capacity<br />
with a margin to suite the plant offered.<br />
• All equipment to be installed shall operate within the manufacturer's ratings.<br />
Motor starters shall be selected for AC3 rating.<br />
• Approval to use alternative equipment to that indicated must be obtained in<br />
writing.<br />
• Approved cable terminations, lugs or pin types shall be used throughout.<br />
"Lugged" type terminals shall be used on all cables 6mm square and above. Pin<br />
type crimped terminations shall be used on cables less than 6mm square.<br />
8.6.4.1 CONNECTIONS<br />
All cables unless enclosed shall be neatly arranged and loosely tied<br />
and supported neatly, where necessary.<br />
All control cables to and from the switchboards shall terminate at an<br />
approved terminal block. No more than two cables shall terminate at<br />
any one terminal point. Power cables for Compressor and<br />
Condenser motors may be directly terminated on respective<br />
Contactors/over-loads.<br />
The switchboard shall comprise a factory made and assembled, free<br />
standing floor mounted front connected enclosure with switchgear<br />
and control gear arranged as to Woolworths current standard.<br />
On Site assembly of switchboard shall not be permitted.<br />
The switchboards shall be totally wired to terminations as detailed<br />
above such that connections terminate at location and terminals<br />
designated and marked for the appropriate cables.<br />
All wires and cables (unless otherwise specified or subject to<br />
statutory fire rating) shall be V75 thermoplastic insulated copper<br />
stranded of Australian manufacture.<br />
Access for conduits and ducts shall be provided by removable<br />
aluminium gland plates.<br />
Access to the front of the switchboard shall be by means of sheet<br />
metal doors fully dust sealed.<br />
Page 77 of 157 77
8.6.4.2 CONSTRUCTION<br />
The overall cubicle structure shall be fabricated from first quality,<br />
minimum 2mm gauge cold reduced, sheet steel to AS1595 (and<br />
subsequent amendments). Sheet steel shall be Zinc coated to<br />
minimum 10 micron thickness. The cubicle shall be of welded metal<br />
type construction.<br />
The base shall be minimum 75mm x 40mm x 10mm M.S channel.<br />
The base channel shall form a continuous box section around the<br />
base of the switchboard there shall be no openings made in this<br />
base such as those used for slinging.<br />
Doors over 1 meter long shall be stiffened to provide sufficient<br />
rigidity. All doors are to be provided with chrome plated Pintle hinges<br />
with stainless steel pins.<br />
All door handles / locks shall have a 3-point locking mechanism.<br />
Door handles shall be a flush latch lift and turn locking unit. Locks<br />
using an external tool to operate shall be replaced.<br />
Panels and doors supporting equipment which require cut outs in the<br />
sheet metal shall be suitably braced to offset any reduction in rigidity<br />
caused by the cut outs to prevent undue movement or vibration<br />
resulting from operation of equipment within the switchboard or that<br />
mounted on the panels or doors.<br />
The electrical compartments shall have interior lighting and<br />
mechanical ventilation operated by a door switch as indicated in the<br />
attached electrical diagrams. Switchboard lighting & fans shall be<br />
installed to the ‘Contactor and Overload’ and ‘Electronic Controller’<br />
Sections only. Mechanical ventilation shall be activated when doors<br />
closed, as indicated on attached electrical diagrams.<br />
The front of the switchboard must incorporate a fascia board<br />
consisting of a back engraved Perspex panel which shall carry Run<br />
(green) and Fault (red) lights for all equipment items. The<br />
equipment items referred to here are;<br />
• Fans (Supply, Exhaust and the like, excluding Condenser<br />
Fans)<br />
• Packaged air conditioning equipment<br />
• Heaters (Including boilers, heat pumps etc)<br />
• Compressors and individual safeties e.g. Motor O/L,<br />
HP/LP, Oil Safety.<br />
• A lamp test button shall be provided on this fascia board.<br />
A 'fire signal activated' (red) lamp shall also be provided<br />
on this fascia board.<br />
External MSSB fascia shall contain the following switches for the<br />
general control of the system:<br />
• Master Control Switch: This on-off switch shall shutdown<br />
the entire air conditioning system as well as all<br />
mechanical ventilation systems, when switch is in the off<br />
position.<br />
• Compressor Sequence Changeover Switch: This switch<br />
changes the sequence of the compressors. The switch<br />
shall be labelled Compressor 1 - Compressor 2.<br />
Page 78 of 157 78
• In installations with four or more separate compressors,<br />
provision must be made to sequence change each<br />
individual compressor for equal running time.<br />
• Air conditioning Selector Switch: This switch labelled 'Air<br />
conditioning/Vent' enables the main air conditioning plant<br />
to be run in an A/C auto or ventilation modes. All exhaust<br />
systems remain unaffected by this switch.<br />
• Compressor Hours Run Meters: One for each<br />
compressor<br />
• Duct electric heater shunt trip circuit breaker must be<br />
installed so that ‘Re-set’ can be carried out with all MSB<br />
doors closed<br />
• The Internal MSSB fascia test switches shall be mounted<br />
on a hinged panel. Test switches shall be provided for<br />
every item of equipment within the switchboard and they<br />
shall be traffolyte, labelled 'Test/Off/Auto. Fire Alarm<br />
Relay shall also be labelled.<br />
8.6.4.3 PAINTING / POWDER COATING<br />
All of the sheet metal work shall be degreased using an approved<br />
solvent. The metal conditioner shall remove oil and greases. Finish<br />
paint work shall comprise at least two coats of a two-pack Urethane<br />
paint applied to a thickness of at least 75 microns.<br />
Powder coating shall be of even thickness of at least 70 microns.<br />
Paint/powder coat colours shall be electric orange on all external<br />
surfaces and white interior, gear trays, escutcheons and equipment<br />
panels.<br />
8.6.4.4 LABELLING<br />
All circuits and equipment (including circuit breakers, relays,<br />
controller equipment and the like) shall be clearly identified by<br />
means of engraved labels as per the attached detail list (see<br />
sections 18.1.14 and 18.1.15).<br />
8.6.5 MANUFACTURERS<br />
Labels shall be affixed adjacent to the equipment they identify and<br />
under no circumstances shall they be fixed to ducts or duct covers or<br />
other removable components.<br />
All labels shall be of the stand-off type and be readable without the<br />
need to disturb wiring or equipment and shall be mechanically<br />
fastened. The label shall refer to the area being served by the<br />
particular control switch or indicator light, e.g. “Donut Exhaust”.<br />
Abbreviations must not be used.<br />
All incoming and outgoing terminals shall be permanently identified,<br />
all cable terminating at these terminals shall have ferrules with<br />
identical markings.<br />
Switchboards may be manufactured by any of the manufacturers nominated in<br />
Section 17.2:<br />
Page 79 of 157 79
8.7 FIELD WIRING & CABLING INSTALLATION<br />
Field wiring and installation shall comply with the following:<br />
Isolating switches for essential services shall be provided with lock on switches, i.e.:smoke<br />
exhaust fans. All wires and cables for essential services are to be fire rated MIMS<br />
or Radox to statutory requirements.<br />
All wiring to field equipment or control devices shall be run in conduit unless there are<br />
more than 6 cables used in which case cable trays shall be used.<br />
AHU lights (4 off) shall be 36W weatherproof fluorescent and shall be installed in each of<br />
the AHU conditioner housing sections and switched from a position adjacent the AHU<br />
main access door. The switch shall be labelled AHU Housing Lighting.<br />
All wires and cables except where otherwise specified shall be type V75 thermoplastic<br />
insulated or thermoplastic sheathed. All wiring shall be copper stranded cables of<br />
Australian manufacture.<br />
All wiring shall be installed using the loop-in system. Joining of cables shall only be made<br />
at fittings or accessories. The use of connectors shall not be permitted except where<br />
required by the SAA Wiring Rules for the connection of heat resisting cables and as may<br />
be directed by Woolworths Engineer.<br />
All circuits shall include a separate earth and neutral, which originates from the same<br />
switchboard as the circuit active conductors.<br />
All conductors in a conduit shall be drawn in at the one time and be capable of being<br />
easily withdrawn from the conduit if required. Particular care shall be taken with the<br />
installation of cables to avoid twisting. Wiring passing through walls, floors and areas<br />
where abrasion may occur shall be sleeved.<br />
All wiring in which abrasions of the insulation occur will not be accepted and shall be<br />
replaced by the contractor at their own expense.<br />
T.P.S cables shall not be installed where open to view, except when run in dedicated<br />
cable trays and only in stock rooms and plant rooms.<br />
Where T.P.S cables are installed in accessible locations concealed from view or above<br />
removable ceiling tiles they shall be secured to the roof framing, slab or softwood battens<br />
with clips, straps, clamps or saddles or catenary wire. Cables shall be supported at a<br />
maximum 1200 mm spacing with cables secured to prevent any strain on the<br />
connections.<br />
T.P.S cables shall not be run in locations where the cables cannot be easily withdrawn<br />
for rewiring purposes. Where T.P.S cables are installed in inaccessible locations such as<br />
cavities, stud partitions, non removable false ceilings etc; the cables shall not be clipped<br />
or secured.<br />
Where T.P.S cables are concealed within cement rendered wall or concrete slabs, the<br />
cables shall be enclosed in conduit.<br />
T.P.S cables installed in locations which are subject to mechanical damage shall be<br />
adequately protected<br />
T.P.S cables shall be separated from other services cabling. Cables shall not be laid<br />
directly onto ceiling tiles, nor be secured to ceiling air ducts, hangers or sprinkler pipes.<br />
Supply and install separate dedicated services cable trays, ducts and catenary.<br />
Separate earth wires shall be installed originating at the switchboard for each sub-circuit.<br />
Page 80 of 157 80
Earth wires shall be so arranged so that the continuity of the earthing conductor is not<br />
broken if an accessory is removed. In particular, where an earth wire is looped into an<br />
accessory it shall be held together by crimping or other approved means prior to insertion<br />
in the accessory.<br />
8.8 VSD INSTALLATION – FIELD WIRING<br />
All cables connected between VSD and driven motors where VSD’s are not fitted with LC<br />
filters shall be fully shielded throughout the entire cable length as follows:<br />
• Approved screening methods are either individual metal conduits for each VSD, or<br />
individual 4 core & ECC braid screened cables for each motor;<br />
• No discontinuity in the metal conduitor screen is permitted throughout the entire cable run;<br />
• The metal conduit/screen shall be used exclusively as E.M.C shielding and shall be<br />
connected to an earth terminal at the VSD end;<br />
• A separate earth wire shall be run to equipment for protective earthing purposes.<br />
Cable entries to VSD control cabinets shall be made through the gland plates built into<br />
the cubicle, fitted with cable glands and sealed to maintain the (IP54) protection rating of<br />
the VSD control cubicle. No site penetrations, drilling, hole cutting or any other<br />
alterations to cabinets, other than gland plate penetrations, shall be undertaken without<br />
the written approval of the manufacturer.<br />
Cable length from the VSD to motors shall be kept to as short as practical, in accordance<br />
with the drive manufacturers’ instructions.<br />
All other cables such as mains and control cables shall be segregated and/or routed<br />
separately from VSD output cables.<br />
8.9 CONDUITS, CABLE TRAY & LADDERS<br />
8.9.1 CONDUITS<br />
The minimum size of conduit shall be 32mm dia for power cables and 25mm for data<br />
cables.<br />
All conduits shall be run concealed wherever possible in walls, floors and ceilings.<br />
Where exposed to view they shall be run parallel to doors, structural members and<br />
corridors and as directed on Site by the Purchaser.<br />
The draw in system of wiring shall be used throughout. Draw in boxes shall be<br />
placed at all outlets and no intermediate boxes shall be permitted unless approved by<br />
the Purchaser.<br />
The wires will be drawn from point to point through draw in boxes. Boxes shall be<br />
suitably sealed.<br />
Deep type outlet boxes with the outer face flush with the finished surface of the<br />
concrete shall be used for embedded conduits.<br />
Conduits emerging from underground in stock areas Plant Room or the like shall be<br />
protected to a height of 2 metres by a 2mm thick sheet steel hat section. The hat<br />
section shall be of sufficient width to adequately protect cabling from side impact.<br />
The sheet steel protection shall be securely fixed to the wall and have a finished paint<br />
coat of electric orange. Treatment of the sheet metal shall be as specified for the<br />
switchboard.<br />
Flexible conduits shall be used from ducts or rigid conduit as final connection to<br />
equipment and motors. Approved conduit connections and fittings only shall be used.<br />
Page 81 of 157 81
Alarm cables shall be segregated from power and control cables.<br />
Conduits shall be connected to duct by screwed conduit and bushed fittings, the<br />
holes for conduit connections being made by means of machine type hole saw or<br />
cutter, to provide a near and correct size diameter hole.<br />
Where ducts change direction sufficient bending radius shall be allowed for easy<br />
installation of cables.<br />
Where ducts penetrate fire walls or where required by Authorities fire barriers and fire<br />
proofing shall be provided by the Contractor. Ducts shall be used for wiring in the<br />
Plant Room with flexible conduit droppers to motors.<br />
8.9.2 CABLE TRAY<br />
Where cables rise vertically, the contractor shall support these on cable cleats or<br />
clamps, the cable tray or ladder being securely fixed to holding brackets as specified<br />
herein.<br />
Cable tray and cable ladder routes shall be checked to ensure that they do not clash<br />
with other services.<br />
Cable trays shall be manufactured from steel, folded edge not less than 20mm high<br />
and be of 0.8mm thickness with punched slots. Minimum cable tray size shall be<br />
150mm.<br />
Fixing cable tray to building structure shall utilise Gripple suspension system using no<br />
smaller than 2mm wire. Supports shall be fixed at intervals not exceeding 1200mm.<br />
Edges shall be folded with a radius. Slots shall be free of burrs and sharp edges on<br />
the side to which cables are installed.<br />
Where the cable tray changes direction, sufficient bending radius shall be provided to<br />
allow easy installation of cables. The midway point of the arc of the change in<br />
direction shall be supported by a threaded rod.<br />
Where cables leave the cable tray, plastic sleeves shall be provided on the<br />
metalwork.<br />
Cables shall be supported with nylon ties at 1000mm centres for vertical runs and<br />
2000mm centres for horizontal runs.<br />
Where trays penetrate fire walls or where required by Authorities, fire barriers and fire<br />
proofing if the tray shall be provided by the Contractor.<br />
Holes in the tray and edges where cables pass over shall be sleeved.<br />
Cabling on cable trays in outdoor areas shall have covers fitted to protect against UV<br />
and predator attack.<br />
8.9.3 CABLE LADDER<br />
Cable ladder shall be sized to support the cables, which it is to carry plus 20% space.<br />
It shall be of no less than medium duty. Bend, tees and similar accessories shall be<br />
factory fabricated.<br />
Page 82 of 157 82
Cable ladder shall be supported from heavy duty cantilever brackets or suspension<br />
rod systems as appropriate, spaced in accordance with the manufacturer’s<br />
recommendations and secured with hold down clamp.<br />
The suspension rod system shall consist of 10mm minimum Zinc passivated rods,<br />
nuts and Unistrut support channel brackets or suspension supports and shall be<br />
provided in accordance with the manufacturer’s recommendation or every 3 metres<br />
whichever is the least.<br />
8.9.4 LABELLING OF DUCTS AND CABLE TRAYS<br />
All ducts, cable trays and cable ladders shall be clearly labelled “MECHANICAL<br />
WIRING ONLY” at 6 metre intervals. Where cable tray used, the label shall be<br />
fastened to a flat metal section secured to the underside of the tray.<br />
8.10 CONDENSERS & OIL COOLERS<br />
Where remote multi-circuited condensers are installed, all condenser fans shall be<br />
separately wired to ensure that in the event of an overload situation, the affected motor only<br />
shall stop.<br />
8.11 COMMISSIONING<br />
The correct function and operation of the installation shall be demonstrated as part of the<br />
acceptance tests including in detail the connections and operation of the high temperature<br />
alarm system.<br />
8.12 DEFECTS LIABILITY & MAINTENANCE<br />
The warranty requirements of section 1.9 shall also apply to the electrical section of the<br />
specification.<br />
The electrical Sub-contractor or the nominated service agent shall inspect the installation on<br />
a six (6) monthly basis for the duration of the free service period in conjunction with and<br />
coinciding with the refrigeration technician. The Sub-contractor shall ensure that all<br />
ventilation fans and filters are cleaned and electrical connections are tight.<br />
At the completion of the Defects Liability period, the electrical sub-contractor shall conduct<br />
thermal scan of all refrigeration switchboards and provide report to the Refrigeration<br />
Engineer and Mechanical Services Asset Specialist. Any irregularities identified by the<br />
thermal scan shall be rectified with no cost to Woolworths.<br />
8.13 RESIDUAL CURRENT DEVICES (RCD’S)<br />
All lighting circuits, GPOs and anti-sweat circuits shall be protected by Residual Current<br />
Devices.<br />
Page 83 of 157 83
9.0 CONTROLS<br />
9.1 GENERAL<br />
• The CPC controls application guide (refer section 19.0) shall be referred to when<br />
installing and commissioning HCAC controls.<br />
• Control system recycling at start-up shall be provided.<br />
• A time delay on start up of main plant items shall be provided.<br />
• Where current limiting starting is required by the local authority, then closed<br />
transition auto transformer (high temperature protection) shall be provided.<br />
• A fail safe control system shall be provided, including the fire trip system.<br />
• All exhaust fans as well as the air conditioning system shall shut down upon<br />
receipt of a fire signal by de-(energising the control circuit. The shut down trip<br />
shall be in the form of a relay energised by 1 external 24 Volt supply installed and<br />
connected by fire contractor. The relay will be provided in the board by the<br />
mechanical contractor and all terminals shall be coloured red. Plant reset shall be<br />
effected at the fire alarm panel by resetting the sprinkler pressure switch.<br />
• Remote normal fault indication A/C status lamp located over door in cashiers<br />
office, shall be provided as per detail drawing (ref section 18.1.7). When the<br />
system is operating normally the green light shall be illuminated and when fire<br />
trip or any item of the mechanical services is in fault the red lights shall be<br />
illuminated.<br />
• Mount one double general purpose outlet incorporating earth leakage protection<br />
inside the control section of MSSB adjacent to test switch panel. Provide internal<br />
switchboard lights to illuminate all internal components and controlled by an<br />
isolation switch adjacent to the test switch panel<br />
9.2 TEMPERATURE / HUMIDITY CONTROL<br />
Temperature and humidity sensors for trading area air conditioning plant are to be<br />
located within the store at 2.2 metres above floor, behind face of columns within 10 m of<br />
the main return air grille.<br />
Note:<br />
� Minimum of two sets of sensors required for stores greater than 2000m 2 . Additional<br />
sensor to be located centrally within the space.<br />
� Humidity sensors not required if store does not have refrigerated cases.<br />
Office amenities and liquor areas shall be controlled locally by either proprietary VRF/V or<br />
CPC controller. Proprietary controllers shall be linked to the main CPC controller<br />
providing full visibility of control functions to CPC in addition to having ability to control<br />
temperature/humidity set points and on/off scheduling.<br />
Control of chilled water temperature when installed shall be precise PID type controlling<br />
the leaving chilled water temperature.<br />
9.3 ENERGY MANAGEMENT<br />
9.3.1 GENERAL<br />
The controls, ductwork, and equipment shall be configured to enable the HVAC<br />
system to always operate in the most economic mode. In addition the energy<br />
management capability shall also determine the HVACs effect on the whole store<br />
Page 84 of 157 84
energy consumption in particular refrigerated display cases. The system shall have<br />
the capability to override is internal economiser mode to achieve the lowest energy<br />
consumption for the store.<br />
The contractor shall provide in addition to the Camel load calculation an estimated<br />
annual energy consumption based on historic BOM data.<br />
9.3.2 STRATEGY<br />
a) Air Distribution - Minimum fresh air to be introduced into system.<br />
• Use of CO2 sensor to determine minimum fresh air to trading area<br />
• Kitchen Exhaust system to only operate when respective kitchen<br />
equipment operating (30 min run on timer also required)<br />
• Make up air provided to specific kitchen exhaust hoods.<br />
• Fresh air make up to main AHU to automatically balance changes in<br />
quantities of air being exhausted through kitchen exhaust hoods<br />
b) Load Management<br />
• Economy Cycle (refer section 3.6)<br />
• Night set back and air purge (Occupied / Unoccupied operation mode).<br />
• Dehumidification control (Supermarket& Liquor brands only)<br />
• Load predicative capability.<br />
c) Mechanical Plant Management<br />
• Suction temp (SST) control enabling SST to float from 6.0 o C to 7.5 o C<br />
when dehumidification is not required.<br />
• Heat reclaim from Refrigeration Plant<br />
9.3.3 CONTROL ENABLERS<br />
The following enablers are mandatory and are in addition any other controls<br />
specified or required to achieve the energy management outcomes:<br />
• Enthalpy algorithms.<br />
• Variable Air Volume Control – AHU VSD, Modulating dampers<br />
• Input from refrigeration systems signalling availability of heat reclaim.<br />
• Inputs from refrigeration plant and store energy metres. (Supermarket&<br />
Liquor brands only)<br />
• Store and ambient temperature and humidity sensors.<br />
• Input from kitchen exhaust systems<br />
• Input from trading area CO2 sensor<br />
• Suction pressure transducers<br />
• Electronic expansion valve<br />
• AHU air pressure sensors<br />
9.3.4 ENERGY MONITORING<br />
The following energy consumption data shall be monitored using the CPC<br />
controller:<br />
• Main A/C Compressors<br />
• Main A/C Condenser Fans<br />
• Main A/C Evaporator Fan<br />
• Total Mechanical<br />
Data shall be expressed in kWhr per hour which shall be stored for 12 months on<br />
the system.<br />
Page 85 of 157 85
Note: Also refer to section (9.4.4.4)<br />
9.4 REFRIGERATION PLANT CONTROLS<br />
9.4.1 SAFETY CONTROLS<br />
All compressors regardless of the type of system in which they are commissioned<br />
shall be fitted with mechanical safety controls. These controls shall comprise of the<br />
following as a minimum and shall be incorporated into system design in addition to<br />
any electronic control system installed:<br />
9.4.2 HP/LP SAFETY CONTROLS<br />
• Mechanically adjustable HP/LP pressure control switch. Controls shall be<br />
Penn P77 series (or other approved). Controls may be individual controls or<br />
a dual pressure control.<br />
• The HP/LP cut out shall be connected to the compressor side of the service<br />
valves so that it cannot be isolated from the compressor.<br />
• The HP/LP cut out shall be connected to the compressor using flexible hose<br />
only. No rigid connections shall be permitted.<br />
• Auto reset HP with 15 min time delay restart.<br />
− This time delay may be the same as that for delayed restart after<br />
overload.<br />
− Shall register a notice to the alarm and monitoring system only with<br />
no alarm to be registered.<br />
− Shall be commissioned and set in alignment with requirements of<br />
AS1677.2: and with respect to compressor design pressures<br />
− (Compressor DP x 0.9).<br />
• Auto reset LP.<br />
− Shall be set to prevent the refrigeration system pulling vacuum;<br />
− Shall be commissioned and set with respect to the system suction<br />
pressure. Suggested setting is system suction pressure minus<br />
35kPa.<br />
9.4.3 OIL SAFETY CONTROLS<br />
9.4.3.1 COMPRESSORS INCORPORATING OIL PUMP<br />
− Compressors incorporating an integral oil pump, an oil pressure<br />
differential failure switches shall be connected.<br />
− Oil safety switch shall be Danfoss MP54 type or otherwise approved.<br />
− Oil safety switches shall be of the manual reset type.<br />
− All oil failure switches shall be connected to the high temperature<br />
monitoring system which in turn records and signals an oil pressure<br />
alarm.<br />
− This device does not remove the requirement for an oil level<br />
regulator.<br />
9.4.3.2 COMPRESSORS NOT INCORPORATING OIL PUMP<br />
− Compressors not incorporating an oil pump, additional oil<br />
management systems need be incorporated into system design.<br />
− An optical oil indicating device shall be incorporated.<br />
− All oil level controls shall be connected to the high temperature<br />
monitoring system which in turn records and signals system oil<br />
alarm.<br />
− This device does not remove the requirement for an oil level<br />
regulator.<br />
Page 86 of 157 86
9.4.4 ELECTRONIC ALARM AND CONTROL SYSTEMS<br />
9.4.4.1 GENERAL<br />
A high temperature alarm and monitoring system shall be supplied<br />
and installed to all mechanical systems and form part of the<br />
mechanical contractors’ scope of works.<br />
Each rack system shall be supplied with dedicated components for<br />
control and alarm functions.<br />
Interconnection of individual control/alarm systems shall only be<br />
permitted for communication, monitoring and alarm annunciation.<br />
The mechanical contractor shall supply communication and heat<br />
reclaim signal wiring to the Refrigeration control panel. Termination<br />
of this wiring shall be by HVAC electrician.<br />
Note: CPC systems shall communicate via shielded Cat-5 cable<br />
terminated at a 5-port hub, located in the Low-Temperature<br />
Switchboard.<br />
Note: Where CPC is the Mechanical Controller, the Heat Reclaim<br />
signal shall be sent via the controller global network;<br />
The system shall be supplied and installed with all necessary<br />
probes, transducers, interfaces, connecting wires and connection to<br />
a telephone point for a complete installation.<br />
All control systems shall be of a make and type approved by<br />
Woolworths. At the time of issue, approved control manufacturer is<br />
the:<br />
• CPC Einstein E2.<br />
9.4.4.2 CPC ECHELON CABLE<br />
Where a CPC control system is being installed, the contractor shall<br />
ensure the correct echelon wiring is used. The specified Echelon<br />
Cable is ET3801-107. No alternatives shall be accepted under any<br />
circumstance.<br />
9.4.4.3 SYSTEM CONTROL<br />
• Compressor start/stop control including unloader and<br />
compressor staging control;<br />
− Suction pressure control, monitoring and cut-out<br />
with delay restart;<br />
− Compressor logic control to minimum 4 suction<br />
groups;<br />
− Suction float control;<br />
• Condenser fan control;<br />
− Floating head pressure control, monitoring and<br />
cut-out with delay restart;<br />
• System Defrost control;<br />
− Capable of achieving defrost controls for up to 12<br />
defrosts/24 hours either electric or off cycle;<br />
• Phase loss monitoring;<br />
Page 87 of 157 87
9.4.4.4 SYSTEM MONITORING<br />
Regardless of the installation and system configuration, the following<br />
shall be incorporated into the mechanical monitoring system:<br />
• kWh monitoring of incoming mechanical submain;<br />
• Main A/C Condenser<br />
• Main A/C Supply fan<br />
• Miscellaneous Monitoring<br />
− Monitor compressor discharge temperature.<br />
Probe to be located no more than 150mm from<br />
each compressor service valve. Probe to be<br />
wrapped with insulating tape;<br />
− Monitor suction return vapour temperature. Probe<br />
to be located on each suction return stub and be<br />
located no more than 150mm from compressor<br />
service valve or suction header;<br />
− Monitor condenser air on temperature. Probe to<br />
be located no more than 150mm from air-on side<br />
of coil face.<br />
− Monitor liquid return temperature immediately<br />
before liquid receiver.<br />
− Monitor store temperatures<br />
− Monitor ambient temperature and humidity (one<br />
probe not to be located near the condenser deck<br />
and positioned in a manner so the probe is not<br />
affected by direct sunlight or reflective heat).<br />
− Monitor store humidity (Supermarket& Liquor<br />
brands only)<br />
− Measure air temperatures across heat reclaim coil<br />
where installed (Supermarket& Liquor brands<br />
only)<br />
• Suitable detectors shall be incorporated to measure and<br />
immediately record an alarm condition at each of the<br />
following points<br />
− Loss of oil pressure at each compressor<br />
− Loss of electrical power supply to compressor<br />
rack;<br />
− Bursting disc over pressure<br />
− Low liquid level<br />
− HP/LP Safety<br />
− Condenser fan fault<br />
9.4.4.5 LOGGING HISTORY<br />
Logs of connected probes and equipment shall be kept in controller<br />
memory and be available through dial-up connection as follows:<br />
• 12 Months (hourly readings):<br />
− All kWhr meters information<br />
• 4 Weeks (5min log intervals):<br />
− Pressure Transducers<br />
− Ambient and Store Temperature Probe<br />
− Store Humidity<br />
− VSD running percentages<br />
− Refrigerant leak detector readings<br />
− Heat Reclaim and condenser split operation<br />
− Stepper and water valve opening percentages<br />
Page 88 of 157 88
9.4.5 ALARMS<br />
Fault or over temperature situation in the following instances shall generate an alarm<br />
through the Refrigeration/Mechanical control network. Details of the alarm shall be<br />
communicated through to the Staff Interface PC (supplied by the Refrigeration<br />
Contractor).<br />
9.5 COMPRESSORS<br />
• HP/LP Safety (per compressor);<br />
• Motor Overload / Fault (per compressor, supply / exhaust fan). Note –<br />
Condenser fans monitor fault per condenser only;<br />
• Loss of oil pressure (per compressor);<br />
• Bursting disc over pressure;<br />
• Low liquid level (system only);<br />
• Fan Failure;<br />
9.5.1 OPERATION AFTER POWER OUTAGE<br />
All compressors shall be wired in a normally off mode in case of control system<br />
failure.<br />
Compressors having an external phase protection module with an integral delay start<br />
timer fitted shall have timers set to stager compressor re-starts.<br />
Compressors utilising internal phase protection module or having an external phase<br />
protection module without an integral delay start timer shall have additional delay<br />
timers wired into the main control circuit to stager compressor re-starts. Timers shall<br />
be set at two second intervals<br />
9.5.2 CAPACITY CONTROL<br />
9.5.2.1 RECIPROCATING COMPRESSORS<br />
Where practically possible, capacity control shall be fitted to<br />
compressors operating in a multiplex configuration. Such capacity<br />
control shall preferably be by the fitting of a solenoid to the<br />
compressor cylinder head unloading one bank of cylinders on fall in<br />
suction pressure. Provision shall be made to ensure that the<br />
compressor loads on a regular basis on up to 10 minute adjustable<br />
cycles.<br />
9.5.2.2 SCROLL COMPRESSORS<br />
For parallel compressor systems, capacity control shall be achieved<br />
by use of variable speed drive fitted to largest compressor.<br />
Additional stages of capacity control shall be achieved by cycling<br />
other compressors within pack.<br />
9.5.2.3 SCREW COMPRESSORS<br />
Capacity control shall be achieved by utilising either infinite step or<br />
VSD controllers.<br />
9.6 CONDENSER FAN CONTROL<br />
The electronic alarm and control system (ref 9.4.4) shall be utilised to ensure reasonable<br />
system discharge pressures are maintained. The condenser fans on all systems shall cycle<br />
using the aforementioned electronic condenser fan control.<br />
All systems offered shall incorporate “Floating Head” design, i.e. the saturated condensing<br />
temperature (S.C.T.) shall be allowed to “float” according to ambient conditions. The<br />
minimum S.C.T. allowable shall be restricted by the compressor manufacturers printed data<br />
Page 89 of 157 89
and recommendations. Particular attention shall be paid to component selection and design,<br />
to ensure correct system operation at both design condition and minimum S.C.T.<br />
No third party condenser fan control systems shall be used with the exception of stand-alone<br />
condensing units.<br />
The control and monitoring system shall be interlocked with the condenser fan overload<br />
device and monitor fan ‘faults’ with respect to detail in section 8.10.<br />
9.6.1 INDIVIDUAL FAN SWITCHING<br />
This control method shall be <strong>limited</strong> to existing systems only.<br />
Systems using this method of control shall have individual output relays assigned for<br />
each condenser fan.<br />
In the event of control system failure, all condenser fans shall revert to off condition<br />
until the system can take control.<br />
The electronic condenser fan control shall include for the rotation of the lead<br />
condenser fan.<br />
9.6.2 EC / VARIABLE SPEED CONTROL<br />
This control method shall be used wherever possible on new installations and<br />
refurbishments. The Mechanical Alarm and Control system shall control fan speed at<br />
all times and have ability to display fan speed and status at all times.<br />
In the event of control system failure, condenser fans shall operate at the selected<br />
speed until the control system can regain control.<br />
When EC fans are in use, the control signal shall be wired to each fan with each fan<br />
acting as a ‘master’.<br />
Fans shall be set up to operate in Day / Night mode with a lockout fan speed of<br />
680rpm applying when ambient temperatures are less than or equal to +35°C. An<br />
option to run at a higher than normal day mode speed up to but not exceeding<br />
1080rpm shall apply when ambient temperatures exceed +35°C.<br />
9.7 OFFICE, AND AMENITIES AREA AIR CONDITIONING UNITS<br />
Wall mounted thermostat and manual override control (set for 2 hrs).<br />
Systems shall be linked to the main HVAC control system (CPC where temperature settings<br />
and run times can be programmed).<br />
9.8 MECHANICAL VENTILATION<br />
9.8.1 BAKERY & HOT CHICKEN EXHAUST AND MAKE UP AIR SYSTEM<br />
Operation of supply & exhaust fans to be interlocked to operation of ovens by<br />
current switch on the submain for the respective oven. See attached generic<br />
electrical wiring schematics for additional information on interlock.<br />
Run & Fault indicator lamp to be installed adjacent the oven by Mechanical<br />
Contractor. Lamps to be 24V maximum. Lamps to be installed on Clipsal<br />
Chemical Grey mounts to match switchgear in the preparation areas supplied by<br />
the Light & Power Electrical contractor.<br />
Page 90 of 157 90
The Contractor shall commission operation of the fans so they operate for twenty<br />
minutes following the end of the cooking cycle. The current switch will need to be<br />
commissioned to register between ‘standby’ and ‘operational’ current in order to<br />
register the end of cooking / cleaning cycle.<br />
9.8.2 DONUT EXHAUST SYSTEM<br />
On - Off switch for fan to be installed adjacent to the Bakery hood by the Electrical<br />
Contractor in accordance with the standard electrical Drawings. This switch is on<br />
common stainless steel plate with the oven and interlocked bakery exhaust<br />
system.<br />
The Contractor shall install wiring to this location connections (termination) by the<br />
Electrical Contractor.<br />
9.8.3 HOT CHICKEN EXHAUST SYSTEM<br />
If more than one exhaust hood is installed for hot chicken exhaust application, one<br />
(1) fan shall be supplied per exhaust hood in order to minimise unnecessary<br />
exhausting of conditioned air.<br />
9.8.4 HOT CHICKEN MAKE UP AIR SYSTEM<br />
A singular supply air system shall be installed, regardless of the arrangement of<br />
the exhaust systems. A VSD complying with section 6.18 and automatic dampers<br />
shall be incorporated and commissioned to supply the required volume of make-up<br />
are to the operational hood only.<br />
9.8.5 DISHWASHER EXHAUST SYSTEM<br />
The dish washer hood exhaust fan shall be controlled by means of a true off delay<br />
timer installed within the dishwasher by the manufacturer. When the machine is in<br />
use the timer will energize, the fan will then operate during the wash cycle and for<br />
an additional time period once the machine has completed its cycle. Once the set<br />
time has elapsed, the timer will reset and consequently be ready for the next cycle.<br />
Mechanical contractor shall provide wiring to the dishwasher fan isolation switch<br />
located adjacent to the work station phone shelf (ref drawing M16). Switch<br />
supplied by the electrical contractor.<br />
Mechanical contractor shall provide wiring from voltage free terminals (provided in<br />
enclosure at dishwasher) to fan contactor.<br />
Waterproof conduit shall be used from dishwasher to enclosure located on wall<br />
(enclosure supplied by electrical contractor complete with pull wires).<br />
9.8.6 FISH EXHAUST<br />
The fish exhaust fan shall run whenever the fish area lighting is switched on. Light<br />
switch shall be appropriately labelled by the Electrical Contractor.<br />
The coil of the exhaust fan contactor shall be wired through a set of contacts in a<br />
relay supplied and installed by the Electrical Contractor.<br />
The relay will be housed in a separate enclosure close to the air conditioning<br />
switchboard and shall be energised on the closing of the light fitting switch.<br />
The enclosure shall be labelled to indicate that two supplies are within the<br />
enclosure.<br />
The fan shall be wired within the air conditioning switchboard so that on operation<br />
of the fire trip the fan will cease to operate.<br />
Page 91 of 157 91
9.8.7 STOCK ROOM EXHAUST SYSTEM<br />
Remote On/Off switch with green neon indicator light shall be located in the Stock<br />
Room area near the Service Desk.<br />
Page 92 of 157 92
10.0 PAINTING AND LABELLING<br />
10.1 GENERAL<br />
For the purpose of uniformity the following colours are preferred for the painting of the air<br />
conditioning equipment.<br />
10.2 PAINT COLOURS<br />
Compressors As supplied by manufacturer<br />
Supply Fans As supplied by manufacturer<br />
Shell & Tube Condensers As supplied by manufacturer<br />
Condenser<br />
Piping<br />
Water Pump & Emerald Green<br />
(To Dry Coolers)<br />
Air Cooled Condensers As supplied by manufacturer<br />
Chilled Water Pumps & Piping Blue<br />
Refrigerant Piping Yellow<br />
Drain Piping Black<br />
Exposed Electrical Conduits &<br />
Ducts<br />
Orange<br />
Switchboard Casing Orange<br />
Switchboard Doors Orange<br />
Conditioner Access Doors White<br />
The baked enamel finish on pre manufactured proprietary equipment, whether plant room<br />
or roof mounted, will be accepted as the finished colour.<br />
All reflective surfaces behind return air grilles, exhaust air grilles, supply air outlets and all<br />
louvres shall be painted matt black.<br />
10.3 LABELLING<br />
All pressure gauges, controls and control equipment, instruments and all valves shall be<br />
labelled and be clearly identified as to function.<br />
Each refrigerant circuit shall be identified with a system number.<br />
Condensers, liquid receivers, compressors, cooling coils, and associated pipe work shall<br />
each be fitted with the identifying number signifying the system.<br />
All labels shall be engraved laminated plastic with black letters on a white background.<br />
Lettering shall be not less than 12 mm high.<br />
Electrical equipment shall also be labelled as defined in Section 8.0 Electrical.<br />
All roof equipment under this specification shall also be suitably labelled with lettering of<br />
at least 25 mm high.<br />
An engraved laminated plastic label detailing the plant stop/start and fault reset<br />
procedures shall be fixed to the face of the air conditioning switchboard.<br />
All labels shall be mechanically fixed using screws or rivets.<br />
Label shall only be fixed to permanently mounted equipment. Labels fixed to any<br />
removable or demountable protective guard, access panel, electrical duct covers or the<br />
like will be rejected.<br />
ONLY ENGRAVED LAMINATED PLASTIC LABELS MECHANICALLY FIXED TO<br />
PERMANENT FIXTURES WILL BE ACCEPTED.<br />
Page 93 of 157 93
11.0 COMMISIONING, TESTING, MAINTENANCE AND SERVICE<br />
11.1 COMMISSIONING<br />
On completion of the works the Contractor shall fully commission all components forming<br />
part of the Contract Works.<br />
After full commissioning and before any tests are witnessed by Woolworths. The test<br />
results must to be forwarded to Woolworths. The commissioning data shall include but<br />
not be <strong>limited</strong> to:<br />
• Results of pressure and vacuum testing of each refrigerant circuit.<br />
• That control wiring and systems have been checked and are fully operational.<br />
• That all safety controls and high temperature safety cut-outs are fully operational.<br />
• That not less than the design quantities are being attained.<br />
• That a general air balance including a final air balance (i.e. a thermal balance) has<br />
been completed. This shall include air volumes at each diffuser.<br />
• That the outside air quantity has been adjusted to required design flow rate.<br />
• That heat reclaim system is operational.<br />
• That calibration of all automatic control equipment has been completed.<br />
• That not less than the design condenser water quantity has been attained. (Dry cooler<br />
system when installed).<br />
• That not less than the design chilled water temperature and water flow has been<br />
attained. (Chilled water system, when installed).<br />
• That the design and as approved suction and discharge pressures have been<br />
achieved.<br />
• That the approved evaporator superheat has been attained.<br />
• That the full load current of each electric (continued) motor has been checked and is<br />
within the name plate rating.<br />
• That any abnormalities, vibration and noises have been corrected.<br />
• That all defects highlighted during the construction phase have been rectified.<br />
The Contractor shall ensure that these tasks have been carried out and provide<br />
certification that the recorded results satisfy the full design intent of this design Brief and<br />
the Schedule of Technical Data.<br />
If the air conditioning system is commissioned other than during summer then the<br />
refrigerant charge must be checked and topped up and capacity checks carried out again<br />
before peak cooling demand is experienced. Summer commissioning check is required.<br />
11.2 CONTROL SCHEDULE<br />
The contractor shall commission the air conditioning and mechanical ventilation system<br />
as per the following schedule. Also refer to the Controls Application Manual section 19.0<br />
Page 94 of 157 94
Page 95 of 157 95
11.3 TEST WITNESSING<br />
The air conditioning and mechanical ventilation systems shall pass any test deemed<br />
necessary by Woolworths.<br />
Woolworths shall be present to witness the tests. The Contractor shall record all test<br />
results and shall forward a copy of the final results to Woolworths.<br />
A copy of all test results shall also be included in the Operating & Maintenance<br />
Instructions.<br />
The Contractor shall make all arrangements for the tests and shall provide all instruments<br />
and gauges necessary for the tests, at no extra cost.<br />
Woolworths will not witness any tests until the installation has been fully commissioned<br />
and commissioning data has been previously presented to Woolworths for comment.<br />
Possible tests may include, but may not be <strong>limited</strong> to the schedule of tests shown in<br />
Appendix C.<br />
The Contractor shall give at least seven (7) days prior notification of a suitable date for<br />
testing. Failure to provide the commissioning data and/or prior notice of a suitable date<br />
for testing will result in the Certificate of Practical Completion being withheld.<br />
11.4 PUTTING INTO OPERATION<br />
When the work has been completed or taken over by Woolworths and placed into<br />
commercial operation the Contractor shall make available a skilled supervisor to start up<br />
and run the equipment for a minimum of one day.<br />
The Contractor shall liaise with the Woolworths Refrigeration Engineer to arrange testing<br />
of heat reclaim system with the Woolworths appointed refrigeration contractor. Suitable<br />
notice to be given.<br />
A Contractors’ representative shall instruct Woolworths staff on site in the operation,<br />
control and maintenance of all of the installed plant.<br />
A representative of either the Contractor or the appointed service agent for the project<br />
shall be in attendance on the opening day of trading.<br />
11.5 MAINTENANCE AND SERVICE<br />
11.5.1 GENERAL<br />
The mechanical contractor shall allow in the tender for maintenance and servicing<br />
from date of practical completion to the end of the maintenance and defects<br />
liability period, to comply with requirements of AS 3666, Local Authority and any<br />
other statutory body having jurisdiction.<br />
Maintenance, in addition to rectification of faults, emergency service and carrying<br />
out of capacity tests as required, shall also include a minimum of 12 regular<br />
monthly visits for routine maintenance.<br />
Routine maintenance shall be deemed to be the regular maintenance of<br />
equipment as recommended by suppliers including but not <strong>limited</strong> to the following<br />
items:<br />
• Check and adjustment of all belt drives and direct couplings.<br />
• Oiling and greasing of all bearings as necessary including fans.<br />
• Check of operating setting and calibration of all controls including heaters.<br />
Page 96 of 157 96
• Check of operation of all electrical switchgear, including setting and<br />
operation of motor overloads.<br />
• Check of all motors for temperature rise, operating current leakage.<br />
Record all parameters.<br />
• Cleaning of evaporator coil basins and flushing of drains.<br />
• General (continued)<br />
• Check and replace dry filter media as required in air conditioning plant and<br />
make-up air systems (if applicable)<br />
• Clean grease filters.<br />
• Check, test and report on fire alarm relays and smoke fan exhaust<br />
systems (if applicable).<br />
• Check SST/SCT<br />
• Check Winter/Summer set points<br />
At the conclusion of each maintenance visit, a check list of items serviced shall be<br />
provided to the Store Manager and the service log book shall be completed and<br />
signed, and within seven days a report, together with a copy of check list shall be<br />
forwarded to the Store Manager, with cc copy to Woolworths.<br />
11.5.2 DOCUMENTS<br />
The contractor shall provide the following documents to the Woolworths EMS<br />
Dept:<br />
• Project Scope of works<br />
• All commissioning details, documents, schedules and reports.<br />
• As built drawings in PDF and DWG electronic formats.<br />
11.5.3 END OF WARRANTY SERVICE<br />
(Woolworths Standard Form to be used)<br />
On the final visit at the end of the Defects Liability Period the maintenance works<br />
shall include but not be <strong>limited</strong> to the following items:<br />
• Re-tension of all switchboard connections, and check all motor starters,<br />
relay controls, motor overloads and all system safety controls.<br />
• Fully leak test refrigerant systems.<br />
• Check and certify fire damper operation.<br />
• Replace dry media filters in all air conditioning plant air handling units and<br />
make-up air systems (if applicable).<br />
• Clean outside air, return air, and exhaust air outlets.<br />
• Clean grease filters.<br />
• Clean coils, trays and flush drains.<br />
• Check, test and report on fire alarm relays and smoke fan exhaust<br />
systems (if applicable).<br />
• Check SST/SCT<br />
• Check Winter/Summer set points<br />
11.5.4 RECTIFICATION OF DEFECTS<br />
All defects shall be promptly rectified, with final inspection defects completed<br />
within one (1) month of site visit. Retention moneys or Bank Guarantee will not be<br />
released until 12 correctly dated and completed maintenance service reports have<br />
been received. The defects liability period and equipment warranties will be<br />
extended until the final inspection has been completed.<br />
On completion of final defects, retention monies or bank guarantee will be<br />
released.<br />
Page 97 of 157 97
11.5.5 QUALITY CONTROL<br />
All air balancing shall be to NEBB standards using NATA certified equipment and<br />
the commissioning personnel shall have successfully completed and accredited<br />
NEBB agents.<br />
All flow rate quantities shall be balanced to within 5% of the design values.<br />
Recorded data shall be submitted on standard NEBB report forms and they must<br />
bear the signature of the person who recorded the data. The recorded data shall<br />
also include the identification details of the calibrated equipment used and copies<br />
of their current test certificates.<br />
Page 98 of 157 98
12.0 OPERATING AND MAINTENANCE<br />
12.1 GENERAL<br />
On completion of satisfactory performance tests three (3) sets of Operating &<br />
Maintenance Instructions shall be compiled.<br />
The Operating & Maintenance Instructions shall include a full description of the<br />
equipment and sufficient instruction for the efficient operation and maintenance of the<br />
installed plant.<br />
The Operating & Maintenance Instruction manuals shall be neatly prepared in vinyl<br />
covered hard backed folders with stamped lettering on the front cover as follows:<br />
OPERATING & MAINTENANCE INSTRUCTIONS<br />
FOR<br />
AIR CONDITIONING & MECHANICAL SERVICES<br />
FOR<br />
WOOLWORTHS LIMITED<br />
(ADDRESS AS APPROPRIATE)<br />
12.2 INCLUSIONS<br />
The Operating & Maintenance Instruction Manual shall include:<br />
• As built drawings as 2 hard copies and one disk copy for in-house record.<br />
• Schematic Electrical Control Diagrams<br />
• Commissioning Test Records<br />
• A complete list of all components used in the installation Manufacturers information<br />
and parts lists.<br />
• Service schedule<br />
• Description of the air conditioning plant and control systems<br />
• Equipment operating procedures<br />
• Equipment test results<br />
• Stop start and fault reset procedures<br />
Note: An engraved laminated plastic label showing the stop/start and fault reset<br />
procedures shall also be fixed to the face of the switchboard. (See also Painting &<br />
Labelling).<br />
12.3 PLANT MAINTENANCE LOG BOOK<br />
In addition to the Operating & Maintenance Instructions, the Contractor shall also supply<br />
a vinyl covered hard back loose leaf folder complete with suitable forms to serve as a<br />
Plant Maintenance Log Book.<br />
The forms shall be of a type acceptable to the local authorities having jurisdiction and<br />
shall be suitable for written entries covering both routine and preventive maintenance<br />
activities.<br />
Page 99 of 157 99
As – installed drawing<br />
Provide a single plan at 1:100 scale indicating plan view all ductwork runs and equipment<br />
locations. This drawing shall be plastic laminated and mechanically fixed to plantroom<br />
wall in a nominated position<br />
12.4 METAL BOX<br />
A metal box manufactured from galvanized sheet metal complete with a hinged lid shall<br />
be supplied and permanently fixed to a wall in the plant room.<br />
The metal box shall be adequately sized to accommodate a complete copy of the<br />
Operating & Maintenance Instructions and the Plant Maintenance Log Book.<br />
12.5 DISTRIBUTION<br />
Following acceptance of the Operating & Maintenance Instructions the Contractor shall<br />
arrange for distribution to the locations hereunder:<br />
• One (1) hard copy to be located in the plant room on the site, as detailed above.<br />
• One (1) hard copy to be given to the Woolworths store manager on the site.<br />
• One (1) disk copy to be forwarded to Woolworths Limited PO Box 8000 Baulkham<br />
Hills NSW 2153 Att: Senior Engineer.<br />
• Electronic copy to be emailed Woolworths Senior Engineer<br />
(mirobertson@<strong>woolworths</strong>.com.au).<br />
(The electronic drawings shall be in Auto Desk - Revit format. These files shall be on CD<br />
and clearly marked with file names. A full schedule of electronic files shall be submitted<br />
with the CD)<br />
Page 100 of 157 100
13.0 REFURBISHMENT WORKS<br />
All refurbishment projects shall include the following items in addition to the general scope of<br />
works:<br />
• Upgrade humidity and temperature sensors to current specification<br />
• Compressors operating on R22 shall be upgraded to current specification<br />
• Check airflow is to acceptable limit, clean coils.<br />
• Change all air filters to current specification<br />
• Re calculate heat load, confirm design meets revised heat load.<br />
• Rebalance air handling system<br />
• Clean condenser – comb coils<br />
• Leak test and recharge system if necessary<br />
• Recommission plant<br />
• Oil change to compressor.<br />
• Replace all copper gauge lines with flexible lines ( remove flare connections as<br />
practicable)<br />
• Provide new mechanical safety switches<br />
• Install pressure relief vent lines and valves (many systems do not have these)<br />
• Flush out drain lines to all systems including splits.<br />
• Check and replace any faulty pipe clips.<br />
• Replace driers.<br />
• Replace air filters<br />
• Check and inspect receiver<br />
• Re-lamp MSSB<br />
• Clean and replace missing labels & electrical duct covers<br />
• Check all electrical connections<br />
• Upgrade controls to current spec (CPC) including pressure transducers and electronic<br />
expansion valves<br />
• Clean all supply and return air ductwork internally including AHU’s.<br />
Page 101 of 157 101
14.0 APPENDIX A – STANDARD ELECTRICAL COMPONENTS<br />
DESCRIPTION MINIMUM<br />
RATINGS<br />
REQUIRED<br />
DISTRIBUTION SECTION<br />
SUPPLIER 1 SUPPLIER 1<br />
PART NUMBER<br />
SUPPLIER 2 SUPPLIER 2<br />
PART NUMBER<br />
MAIN ISOLATOR 400A 50KA SCHNEIDER LV432756 +<br />
NHP S400NN3 +<br />
NON AUTO<br />
LV432598<br />
T2HS40R6GM<br />
DISTRIBUTION CHASSIS 630A<br />
SCHN<br />
CNS63006 NHP XB8006U<br />
40KA<br />
1SEC<br />
EIDER<br />
COMPRESSOR CHASSIS 250A 25KA SCHNEIDER LV431629 NHP S250NN3<br />
ISOLATOR<br />
NON AUTO<br />
108 POLE CHASSIS<br />
ISOLATOR<br />
160A 25KA SCHNEIDER LV430310 NHP S160NJ3160<br />
COMPRESSOR CHASSIS 630A 40KA<br />
1SEC<br />
SCHNEIDER CNS63015SS NHP XASSL630-15U<br />
CPC & MISC CONTROL SECTION<br />
CIRCUIT BREAKERS 6,10A 6KA SCHNEIDER 25801, 25802,<br />
NHP DTCB61-<br />
25803<br />
6C,10C,16C<br />
RCB0 10,16A 10KA SCHNEIDER 26858, 26859 NHP DSRCBH<br />
240VAC<br />
1030A,1630A<br />
LINE FILTER 6A 240VAC SCHAFFNER /<br />
WESTEK<br />
FN352 Z 6/06<br />
CONTROL RELAYS 6A 240VAC, SCHNEIDER RXM2AB2 B7, P7 NHP 55.32, 55.34<br />
24VAC<br />
RXM4AB2 B7, P7<br />
240VAC, 56.32,<br />
56.34 24VAC<br />
LED LAMPS 22mm IP66<br />
LED<br />
SCHNEIDER XB4BVM SERIES NHP DT7 SERIES<br />
VENTILATION FAN 240VAC ZEIHL W2S130-AA<br />
LIGHTING CONTACTOR 240VAC 20A SCHNEIDER 15962, 15959 NHP DTC24-40-240,<br />
DTC20-20-240<br />
COMPRESSOR POWER & CONTROL<br />
VSD COMPRESSOR CIRCUIT<br />
BREAKER<br />
160A 25KA SCHNEIDER LV430830 NHP S125GJ3125<br />
DOL / PART WIND<br />
COMPRESSOR CIRCUIT<br />
BREAKER<br />
160A 25KA SCHNEIDER GV7 RE 40,50,80 NHP S125GJ SERIES<br />
VSD COMPRESSOR<br />
CONTACTOR<br />
80A AC3 SCHNEIDER LC1-D80 U7 NHP CA7-85-00 240V<br />
DOL / PART WIND<br />
25A, 38A, SCHNEIDER LC1-D SERIES NHP CA7 SERIES<br />
COMPRESSOR CONTACTOR 50A, 80A AC3<br />
DOL / PART WIND VARIOUS TO SCHNEIDER LRD SERIES NHP CT7 SERIES<br />
COMPRESSOR OVERLOAD 53A<br />
DOL COMPRESSOR PHASE<br />
PHASEFALE MP15 NHP / DPB-02-C-M48 /<br />
FAILURE ASYMMETRY<br />
RELAY<br />
SCHNEIDER RM17TA00<br />
LED LAMPS 22mm IP66<br />
LED<br />
SCHNEIDER XB4BVM SERIES NHP DT7 SERIES<br />
CONTROL RELAYS 6A 240VAC, SCHNEIDER RXM2AB2 B7, P7 NHP 55.32, 55.34<br />
24VAC<br />
RXM4AB2 B7, P7<br />
240VAC, 56.32,<br />
56.34 24VAC<br />
KEY SWITCH 6A 240VAC SCHNEIDER ZB4BG2 +<br />
ZB4BZ101<br />
NHP D7PSM22PX10<br />
CIRCUIT BREAKERS 6,10A 6KA SCHNEIDER 25801, 25802,<br />
NHP DTCB61-<br />
25803<br />
6C,10C,16C<br />
TIMERS ON/OFF SCHNEIDER RE11RAMU,<br />
NHP DAA-01-C-M24<br />
DELAY 1C/O<br />
RE11RCMU<br />
DBA-02-C-M24<br />
CONDENSER POWER & CONTROL<br />
CIRCUIT BREAKERS SINGLE<br />
PHASE<br />
CIRCUIT BREAKERS THREE<br />
PHASE<br />
6A 6KA SCHNEIDER 25801 NHP DTCB61-6C<br />
32A, 50A,<br />
63A 6KA<br />
SCHNEIDER 25834, 25836,<br />
25837<br />
NHP DTCB6-332C, 350C,<br />
363C<br />
Page 102 of 157 102
DOL CONDENSER PHASE<br />
PHASEFALE MP15 NHP / DPB-02-C-M48 /<br />
FAILURE ASYMMETRY<br />
RELAY<br />
SCHNEIDER RM17TA00<br />
CONDENSER VSD LINE AND 25A, 38A, SCHNEIDER LC1-D SERIES NHP CA7 SERIES<br />
BYPASS CONTACTORS 50A, 80A AC3<br />
CONDENSER MOTOR 12A AC3 SCHNEIDER LUB12 + LUCB NHP KTA7 SERIES +<br />
CIRCUIT BREAKER AND<br />
CONTACTORS<br />
SERIES<br />
CA7 SERIES<br />
CONTROL RELAYS 6A 240VAC, SCHNEIDER RXM2AB2 B7, P7 NHP 55.32, 55.34<br />
24VAC<br />
RXM4AB2 B7, P7<br />
240VAC, 56.32,<br />
56.34 24VAC<br />
EC CONDENSER MOTOR<br />
CIRCUIT BREAKERS<br />
12A AC3 SCHNEIDER GV2M SERIES NHP KTA7 SERIES<br />
SUB SYSTEM POWER & CONTROL<br />
KEY SWITCH 6A 240VAC SCHNEIDER ZB4BG2 +<br />
ZB4BZ101<br />
CONTROL RELAYS 6A 240VAC, SCHNEIDER RXM2AB2 B7, P7<br />
24VAC<br />
RXM4AB2 B7, P7<br />
CIRCUIT BREAKERS SINGLE<br />
PHASE<br />
6,10,<br />
16,20,25,32A<br />
6KA<br />
10, 16, 20, 25,<br />
32A, 6KA<br />
CIRCUIT BREAKERS THREE<br />
PHASE<br />
RCB0 10,16,32A<br />
10KA<br />
240VAC<br />
LIGHTING CONTACTOR 240VAC 20A,<br />
40A<br />
NHP D7PSM22PX10<br />
NHP 55.32, 55.34<br />
240VAC, 56.32,<br />
56.34 24VAC<br />
SCHNEIDER 2580 SERIES NHP DTCB61 SERIES<br />
SCHNEIDER 2583 SERIES NHP DTCB6-3 SERIES<br />
SCHNEIDER 26858, 26859,<br />
26861<br />
SCHNEIDER 15962, 15959,<br />
15966, 15967,<br />
15968<br />
NHP DSRCBH<br />
1030A,1630A,<br />
3230A<br />
NHP DTC24-40-240,<br />
DTC20-20-240,<br />
DTC40-40-240,<br />
*THE STATED NAME OF SUPPLIER IN 'SUPPLIER 1' COLUMN IN NO WAY DICTATES<br />
PREFERENCE OVER SUPPLIER NAMED IN 'SUPPLIER 2' COLUMN<br />
Page 103 of 157 103
15.0 APPENDIX B: SCHEDULE OF TECHNICAL DATA<br />
15.1 GENERAL<br />
The Designer shall complete the appropriate sections of the following Schedule of<br />
Technical Data, as applicable to each installation, and submit the completed Schedule to<br />
Woolworths for approval at completion of design work and prior to accepting any <strong>Tender</strong>.<br />
15.2 AIR HANDLING UNIT CASING<br />
The Designer shall complete the appropriate sections of the following Schedule of<br />
Technical Data, as applicable to each installation, and submit the completed Schedule to<br />
Woolworths for approval at completion of design work and prior to accepting any <strong>Tender</strong>.<br />
Type of Construction<br />
Factory or Site Fabrication<br />
Manufacturer<br />
15.3 REFRIGERANT<br />
Refrigerant No.<br />
15.4 COOLING COIL<br />
15.4.1 DIRECT EXPANSION (WHEN APPLICABLE)<br />
Make & Number<br />
Number of Rows Deep<br />
Fin Density fins/m<br />
Air Face Velocity<br />
Air on Temperature C DB C WD<br />
Air Off Temperature C DB C WB<br />
Refrigerant Pressure Drop kPa<br />
Refrigerant Velocity m/s<br />
Coil Superheat °K<br />
SST °C<br />
Number of Thermostatic Expansion Valves<br />
Air Side Pressure Drop Pa<br />
15.4.2 CHILLED WATER COIL (WHEN APPLICABLE)<br />
15.5 SUPPLY AIR FAN<br />
Make & Number<br />
Number of Rows Deep<br />
Fin Density fins/m<br />
Air Face Velocity<br />
Air On Temperature C DB °C WB<br />
Air Off Temperature °C DB °C WB<br />
Water Temperature In °C Out°C<br />
Water Flow l/s<br />
Water Pressure Drop kPa<br />
Air Side Pressure Drop Pa<br />
Make<br />
Type<br />
Total Air Quantity l/s<br />
Page 104 of 157 104
System Resistance Pa<br />
Speed RPS<br />
Motor Size KWE<br />
"V" Belt Size & no. off<br />
15.6 AIR FILTERS<br />
Make<br />
Type<br />
Face Velocity M/s<br />
Number Off<br />
15.7 COMPRESSORS<br />
Make & Number off<br />
Capacity Each kWR Total kWR<br />
Type - Semi hermetic<br />
Motor Size Each KWE<br />
Speed RPS<br />
Suction Temperature °C<br />
Saturated Suction Pressure kPa / SST (oC)<br />
Condensing Temperature (SCT)<br />
Economiser (type, min capacity)<br />
Unloaders (qty and capacity)<br />
°C<br />
15.8 CONDENSERS<br />
1. Air Cooled<br />
Make<br />
Number off<br />
Circuits No. off<br />
No. of Fans – Each<br />
Temperature Difference °K<br />
Head Pressure Control Method<br />
2. Shell and Tube<br />
Make<br />
Number off<br />
Water Flow 1/s<br />
Water Temperature In °C Out °C<br />
15.9 AIR COOLERS - DRY<br />
• Water to Air<br />
Make<br />
Number Off<br />
Circuits No. Off<br />
Fans No. Off - Each<br />
Water Flow l/s<br />
Water Temperature In °C Out °C<br />
Overall Operating Temperature<br />
Difference – Refrigerant to Air Off °K<br />
Head Pressure Control Method<br />
Page 105 of 157 105
15.10 CHILLER SET<br />
Make<br />
Model Number<br />
Refrigerant Circuits No. Off<br />
Chilled Water Temp ____In°C Out °C<br />
Chilled Water Flow l/s<br />
Evaporator Temperature °C<br />
Condensing to Air Temperature °KTD<br />
Chilled Water Temperature Control Method<br />
Discharge Pressure Control Method<br />
15.11 AUXILIARY FANS<br />
a Stock Room Exhaust<br />
Make<br />
No. off<br />
Total Capacity l/s<br />
b. Toilet Exhaust<br />
Make<br />
Total Capacity l/s<br />
c. Bakery Oven Exhaust<br />
Make<br />
Total Capacity l/s<br />
d. Bakery Oven Make Up<br />
Make<br />
Total Capacity l/s<br />
e. Donut Cooking<br />
Make<br />
Total Capacity l/s<br />
f. Chicken Cooking Exhaust<br />
Make<br />
Total Capacity l/s<br />
g. Chicken Cooking Make Up<br />
Make<br />
Total Capacity l/s<br />
h. Fish Preparation Area Exhaust<br />
Make<br />
Total Capacity l/s<br />
i Cold Aisle Return Fan<br />
Make<br />
Total Capacity l/s<br />
Page 106 of 157 106
16.0 APPENDIX C: TEST DATA SCHEDULE<br />
The following Test Data Schedule may be used as a guide for plant test purposes. Other<br />
tests, however, may be conducted at Woolworths discretion.<br />
PROJECT: DATE:<br />
16.1 AIR QUANTITIES<br />
Supply Air<br />
Return Air<br />
Outside Air<br />
Design Actual Velocity<br />
l/s l/s m/s<br />
Submit a drawing showing the measured air quantity at each register, diffuser, return<br />
air grille, toilet exhaust grille and cooking exhaust hoods.<br />
16.2 REFRIGERATION SUPERHEAT<br />
At each Evaporator<br />
At each<br />
Compressor<br />
16.3 PLANT CAPACITY<br />
Return air<br />
Temperature<br />
°C WB<br />
°C DB<br />
Outside air Temperature<br />
°C WB<br />
°C DB<br />
Air on Coil<br />
Temperature<br />
°C WB<br />
°C DB<br />
Air off Coil<br />
Temperature<br />
°C WB<br />
°C DB<br />
Total Capacity kW<br />
System<br />
No.1<br />
System<br />
No.1<br />
System<br />
No.1<br />
System<br />
No.2<br />
System<br />
No.2<br />
System<br />
No.2<br />
Page 107 of 157 107
16.4 CONTROLS<br />
Air conditioning control thermostat set point - Summer °C / Winter °C<br />
Heater safety thermostat set points and time delay to<br />
cut out.<br />
Time delay<br />
Set Point<br />
Min/Sec<br />
Temp.<br />
Hot Water Coil °C<br />
Compressor High Pressure Safety Cut-out set point kPa<br />
Compressor Low Pressure Safety Cut-out set point kPa<br />
Condensing Pressure Control Set point kPa<br />
16.5 PLANT OPERATING CONDITIONS<br />
Ambient temperature °C DB<br />
°C WB<br />
Operating Discharge Pressure<br />
Compressor no. 1 kPa / SCT<br />
Compressor no. 2 kPa / SCT<br />
Operating Suction Pressure<br />
Compressor no. 1 kPa / SST<br />
Compressor no. 2 kPa / SST<br />
16.6 ELECTRICAL<br />
Note: Information to be provide for each A/C unit/system<br />
Supply Fan Motor Full Load amps<br />
Running amps<br />
Compressor Motor<br />
Compressor no. 1 Full Load amps<br />
Running amps<br />
Compressor no. 2 Full Load amps<br />
Running amps<br />
-<br />
Page 108 of 157 108
16.7 NOISE LEVELS<br />
Air Conditioned Spaces dB(a)<br />
Ventilated Occupied Spaces dB(a)<br />
Page 109 of 157 109
17.0 APPENDIX D: APPROVED SUPPLIERS & EQUIPMENT<br />
17.1 MECHANICAL CONTRACTORS<br />
State Supplier<br />
NSW<br />
SA<br />
QLD<br />
Vic<br />
WA<br />
NT<br />
Equilibrium Air Conditioning<br />
Faircloth & Reynolds<br />
Crest Air Conditioning Pty Ltd<br />
J.E.C. Air Conditioning Services<br />
Benmax Engineering<br />
James & Scott Air<br />
Airmaster Australia.<br />
Air Comfort Services<br />
Hayden Engineering<br />
National Air Conditioning<br />
Season Air<br />
Airmaster Australia.<br />
AE Smith<br />
Faircloth & Reynolds<br />
Isothermal Pty Ltd<br />
John Goss Mechanical<br />
Hastie Services<br />
National Air Pty Ltd<br />
JL Williams<br />
Airmaster Australia.<br />
Haden Engineering<br />
Apex Air<br />
A.E. Smith & Son<br />
James & Scott Air<br />
Airmaster Australia.<br />
Hexagon Services<br />
Mechanical Project Management<br />
Jako Industries<br />
Mechanical Constructions<br />
Envar<br />
Centigrade<br />
CMS Engineering<br />
Airmaster Australia.<br />
York Air Conditioning<br />
Carrier Air Conditioning<br />
Mecair Engineering<br />
Faircloth & Reynolds<br />
Page 110 of 157 110
17.2 SWITCHBOARD MANUFACTURES<br />
Supplier<br />
S J Electric Pty Ltd<br />
G B Electric<br />
PM Switchboards<br />
JP Richardson Industries<br />
Elite Electrical group<br />
Faircloth & Reynolds<br />
R G Ladd Pty Ltd<br />
K E Brown Electrical Switchboards<br />
17.3 COMPRESSORS<br />
17.3.1 SCREW COMPRESSORS<br />
• Bitzer<br />
• Frascold<br />
17.3.2 RECIPROCATING COMPRESSORS<br />
• Bitzer<br />
• Bock<br />
• Copeland<br />
• Dorin<br />
17.3.3 SCROLL COMPRESSORS<br />
• Bitzer<br />
• Copeland<br />
17.4 CONDENSERS<br />
• Buffalo Trident: RC, DV, LDV, VB, FMC<br />
• Heatcraft KRC, WRC-B (with cyclone kit in all regions);<br />
• Geenhalgh<br />
17.4.1 CONDENSER FANS<br />
• Zeihl-Abegg<br />
• EBM Papst<br />
17.5 HEAT EXCHANGERS<br />
17.5.1 SHELL & TUBE<br />
• Bitzer<br />
• Inline Brolga<br />
17.5.2 PLATE<br />
• Alfa Laval<br />
17.6 PUMPS<br />
• Kelly & Lewis<br />
• Grundfoss<br />
Page 111 of 157 111
17.7 VRF UNITS<br />
• Fujitsu<br />
• Daikin<br />
• Mitsubishi Electric<br />
• Panasonic<br />
17.8 ROOF TOP PACKAGE UNITS<br />
• Temperzone<br />
• Actron Air<br />
17.9 FANS<br />
17.9.1 CENTRIFUGAL FANS (LESS THAN 2000 L/S)<br />
• Fans Direct<br />
• Fantech<br />
• CFM<br />
17.9.2 CENTRIFUGAL FANS (GREATER THAN 2000 L/S)<br />
• Fantech<br />
• Fan & Blower<br />
17.9.3 AXIAL FANS<br />
• Ziehl Abegg<br />
• EBM Papst<br />
• Fantech<br />
• Fans Direct<br />
17.9.4 MIXED FLOW FANS<br />
• Fantech – Mixivent Series<br />
• CFM – EC Blue<br />
17.9.5 PLUG FANS<br />
• Ziehl Abegg<br />
• EBM Papst<br />
17.9.6 KITCHEN EXHAUST FANS<br />
• Fantech - Heritage Series<br />
• CFM - MCV<br />
17.9.7 ROOF MOUNTED EXHAUST FANS<br />
• Fans Direct<br />
• Fantech<br />
• CFM<br />
17.10 AIR CURTAINS<br />
• Mitsubishi GK 35 series<br />
17.11 CHILLERS<br />
• York<br />
• Climaveneta<br />
• Carrier<br />
Page 112 of 157 112
17.12 CONTROLS<br />
• HVAC controller - CPC Emerson<br />
• Thermostat - CPC Emerson<br />
• Humidistat - CPC Emerson<br />
17.13 VARIABLE SPEED DRIVES<br />
• Vacon<br />
• Toshiba<br />
• Emerson<br />
17.14 BOILERS<br />
• Raypak<br />
• Baxi<br />
Page 113 of 157 113
18.0 APPENDIX E - SCHEDULE OF DRAWINGS<br />
18.1 GENERAL<br />
The following are the standard drawings to be used for tendering purposes and for<br />
guidance only, in preparing the air conditioning and mechanical ventilation design.<br />
The dimensions shown on the following details are approximate only and may vary.<br />
The Designer and/or Contractor shall be responsible for checking the dimensions, in<br />
each case, and include the correct sizes in the preparation of the design.<br />
All drawings shall be read in conjunction with the architectural, store layout and structural<br />
details applicable to each project.<br />
Title #<br />
Woolworths Standard Duct Layout M 19<br />
Chicken Cooker Exhaust Hood - Single SD20<br />
Chicken Cooker Exhaust Hood - Double SD20 A<br />
Bakery Oven Exhaust Hood Single SD21<br />
Bakery Oven Exhaust Hood Double D21A<br />
Doughnut Cooking Exhaust Hood SD22<br />
Chicken Cooker Exhaust Hood - Cylindrical SD23<br />
Air Conditioning Status Lamp Plate SD24<br />
Air Conditioning Refrig Schematic (1,2,3) SD25<br />
MSSB External Fascia layout SD26A<br />
MSSB Internal Fascia layout SD26B<br />
Air Conditioning Refrigeration Piping Schematic SD27<br />
Dishwasher Hood SD28<br />
Switchboard Layout BW380048S<br />
Std Power Diagram Mech SD1<br />
BCA Climate Zone Map<br />
Page 114 of 157 114
18.1.1 CHICKEN COOKER HOOD – SINGLE - SD 20<br />
Page 115 of 157 115
18.1.2 CHICKEN COOKER HOOD – DOUBLE - SD 20A<br />
Page 116 of 157 116
18.1.3 BAKERY HOOD – SINGLE - SD 21<br />
Page 117 of 157 117
18.1.4 BAKERY HOOD – DOUBLE - SD 21A<br />
Page 118 of 157 118
18.1.5 DONUT HOOD- SD 22<br />
Page 119 of 157 119
18.1.6 CHICKEN COOKER HOOD - CYLINDRICAL - SD 23<br />
Page 120 of 157 120
18.1.7 AIR CONDITIONING STATUS LAMP PLATE - SD 24<br />
Page 121 of 157 121
18.1.8 AIR CONDITIONING REFRIG SCHEMATIC (1,2,3) – SD25<br />
Page 122 of 157 122
18.1.9 MSSB EXTERNAL FASCIA LAYOUT – SD 26A<br />
Page 123 of 157 123
18.1.10 MSSB INTERNAL FASCIA LAYOUT – SD 26B<br />
Page 124 of 157 124
18.1.11 AIR CONDITIONING REFRIGERATION PIPING SCHEMATIC – SD27<br />
Page 125 of 157 125
18.1.12 DISHWASHER HOOD SD 28<br />
Page 126 of 157 126
18.1.13 BCA CLIMATE ZONE MAP<br />
Page 127 of 157 127
18.1.14 SWITCHBOARD LAYOUT<br />
Page 128 of 157 128
18.1.15 MECHANICAL SWITCHBOARD STANDARD LABELS<br />
Page 129 of 157 129
18.1.16 STD POWER DIAGRAM<br />
Page 130 of 157 130
19.0 APPENDIX F - CONTROLS APLICATION MANUAL (CPC)<br />
19.1 EXECUTIVE SUMMARY<br />
The installation of the Emerson Climate Technologies’ control system will provide<br />
Woolworths with an effective and reliable energy management system capable of providing<br />
significant savings by unifying the store’s HVAC, lighting and energy monitoring under a<br />
single controls platform.<br />
Page 131 of 157 131
19.2 CONTROL STRATEGY OVERVIEW<br />
19.2.1 INTRODUCTION<br />
19.2.1.1 General<br />
The Emerson Climate Technologies Building Management System (ECT BMS)<br />
will provide Woolworths with a cost effective energy management solution for<br />
each site. It will deliver a high level of control, incorporating DDC controls, Store<br />
Manager Interface and a total store control system.<br />
The E2 controller is a microprocessor-based control system designed to provide<br />
complete control of compressor groups, condensers, HVAC Zones and other<br />
components related to refrigeration and building control. The E2 is the controlling<br />
component of a three-network configuration (RS485 I/O, Echelon ® Lonworks<br />
Networks, and Ethernet) that includes input and output communication boards,<br />
remote communication software, and a variety of sensors, probes, and<br />
transducers.<br />
The E2 CX, which controls HVAC systems for low-rise retail, industrial, and<br />
commercial buildings. The CX’s primary function is to provide energy-efficient<br />
control of air handling units (AHUs), rooftop units (RTUs), and other systems<br />
related to environment control. In addition, the CX provides extensive sensor<br />
control, logging, and graphing features that allow the user to view accurate realtime<br />
information about system conditions. The CX is equipped with many power<br />
monitoring and demand control features that give you the information you need to<br />
keep your site’s energy consumption low.<br />
Page 132 of 157 132
19.2.1.2 Networks<br />
RS485 Networks<br />
The RS485 Input/Output (I/O) Network connects all input and<br />
output communication boards together in a single open<br />
communications loop. This loop, or “daisy chain,” connects the<br />
E2 to multiple input and output communication boards, and<br />
terminates at the last input or output board on the network. Daisy<br />
chains are the only allowable network structure for CPC RS485<br />
I/O and Modbus networks. Branching and “star configurations”<br />
can seriously affect network performance and therefore are not<br />
allowed. Proper termination is an important part of reducing I/O<br />
network noise. For daisy chain networks, the devices at each end<br />
of the daisy chain must be terminated with a 150-ohm resistor. All<br />
CPC-manufactured devices with RS485 and MODBUS ports are<br />
equipped with on-board termination jumpers that, when set to the<br />
“termination” position, provide the 150 ohms of resistance<br />
necessary to terminate the network endpoint. Third-party devices<br />
may or may not have on-board termination — consult the<br />
manufacturer’s instructions for termination information. If an end<br />
device does not have termination jumpers, you can terminate the<br />
network by placing a 150- ohm resistor across the RS485+ and<br />
RS485- terminals of the device’s connector.<br />
Echelon Networks<br />
Echelon devices are networks together into configurations called segments. A<br />
segment is a group of up to 64 Echelon devices that are connected together on<br />
an unbroken series of wires. The recommended way of constructing an Echelon<br />
Network is called daisy-chaining. In the daisy chain network configuration,<br />
devices are arranged by subnets, which consist of one E2 and all Echelon<br />
devices associated with the E2. First, all devices in a subnet are connected in<br />
an unbroken chain without branches or “star configurations”.<br />
Then, if more than one E2 is present on-site, all chains are connected so that<br />
the entire network forms a large unbroken chain, called a daisy chain this allows<br />
Page 133 of 157 133
for all devices in the Echelon Network to be hard wired together for trouble free<br />
communication.<br />
Echelon networks require the devices on each end of the daisy chain to be<br />
terminated with a 108- ohm resistor across the signal-carrying leads. Most<br />
CPC-manufactured Echelon devices have on-board termination jumpers that,<br />
when set to the “terminated” position, provide the required termination<br />
resistance (refer to the device’s own installation documentation). If the device<br />
does not have termination jumpers, CPC offers an Echelon termination block<br />
(P/N 535-2715) that may be wired in series right before the end device or at the<br />
end of an Echelon network run. The termination block provides the necessary<br />
108-ohm resistance for network termination. (Note: For The only Specified<br />
Echelon Cable - Euro Tech cables, 8 Epic Place Villawood NSW, 2163 contact:<br />
Fred Varda Tel: 02 9645-5444 fax: 02 9645-5433, Part Number ET3801-107<br />
Grounding Networks<br />
Proper grounding is an essential part of reducing network noise. Failure to<br />
properly ground power and network wiring is one of the most common causes<br />
of Critical noise problems. Follow these guidelines when installing<br />
RS485/MODBUS and Echelon networks, and refer to them when<br />
troubleshooting problematic installations to ensure the grounding is correct.<br />
The length of all ground wires should be kept to 6 inches (15.3 cm) or less. Use<br />
a 14AWG wire or larger.<br />
The best earth ground sources to use are listed below, in priority order:<br />
• A large metal panel or plate that is connected to a good electrical ground. A<br />
panel or plate that is at least 3 feet by 3 feet (0.9 m by 0.9 m) is desirable.<br />
• Earth grounded steel rack.<br />
Page 134 of 157 134
19.2.2 PID CONTROL<br />
PID Control is a specialized method of closed-loop control that strives to maintain<br />
equality between an input value and a user-defined set point by operating a device<br />
or a number of devices at somewhere between 0% and 100% v of full capacity.<br />
PID Control works by making adjustments to the output at a constant rate called<br />
the update rate (usually 2-6 seconds). For every update that occurs, PID Control<br />
takes a reading from the input sensor or transducer, measures the distance<br />
between the input and the set point (also called the error), makes a series of<br />
calculations, and adjusts the output percentage in such a way as to move the input<br />
towards the set point in the most efficient manner.<br />
The “calculations” that determine the new value of the output after each update are<br />
made by three different modes of control: Proportional (“P”) Mode, Integral (“I”)<br />
Mode, and Derivative (“D”) Mode. Each mode of control makes its own adjustment<br />
to the output percentage, and the three adjustments are added to the previous<br />
output percentage to determine the new output percentage. In mathematical terms,<br />
every update will affect the output percentage as follows:<br />
NEW OUT% = OLD OUT% + (“P” mode adjustment) + (“I” mode adjustment) + (“D”<br />
mode adjustment) each of the three modes (P, I, and D) serves a different and<br />
important purpose, as described below:<br />
Page 135 of 157 135
19.3 WIRING / POWERING<br />
19.3.1 TRANSFORMER<br />
All transformers for Devices are supplied as part of the Woolworths HVAC Controls<br />
Package. The supplied transformers are to be used only for the Emerson devices<br />
stated below and not to be shared with other devices -<br />
19.3.1.1 E2<br />
The E2 Series requires one (1) #804421 Transformer per unit<br />
19.3.1.2 Multiflex<br />
Up to ten (10) Multiflex I/O Cards can be installed on the one (1) #640-0048<br />
Transformer, additional transformers are required for more than ten (10).<br />
19.3.1.3 EC3-x31<br />
The EC3-x31 Series requires one (1) #804424 Transformer per unit<br />
Page 136 of 157 136
19.3.2 SENSOR WIRING<br />
19.3.2.1 Pressure Transducer<br />
CPC transducers are used for monitoring and control of compressor suction and<br />
discharge pressures, they convert pressure readings to proportional electrical<br />
signals between 0.5 and 4.5 volts. The transducer is designed with a 1/8-inch<br />
male FPT fitting for connection to a standard access fitting. Each pressure<br />
transducer is supplied with 20 feet of cable for connection to a 16AI input board.<br />
The pressure transducers should be mounted in a vertical position (pressure port<br />
down) above crank case oil level to prevent drainage of oil into transducer port.<br />
19.3.2.2 General Purpose Sensor<br />
These sensors are used to monitor mixed, supply and return air temperature.<br />
When used in this application, the sensors are supplied without enclosure covers.<br />
The sensors should be mounted directly in the air stream of the supply or return<br />
air duct. The sensors are not supplied with any mounting hardware for this<br />
application.<br />
19.3.2.3 Outdoor Humidity Sensor<br />
The outdoor RH sensor used for control and monitoring of outdoor conditions<br />
should always be mounted on the south side if in the Southern Hemisphere. The<br />
sensor should be mounted under an overhang or otherwise out of direct sunlight.<br />
Page 137 of 157 137
19.3.2.4 Indoor CO2 Sensor<br />
The Indoor CO2 sensor used for control and monitoring of indoor air quality<br />
conditions should always be located in a central location with in the zone to be<br />
measured, away from doors, windows, vents, heaters, and outside walls that<br />
could affect temperature readings.<br />
19.3.2.5 Indoor Humidity Sensor<br />
The indoor relative humidity sensor used for control and monitoring of indoor<br />
humidity should be mounted in a central location within the zone to be measured,<br />
away from doors, windows, vents, heaters, and outside walls that could affect<br />
temperature readings. Note that this sensor generates a small amount of heat;<br />
therefore, do not mount temperature sensors directly above RH sensors.<br />
19.3.2.6 Indoor Temperature Sensor<br />
Inside temperature sensors are supplied within a wall mounted enclosure for<br />
attachment to a standard switch plate. The temperature sensor should be located<br />
in a central location—within the zone to be measured—away from doors,<br />
windows, vents, heaters, and outside walls that could affect temperature<br />
readings. In addition, the sensor should not be mounted above other sensors that<br />
generate heat during operation (such as Relative humidity sensors).<br />
Page 138 of 157 138
19.3.3 GENERIC POINTS SCHEDULES<br />
Page 139 of 157 139
Page 140 of 157 140
19.4 CONTROL STRATEGY<br />
19.4.1 MAIN AIR HANDLING UNIT (AHU)<br />
19.4.1.1 General<br />
An AHU control application consists of 3 separate control algorithms. The main<br />
algorithm monitors the indoor temperature (s) and activates heating and cooling<br />
stages when necessary to maintain a user defined set point. Another algorithm<br />
monitors the indoor humidity and brings on additional heating and cooling stages<br />
to reduce the indoor humidity level. The third controls either a two position<br />
(digital) or variable position damper (analog) according too the outside air<br />
conditions.<br />
19.4.1.2 AHU Selector Switch<br />
The Main AHU Selector Switch located on the HVAC Electrical switchboard has 3<br />
positions that determine the control stage in the E2 –<br />
19.4.1.3 Occupied / Unoccupied<br />
The Building Occupied and Unoccupied times are controlled by a time schedule<br />
with in the E2 CX. The times entered are dependant on the stores locations and<br />
trading hours. Occupied times are set to be enabled one (1) hour before and after<br />
store trading hours.<br />
19.4.1.4 Night Purge<br />
The AHU Night Purge function utilizes cool early morning are to cool down the<br />
store to reduce the morning energy usage, allowing less early morning cooling<br />
requirements.<br />
The AHU Night purge will operate if the following conditions are met<br />
The average store temperature is above the cooling set point<br />
The outside temp is more than 4dc below store space temperature<br />
The outside Humidity is less than 75%<br />
When The AHU’s are in Night Purge the following will occur<br />
The AHU temperature control will not be utilized<br />
Page 141 of 157 141
The economy dampers will be driven open 100%<br />
The AHU’s supply air VSD’s will run at 80%<br />
Night purge will run for a minimum 10mins and will continue to run until the store<br />
AHU set point is achieved. Night Purge is Enabled and Disabled by the Night<br />
Purge Time schedule by default.<br />
19.4.1.5 Optimum Start / Stop<br />
The optimum start/stop (OSS) is a feature that works alongside the AHU’s<br />
Unoccupied / Occupied application’s temperature control modes. OSS takes<br />
control of heating and cooling before the AHU is scheduled to change to<br />
Occupied and also on the change the Unoccupied. As a result the Temperature<br />
will make comfortable set point changes allowing gradual running of heating and<br />
cooling furthermore reducing energy consumption.<br />
When the ECT EMS receives a occupied signal from the store trading time<br />
schedule the AHU application switches from Disabled (Unoccupied) to Enabled<br />
(Occupied) allowing the OSS to bring store up to occupied set point in a smooth<br />
energy efficient manner.<br />
19.4.1.6 Fan Control<br />
The E2 CX control for the fan is Continuous; the fan is always on, even when the<br />
AHU is not in heating, cooling, or dehumidification mode. The Continuous Fan<br />
mode is enabled buy the Fans “Run Proof” status, this inputs informs the E2’s<br />
AHU application that the fan is operational. When the “Run Proof” status input is<br />
“Bad” or Open the AHU application will disable all heating and cooling with in the<br />
Air Handling Unit.<br />
19.4.1.6.1 Single-Speed Fans<br />
Single-speed fans require no advanced control parameters. Whether in<br />
Continuous or Auto mode, the fan will be ON when Fan Control calls for it<br />
to be ON, and OFF when it calls for it to be OFF.<br />
19.4.1.6.2 Variable-Speed Fans<br />
Variable-speed fans may operate at any percentage of its maximum<br />
speed. The method AHU Control uses to determine the speed<br />
percentage is dependent on whether the heat and cool outputs are<br />
staged or modulating.<br />
19.4.1.6.3 Variable-Speed Fan Operation<br />
Page 142 of 157 142
For staged AHU outputs, each stage must be programmed with its own<br />
speed percentage set point. The AHU Control application looks at all of<br />
the active stages, takes the highest speed percentage set point, and<br />
operates the fan at this speed. For example, if cool stage 1 is active with<br />
a 30% speed percentage set point, the fan will likewise operate at 30%<br />
speed. If a second stage with a set point of 50% were to become active,<br />
the fan speed would increase to 50%. For each heating and cooling<br />
stage, you may specify both occupied and unoccupied speed percentage<br />
set points.<br />
19.4.1.6.4 Dehumidification with VS Fans<br />
When in dehumidification mode, a user-defined slowdown percentage is<br />
subtracted from the variable-speed fan percentage. This percentage will<br />
continue to be subtracted until the AHU exits dehumidification mode.<br />
SAF Variable Speed Drive Modbus Communication – Layout<br />
19.4.1.7 Heat / Cool Control<br />
In its most basic form, Temperature Control simply reads a control input value,<br />
compares it to the active temperature set point, and activates or deactivates<br />
heating or cooling stages in an effort to satisfy the set point. The majority of user<br />
setup that must be done in Temperature Control involves specifying which input<br />
is to be used as the control source, defining different set points for use in<br />
occupied, unoccupied, summer, and winter modes, and setting up the operating<br />
characteristics of the heating and cooling stages.<br />
An AHU controls all aspects of an air handling unit, including up to eight stages of<br />
auxiliary or reclaim heat, six cooling stages, dehumidification, analog or digital<br />
economization, and support for single-, two-, or variable speed.<br />
Page 143 of 157 143
19.4.1.7.1 Cooling Stages<br />
a) Electronic Expansion Valve Control (EXV)<br />
This strategy incorporates the use of EXV for superheat control<br />
across each cooling coil. Each EXV is driven by an EC3-x31<br />
which operates the valve according to the superheat that is<br />
calculated by actual pressure vs. outlet temperature. LLSV’s are<br />
not required when using the Emerson EXV.<br />
EC3-X31 is the superheat controller with LON connection for<br />
stepper motor driven Alco Electrical Control Valves EX4...EX8.<br />
The EC3-X31 has a Lon Works FTT10 interface. The connection<br />
to the LON network is via the RJ45 connector labelled “COM”.<br />
The EC3-x31 is connected using the optional ECC-Nxx cable<br />
assembly or a standard CAT5 network cable with RJ45 plugs<br />
assembly. LON A is on pin1 and LON B is on pin2 of the RJ45<br />
connector. Full monitoring and control adjustment is achievable<br />
through the E2 CX controller.<br />
EC3-x31 Electronic Expansion Valve Controller – Enable<br />
(Note: For The only Specified Echelon Cable - Euro Tech cables, 8 Epic Place Villawood NSW, 2163 contact: Fred Varda Tel:<br />
02 9645-5444 fax: 02 9645-5433, Part Number ET3801-107<br />
Page 144 of 157 144
EC3-x31 Electronic Expansion Valve Controller – Layout<br />
19.4.1.7.2 Heating<br />
a) Refrigeration Heat Reclaim (Free Heat)<br />
This strategy incorporates the refrigeration medium and high temperature<br />
parallel racks series heat reclaims systems. This method of free heat<br />
when available is always the first 2 stages of the Air Handling Units<br />
heating and dehumidification strategies.<br />
b) Boiler Heating<br />
Hot Water control will be enabled in heating mode, the hot water pump<br />
will be enabled then a time delay of 2min before Boiler is enabled if water<br />
flow switch is sensing water flow. The Pump will have a 5min run on time<br />
once heating call is terminated. Hot water flow and return sensors are<br />
monitoring sensors only.<br />
Hot water modulating valve is driven via 0-10 volt output to maintain the<br />
user defined set point for heating and dehumidification modes.<br />
Boiler Enable<br />
c) Heat Pump Units<br />
These units are used to eliminate the use of electric and/or gas heating<br />
systems. They are set as heat stages in the E2 CX’s AHU Application.<br />
Each Heat pump unit has a CPC Multiflex 168 I/O Card and a EC3-x31<br />
EXV Unit. See manufactures guide lines for setups and commissioning if<br />
the unit.<br />
Page 145 of 157 145
.<br />
Heat Pump Diagram with Multiflex and EC3-x31<br />
19.4.1.8 Dehumidification<br />
Air Handling Units use a special dehumidification algorithm based on the<br />
Proportional loop in PID control. When dehumidification is enabled by the Zone<br />
application, the AHU application will activate a percentage of its total cool stage<br />
capacity, the amount of which depends on how close the current relative humidity<br />
is to the set point.<br />
When dehumidification is called for a separate logic with in the E2 is enabled in<br />
order to heating to shift above the cool set point. This logic will shift the heating<br />
and cooling set points in order to achieve “heating before cooling” logic. This<br />
logic is incorporated into the system to maintain a consistent sales floor<br />
temperature dew point.<br />
Page 146 of 157 146
Air Handling Units Set Points<br />
19.4.1.9 Economy Cycle<br />
Economizer dampers on AHUs are used to bring outside air into the building for<br />
use in cooling. When temperature and humidity conditions are favourable, the<br />
Economization dampers are opened, and outside air is allowed to flow into the<br />
AHU. Economization is generally used by the AHU just as a cool stage would be<br />
in Temperature Control; if cooling is needed, and conditions are favourable for<br />
economization, the dampers will open and economization will begin. If more<br />
cooling is needed, the cooling stages would then cycle on as normal. The E2<br />
supports control of both two-position (digital) and variable-position (analog)<br />
economizer dampers.<br />
Economization Enable<br />
Before the AHU Control application may open economization dampers, it<br />
must first determine if the outdoor air conditions are favourable for<br />
economization. The Control Strategy Used is In vs. out Enthalpy. This<br />
strategy requires indoor and outdoor humidity sensors and also indoor and<br />
outdoor temperature sensors. The enthalpy of the outdoor air is calculated<br />
and compared to the enthalpy of the indoor air. If the outdoor air enthalpy is<br />
less than the indoor air enthalpy, economization is enabled. Otherwise,<br />
economization is disabled. You may choose a different economization<br />
checking method for use in summer and winter months.<br />
Economization Lockout Features<br />
In addition to the method listed above, there are two economization lockout<br />
features that apply to all AHUs using economization.<br />
Page 147 of 157 147
Max Outside Air Humidity<br />
The Max outside Air Humidity is the highest allowable humidity level for the<br />
outside air. If the outside relative humidity is higher than this set point,<br />
economization will not be allowed to occur.<br />
Minimum Supply Temp<br />
The Minimum Supply Temp is a user-defined set point that locks out<br />
economization if the supply air temperature falls below a minimum supply<br />
temperature set point. This feature ensures that the air coming from outside<br />
is not too cold.<br />
Digital Economizer Control<br />
Control of digital or two-position economizers is relatively simple. When<br />
conditions are favourable for economization, the dampers will be opened<br />
when cooling is needed. If not favourable, the dampers will be closed.<br />
Analog Economizer Control<br />
For variable-position dampers, economization is generally used by the AHU<br />
just as a cool stage would be in Temperature Control. If cooling is needed,<br />
and conditions are favourable for economization, the dampers will open and<br />
economization will begin. If more cooling is needed, the cooling stages<br />
would then cycle on as normal. The position of the analog economizer<br />
damper is Important only for the purposes of keeping the mixed air<br />
temperature (a combination of the outdoor air coming through the dampers<br />
and the return air temperature) near the user-specified set point. The<br />
damper is controlled using<br />
19.4.1.10 CO2 / Fresh Air Damper<br />
When the CO2 level in the space reaches the threshold, the outdoor dampers will<br />
modulate open to ventilate for the higher occupancy conditions. A calculation of<br />
supply air fans running at the time is also taken into consideration and subtracted<br />
from the amount of unconditioned outside air that is bought into the space. The<br />
CO2 Sensor that monitors and controls the damper is located on the Sales Floor.<br />
19.4.2 COMPRESSORS<br />
19.4.2.1 General<br />
The E2 CX refrigeration controller uses suction group applications to cycle<br />
compressors in an effort to maintain a constant suction pressure in refrigeration<br />
system. A suction group may contain up to 16 compressor stages (standard,<br />
variable-speed, or unloader).<br />
19.4.2.2 Compressor Enable<br />
19.4.2.3 Infinite Controlled Compressor<br />
Page 148 of 157 148
Infinite Controlled Compressor Schematic<br />
Along side the E2, a Multiflex 168DO (810-3067) is required to control a 3 –<br />
32VDC Solid State Relay for the increase and decrease capacity coils. The DO<br />
board generates either a high (12VDC) or a low (0VDC) Signal. The decrease<br />
capacity coil is directly energized on compressor start up and shut down and is<br />
controlled by an On/Off Relay output that is initiated by the Compressors “Run<br />
Proof” input status.<br />
Once a cooling call from the AHU has been initiated and the Compressors<br />
minimum off delay has passed and no faults are present the “decrease capacity”<br />
Coil is energized and the compressor will start. Once time delay for the decrease<br />
capacity coil has elapsed the increase or decrease capacity coils will operate<br />
depending on the Actual pressure vs. pressure set point. Set point is set in the<br />
Suction Group setup and used to control the capacity. A pre set amount is<br />
entered to initiate increase or decrease in capacity.<br />
During operation loading and unloading is achieved when actual pressure is<br />
below or has exceeded the pressure set point. The Loading / unloading capacity<br />
coil will be energized by the DO Pulsed output, times and delays are set by the<br />
user to ensure correct operation. No unloading or loading occurs while the<br />
pressure is within the dead band.<br />
If at any time the unit goes into fault condition the decrease capacity coil is<br />
energized and the unit will be forced off. If the fault condition is no longer present<br />
and the start delays have elapsed the unit will begin its start procedure.<br />
When cooling is no longer required the unit will have a preset pump down period<br />
and then be disabled, at this point the decrease capacity coil will be energized<br />
and the unit will start its minimum off time.<br />
19.4.2.4 Standard Compressor Control<br />
Once a cooling call from the AHU has been initiated and the Compressors<br />
minimum off delay has passed and no faults are present the relay will energized<br />
and the compressor will start, it will operate a series of either on/off style<br />
unloaders in order to maintain the user defined set point. Set point is set in the<br />
Suction Group setup and used to control the capacity.<br />
Page 149 of 157 149
When cooling is no longer required the unit will have a preset pump down period<br />
and then be disabled, at this point all unloaders will be disabled and the<br />
compressor will not run until its preset off time has elapsed.<br />
19.4.3 CONDENSERS<br />
19.4.3.1 General<br />
The air cooled strategy uses a simple PID control loop that compares a single<br />
Control In input to a PID set point. The resulting percentage is used to activate<br />
the condenser fan(s) necessary to bring the input value down below the set point.<br />
Control inputs for air cooled strategies most commonly come from a pressure<br />
transducer mounted on the discharge line, the condenser inlet, or the condenser<br />
outlet.<br />
19.4.3.2 Analog Output Condenser Fan Control<br />
Variable-speed fans simply use the percentage to determine the fan speed.<br />
Thus, a 51% PID percentage will result in the fan running at 51% maximum<br />
speed. This is achieved by a 0-10v output from the Multiflex 168AO (#810-3065).<br />
The 0-10 output is a direct relation to the PID percentage. E.g. PID is at 51% the<br />
0-10v output will be 5.1 Volts DC.<br />
19.4.3.3 Single Speed Condenser Control<br />
Single-speed fans translate the PID percentage into a percentage of total fan<br />
capacity. For example, if the PID percentage is 75%, then 75% of all condenser<br />
fan stages will be ON. All Fans using this strategy will have equal runtimes.<br />
19.4.4 PACKAGE UNITS<br />
19.4.4.1 Control<br />
Office and amenities areas are controlled by VRV Systems. The E2 CX monitors<br />
Zone Temperatures and enables the VRV system by Output on Multiflex relay<br />
card. The enable is based on the store trading time schedule. An override button<br />
is also incorporated allowing an override time of 1 hour before the system reverts<br />
back to disable. The heating and cooling stages are controlled by the local<br />
controllers inbuilt in the VRV systems.<br />
19.4.4.2 Echelon Interface<br />
The E2 CX has the ability to control, monitor and communicate with the following<br />
units via Echelon communications –<br />
Dakin VRV – Using a DMS504B51 Interface Module<br />
Mitsubishi LMAP02-E, PAC-YV02LMAP<br />
19.4.5 SUPPLY AND EXHAUST FANS<br />
19.4.5.1 Temperature Controlled Fans<br />
These modules read values from one or more analog sensor, compare them to a<br />
set of cut in / cut out set points and operates a digital output (such as a relay)<br />
based on the analog input in relation to a set point. Fans Run Proof and fault<br />
status are also monitored for remote and local integration purposes.<br />
EF-0x Switch room Exhaust<br />
Controlled by locally mounted temperature sensor<br />
Page 150 of 157 150
19.4.5.2 Digital Controlled Fans<br />
These modules read the values from one or more digital input, combine them<br />
using a series of logical commands and operates a digital output (such as a<br />
relay) based on the result of the logical combination.<br />
EF-0x Loading Dock Exhausts<br />
Remote on/off switch with green neon indicator light shall be<br />
located in the loading dock area<br />
EF-0x Stock Room Exhausts<br />
Remote on/off switch with green neon indicator light shall be<br />
located in the Stock Room area.<br />
EF-0x Bakery Exhausts –<br />
Controlled by an On-Off switch for fan interlocked with ovens to be<br />
installed adjacent the hood. There is also a 20 minute run off timer<br />
programmed.<br />
SF-0x Bakery Supply –<br />
Fan will be enabled in conjunction with Bakery Exhaust.<br />
EF-0x Dishwasher Exhaust –<br />
Controlled by a relay that energizes when ever the dishwasher is in<br />
“wash” cycle.<br />
EF-0x Donut Exhaust –<br />
Controlled by an on/off switch for fan to be installed adjacent to the<br />
Bakery hood.<br />
EF-0x Chicken Exhaust –<br />
Controlled by an on/off switch locally fitted.<br />
SF-0x Chicken Supply –<br />
Fan is enabled in conjunction with Chicken Exhaust<br />
EF-0x Fish Prep Exhaust –<br />
Controlled by a relay that energizes when the fish area lighting is<br />
switched on<br />
RAF-0x Return Air Fan –<br />
Controlled by the main Air Handling Units supply fan run proof<br />
status.<br />
19.4.5.3 Time Schedule Controlled Fans<br />
These modules read the values from a time schedule application with in the E2<br />
CX, which commands and operates a digital output (such as a relay) based on<br />
the result of the applications operating hours.<br />
TEF-0x Cleaners Room<br />
EF-0x Toilet Exhausts<br />
Page 151 of 157 151
19.4.6 LOGGING<br />
19.4.6.1 Logging Configuration<br />
Logs of connected probes and equipment will be kept in the controller memory<br />
for fourteen (14) days and will be available via remote connections:<br />
15 minute log group<br />
KWH Meters<br />
5 minute log group – (Base Log)<br />
Indoor Temperature Probes<br />
Indoor Humidity’s<br />
Indoor CO2<br />
Outside Probes<br />
Outside Humidity’s<br />
AHU Probes<br />
VSD Percentages<br />
Damper Percentages<br />
1 minute log group<br />
Compressor Transducers<br />
Mechanical Faults<br />
Mechanical Proofs<br />
Page 152 of 157 152
19.5 GENERIC NAMING CONVENTION<br />
It is customary practice to name the Equipment in the controller given below is a brief description of<br />
the terminology and corresponding names as might be seen in the Emerson controller at<br />
Woolworth’s facilities:<br />
Item / Circuit Description Naming Convention<br />
Compressors CP-0x<br />
Condensers CP-0x-Cond01<br />
Air Handling Units AHU-0x<br />
Roof Top Units / Air Coil Units ACU-0x<br />
Hot Water Units / Boilers HWU-0x<br />
Exhaust Air Fans EF-0x<br />
Supply Air Fans SF-0x<br />
Return Air Fans RAF-0x<br />
Outside Air Fans OAF-0x<br />
Hot Water Units / Boilers HWU-0x<br />
Electric Duct Heaters EDH-0x<br />
Outside Air Conditioners OAC-0x<br />
Page 153 of 157 153
19.6 GENERIC PARTS<br />
19.6.1 ITEMS AND PART NUMBERS FOR THE GENERIC SYSTEM<br />
Part # Description Amount<br />
834-0410 E2 CX-400 1<br />
804421 ECT 623 60VA Transformer 24v 2<br />
640-0048 Ten Board Transformer 1<br />
810-3066 Multiflex 168, 16 Inputs & 8 Outputs 3<br />
810-3065 Multiflex 168AO, 16 Inputs, 8 Outputs, 4 Analog Outputs 2<br />
810-3067 Multiflex 168DO, 16 Inputs, 8 Outputs, 4 Digital Outputs 1<br />
800-2200 0-200 PSI Transducer with 20-foot Lead, Requires 5VDC Input 2<br />
800-2500 0-500 PSI Transducer with 20-foot Lead, Requires 5VDC Input 2<br />
804283 Standard Discharge Air Sensor 20-foot Lead 4<br />
201-1191 High Temperature Sensor for E2 Units 4<br />
111-3163 Temperature Sensor in Wall Mount Enclosure 6<br />
203-5751 Wall Mount Relative Humidity Transmitter 1<br />
203-5754 Outdoor Relative Humidity Transmitter 1<br />
210-2000 CO2 Sensor - Wall Mount Diffusion 1<br />
E50-C2 KWH Meter 1<br />
807795 EC3-x31 Echelon Based Superheat Driver 4<br />
807657 ECD-002 Hand Controller/Display 4<br />
807644 EC3-x31 Terminal Kit 4<br />
804803 PT4-M15 Plug And Lead 4<br />
804281 ECN-P60 Pipe Mount Probe 4<br />
802350 PT5-07M Transducer 7 Bar 4<br />
804424 ECT 323 25 VA Transformer 4<br />
800624 EX-7 U21 – Electronic Expansion Valve 4<br />
804650 Plug And Lead Assembly for EX Range 4<br />
Page 154 of 157 154
19.7 PRE COMMISSIONING SIGN OFF SHEET<br />
19.7.1 GENERAL<br />
Before Emerson Climate Technologies commences the onsite controls<br />
commissioning the contractor will check all items on the Pre Commissioning Sign<br />
off Sheet. Once complete and signed the check list will then be emailed to the<br />
corresponding Emerson Climate Technologies Technician and a the day can be<br />
set for controls commissioning.<br />
Page 155 of 157 155
19.8 SENSOR LOCATIONS<br />
19.8.1 AIR HANDLING UNIT<br />
19.8.2 SALES FLOOR<br />
Page 156 of 157 156
19.9 POWER MONITORING<br />
19.9.1 EMERSON E50 KWH METER<br />
The E50 DIN Rail Power Meter provides a solution for measuring energy data with<br />
a single device. Inputs include Control Power, CT, and 3-phase voltage. The E50<br />
Supports multiple output options, including solid state relay contacts, Modbus (with<br />
or without data logging), and pulse. Data Outputs include -<br />
Power (kW)<br />
Energy (kWh)<br />
Diagnostic alerts<br />
Current: 3-phase average<br />
Volts: 3-phase average<br />
Current: by phase<br />
Volts: by phase Line-Line and Line-Neutral<br />
Power: Real, Reactive, and Apparent 3-phase total and per phase<br />
Power Factor: 3-phase average and per phase<br />
Frequency<br />
Power Demand: Most Recent and Peak<br />
19.9.2 KWH OPERATION<br />
The KWH Meter will be set to monitor and log all power information. The meter will<br />
also be capable for demand control or load shedding.<br />
Demand Control applications are used by E2 to keep the total power usage of the<br />
building environmental system below a specific demand set point dictated by the<br />
power company. Demand Control applications achieve this by reducing power<br />
consumption in one or more applications in the other E2 applications as necessary<br />
until the total KW is below the set point. This process is called load shedding. The<br />
Demand Control application is designed to calculate power usage in much the<br />
same way power companies do, which ensures that it will be able to meet the<br />
power company’s demand limit accurately. The Demand Control application is also<br />
designed with a large amount of flexibility in the way load shedding is prioritized,<br />
which allows users to maximize power economization with a minimal amount of<br />
interference into the normal operations of the building’s HVAC systems.<br />