Guide to Connecting a Distributed Generator - Sustainability Victoria
Guide to Connecting a Distributed Generator - Sustainability Victoria
Guide to Connecting a Distributed Generator - Sustainability Victoria
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Applicant tasks and miles<strong>to</strong>nesDNSP processes and responsesStep 3: Application <strong>to</strong> connectTask: Finalise all connection terms and requirements for a connection offer from DNSP.• Finalise type, model, size and operating characteristicsof genera<strong>to</strong>r.• Prepare and submit full application <strong>to</strong> connect <strong>to</strong> DNSPwith all technical design details and data.• Pay application fee <strong>to</strong> DNSP.• Provide secondary information requested by the DNSP.• Understand or seek advice about the networkaugmentation and costs required by the DNSP.• Negotiate all technical and commercial terms for theconnection offer that will be included in a connectionagreement• Connection application received. Fee received at DNSP.• Request applicant <strong>to</strong> provide further information asreasonably required <strong>to</strong> assess the application.• Evaluate connection requirements and prepare costestimation for augmentation. Check for paymentprocess and timing.• Advise applicant of a decision <strong>to</strong> accept or rejectconnection for network access as submitted inapplication (30 business days).• If network connection is accepted advise applican<strong>to</strong>f their risks and obligations.• Prepare a fair and reasonable offer <strong>to</strong> connect fornetwork services and required network augmentation.Step 4: Connection agreement and genera<strong>to</strong>r installationTask: Formalise agreements and complete installation.• Accept the offer <strong>to</strong> connect from DNSP.• Submit all design details and data.• Negotiate the connection agreement based on the offer<strong>to</strong> connect as agreed.• Connection agreement established.• Installation of genera<strong>to</strong>r and all necessary extensions /augmentation.• Review and approval of applicant’s design dataand drawings.• Design of DNSP network extension / augmentation.• Negotiate the connection agreement based on theoffer <strong>to</strong> connect as agreed.• Formalisation of agreements including protectioncoordination and opera<strong>to</strong>r coordination.Step 5: Inspection and commissioningTask: Achieve successful connectionWhen installation / construction is complete:• ESV conducts an electrical safety inspection of theinstallation.• All tests carried out, in the presence of the DNSP andlive connection <strong>to</strong> network achieved.• Genera<strong>to</strong>r plant commissioning undertaken.• Inspection of cus<strong>to</strong>mer’s installation.• Approval of cus<strong>to</strong>mer’s commissioning testprocedures and operating procedures.• Attendance at commissioning tests.Genera<strong>to</strong>r connected and commissionedFigure 4. Connection process flowchart (continued)<strong>Guide</strong> <strong>to</strong> <strong>Connecting</strong> a <strong>Distributed</strong> Genera<strong>to</strong>r in Vic<strong>to</strong>ria - 25