12.07.2015 Views

DART-SVP/OS Operation Requirements and ... - IonSense

DART-SVP/OS Operation Requirements and ... - IonSense

DART-SVP/OS Operation Requirements and ... - IonSense

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Cleaning:RequiredA day or two before the <strong>DART</strong> installation, clean the area around the atmosphericpressure inlet (API) of your mass spectrometer, as well as the capillary <strong>and</strong>/or orificecones. Due to the <strong>DART</strong> source’s unique characteristics, contaminants that were notreadily observed with an orthogonal spray sources may interfere with <strong>DART</strong> analysis.Pumping:RequiredRequired for use with Vapur flange; customers not using a Vapur flange do not needpumping.<strong>IonSense</strong> offers an external rough pump for purchase:Vacuubr<strong>and</strong> ME2 NT PumpSpecifications here: http://www.vacuubr<strong>and</strong>.com/en-pageID802.phpAlternatively a customer may opt to use laboratory house vacuum as asubstitute or an equivalent pump.Gas:RequiredHelium: of at least 4.7 grade (99.997% pure.)Nitrogen: of at least 4.8 grade (99.998% pure.)Recommended size of tank is 300Regulator:RequiredOur recommendation is a single stage regulator for each gas tank with the followingspecs:Stainless steel diaphragmHelium leak integrity of 1 * 10^ (-9)Ultrasonically cleaned1/4" NPT male or female outlet

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!