OPERATIONS ANDMAINTENANCEMANUALLiverpool John Moores UniversityEverlast Waterproofing Ltd O&M rev 1LJMU


INDEXProject Details 1S<strong>co</strong>pe of Works 2Contractor Details 3Suppliers/Manufacturers Details 4Product Data Sheets 5Test Certificates 6Guarantees/Warranties 7Cleaning <strong>and</strong> Maintenance Procedures 8Specifications 9Everlast Waterproofing Ltd O&M rev 1LJMU


PROJECT DETAILSRoofing works atLiverpool John Moores UniversityNew Clarence Street DevelopmentLiverpoolForWates Construction LtdWates HouseStation ApproachLeatherheadSurreyKT22 7SW-1-Everlast Waterproofing Ltd O&M rev 1LJMU


SCOPE OF WORKSPrepare <strong>and</strong> waterproof the new <strong>co</strong>ncrete deck to the main roof,the 4 bal<strong>co</strong>ny roofs including the timber decked stair pod, the liftpod, the plant pod <strong>and</strong> 2 roof level risers, the single storeyS<strong>co</strong>ttish Power transformer roof.Main roof, transformer room roof <strong>and</strong> bal<strong>co</strong>nies waterproofedwith Bauder felt.The Pods <strong>and</strong> risers are waterproofed with Bauder single ply.Main roof <strong>and</strong> transformer room roof have 200mm invertedinsulation, protection membrane <strong>and</strong> 20-40mm ballast.The Bal<strong>co</strong>ny roofs have 200mm inverted insulation, protectionmembrane <strong>and</strong> Kobra granite paving slabs on paving supports.The margins are protected by 20-40mm ballast.The Pods <strong>and</strong> risers have encapsulated 160mm insulation <strong>and</strong> areblue grey smooth finish.-2-Everlast Waterproofing Ltd O&M rev 1LJMU


CONTRACTOR DETAILSEverlast Waterproofing LtdThe School HouseParkfield TerraceOff Richardshaw RoadPudseyLeedsLS28 7RTWeb: www.everlastwaterproofing.<strong>co</strong>.<strong>uk</strong>Email: sales@everlastwaterproofing.<strong>co</strong>.<strong>uk</strong>Tel 0113 255 2739Fax 0113 255 2600-3-Everlast Waterproofing Ltd O&M rev 1LJMU


SUPPLIERS/MANUFACTURERS DETAILSBauder Ltd70 L<strong>and</strong>seer Road, Ipswich, Suffolk, IP3 0DH.Tel 01473 257671 - Fax 01473 230761Web : www.bauder.<strong>co</strong>.<strong>uk</strong> - Email : technical@bauder.<strong>co</strong>.<strong>uk</strong>-------------------------------------------------------Alfa Aggregates Products LimitedKingsley Works, Kingsley, Nr Cheadle, Staffordshire, ST10 2DQTel: 01538 754 773 - Fax: 01538 750 280Email: info@alfaaggregates.<strong>co</strong>m-------------------------------------------------------Surespan LimitedLeamore Enterprise Park, Walsall, West Midl<strong>and</strong>s, WS2 7NLTel : 01922 711185 - Fax: 01922 714099E-mail: sales@surespan<strong>co</strong>vers.<strong>co</strong>m-------------------------------------------------------Jablite LtdInfinity House, Anderson Way, Belvedere, Kent, DA17 6BG.Tel: 020 8320 9100 - Fax: 020 8320 9110Web : www.jablite.<strong>co</strong>.<strong>uk</strong> - Email : sales@jablite.<strong>co</strong>.<strong>uk</strong>-------------------------------------------------------Whitesales Ltd,Europa House, Alfold Road, Cranleigh, GU6 8NQTel: 01483 271371 - Fax: 01483 271771Web : www.whitesales.<strong>co</strong>.<strong>uk</strong> - Email : sales@whitesales.<strong>co</strong>.<strong>uk</strong>--------------------------------------------------------4-Everlast Waterproofing Ltd O&M rev 1LJMU


BTS FabricationsUnit 11, Greenhills Bus Park, Spennymoor, Co. Durham, DL16 6JB.Tel : 01388 816883 Fax: 01388 813037Web: www.btsfabrications.<strong>co</strong>.<strong>uk</strong>-------------------------------------------------------Tata Steel UK LimitedShotton Works, Deeside, FLINTSHIRE, CH5 2NHTel : (01684) 856600 – Fax : (01684) 856601Web: www.tatasteel.<strong>co</strong>mEmail: customer-service@tatasteel.<strong>co</strong>m-------------------------------------------------------QBM Distributors LtdGeIderd Road, Birstall, Batley, West Yorks, WF17 9QDTEL: 01924 472251 - FAX: 01924 440237Web: www.qbmdistributors.<strong>co</strong>mEmail: sales@qbmdistributors.<strong>co</strong>m--------------------------------------------------------4a-Everlast Waterproofing Ltd O&M rev 1LJMU


PRODUCT DATA SHEETS Bauder Felts Bauder/Jablite Insulation Bauder Coatings Bauder Thermofol PVC Harmer Outlets Kobra Granite Paving Flags Natural Concrete Paving Flags Caro Paving Supports Alpha 20 – 40mm washed ballast Surespan Hatch Whitesales Termination Bar Tata D100 Metal Decking Galvanised angles <strong>and</strong> galvanised flat sheets-5-Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Alfa Aggregates Products LimitedKingsley Works, KingsleyNr Cheadle, Staffordshire, ST10 2DQTel: 01538 754 773Fax: 01538 750 280Email: info@alfaaggregates.<strong>co</strong>mCaledonian Pebbles - Data SheetDESCRIPTIONPebbles are rinsed before packing, although due to the nature ofthe product some dust may be created during transit.Grade sizes available:10-20mm20-40mm40-80mmAvailable in:25kg sacks1 Tonne Bulk BagsLoose bulkLoose bulk density: 1500 kg/m³Naturally Rounded PebblesSAFETY DATAEverlast Waterproofing Ltd O&M rev 1LJMU


In the <strong>co</strong>ndition sold, the product does not present a hazard to health. Theproducts are not required to carry a hazard label under the chemicals(Hazard information <strong>and</strong> packaging for supply) Regulations 1994 (CHIP 2).When chipped, stone particles can cause damage to the eyes. Eyeprotection to B.S. EN 166 should be worn.When products are mechanically crushed, respirable dust will be produced which can<strong>co</strong>ntain silica (quartz). Engineering <strong>co</strong>ntrol measures should be employed to keepairborne dust to a minimum. If adequate local exhaust ventilation equipment is notprovided, dust masks, or their equivalent, to type FFP2 should be worn.FIREThere are no direct risks of fire or explosion from this product.OFF-LOADINGEnsure that the lifting equipment is suitable <strong>and</strong> will carry the weight.FIRST AIDWhere particles enter the eye, irrigate well with <strong>co</strong>pious amounts of cleanwater. Seek medical attention, if necessary.Inhalation of dust, remove to fresh air <strong>and</strong> seek medical attention, ifnecessary.DISPOSALWaste from stone is easy to h<strong>and</strong>le, non-toxic <strong>and</strong> inert. However, its storage <strong>and</strong>disposal should be carried out in ac<strong>co</strong>rdance with section 34 of the EnvironmentalProtection Act: Waste Management – The Duty of Care.Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


TEST CERTIFICATES Bauder <strong>co</strong>mpliance visit 1 – 18/05/2011 bit Bauder <strong>co</strong>mpliance visit 2 – 10/06/2011 bit Bauder <strong>co</strong>mpliance visit 3 – 27/06/2011 bit Bauder <strong>co</strong>mpliance visit 4 – 07/07/2011 bit Bauder <strong>co</strong>mpliance visit 5 – 25/07/2011 bit & sp Bauder <strong>co</strong>mpliance visit 6 – 09/08/2011 bit Bauder <strong>co</strong>mpliance visit 7 – 17/08/2011 bit Bauder <strong>co</strong>mpliance visit 8 – 30/08/2011 bit Bauder <strong>co</strong>mpliance visit 9 – 06/09/2011 bit Bauder <strong>co</strong>mpliance visit 10 – 26/09/2011 bit Bauder <strong>co</strong>mpliance visit 11 – 05/10/2011 bit Bauder <strong>co</strong>mpliance visit 12 – 21/10/2011 bit Bauder <strong>co</strong>mpliance visit 12 – 15/12/2011 bit Bauder <strong>co</strong>mpliance visit 12 – 18/01/2012 bit & sp-6-Everlast Waterproofing Ltd O&M rev 1LJMU


INTERIM INSPECTION REPORTBituminous InterimPROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 x Level 6 Plant Roof 1290.00 BTRS + Hard L<strong>and</strong>scaping 95RA 2 North Terrace Level 4 137.00 BTRS + Hard L<strong>and</strong>scaping 95RA 3 North Terrace Level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 4 South Terrace Level 4 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 5 South Terrace level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 6 1st Floor Substation Roof 30.00 BTRS + Hard L<strong>and</strong>scaping 95Products (Kit List)Part RA 1 RA 2 RA 3 RA 4 RA 5 RA 6K5K Char<strong>co</strong>al Grey (flashing & detail work)XK5K Char<strong>co</strong>al Grey (flashing & details only)XK5K Char<strong>co</strong>al Grey (flashings & details only) X X X XG4E X X X X X XK5E X X X X X XJFRI (120mm)XJFRI (200mm) X X X X XKH60-90 Lineal drain system incl grill & feet X X X X XUMAX-Geotextile (vapour permeable membrane) X X X X XUMAX-Geotextile (vapour permeable membrane) (JFRI VPM Required)XLiquiFIBRE detailing kit - RAL 7043 X X X X XINSPECTED BY: Paul adderley Date: 18/05/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XIs the detailing being carried out in ac<strong>co</strong>rdance with the specification?XEverlast Waterproofing Ltd O&M rev 1LJMU


Do the roof areas <strong>co</strong>rrespond with the specification?xIf Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?XDid you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?xActions Required By TechnicalNoOther CommentsSmall amount of g4e to level 6 0nly upst<strong>and</strong> details need to be built to all roofs to progress also plinths need to be <strong>co</strong>nstructed to steelwork <strong>and</strong> h<strong>and</strong>rail postsMain <strong>co</strong>ntractor is aware no other issuesPlease See Below For Relevant PhotographsApproved Operative NameBadge No.CarlDistribution ListDistribution by Inspector x OR Distribution by Tech. Dept. OR Distribution by ATSMClient Approved Contractor Main ContractorTech. Dept. x ATM x Regional DirectorEverlast Waterproofing Ltd O&M rev 1LJMU


Photo 4Photo 1Photo 2Photo 3Photo 2Photo 1Photo 7NO TERMINATION BAR INSTALLEDEverlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


INTERIM INSPECTION REPORTBituminous InterimPROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 x 40% Level 6 Plant Roof 1290.00 BTRS + Hard L<strong>and</strong>scaping 95RA 2 North Terrace Level 4 137.00 BTRS + Hard L<strong>and</strong>scaping 95RA 3 North Terrace Level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 4 South Terrace Level 4 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 5 South Terrace level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 6 1st Floor Substation Roof 30.00 BTRS + Hard L<strong>and</strong>scaping 95Products (Kit List)Part RA 1 RA 2 RA 3 RA 4 RA 5 RA 6K5K Char<strong>co</strong>al Grey (flashing & detail work)XK5K Char<strong>co</strong>al Grey (flashing & details only)XK5K Char<strong>co</strong>al Grey (flashings & details only) X X X XG4E X X X X X XK5E X X X X X XJFRI (120mm)XJFRI (200mm) X X X X XKH60-90 Lineal drain system incl grill & feet X X X X XUMAX-Geotextile (vapour permeable membrane) X X X X XUMAX-Geotextile (vapour permeable membrane) (JFRI VPM Required)XLiquiFIBRE detailing kit - RAL 7043 X X X X XINSPECTED BY: Paul adderley Date: 10/06/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XIs the detailing being carried out in ac<strong>co</strong>rdance with the specification?XEverlast Waterproofing Ltd O&M rev 1LJMU


Do the roof areas <strong>co</strong>rrespond with the specification?xIf Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?XDid you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?XActions Required By TechnicalNoOther CommentsProgress as follows 90% G4E Underlay to level 6 plant roomGalv plinths to Louvre legs require encapsulating in g4e underlay <strong>and</strong> plant e <strong>and</strong> only require liquid-tec to terminate 100mm on to mineral <strong>and</strong> 100mm on tosteel legThere is evidence that the track crane has been running on the underlay this should be protected at all times as this <strong>co</strong>uld cause damage to the membranesAll workmanship is to a good st<strong>and</strong>ard <strong>and</strong> there are no other issues(see pics below)Please See Below For Relevant PhotographsApproved Operative NameBadge No.carlDistribution ListDistribution by Inspector x OR Distribution by Tech. Dept. OR Distribution by ATSMClient Approved Contractor Main ContractorTech. Dept. x ATM x Regional DirectorEverlast Waterproofing Ltd O&M rev 1LJMU


hoto 3 general roof viewhoto 4 plinths require encapsulating in feltPhoto 7NO TERMINATION BAR INSTALLEDhoto 5 crane track lines this <strong>co</strong>uld damage feltPhoto 6 as pic 5Everlast Waterproofing Ltd O&M rev 1LJMU


hoto 7Everlast Waterproofing Ltd O&M rev 1LJMU


INTERIM INSPECTION REPORTBituminous InterimPROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 X 50% Level 6 Plant Roof 1290.00 BTRS + Hard L<strong>and</strong>scaping 95RA 2 x 20% North Terrace Level 4 137.00 BTRS + Hard L<strong>and</strong>scaping 95RA 3 X 20% North Terrace Level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 4 X 20% South Terrace Level 4 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 5 x 20% South Terrace level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 6 1st Floor Substation Roof 30.00 BTRS + Hard L<strong>and</strong>scaping 95Products (Kit List)Part RA 1 RA 2 RA 3 RA 4 RA 5 RA 6K5K Char<strong>co</strong>al Grey (flashing & detail work)XK5K Char<strong>co</strong>al Grey (flashing & details only)XK5K Char<strong>co</strong>al Grey (flashings & details only) X X X XG4E X X X X X XK5E X X X X X XJFRI (120mm)XJFRI (200mm) X X X X XKH60-90 Lineal drain system incl grill & feet X X X X XUMAX-Geotextile (vapour permeable membrane) X X X X XUMAX-Geotextile (vapour permeable membrane) (JFRI VPM Required)XLiquiFIBRE detailing kit - RAL 7043 X X X X XINSPECTED BY: Paul adderley Date: 27/06/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XIs the detailing being carried out in ac<strong>co</strong>rdance with the specification?XEverlast Waterproofing Ltd O&M rev 1LJMU


Do the roof areas <strong>co</strong>rrespond with the specification?xIf Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?XDid you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?XActions Required By TechnicalNoOther CommentsWork are now progressing to all areas except 1 st floor substation there a some blisters to the upst<strong>and</strong>s 6 th floor these need to be rectified before mineral isappliedMain <strong>co</strong>ntractor has requested a strip of capsheet <strong>and</strong> detail work to upst<strong>and</strong>s to allow them to progress with wall glazing etc this should not be a problem as theroof is <strong>co</strong>mpletely flatMain <strong>co</strong>ntractor has been storing glazing racks on roof which has caused visible damage to the underlay this will need to be rectified before capsheet is installedPlease See Below For Relevant PhotographsApproved Operative NameBadge No.DougieDistribution ListDistribution by Inspector x OR Distribution by Tech. Dept. OR Distribution by ATSMClient Approved Contractor Main ContractorTech. Dept. x ATM x Regional DirectorEverlast Waterproofing Ltd O&M rev 1LJMU


hoto 2Photo 1hoto 3hoto 4Photo 4Everlast Waterproofing Ltd O&M rev 1LJMU


INTERIM INSPECTION REPORTBituminous InterimEverlast Waterproofing Ltd O&M rev 1LJMU


PROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 X 50% Level 6 Plant Roof 1290.00 BTRS + Hard L<strong>and</strong>scaping 95RA 2 x 20% North Terrace Level 4 137.00 BTRS + Hard L<strong>and</strong>scaping 95RA 3 X 25% North Terrace Level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 4 X 25% South Terrace Level 4 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 5 x 25% South Terrace level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 6 x 50% 1st Floor Substation Roof 30.00 BTRS + Hard L<strong>and</strong>scaping 95Products (Kit List)Part RA 1 RA 2 RA 3 RA 4 RA 5 RA 6K5K Char<strong>co</strong>al Grey (flashing & detail work)XK5K Char<strong>co</strong>al Grey (flashing & details only)XK5K Char<strong>co</strong>al Grey (flashings & details only) X X X XG4E X X X X X XK5E X X X X X XJFRI (120mm)XJFRI (200mm) X X X X XKH60-90 Lineal drain system incl grill & feet X X X X XUMAX-Geotextile (vapour permeable membrane) X X X X XUMAX-Geotextile (vapour permeable membrane) (JFRI VPM Required)XLiquiFIBRE detailing kit - RAL 7043 X X X X XINSPECTED BY: Paul adderley Date: 07/07/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XIs the detailing being carried out in ac<strong>co</strong>rdance with the specification?XDo the roof areas <strong>co</strong>rrespond with the specification?xIf Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?XEverlast Waterproofing Ltd O&M rev 1LJMU


Did you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?XActions Required By TechnicalPlease see <strong>co</strong>mments belowOther CommentsWorks are now progressing to all roofs. Some parapets to level 6 have been <strong>co</strong>mpleted but main <strong>co</strong>ntractor has now fitted a number of bolts through to fix wallpanels these parapets will now need to be re-feltedAll bal<strong>co</strong>nies up st<strong>and</strong>s have a g4e undelay flashing fitted which main <strong>co</strong>ntractor has now used some type of sili<strong>co</strong>ne / mastic to seal the breathable membrane tothe underlay as a temp measure the <strong>co</strong>mpatibility of the mastic to the felt is not known, I have requested a COSH SHEET for this <strong>and</strong> if found to <strong>co</strong>ntain spiritssome of these up st<strong>and</strong>s will need to be replaced before mineral works are <strong>co</strong>mpletedLevel 6 also has debris timber steel etc likely to cause damage to underlayAll felt works are to a good st<strong>and</strong>ard <strong>and</strong> there are no other issuesPlease See Below For Relevant PhotographsApproved Operative NameBadge No.DougieDistribution ListDistribution by Inspector x OR Distribution by Tech. Dept. OR Distribution by ATSMClient Approved Contractor Main ContractorTech. Dept. x ATM x Regional DirectorEverlast Waterproofing Ltd O&M rev 1LJMU


Photo 1 Bolts through <strong>co</strong>mpleted upst<strong>and</strong>sPhoto 2Photo 3 mastic to g4e underlayPhoto 4 likelihood of damage TO UNDERLAYEverlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


INTERIM INSPECTION REPORTBituminous InterimPROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 X 50% Level 6 Plant Roof 1290.00 BTRS + Hard L<strong>and</strong>scaping 95RA 2 x 25% North Terrace Level 4 137.00 BTRS + Hard L<strong>and</strong>scaping 95RA 3 X 25% North Terrace Level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 4 X 25% South Terrace Level 4 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 5 x 25% South Terrace level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 6 x 50% 1st Floor Substation Roof 30.00 BTRS + Hard L<strong>and</strong>scaping 95Products (Kit List)Part RA 1 RA 2 RA 3 RA 4 RA 5 RA 6K5K Char<strong>co</strong>al Grey (flashing & detail work)XK5K Char<strong>co</strong>al Grey (flashing & details only)XK5K Char<strong>co</strong>al Grey (flashings & details only) X X X XG4E X X X X X XK5E X X X X X XJFRI (120mm)XJFRI (200mm) X X X X XKH60-90 Lineal drain system incl grill & feet X X X X XUMAX-Geotextile (vapour permeable membrane) X X X X XUMAX-Geotextile (vapour permeable membrane) (JFRI VPM Required)XLiquiFIBRE detailing kit - RAL 7043 X X X X XINSPECTED BY: Paul Adderley Date: 25/07/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XEverlast Waterproofing Ltd O&M rev 1LJMU


Is the detailing being carried out in ac<strong>co</strong>rdance with the specification?XDo the roof areas <strong>co</strong>rrespond with the specification?xIf Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?XDid you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?XActions Required By TechnicalNoneOther CommentsWorks are now progressing to all roofs. There is a lot of damage to the underlay to the level 6 plant roof this will all need to be checked by <strong>co</strong>ntractor beforeany capsheet is installed photographs of marked damage <strong>and</strong> rectified damage will be sent to us by main <strong>co</strong>ntractorAlso main <strong>co</strong>ntractor is to make a decision on whether to fully overlay parapets which have been penetrated with bolts these <strong>co</strong>uld have a small flashing installedbut this would not be aesthetically pleasing but would not effect the guaranteePlease See Below For Relevant PhotographsApproved Operative NameBadge No.DougieDistribution ListDistribution by Inspector x OR Distribution by Tech. Dept. OR Distribution by ATSMClient Approved Contractor Main ContractorTech. Dept. x ATM x Regional DirectorEverlast Waterproofing Ltd O&M rev 1LJMU


Photo 1Photo 2Photo 3Photo 4Photo 5Everlast Waterproofing Ltd O&M rev 1LJMU


INTERIM INSPECTION REPORTSingle Ply InterimPROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 x 80% Lift 02 85.00 Thermofol 1.5mm FB 161RA 2 x 80% Stair 07 0.00 Thermofol 1.5mm FB 161RA 3 x 80% Stair 01 0.00 Thermofol 1.5mm FB 161Products (Kit List)Part RA 1 RA 2 RA 3PIR 160mm (160mm) X XDS1 DUO X XThermofol U15 V Blue Grey- Fleece Backed X X XThermofol Parapet Outlet X X XSealant Kit X X XThermofol Outlet X XINSPECTED BY: Paul Adderley Date: 25/07/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XIs the detailing being carried out in ac<strong>co</strong>rdance with the specification?XDo the roof areas <strong>co</strong>rrespond with the specification?XIf Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?XDid you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?XActions Required By TechnicalEverlast Waterproofing Ltd O&M rev 1LJMU


NoneOther CommentsDetail only to <strong>co</strong>mplete these roofs workmanship is good <strong>and</strong> there are no issuesPlease See Below For Relevant PhotographsApproved Operative NameBadge No.Not knownDistribution ListDistribution by Inspector x OR Distribution by Tech. Dept. OR Distribution by ATSMClient x Approved Contractor Main ContractorTech. Dept. x ATM x Regional DirectorPhoto 1Photo 2Everlast Waterproofing Ltd O&M rev 1LJMU


Photo 3Photo 4Everlast Waterproofing Ltd O&M rev 1LJMU


INTERIM INSPECTION REPORTBituminous InterimPROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 X 50% Level 6 Plant Roof 1290.00 BTRS + Hard L<strong>and</strong>scaping 95RA 2 x 20% North Terrace Level 4 137.00 BTRS + Hard L<strong>and</strong>scaping 95RA 3 X 25% North Terrace Level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 4 X 25% South Terrace Level 4 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 5 x 25% South Terrace level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 6 x 50% 1st Floor Substation Roof 30.00 BTRS + Hard L<strong>and</strong>scaping 95Products (Kit List)Part RA 1 RA 2 RA 3 RA 4 RA 5 RA 6K5K Char<strong>co</strong>al Grey (flashing & detail work)XK5K Char<strong>co</strong>al Grey (flashing & details only)XK5K Char<strong>co</strong>al Grey (flashings & details only) X X X XG4E X X X X X XK5E X X X X X XJFRI (120mm)XJFRI (200mm) X X X X XKH60-90 Lineal drain system incl grill & feet X X X X XUMAX-Geotextile (vapour permeable membrane) X X X X XUMAX-Geotextile (vapour permeable membrane) (JFRI VPM Required)XLiquiFIBRE detailing kit - RAL 7043 X X X X XINSPECTED BY: John Wilkinson & John Llewellyn Date: 09/08/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XIs the detailing being carried out in ac<strong>co</strong>rdance with the specification?XEverlast Waterproofing Ltd O&M rev 1LJMU


Do the roof areas <strong>co</strong>rrespond with the specification?xIf Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?XDid you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?XActions Required By TechnicalOther CommentsPlease see <strong>co</strong>mments against photos below.Please See Below For Relevant PhotographsApproved Operative NameBadge No.DougieCarl StephensonDistribution ListDistribution by Inspector OR Distribution by Tech. Dept. OR Distribution by ATSM XClient Approved Contractor Main ContractorTech. Dept. x ATM x Regional DirectorEverlast Waterproofing Ltd O&M rev 1LJMU


Photo 1 Due to <strong>co</strong>ntinued access on terrace areas some of the G4E has de-bondedat edges. Agreed action is to re-prime under affected areas <strong>and</strong> re bond areas withtorch. Patching or replacing damaged areas.Photo 2 Agreed with Chris White of Wates that sealant be removed prior to capsheet installation. To be re-sealed with <strong>co</strong>mpatible product from ArboPhoto 3 Agreed remedial action where bolts penetrateupst<strong>and</strong>s: Apply strip of G4E <strong>and</strong> <strong>co</strong>mpletely re<strong>co</strong>ver upst<strong>and</strong>with K5KPhoto 4 Area affected by spillage of oil needs to be cutout <strong>and</strong> re waterproofed with G4E & K5EPhoto 5Photo 6 & Photo 5. Explained to Chris White importance ofsealing holes in h<strong>and</strong>rail systems to prevent water ingressthrough the steelwork.INTERIM INSPECTION REPORTBituminous InterimPROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739Everlast Waterproofing Ltd O&M rev 1LJMU


SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 X 65% Level 6 Plant Roof 1290.00 BTRS + Hard L<strong>and</strong>scaping 95RA 2 x 20% North Terrace Level 4 137.00 BTRS + Hard L<strong>and</strong>scaping 95RA 3 X 25% North Terrace Level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 4 X 50% South Terrace Level 4 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 5 x 25% South Terrace level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 6 x 50% 1st Floor Substation Roof 30.00 BTRS + Hard L<strong>and</strong>scaping 95Products (Kit List)Part RA 1 RA 2 RA 3 RA 4 RA 5 RA 6K5K Char<strong>co</strong>al Grey (flashing & detail work)XK5K Char<strong>co</strong>al Grey (flashing & details only)XK5K Char<strong>co</strong>al Grey (flashings & details only) X X X XG4E X X X X X XK5E X X X X X XJFRI (120mm)XJFRI (200mm) X X X X XKH60-90 Lineal drain system incl grill & feet X X X X XUMAX-Geotextile (vapour permeable membrane) X X X X XUMAX-Geotextile (vapour permeable membrane) (JFRI VPM Required)XLiquiFIBRE detailing kit - RAL 7043 X X X X XINSPECTED BY: Paul Adderley Date: 17/08/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XIs the detailing being carried out in ac<strong>co</strong>rdance with the specification?XDo the roof areas <strong>co</strong>rrespond with the specification?xIf Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?XDid you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?XActions Required By TechnicalEverlast Waterproofing Ltd O&M rev 1LJMU


NoneOther CommentsProgress to level 4 bal<strong>co</strong>ny <strong>and</strong> level 6 there are a number of areas which will require repairs to G4E underlay on all levels main <strong>co</strong>ntractor <strong>and</strong> roofing<strong>co</strong>ntractor are both rectify before any capsheet is installed I have agreed with roofing <strong>co</strong>ntractor <strong>and</strong> Main <strong>co</strong>ntractor that 20% Of level 6 roof can now bel<strong>and</strong>scaped as this is <strong>co</strong>mplete <strong>and</strong> it will protect the waterproofing from ongoing <strong>co</strong>nstruction works all workmanship to these areas is to a good st<strong>and</strong>ardRoofing <strong>co</strong>ntractors flat termination bars for abutment to upst<strong>and</strong>sPlease See Below For Relevant PhotographsApproved Operative NameBadge No.DougieCarl StephensonDistribution ListDistribution by Inspector x OR Distribution by Tech. Dept. OR Distribution by ATSM XClient Approved Contractor Main Contractor xTech. Dept. x ATM x Regional DirectorPhoto 1 DETAILING TO HANDRIAL POST COMPLETED DETIAL YET TO BE AGREEDPhoto 2Everlast Waterproofing Ltd O&M rev 1LJMU


COMPLETED FIELD AND UPSAND AREAS TO LEVEL 4HANDRAILLS STILL TO BE COMPLETEDDAMAGED G4E UNDERLAYTO BE REPAIRED OROVERLAYEDPhoto 5 Damaged g4e to be overlaidBuilding materials stored on roof again all this underlayrequires checking <strong>and</strong> repairing before cap sheet is laidINTERIM INSPECTION REPORTBituminous InterimPROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 X 65% Level 6 Plant Roof 1290.00 BTRS + Hard L<strong>and</strong>scaping 95RA 2 x 90% North Terrace Level 4 137.00 BTRS + Hard L<strong>and</strong>scaping 95Everlast Waterproofing Ltd O&M rev 1LJMU


RA 3 X 50% North Terrace Level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 4 X 60% South Terrace Level 4 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 5 x 355 South Terrace level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 6 x 50% 1st Floor Substation Roof 30.00 BTRS + Hard L<strong>and</strong>scaping 95Products (Kit List)Part RA 1 RA 2 RA 3 RA 4 RA 5 RA 6K5K Char<strong>co</strong>al Grey (flashing & detail work)XK5K Char<strong>co</strong>al Grey (flashing & details only)XK5K Char<strong>co</strong>al Grey (flashings & details only) X X X XG4E X X X X X XK5E X X X X X XJFRI (120mm)XJFRI (200mm) X X X X XKH60-90 Lineal drain system incl grill & feet X X X X XUMAX-Geotextile (vapour permeable membrane) X X X X XUMAX-Geotextile (vapour permeable membrane) (JFRI VPM Required)XLiquiFIBRE detailing kit - RAL 7043 X X X X XINSPECTED BY: Paul Adderley Date: 30/08/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XIs the detailing being carried out in ac<strong>co</strong>rdance with the specification?XDo the roof areas <strong>co</strong>rrespond with the specification?xIf Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?XDid you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?XActions Required By TechnicalNoneOther CommentsLevel 4 bal<strong>co</strong>nies require liquid- tec to h<strong>and</strong>rail posts only these areas have now been closed off to other trades level 5 bal<strong>co</strong>nies are 50to 60% <strong>co</strong>mplete with noissues level 6 roof is being used as a storage <strong>and</strong> work are this has led to a large amount of the g4e underlay being damaged some areas will require strippingwhilst other areas require the felt cutting back re-priming re-sealing <strong>and</strong> then overlaying I have spoken to roofing <strong>co</strong>ntractor <strong>and</strong> Chris White from main<strong>co</strong>ntractor regarding these issues <strong>and</strong> Bauder need to inspect all underlay before any to top layer is installedEverlast Waterproofing Ltd O&M rev 1LJMU


Please See Below For Relevant PhotographsApproved Operative NameBadge No.DougieCarl StephensonDistribution ListDistribution by Inspector x OR Distribution by Tech. Dept. OR Distribution by ATSM XClient Approved Contractor Main Contractor xTech. Dept. x ATM x Regional DirectorPhoto 1Photo 2Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


INTERIM INSPECTION REPORTBituminous InterimPROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 X 65% Level 6 Plant Roof 1290.00 BTRS + Hard L<strong>and</strong>scaping 95RA 2 x 90% North Terrace Level 4 137.00 BTRS + Hard L<strong>and</strong>scaping 95RA 3 X 65% North Terrace Level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 4 X 60% South Terrace Level 4 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 5 x 50% South Terrace level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 6 x 50% 1st Floor Substation Roof 30.00 BTRS + Hard L<strong>and</strong>scaping 95Products (Kit List)Part RA 1 RA 2 RA 3 RA 4 RA 5 RA 6K5K Char<strong>co</strong>al Grey (flashing & detail work)XK5K Char<strong>co</strong>al Grey (flashing & details only)XK5K Char<strong>co</strong>al Grey (flashings & details only) X X X XG4E X X X X X XK5E X X X X X XJFRI (120mm)XJFRI (200mm) X X X X XKH60-90 Lineal drain system incl grill & feet X X X X XUMAX-Geotextile (vapour permeable membrane) X X X X XUMAX-Geotextile (vapour permeable membrane) (JFRI VPM Required)XLiquiFIBRE detailing kit - RAL 7043 X X X X XINSPECTED BY: Paul Adderley Date: 06/09/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XIs the detailing being carried out in ac<strong>co</strong>rdance with the specification?XEverlast Waterproofing Ltd O&M rev 1LJMU


Do the roof areas <strong>co</strong>rrespond with the specification?xIf Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?XDid you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?XActions Required By TechnicalNoneOther CommentsLevel 4 bal<strong>co</strong>nies require liquid- tec to h<strong>and</strong>rail posts only these areas have now been closed off to other trades level 5 bal<strong>co</strong>nies are 50to 60% <strong>co</strong>mplete with noissues An area of level 6 roof has now been exposed for inspection <strong>and</strong> are findings where approx. 440square metres will need to be stripped up or over layeddepending on the <strong>co</strong>ndition of the felt as trial hole are to be taken to test adhesion, this has been agreed with both roofing <strong>co</strong>ntractor <strong>and</strong> main <strong>co</strong>ntractor oncethis has been overlayed it will need to be inspected by Bauder before any capshheet is layedAll OTHER AREAS WILL ALSO NEED TO GO THROUGH THIS PROCESS AS THIS ROOF HAS HAD A LOT OF TRAFFIC AND THERE IS A LOT OF DAMAGE TO THRUNDERLAY(see pics below)Please See Below For Relevant PhotographsApproved Operative NameBadge No.DougieCarl StephensonDistribution ListDistribution by Inspector x OR Distribution by Tech. Dept. OR Distribution by ATSM XClient Approved Contractor Main Contractor xTech. Dept. x ATM x Regional DirectorEverlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Photo 7Everlast Waterproofing Ltd O&M rev 1LJMU


INTERIM INSPECTION REPORTBituminous InterimPROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 X 75% Level 6 Plant Roof 1290.00 BTRS + Hard L<strong>and</strong>scaping 95RA 2 90% North Terrace Level 4 137.00 BTRS + Hard L<strong>and</strong>scaping 95RA 3 65% North Terrace Level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 4 60% South Terrace Level 4 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 5 50% South Terrace level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 6 x 95% 1st Floor Substation Roof 30.00 BTRS + Hard L<strong>and</strong>scaping 95Products (Kit List)Part RA 1 RA 2 RA 3 RA 4 RA 5 RA 6K5K Char<strong>co</strong>al Grey (flashing & detail work)XK5K Char<strong>co</strong>al Grey (flashing & details only)XK5K Char<strong>co</strong>al Grey (flashings & details only) X X X XG4E X X X X X XK5E X X X X X XJFRI (120mm)XJFRI (200mm) X X X X XKH60-90 Lineal drain system incl grill & feet X X X X XUMAX-Geotextile (vapour permeable membrane) X X X X XUMAX-Geotextile (vapour permeable membrane) (JFRI VPM Required)XLiquiFIBRE detailing kit - RAL 7043 X X X X XINSPECTED BY: Paul Adderley Date: 26/09/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XIs the detailing being carried out in ac<strong>co</strong>rdance with the specification?XEverlast Waterproofing Ltd O&M rev 1LJMU


Do the roof areas <strong>co</strong>rrespond with the specification?xIf Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?xDid you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?xActions Required By TechnicalnoneOther CommentsProgress to 1 st floor substation <strong>and</strong> capsheet on 6 th floor plant deck only, area of approx 250 square meters are now passed for l<strong>and</strong>scaping.Workmanship is to a good st<strong>and</strong>ard <strong>and</strong> there are no issues.Please See Below For Relevant PhotographsApproved Operative NameBadge No.DougieCarl StephensonDistribution ListDistribution by Inspector x OR Distribution by Tech. Dept. OR Distribution by ATSM XClient Approved Contractor Main Contractor xTech. Dept. x ATM x Regional DirectorEverlast Waterproofing Ltd O&M rev 1LJMU


Photo 1Photo 2Photo 3Photo 4Photo 5Photo 6Everlast Waterproofing Ltd O&M rev 1LJMU


Photo 7Everlast Waterproofing Ltd O&M rev 1LJMU


INTERIM INSPECTION REPORTBituminous InterimPROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 X 80% Level 6 Plant Roof 1290.00 BTRS + Hard L<strong>and</strong>scaping 95RA 2 90% North Terrace Level 4 137.00 BTRS + Hard L<strong>and</strong>scaping 95RA 3 70% North Terrace Level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 4 60% South Terrace Level 4 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 5 50% South Terrace level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 6 x 95% 1st Floor Substation Roof 30.00 BTRS + Hard L<strong>and</strong>scaping 95Products (Kit List)Part RA 1 RA 2 RA 3 RA 4 RA 5 RA 6K5K Char<strong>co</strong>al Grey (flashing & detail work)XK5K Char<strong>co</strong>al Grey (flashing & details only)XK5K Char<strong>co</strong>al Grey (flashings & details only) X X X XG4E X X X X X XK5E X X X X X XJFRI (120mm)XJFRI (200mm) X X X X XKH60-90 Lineal drain system incl grill & feet X X X X XUMAX-Geotextile (vapour permeable membrane) X X X X XUMAX-Geotextile (vapour permeable membrane) (JFRI VPM Required)XLiquiFIBRE detailing kit - RAL 7043 X X X X XINSPECTED BY: Paul Adderley Date: 05/10/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XIs the detailing being carried out in ac<strong>co</strong>rdance with the specification?XEverlast Waterproofing Ltd O&M rev 1LJMU


Do the roof areas <strong>co</strong>rrespond with the specification?xIf Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?xDid you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?xActions Required By TechnicalnoneOther CommentsPROGRESS TO CAPSHEET ON 6 TH FLOOR PLANT DECK ONLY I HAVE PASSED CENTRAL AREA FOR LANSCAPING WORKMANSHIP IS TO A GOOD STANDARD ANDTHERE ARE NO ISSUESPlease See Below For Relevant PhotographsApproved Operative NameBadge No.DougieCarl StephensonDistribution ListDistribution by Inspector x OR Distribution by Tech. Dept. OR Distribution by ATSM XClient Approved Contractor Main Contractor xTech. Dept. x ATM x Regional DirectorEverlast Waterproofing Ltd O&M rev 1LJMU


Photo 1Photo 2Photo 3Photo 4Photo 5Photo 6Everlast Waterproofing Ltd O&M rev 1LJMU


Photo 7Everlast Waterproofing Ltd O&M rev 1LJMU


INTERIM INSPECTION REPORTBituminous InterimPROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 X 85% Level 6 Plant Roof 1290.00 BTRS + Hard L<strong>and</strong>scaping 95RA 2 X 90% North Terrace Level 4 137.00 BTRS + Hard L<strong>and</strong>scaping 95RA 3 X 90% North Terrace Level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 4 X 90% South Terrace Level 4 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 5 x 90% South Terrace level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 6 x 95% 1st Floor Substation Roof 30.00 BTRS + Hard L<strong>and</strong>scaping 95Products (Kit List)Part x RA 1 RA 2 RA 3 RA 4 RA 5 RA 6K5K Char<strong>co</strong>al Grey (flashing & detail work)XK5K Char<strong>co</strong>al Grey (flashing & details only)XK5K Char<strong>co</strong>al Grey (flashings & details only) X X X XG4E X X X X X XK5E X X X X X XJFRI (120mm)XJFRI (200mm) X X X X XKH60-90 Lineal drain system incl grill & feet X X X X XUMAX-Geotextile (vapour permeable membrane) X X X X XUMAX-Geotextile (vapour permeable membrane) (JFRI VPM Required)XLiquiFIBRE detailing kit - RAL 7043 X X X X XINSPECTED BY: Paul Adderley Date: 21/10/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XIs the detailing being carried out in ac<strong>co</strong>rdance with the specification?XEverlast Waterproofing Ltd O&M rev 1LJMU


Do the roof areas <strong>co</strong>rrespond with the specification?xIf Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?xDid you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?xActions Required By TechnicalnoneOther CommentsPROGRESS TO UDERLAY AND CAPSHEET ON 6 TH FLOOR PLANT DECK ONLY instruction of liquid fibre has been carried out <strong>and</strong> small amount of area to level 6passed for l<strong>and</strong>scapingPlease See Below For Relevant PhotographsApproved Operative NameBadge No.DougieCarl StephensonDistribution ListDistribution by Inspector x OR Distribution by Tech. Dept. OR Distribution by ATSM XClient Approved Contractor Main Contractor xTech. Dept. x ATM x Regional DirectorEverlast Waterproofing Ltd O&M rev 1LJMU


Photo 1Photo 2Everlast Waterproofing Ltd O&M rev 1LJMU


INTERIM INSPECTION REPORTBituminous InterimPROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 X 90% Level 6 Plant Roof 1290.00 BTRS + Hard L<strong>and</strong>scaping 95RA 2 x 95% North Terrace Level 4 137.00 BTRS + Hard L<strong>and</strong>scaping 95RA 3 X 95% North Terrace Level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 4 X 95% South Terrace Level 4 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 5 x 95% South Terrace level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 6 x 95% 1st Floor Substation Roof 30.00 BTRS + Hard L<strong>and</strong>scaping 95Products (Kit List)Part RA 1 RA 2 RA 3 RA 4 RA 5 RA 6K5K Char<strong>co</strong>al Grey (flashing & detail work)XK5K Char<strong>co</strong>al Grey (flashing & details only)XK5K Char<strong>co</strong>al Grey (flashings & details only) X X X XG4E X X X X X XK5E X X X X X XJFRI (120mm)XJFRI (200mm) X X X X XKH60-90 Lineal drain system incl grill & feet X X X X XUMAX-Geotextile (vapour permeable membrane) X X X X XUMAX-Geotextile (vapour permeable membrane) (JFRI VPM Required)XLiquiFIBRE detailing kit - RAL 7043 X X X X XINSPECTED BY: Paul Adderley Date: 15/12/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XIs the detailing being carried out in ac<strong>co</strong>rdance with the specification?XEverlast Waterproofing Ltd O&M rev 1LJMU


Do the roof areas <strong>co</strong>rrespond with the specification?xIf Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?xDid you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?xActions Required By TechnicalNoneOther CommentsTerrace to both 4 th <strong>and</strong> 5 th floor are now 90% past for l<strong>and</strong>scaping as there is small section in<strong>co</strong>mplete to both 3 rd <strong>and</strong> 4th floor terraces due to scaffolding alsothe EPDM flashing to the up st<strong>and</strong> in areas has been stapled through the Bauder membrane these will need to be removed <strong>and</strong> a new piece of membraneinstalled <strong>and</strong> termination bars to all up st<strong>and</strong>s as discussed on a number of occasions, These works to up st<strong>and</strong>s can be carried out with l<strong>and</strong>scaping /insulationin place <strong>co</strong>ntractor is aware of these issues <strong>and</strong> will rectify, Contractor assures me he will check for any damage to membrane thoroughly before installinginsulation6 th floor plant area is not past for l<strong>and</strong>scaping/insulation as there is still a lot of materials debris ect stored on the roof. There are a number of details which needto be <strong>co</strong>mplete including h<strong>and</strong>rail posts where the detail to the liquitec is not acceptable <strong>and</strong> requires removing <strong>and</strong> re-installing. Also in the area adjacent to theglass atrium around 3 no plinths where the extruded insulation is not a Bauder product it is a Kingspan TR27 this needs to be taken out <strong>and</strong> replaced using thebauder product, <strong>co</strong>ntractor is aware again aware of these issues <strong>and</strong> will rectify for next inspectionPlease See Below For Relevant PhotographsApproved Operative NameBadge No.DougieCarl StephensonDistribution ListDistribution by Inspector x OR Distribution by Tech. Dept. OR Distribution by ATSM XClient Approved Contractor Main Contractor xTech. Dept. x ATM x Regional DirectorEverlast Waterproofing Ltd O&M rev 1LJMU


PPPhoto 1 LIQUITEC INSTALLED INCORRECTLYPhoto 2 TR27 USED THIS NEED TO BE CHANGEDPPSTAPLES THROGH BAUDER NEMBRANE THESE NEED TO BETAKEN OUT AND A NEW PIECE OF MEMBRANE INSTALLEDNo Termination BarEverlast Waterproofing Ltd O&M rev 1LJMU


PROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 X 99% Level 6 Plant Roof 1290.00 BTRS + Hard L<strong>and</strong>scaping 95RA 2 x 95% North Terrace Level 4 137.00 BTRS + Hard L<strong>and</strong>scaping 95RA 3 X 99% North Terrace Level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 4 X 95% South Terrace Level 4 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 5 x 95% South Terrace level 5 136.00 BTRS + Hard L<strong>and</strong>scaping 95RA 6 x 99% 1st Floor Substation Roof 30.00 BTRS + Hard L<strong>and</strong>scaping 95Products (Kit List)Part RA 1 RA 2 RA 3 RA 4 RA 5 RA 6K5K Char<strong>co</strong>al Grey (flashing & detail work)XK5K Char<strong>co</strong>al Grey (flashing & details only)XK5K Char<strong>co</strong>al Grey (flashings & details only) X X X XG4E X X X X X XK5E X X X X X XJFRI (120mm)XJFRI (200mm) X X X X XKH60-90 Lineal drain system incl grill & feet X X X X XUMAX-Geotextile (vapour permeable membrane) X X X X XUMAX-Geotextile (vapour permeable membrane) (JFRI VPM Required)XLiquiFIBRE detailing kit - RAL 7043 X X X X XINSPECTED BY: Paul Adderley Date: 15/12/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XIs the detailing being carried out in ac<strong>co</strong>rdance with the specification?XDo the roof areas <strong>co</strong>rrespond with the specification?xEverlast Waterproofing Ltd O&M rev 1LJMU


If Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?xDid you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?xActions Required By TechnicalNoneOther Commentsl<strong>and</strong>scaping now being carried out on 3 rd <strong>and</strong> 4th floor terraces with a small amount of felting still to be carried out once scaffoldings are removed5 th floor terrace under scaffolding there is approx. 2lm of upst<strong>and</strong> which is dropping this needs to be cut back <strong>and</strong> replaced <strong>co</strong>ntractor is aware <strong>and</strong> will rectifyFor next inspection.( TERMINATION BARS STILL REQUIRED TO UPSANDS)6 th floor plant area has now been past for the remainder of the l<strong>and</strong>scaping to be <strong>co</strong>mpletedThere is one interface with the glazing which will need some attention a felt or metal flashing required under pressure plate <strong>and</strong> adhering to the upst<strong>and</strong> again<strong>co</strong>ntractor is aware <strong>and</strong> will discuss with main <strong>co</strong>ntractor also 1 no lead soaker to be fitted to svp pipe <strong>and</strong> waterproofing as Bauder specificationSnag works to insulation <strong>and</strong> liquifibre from last inspection have now been rectified <strong>and</strong> are acceptablePlease See Below For Relevant PhotographsApproved Operative NameBadge No.DougieCarl StephensonDistribution ListDistribution by Inspector x OR Distribution by Tech. Dept. OR Distribution by ATSM XClient Approved Contractor Main Contractor xTech. Dept. x ATM x Regional DirectorEverlast Waterproofing Ltd O&M rev 1LJMU


PPPhoto 1Photo 2PFLASHING REQUIRED TO INTERFACEEverlast Waterproofing Ltd O&M rev 1LJMU


INTERIM INSPECTION REPORTSingle Ply InterimPROJECT NUMBER B101732/1 AREA MANAGER John WilkinsonPROJECT NAMEMount Pleasant Campus - GTBPROJECT ADDRESSLiverpool John Moores University, Mount Pleasant, LIVERPOOL, L35RGAPPROVED CONTRACTOREverlast WaterproofingTEL 0113 2552739SITE FOREMAN FOR ABOVE Alex Kettle (0113 255 2739)Roof No.Roof(s)Inspected%CompleteRoof Area Name Size System ID (Office Use Only)RA 1 x 95% Lift 02 85.00 Thermofol 1.5mm FB 161RA 2 100% Stair 07 0.00 Thermofol 1.5mm FB 161RA 3 x 80% Stair 01 0.00 Thermofol 1.5mm FB 161Products (Kit List)Part RA 1 RA 2 RA 3PIR 160mm (160mm) X XDS1 DUO X XThermofol U15 V Blue Grey- Fleece Backed X X XThermofol Parapet Outlet X X XSealant Kit X X XThermofol Outlet X XINSPECTED BY: Paul Adderley Date: 18/01/2011QuestionsIf No is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NOAre the <strong>co</strong>rrect materials on site?XAre the materials being stored <strong>co</strong>rrectly <strong>and</strong> safely?XAre there the <strong>co</strong>rrect tools <strong>and</strong> equipment on site?XIs there a <strong>co</strong>py of a specification, drawings <strong>and</strong> tapered scheme (if required) on site?XIs the workmanship <strong>co</strong>nsistent with Bauder's requirements for the guarantee?XIs the detailing being carried out in ac<strong>co</strong>rdance with the specification?XDo the roof areas <strong>co</strong>rrespond with the specification?xIf Yes is answered to any of the following questions, please add <strong>co</strong>mments in area below YES NODid any discussions take place whilst on site that need re<strong>co</strong>rding?XDid you notice any unsafe roof installation practices?XIs there debris that is damaging or likely to damage the roof?XAre there any following trades that are damaging or likely to damage the roof?xEverlast Waterproofing Ltd O&M rev 1LJMU


Actions Required By TechnicalNoneOther CommentsThere is an issues with the detailing to the perimeter of one of the stairwell a bracket has been fixed to the top of the slope through the bauder single ply toenable the fixing of the capping this has no detail <strong>co</strong>vering it to achieve a Bauder acceptable detail the capping should be stripped of <strong>and</strong> a bauder single plyflashing encapsulating the bracket <strong>and</strong> the capping re fixed using a suitable watertight fixingPlease See Below For Relevant PhotographsApproved Operative NameBadge No.Not knownDistribution ListDistribution by Inspector x OR Distribution by Tech. Dept. OR Distribution by ATSMClient x Approved Contractor Main ContractorTech. Dept. x ATM x Regional DirectorPPEverlast Waterproofing Ltd O&M rev 1LJMU


GUARANTEES/WARRANTIES Bauder WaterproofingNot available until all work <strong>co</strong>mplete <strong>and</strong> passed byBauder-7-Everlast Waterproofing Ltd O&M rev 1LJMU


CLEANING AND MAINTENANCEPROCEDURES Bauder Felts Kobra Granite Paving Surespan Hatch-8-Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


Everlast Waterproofing Ltd O&M rev 1LJMU


AS-BUILT SPECIFICATION J41 NBS Bauder Bituminous J42 NBS Bauder Single Ply-9-NBS SECTION J41 - DESCRIPTION OF WORKSSection J41 deals with the installation of the Bauder Waterproofing System, <strong>co</strong>mprising<strong>co</strong>verings of multiple layers of reinforced bituminous membranes laid <strong>and</strong> jointed using selfadhesive<strong>and</strong>/or torch application as required. It includes where required, the vapour <strong>co</strong>ntrolEverlast Waterproofing Ltd O&M rev 1LJMU


layer, thermal insulation, underlayer <strong>and</strong> capping sheet membranes (root resistant for green roofsystems) <strong>and</strong> presumes the deck substrate <strong>and</strong> roof falls as stated within the specificationbelow. Accessories are included where relevant.It is intended for use on projects where the detailed design is <strong>co</strong>mpleted by the specifier(architect or l<strong>and</strong>scape architect) with technical assistance from the manufacturer as required<strong>and</strong> should be read in <strong>co</strong>njunction with any project specific drawings provided.SCOPE OF WORKSThis section includes:The Bauder waterproofing system.Related Bauder system accessoriesThermal insulation that meets the required U Value.Internal rainwater outlets (but not the <strong>co</strong>nnected drainage/plumbing goods)Surfacing (paving <strong>and</strong> ballast)This section does not include: Construction of the structural deck. Proprietary rainwater drainage / plumbing – refer NBS section R10 Lightning protection – refer NBS Engineering Services, Section W60. Proprietary metal capping system – refer Section H72.J41REINFORCED BITUMEN MEMBRANE ROOF COVERINGSTo be read with Preliminaries/ General Conditions.TYPES OF COVERING120 BUILT-UP REINFORCED BITUMEN MEMBRANE INVERTED ROOF COVERING Roof area: Level 6 Plant Roof Substrate: New Concrete deck (designed <strong>and</strong> <strong>co</strong>nstructed level with no deflections,hollows or back-falls).- Preparation: As clause 610C. Waterproof <strong>co</strong>vering: BAUDER TOTAL ROOF SYSTEM- System manufacturer: Bauder Limited, 70, L<strong>and</strong>seer Road, Ipswich, Suffolk, IP30DH.Tel: 01473 257 671. Fax: 01473 230 761. Email: technical@bauder.<strong>co</strong>.<strong>uk</strong>Web: www.bauder.<strong>co</strong>.<strong>uk</strong>- Underlayer: Bauder G4E, 4 mm thick, 200g/m² glass-fibre reinforced, elastomerictorch applied bitumen underlayerAttachment: As clauses 710, 740A.- Top layer / Cap sheet: Bauder K5E, 5 mm thick, 250g/m² polyester reinforced,elastomeric bitumen torch applied capping sheet - mica finish.Attachment: As clauses 710, 750D.- Flashings <strong>and</strong> detail work: Bauder K5K capping sheet, char<strong>co</strong>al grey finish. Install asclause 775B. Liquid applied detailing: Bauder LiquiFIBRE Detailing System applied to the specificareas stated below, in strict ac<strong>co</strong>rdance with the Bauder instructions provided, asclause 776. The product must not be used in any areas of Bauder Roof Systemswithout prior <strong>co</strong>nsent of Bauder Limited.- Areas for application: Balustrade Posts <strong>and</strong> other Penetrations where required.Insulation: 200mm thick, Bauder JFRI Inverted Insulation (to achieve 0.15 W/m²K ‘U’Value). Installation as clause 810A.Insulation to upst<strong>and</strong>s: N/AEverlast Waterproofing Ltd O&M rev 1LJMU


Vapour Permeable Membrane: Bauder JFRI vapour permeable membrane. Installationas clause 816A.Surface protection / securement:- 20-40 mm grade washed stone ballast (supplied by others), as clause 460.Installation as clause 820.- Concrete paving on proprietary support pads (supplied by others), as clauses465, 467. Installation as clause 835. Installation of paving as clause 840A.Accessories:- New internal rainwater outlets (supplied <strong>and</strong> installed by others), as clause 490.- 50 mm x 50 mm treated timber angle fillets, as clause 335A . Installation, asclause 775B.- Bauder KH60/90 linear drainage channel. Installation, as clause 830D. Additional Requirements: 210, 515, 520, 530, 560, 561, 910A, 940, 950B.120A BUILT-UP REINFORCED BITUMEN MEMBRANE INVERTED ROOF COVERING Roof area: North & South Terraces on Levels 4 & 5 Substrate: New Concrete deck (designed <strong>and</strong> <strong>co</strong>nstructed level with no deflections,hollows or back-falls).- Preparation: As clause 610C. Waterproof <strong>co</strong>vering: BAUDER TOTAL ROOF SYSTEM- System manufacturer: Bauder Limited, 70, L<strong>and</strong>seer Road, Ipswich, Suffolk, IP30DH.Tel: 01473 257 671. Fax: 01473 230 761. Email: technical@bauder.<strong>co</strong>.<strong>uk</strong>Web: www.bauder.<strong>co</strong>.<strong>uk</strong>- Underlayer: Bauder G4E, 4 mm thick, 200g/m² glass-fibre reinforced, elastomerictorch applied bitumen underlayerAttachment: As clauses 710, 740A.- Top layer / Cap sheet: Bauder K5E, 5 mm thick, 250g/m² polyester reinforced,elastomeric bitumen torch applied capping sheet - mica finish.Attachment: As clauses 710, 750D.- Flashings <strong>and</strong> detail work: Bauder K5K capping sheet, char<strong>co</strong>al grey finish. Install asclause 775B. Liquid applied detailing: Bauder LiquiFIBRE Detailing System applied to the specificareas stated below, in strict ac<strong>co</strong>rdance with the Bauder instructions provided, asclause 776. The product must not be used in any areas of Bauder Roof Systemswithout prior <strong>co</strong>nsent of Bauder Limited.- Areas for application: Balustrade Posts. Insulation: 200mm thick, Bauder JFRI Inverted Insulation (to achieve 0.15 W/m²K ‘U’Value). Installation as clause 810A. Insulation to upst<strong>and</strong>s: N/A Vapour Permeable Membrane: Bauder JFRI vapour permeable membrane. Installationas clause 816A. Surface protection / securement: Concrete paving on proprietary support pads(supplied by others), as clauses 465, 467. Installation as clause 835. Installation ofpaving as clause 840A. Accessories:- New internal rainwater outlets (supplied <strong>and</strong> installed by others), as clause 490.- 50 mm x 50 mm treated timber angle fillets, as clause 335A . Installation, asclause 775B.- Bauder KH60/90 linear drainage channel. Installation, as clause 830D. Additional Requirements: 210, 515, 520, 530, 560, 561, 910A, 940, 950B.Everlast Waterproofing Ltd O&M rev 1LJMU


120B BUILT-UP REINFORCED BITUMEN MEMBRANE INVERTED ROOF COVERING Roof area: 1 st Floor Substation Roof Substrate: New Concrete deck (designed <strong>and</strong> <strong>co</strong>nstructed level with no deflections,hollows or back-falls).- Preparation: As clause 610C. Waterproof <strong>co</strong>vering: BAUDER TOTAL ROOF SYSTEM- System manufacturer: Bauder Limited, 70, L<strong>and</strong>seer Road, Ipswich, Suffolk, IP30DH.Tel: 01473 257 671. Fax: 01473 230 761. Email: technical@bauder.<strong>co</strong>.<strong>uk</strong>Web: www.bauder.<strong>co</strong>.<strong>uk</strong>- Underlayer: Bauder G4E, 4 mm thick, 200g/m² glass-fibre reinforced, elastomerictorch applied bitumen underlayerAttachment: As clauses 710, 740A.- Top layer / Cap sheet: Bauder K5E, 5 mm thick, 250g/m² polyester reinforced,elastomeric bitumen torch applied capping sheet - mica finish.Attachment: As clauses 710, 750D.- Flashings <strong>and</strong> detail work: Bauder K5K capping sheet, char<strong>co</strong>al grey finish. Install asclause 775B. Insulation: 120mm thick, Bauder JFRI Inverted Insulation (to achieve 0.25 W/m²K ‘U’Value). Installation as clause 810A. Insulation to upst<strong>and</strong>s: N/A Vapour Permeable Membrane: Bauder JFRI vapour permeable membrane. Installationas clause 816A. Surface protection / securement: Concrete paving on proprietary support pads(supplied by others), as clauses 465, 467. Installation as clause 835. Installation ofpaving as clause 840A. Accessories:- New internal rainwater outlets (supplied <strong>and</strong> installed by others), as clause 490.- 50 mm x 50 mm treated timber angle fillets, as clause 335A . Installation, asclause 775B. Additional Requirements: 210, 515, 520, 530, 560, 561, 910A, 940, 950B.PERFORMANCE210 ROOF PERFORMANCE General: Secure, free draining <strong>and</strong> weather tight.PRODUCTS320 PRIMERType: Any <strong>co</strong>mmercially available Bituminous Priming Solution meeting characteristics ofBS 8217, clause 5.6.2. supplied by approved installer, or Bitumen cut back with volatilesolvent. Characteristics when tested to BS EN 13357:- Volatile solvent <strong>co</strong>ntent (minimum): 40% by mass.- Vis<strong>co</strong>sity (maximum) (STV at 25°C, 4 mm orifice): 10s.460 STONE BALLAST Type: Natural Round Washed Caledonian Supplier: Alpha Aggregates. Size: Graded 20-40 mm, free from fines <strong>and</strong> sharps. Colour: Mixed465 PRECAST CONCRETE PAVING SLABS St<strong>and</strong>ard: To BS 7263-1, hydraulically pressed.Everlast Waterproofing Ltd O&M rev 1LJMU


Manufacturer: Marshalls Product reference: n/a Colour/ Finish: Natural Size: 600mm x 600mm467 SUPPORT SYSTEM FOR PRECAST CONCRETE PAVING SLABS Manufacturer: Caro Size: 100mm x 20mm490 ROOF DRAINAGE OUTLETS Manufacturer: Alumasc Building Exteriors Product reference: Harmer AV 400 Material: Aluminium Size: 100mmEXECUTION GENERALLY515 ADVERSE WEATHER General: Do not lay <strong>co</strong>verings in high winds, wet or damp <strong>co</strong>nditions or in extremes oftemperature unless effective temporary <strong>co</strong>ver is provided over working area. Unfinished areas of roof: Keep dry, protect edges of laid membrane from wind action.520 INCOMPLETE WORK End of working day: Provide temporary seal to prevent water infiltration. On resumption of work: Cut away tail of membrane from <strong>co</strong>mpleted area <strong>and</strong> removefrom roof.530 APPLYING PRIMERS Coverage per <strong>co</strong>at (minimum): As per manufacturer’s re<strong>co</strong>mmendations. Surface <strong>co</strong>verage: Even <strong>and</strong> full. Coats: Fully bond. Allow volatiles to dry off thoroughly between <strong>co</strong>ats.560 GENERAL WORKMANSHIP REQUIREMENTS Installation of the Bauder waterproofing system may only be carried out by trained <strong>and</strong>certified operatives approved by Bauder Ltd <strong>and</strong> who carry current ID badges. Theseshould be available for inspection at all times. Workmanship must <strong>co</strong>mply with Codes of Practice BS 8217:2005 (or alternativelyBauder Ltd’s specification where otherwise stated). Non-<strong>co</strong>mpliant workmanship will notbe permitted, even if the system is watertight. The client will be told that all such faultsmust be remedied, before the Guarantee is issued. All waterproofing materials <strong>and</strong> system <strong>co</strong>mponents must be supplied by Bauder Ltd,unless otherwise stated. Any sub-st<strong>and</strong>ard materials or un-authorised alternatives willbe rejected. Any building work which is the responsibility of the roofing <strong>co</strong>ntractor <strong>and</strong>has a bearing on the life of the Bauder System must be carried out by properly trained<strong>and</strong> qualified tradesmen. Any structural damage, peculiarities or details dis<strong>co</strong>vered that might affect theperformance of the Bauder system, should be reported immediately to the client’srepresentative <strong>and</strong> Bauder Limited in order that they may assist in over<strong>co</strong>ming theproblem. The <strong>co</strong>ntractor is to ensure water tightness of the roof at all times. Proper day jointsmust be formed at the end of each working day to provide a temporary seal. Nomopping or loose <strong>co</strong>vers will be permitted. Where building works are to be carried out by other trades, following <strong>co</strong>mpletion of thewaterproofing, the <strong>co</strong>ntractor must make adequate provision for supplying protection toprevent damage to the new membranes. The final inspection will not be carried out byEverlast Waterproofing Ltd O&M rev 1LJMU


the Bauder Site Technician or the Bauder nominated Independent surveyor until allassociated trades are <strong>co</strong>mplete <strong>and</strong> the roof areas are clear from all debris <strong>and</strong>protection layers.It is imperative that the Bauder Approved Contractor <strong>co</strong>nforms to the workmanshipcriteria as listed above. Any deviation will result in the <strong>co</strong>ntract being <strong>co</strong>nsideredunguaranteeable.All mechanical <strong>and</strong> electrical work to plant <strong>and</strong> equipment should be carried out by<strong>co</strong>mpetent mechanical <strong>and</strong> electrical qualified tradesmen. All plant is to be reinstated<strong>and</strong> re-<strong>co</strong>mmissioned on <strong>co</strong>mpletion of the roofing works in ac<strong>co</strong>rdance with the client'sdetailed specification.Where building works are to be carried out by other trades, following <strong>co</strong>mpletion of thewaterproofing, the <strong>co</strong>ntractor must make adequate provision for supplying protection toprevent damage to the new waterproofing.If any items of plant/equipment are to be situated on the finished roof, a sacrificial layerof Bauder capping sheet is to be loose laid beneath. This is to extend a minimum 25mmpast the point of <strong>co</strong>ntact on all sides. In the case of heavy items it may be necessary tointroduce a load-spreading slab, please <strong>co</strong>ntact Bauder for further advice.All lead work to be carried out by skilled tradesmen <strong>and</strong> in ac<strong>co</strong>rdance with current<strong>co</strong>des of practice <strong>and</strong> the re<strong>co</strong>mmendations of the Lead Development Association.561 SITE INSPECTIONSBauder Site Technicians will carry out regular inspections of the project during the<strong>co</strong>urse of the works. The Approved Contractor must give reasonable notice to Bauder oftheir intention to <strong>co</strong>mmence laying capping sheet. This will allow a discretionaryinspection of the underlayer to take place, so that any remedial treatment necessary canbe carried out prior to installing the capping sheet. This is particularly important whentapered insulation has been used to ensure that any areas of st<strong>and</strong>ing water that mayremain can be addressed.Bauder must be notified when the roof is ready for final inspection <strong>and</strong> all related works<strong>and</strong> snagging <strong>co</strong>mplete. See also clauses 910A or 910B (L<strong>and</strong>scaped roofs).SUBSTRATES / VAPOUR CONTROL LAYERS / WARM ROOF INSULATION610C SUITABILITY OF SUBSTRATES (CONCRETE) Substrates generally: Secure, clean, dry, smooth, free from frost, <strong>co</strong>ntaminants, voids<strong>and</strong> protrusions. Falls: Where provided, the falls/cross-falls should be a minimum of 1:60. No deflectionsor back-falls present if the deck is designed to achieve a 0° level finished surface. Preliminary work: Complete including:- Grouting of deck slab joints, application of surface screed (including falls if specified).- Formation of abutment upst<strong>and</strong>s, kerbs, box gutters, sumps, grooves, chases <strong>and</strong>expansion joints.- Fixing of battens, fillets <strong>and</strong> anchoring plugs/strips as required. Moisture <strong>co</strong>ntent <strong>and</strong> stability of substrate: Must not impair roof integrity. Preparation: The new <strong>co</strong>ncrete/ screed deck to be allowed to cure thoroughly, removerough edges, <strong>and</strong> surface defects. If the surface is very rough a skin screed of <strong>co</strong>ncreteto be applied to give a smooth surface. Prime all areas receiving the new waterproofingwith bitumen primer, as clause 320, <strong>and</strong> allow it to dry.WATERPROOF COVERINGS/ ACCESSORIES710 LAYING REINFORCED BITUMEN MEMBRANES GENERALLY Direction of laying: Unrolled up the slope.- Where practicable, install so that water drains over <strong>and</strong> not into laps. Side <strong>and</strong> end laps (minimum): 100 mm, with the exception of mineral surfacedmembranes, where side laps are 80 mm, but the head laps to remain 100 mm.Everlast Waterproofing Ltd O&M rev 1LJMU


Head <strong>and</strong> side laps: Offset.Intermediate <strong>and</strong> top layer/Capping sheet: Fully bond.Successive layers: Apply without delay. Do not trap moisture.Strips of bitumen membrane for 'linear' details: Cut from length of roll e.g. gutter solepieces.Detail flashings: to be cut from width of roll.Completed <strong>co</strong>verings: Firmly attached, fully sealed, smooth, weather proof <strong>and</strong> freedraining.740A TORCH-ON BONDING OF REINFORCED BITUMEN UNDERLAYER Bond: Partially bonded in the approved Bauder manner. Laps: Head <strong>and</strong> side laps to be 100 mm. All laps to upst<strong>and</strong>s, edge details, flashings,etc., to be a minimum 100 mm. The underlayer must be taken up all upst<strong>and</strong>s, edgedetails, in ac<strong>co</strong>rdance with current British St<strong>and</strong>ards <strong>and</strong> the manufacturer’sre<strong>co</strong>mmendations. Underlayer inspection: The Approved Contractor must give reasonable notice to thenominated Bauder Site Technician of their intention to <strong>co</strong>mmence laying capping sheet.This will allow a discretionary inspection of the underlayer to take place, so that anyremedial treatment necessary can be carried out prior to installing the capping sheet.750D LAYING MICA FINISHED REINFORCED BITUMEN TORCH-ON CAPPING SHEET Bond: Full over whole surface, with no air pockets. Excess <strong>co</strong>mpound at laps of top layer/ capping sheet: Provide a 5 mm - 10 mm<strong>co</strong>ntinuous bitumen bead extrusion that must be subsequently heated <strong>and</strong> trowelledflush with the surface prior to applying the pedestrian tiles. Laying top layer: Fully bonded to the underlayer by torching in the approved Baudermanner. All laps to be butt-jointed, with joints off-set from the preceding layer. All laps toupst<strong>and</strong>s, edge details, flashings, etc. to be 100 mm. Final Inspection: The finished roof must be thoroughly inspected by the Bauder SiteTechnician before any surface finish is laid (i.e. tiles). This is to ensure that anyremedial treatment that is necessary can be carried out prior to issuing the guarantee.Failure to ensure the instigation of this inspection will result in the issuing of the Bauderguarantee being put in jeopardy. Surface Finish: Paving Tiles to client’s specification <strong>and</strong> installed in ac<strong>co</strong>rdance withmanufacturers guidelines. Layers of bitumen membrane: Carry in staggered formation up the upst<strong>and</strong>, with eachlayer fully bonded. Upst<strong>and</strong>s: -At ends of rolls: Underlay layer only - Form with specified bitumen membrane carriedup without using separate strip.Elsewhere: Form with matching strips of bitumen membrane, maintaining laps.Additional fixing of bitumen membranes: Mechanically fix all upst<strong>and</strong>s in excess of250 mm in height using appropriate fasteners. In the event of doubt, Bauder should be<strong>co</strong>nsulted regarding any specific requirement.Upst<strong>and</strong> details (minimum height): 150 mm minimum, taken from the surface of thefinished l<strong>and</strong>scaping. Special attention should be paid to all structures, such asrooflights, <strong>co</strong>unter-flashings, window <strong>and</strong> door cills, pipes etc. Bauder cannot takeresponsibility for water ingress over waterproofing details <strong>co</strong>nstructed below there<strong>co</strong>mmended minimum height.Flashings: Separate flashings must always be formed. Capping sheet taken up theupst<strong>and</strong> in one piece will not be permitted.776 LIQUID APPLIED DETAILING Product: Bauder LiquiFIBRE Detailing System Preparation: Ensure that the surface receiving the Bauder LiquiFIBRE is clean, dry <strong>and</strong>free from dust, laitance, grease, oil, <strong>and</strong> any other <strong>co</strong>ntaminants.Everlast Waterproofing Ltd O&M rev 1LJMU


- Protection: Cover the <strong>co</strong>mpleted bituminous membranes with a clean tarpaulin toprotect from any spills <strong>and</strong> splashes.- Metal: surfaces should be rubbed down with thoroughly with Bauder LiquiCLEAN<strong>and</strong> allowed to evaporate for 20 minutes <strong>and</strong> over-<strong>co</strong>ated within 60 minutes. Allpaint should be removed back to clean metal. Any rust should be treated with‘Hammerite No.1 Rustbeater’ strictly in ac<strong>co</strong>rdance with the manufacturer’sinstructions.- Plastics: should be rubbed down thoroughly with BauderCLEAN <strong>and</strong> lightlyabraded before carrying out adhesion testing. Bauder LiquiCLEAN <strong>and</strong> allowed toevaporate for 20 minutes <strong>and</strong> over-<strong>co</strong>ated within 60 minutes.- Note: Bauder LiquiCLEAN must not <strong>co</strong>me into <strong>co</strong>ntact with bituminous membranes.Application: Apply Bauder LiquiFIBRE Detailing System to specified areas, in strictac<strong>co</strong>rdance with the Bauder application instructions provided within each kit. Applicationis straightforward, but Bauder will provide on-site training in the use of this product onrequest. The product must not be used in any areas of Bauder Roof Systems withoutprior <strong>co</strong>nsent of Bauder Limited.SURFACING810A LAYING INVERTED ROOF INSULATION (FLAT AREAS) Preparation: Clear roof of other trades. Condition of substrate: Clean. Separating layer: N/A Setting out: Loose lay insulation directly over the capping sheet to brick pattern withstaggered joints. Minimize cutting <strong>and</strong> avoid small pieces at perimeters <strong>and</strong> penetrations.Dependent upon the total thickness required, it may be necessary to <strong>co</strong>nstruct theinsulation using two layers of board. The manufacturer/supplier can advise on theavailable <strong>co</strong>mbination options. Joints: Butt together. Projections, upst<strong>and</strong>s, rainwater outlets, etc: Cut insulation cleanly <strong>and</strong> fit closely around. Completion: Boards in good <strong>co</strong>ndition, well fitting <strong>and</strong> stable with no springing orrocking. Cover to prevent wind uplift <strong>and</strong> flotation as soon as practicable.816A VAPOUR PERMEABLE MEMBRANESetting out: To be rolled out loose over the Insulation. The material should be dressedup all upst<strong>and</strong> abutments <strong>and</strong> details to the height of the surfacing.Laps: The material is to be lapped a minimum of 300mm in a direction that helps shedwater from the roof rather than beneath the membrane.The ballast loading /l<strong>and</strong>scaping should be applied immediately after the vapourpermeable membrane to ensure it is secure against wind uplift.820 LAYING STONE BALLAST Gravel guards: Fit to outlets. Condition of substrate: Clean. Application: Do not pile to excessive heights. Spread evenly. Depth (minimum): min.60 mm Installation: 20 – 40mm rounded washed pebbles to be installed onto the vapourpermeable membrane to a minimum depth of 60mm, which prevents wind uplift <strong>and</strong>flotation of the insulation in high winds <strong>and</strong>/or heavy rainfall Additional loading at perimeters: On high buildings in more exposed areas, wind upliftmay be a problem <strong>and</strong> in these instances paving slab ballast must be <strong>co</strong>nsidered.Paving slabs should be a minimum of 50mm thick. The slabs should be laid on pavingslab supports of minimum 175mm diameter (or equivalent base area). All final details must to be <strong>co</strong>nfirmed with Bauder before proceeding.830D LINEAR DRAINAGE SYSTEMEverlast Waterproofing Ltd O&M rev 1LJMU


Bauder KH60/90 linear drainage channel, 1.5 mm galvanised steel channel sections,1000 x 150 x 50 mm with integral grille plate. These units are supplied <strong>and</strong> fitted withadjustable feet with an adjustment range of 60 mm - 90 mm. A perforated bridging stripis also available to special order. This clip-on strip is used when the angle fillets preventthe supporting feet of the channel from being positioned tight against the abutment wallor kerb.Individual sections of Bauder KH60/90 channel should be joined using BauderConnection Clips, with Bauder Stop Ends used where the drain terminates at abutments.These channel units are perforated <strong>and</strong> designed to allow water to discharge at a<strong>co</strong>ntrolled rate into the drainage layer below.Please note that these units are not suitable for supporting the weight of vehicular traffic.835 ADJUSTABLE PAVER SUPPORT Placement - Supports to be installed ac<strong>co</strong>rding to the system build-up below: -Bituminous membranes: directly on to the waterproofing.Inverted insulation: directly on to filter layer / vapour permeable membrane.Thermofol Single Ply Membrane: directly on to Bauder protection fleece.Thermoplan Single Ply membrane: directly on to membrane surface.LiquiTEC liquid <strong>co</strong>ld applied system: directly on to waterproofing surface. Installation: Refer to clause 467 <strong>and</strong> supplying manufacturer’s guidelines.840A LAYING PRECAST CONCRETE PAVING SLABS Extent: To designated areas – See l<strong>and</strong>scape designers plan. Support: Slabs to be laid on specified support pads, adjusted in ac<strong>co</strong>rdance with themanufacturer’s re<strong>co</strong>mmendations to ensure a flush, level finished surface. Setting out: Minimize cutting. Joints: ca. 4 mm. Completion: Slabs must be level <strong>and</strong> stable.COMPLETION910A INSPECTION Interim <strong>and</strong> final roof inspections: Strictly in ac<strong>co</strong>rdance with the manufacturer’srequirements for guarantee. Notification: It is the responsibility of the approved <strong>co</strong>ntractor to advise Bauder Ltdwhen the roof is ready for Final Inspection. Other requirements: Please also refer to preliminaries / general <strong>co</strong>nditions.940 COMPLETION Roof areas: Clean. Outlets: Clear. Work necessary to provide a weather tight finish: Complete. Storage of materials on finished surface: Not permitted. Completed membrane: Do not damage. Protect from chemicals, traffic <strong>and</strong> adjacent orhigh level working.950B GUARANTEE A 20 year product <strong>and</strong> workmanship guarantee is to be provided upon <strong>co</strong>mpletionfollowing a Final Inspection by Bauder. Details regarding the full terms <strong>and</strong> <strong>co</strong>nditionsare available separately from Bauder Ltd upon request. This system must installed by aBauder Approved Contractor, to be eligible for guarantee.Everlast Waterproofing Ltd O&M rev 1LJMU


NBS SECTION J42 - DESCRIPTION OF WORKSSection J42 deals with the installation of the Bauder Single Ply System, <strong>co</strong>mprising single layer<strong>co</strong>verings of polymeric sheets either mechanically fixed or adhesive bonded <strong>and</strong> jointed usinghot air equipment. It includes where required the vapour <strong>co</strong>ntrol layers, insulation (whetherabove or below the waterproofing) the waterproof membrane <strong>and</strong> additional surface finishes ofpaving slabs or gravel in specifications where this finish is required. We presume the decksubstrate <strong>and</strong> falls to be as stated within the specification below. Accessories are includedwhere relevant.It is intended for use on projects where the detailed design is <strong>co</strong>mpleted by the specifier(architect or l<strong>and</strong>scape architect) with technical assistance from the manufacturer as required<strong>and</strong> should be read in <strong>co</strong>njunction with any project specific drawings provided.SCOPE OF WORKSThis section includes:The Bauder Single Ply waterproofing system.Thermal insulation to meet the clients required U value.Related Bauder system accessories.Internal rainwater outlets (but not the <strong>co</strong>nnected drainage/plumbing goods).This section does not include: Construction of the structural deck. Fall arrest /restraint systems – refer NBS Section N25. Lightning protection – refer NBS Engineering Services, Section W60. Proprietary rainwater drainage / plumbing – refer NBS section R10J42SINGLE LAYER POLYMERIC SHEET COVERINGSTo be read with preliminaries /general <strong>co</strong>nditions110 WARM ROOF COVERING: Roofs to Lift 02 <strong>and</strong> Stair 07 Substrate: New Cement Particle Board deck (designed <strong>and</strong> <strong>co</strong>nstructed to provide aminimum finished slope of 1°).- Preparation: As clause 610F. Roof <strong>co</strong>vering system: BAUDER SINGLE PLY THERMOFOL SYSTEM System manufacturer: Bauder Limited, 70, L<strong>and</strong>seer Road, Ipswich, Suffolk, IP3 0DH.Tel: 01473 257 671. Fax: 01473 230 761. Email: technical@bauder.<strong>co</strong>.<strong>uk</strong>Web: www.bauder.<strong>co</strong>.<strong>uk</strong> Vapour <strong>co</strong>ntrol layer: BauderTHERM DS1 Duo, 3.5 mm thick aluminium lined,elastomeric bitumen self-adhesive vapour. Installation as clause 670B. Insulation: 160mm thick, Bauder Thermotech Glass flat board, fire resistant, highlyefficient rigid urethane insulation, with zero ODP (to meet required U Value of0.15W/m²K). Installation by adhesive bonding, as clause 680C. Insulation to upst<strong>and</strong>s: N/A Insulation to vertical upst<strong>and</strong>s (abutment walls only): N/A Separating layer (loose laid): N/A Waterproof membrane: Thermofol U15 V, 1.5 mm thick polyester reinforced fleecebacked waterproofing membrane, <strong>co</strong>lour Blue Grey, fully bonded by <strong>co</strong>ld appliedadhesive. Installation as clauses 720D.Everlast Waterproofing Ltd O&M rev 1LJMU


Lap joints: All joints to be hot air welded, as clause 730A. Details: -Two dimensional detailing: formed using Thermofol pre-<strong>co</strong>ated, pre-fabricated metal,or non-fleece backed membrane (<strong>co</strong>lour <strong>and</strong> thickness as used for the flat areas), orused in <strong>co</strong>mbination where appropriate. Membrane to be either fully bonded using theappropriate Bauder <strong>co</strong>ntact adhesive or mechanically fixed ac<strong>co</strong>rding to the <strong>co</strong>nstruction- refer to the Bauder Single Ply Installation Manual for further guidance.Three dimensional detailing: Complex three dimensional detailing to curves, pipes orawkward shapes to be formed using Thermofol un-reinforced D15 membrane. OtherwiseThermofol pre-formed <strong>co</strong>rners must be used at intersections <strong>and</strong> returns.Detailing generally: to be carried out in ac<strong>co</strong>rdance with clauses 760, 764A, 765A,766A, 767A, 768A, 769, 770, 780A <strong>and</strong> the Bauder Single Ply Installation Manual. Surface protection: N/A Accessories:- Use of Bauder Mastic Sealant. Application as clause 901A.- Bauder Thermofol St<strong>and</strong>ard Internal Rainwater outlet (size as required to matchdrainage pipe work). Installation as clause 903A.- Bauder Thermofol St<strong>and</strong>ard Parapet outlet (size as required to match drainagepipe work). Installation as clause 904A. Additional requirements: 210, 310, 510A, 517A, 520, 522, 523, 530, 910A, 940, 950D.130 COLD ROOF COVERING: Roof Over Stair 01 Substrate: New OSB 3 deck (designed <strong>and</strong> <strong>co</strong>nstructed to provide a minimum finishedslope of 1°).- Preparation: As clause 610I. Roof <strong>co</strong>vering system: BAUDER SINGLE PLY THERMOFOL SYSTEM System manufacturer: Bauder Limited, 70, L<strong>and</strong>seer Road, Ipswich, Suffolk, IP3 0DH.Tel: 01473 257 671. Fax: 01473 230 761. Email: technical@bauder.<strong>co</strong>.<strong>uk</strong>Web: www.bauder.<strong>co</strong>.<strong>uk</strong> Protection layer (loose laid): N/A Waterproof membrane: Thermofol U15 V, 1.5 mm thick polyester reinforced fleecebacked waterproofing membrane, <strong>co</strong>lour Blue Grey, fully bonded by <strong>co</strong>ld appliedadhesive. Installation as clauses 720G. Lap joints: All joints to be hot air welded, as clause 730A. Details: -Two dimensional detailing: formed using Thermofol pre-<strong>co</strong>ated, pre-fabricated metal,or non-fleece backed membrane (<strong>co</strong>lour <strong>and</strong> thickness as used for the flat areas), orused in <strong>co</strong>mbination where appropriate. Membrane to be either fully bonded using theappropriate Bauder <strong>co</strong>ntact adhesive or mechanically fixed ac<strong>co</strong>rding to the <strong>co</strong>nstruction- refer to the Bauder Single Ply Installation Manual for further guidance.Three dimensional detailing: Complex three dimensional detailing to curves, pipes orawkward shapes to be formed using Thermofol un-reinforced D15 membrane. OtherwiseThermofol pre-formed <strong>co</strong>rners must be used at intersections <strong>and</strong> returns.Detailing generally: to be carried out in ac<strong>co</strong>rdance with clauses 760, 764A, 765A,766A, 767A, 768A, 769, 770, 780A <strong>and</strong> the Bauder Single Ply Installation Manual. Upper protective layer (loose laid): N/A Surfacing: N/A Accessories:- Use of Bauder Mastic Sealant. Application as clause 901A.- Bauder Thermofol St<strong>and</strong>ard Parapet outlet (size as required to match drainagepipe work). Installation as clause 904A. Additional requirements: 210, 310, 510A, 517A, 520, 522, 523, 910A, 940, 950D.Everlast Waterproofing Ltd O&M rev 1LJMU


PERFORMANCE210 ROOF PERFORMANCE Roof <strong>co</strong>vering: Secure, free draining <strong>and</strong> weather-tight.PRODUCTS310 ANCILLARY PRODUCTS AND ACCESSORIES Types: Re<strong>co</strong>mmended by <strong>co</strong>ating manufacturer320 PRIMER Type: Any <strong>co</strong>mmercially available Bituminous Priming Solution meetingcharacteristics of BS 8217, clause 5.6.2. supplied by approved installer, or- Bitumen cut back with volatile solvent. Characteristics when tested to BS EN13357:Volatile solvent <strong>co</strong>ntent (minimum): 40% by mass.Vis<strong>co</strong>sity (maximum) (STV at 25°C, 4 mm orifice): 10s.330 TIMBER TRIMS, ETC Quality: Planed. Free from wane, pitch pockets, decay <strong>and</strong> insect attack (exceptambrosia beetle damage). Moisture <strong>co</strong>ntent at time of <strong>co</strong>vering (maximum): 22%. Preservative treatment: Please note organic solvent based timber preservatives are notpermitted, as these attack bitumen based materials.EXECUTION GENERALLY510A ADVERSE WEATHER General: Do not lay membrane at temperatures below 5°C or in wet or damp <strong>co</strong>nditions. Provide temporary <strong>co</strong>vers <strong>and</strong> drainage as required to keep finished areas of the roof dry. Poor weather: Suspend work in severe or <strong>co</strong>ntinuously wet weather, unless an effectivetemporary roof is provided over the working area. If unavoidable wetting of the <strong>co</strong>nstruction does occur, take prompt action to minimise <strong>and</strong>make good any damage. Unfinished areas of roof: Temporarily ballast in<strong>co</strong>mplete areas of membrane asnecessary to protect from wind action.517A GENERAL WORKMANSHIP REQUIREMENTSInstallation of the Bauder waterproofing system may only be carried out by trained <strong>and</strong>certified operatives approved by Bauder Ltd <strong>and</strong> who carry current ID badges. Theseshould be available for inspection at all times.Workmanship must <strong>co</strong>mply with current Codes of Practice, BS6229 <strong>and</strong> Bauder Ltdinstallation instructions. Non-<strong>co</strong>mpliant workmanship will not be permitted, even if thesystem is watertight. The client will be told that all such faults must be remedied, beforethe Guarantee is issued.All waterproofing materials <strong>and</strong> system <strong>co</strong>mponents must be supplied by Bauder Ltd,unless otherwise stated. Any sub-st<strong>and</strong>ard materials or un-authorised alternatives willbe rejected.Any building work which is the responsibility of the roofing <strong>co</strong>ntractor <strong>and</strong> has a bearingon the life of the Bauder System must be carried out by properly trained <strong>and</strong> qualifiedtradesmen.Any structural damage, peculiarities or defects dis<strong>co</strong>vered that might affect theperformance of the Bauder system, should be reported immediately to the client’srepresentative <strong>and</strong> Bauder Limited in order that they may assist in over<strong>co</strong>ming theproblem.The <strong>co</strong>ntractor is to ensure water tightness of the roof at all times.Everlast Waterproofing Ltd O&M rev 1LJMU


Where building works are to be carried out by other trades, following <strong>co</strong>mpletion of thewaterproofing, the <strong>co</strong>ntractor must make adequate provision for supplying protection toprevent damage to the new membranes. The final inspection will not be carried out bythe Bauder technician until all associated trades are <strong>co</strong>mplete <strong>and</strong> the roof areas areclear from all debris <strong>and</strong> protection layers.All mechanical <strong>and</strong> electrical work to plant <strong>and</strong> equipment should be carried out by<strong>co</strong>mpetent mechanical <strong>and</strong> electrical qualified tradesmen. All plant is to be reinstated<strong>and</strong> re-<strong>co</strong>mmissioned on <strong>co</strong>mpletion of the roofing works in ac<strong>co</strong>rdance with the client'sdetailed specification.Any lead work must carried out by skilled tradesmen <strong>and</strong> in ac<strong>co</strong>rdance with current<strong>co</strong>des of practice <strong>and</strong> the re<strong>co</strong>mmendations of the Lead Development Association.Coats: Fully bond. Allow volatiles to dry off thoroughly between <strong>co</strong>ats.520 INCOMPLETE WORK End of working day: Provide temporary seal to the deck to prevent water infiltration,ensuring that the insulation, if present, is protected. Ensure that the sequence of laying enables temporary sealing of loose membrane edgesto be down on the slope <strong>and</strong> not against the flow of water. On resumption of work: Cut away tail of membrane from <strong>co</strong>mpleted area <strong>and</strong> removefrom roof.522 PROTECTION AND STORAGE OF MATERIALS Store rolls of polymeric membrane <strong>and</strong> associated products in a clean, dry, wellventilated <strong>and</strong> <strong>co</strong>ol <strong>co</strong>nditions. Store materials designated by the manufacturers as temperature sensitive in facilitieswhere temperature can be maintained at the re<strong>co</strong>mmended level. Insulation products must be kept dry <strong>and</strong> protected from wet weather during storage <strong>and</strong>installation.523 PROTECTION OF WORK Ensure that from <strong>co</strong>mpletion of the roof until practical <strong>co</strong>mpletion: The roof is not used as a working platform, unless fully protected to the satisfaction of theCA. No paints, solvents or other volatile substances harmful to the membrane are allowed to<strong>co</strong>me into <strong>co</strong>ntact with the roof surface. No building materials stored on the roof. Finished roof areas are adequately protected from damage by subsequent building<strong>operations</strong>.530 APPLYING PRIMERS Coverage per <strong>co</strong>at (minimum): As per manufacturer’s re<strong>co</strong>mmendations. Surface <strong>co</strong>verage: Even <strong>and</strong> full. Coats: Fully bond. Allow volatiles to dry off thoroughly between <strong>co</strong>ats.SUBSTRATES/ VAPOUR CONTROL LAYERS/ WARM ROOF INSULATION610F SUITABILITY OF SUBSTRATES (CEMENT PARTICLE BOARD)Substrates generally: Secure, clean, dry, smooth, free from frost, <strong>co</strong>ntaminants, voids<strong>and</strong> protrusions. Should <strong>co</strong>nform to BS 5669: Part 4:1989.Falls: Where provided, the falls/cross-falls should be a minimum of 1:60. No deflectionsor back-falls present if the deck is designed to achieve a 0° level finished surface.Preliminary work: Complete including:- Grouting of deck slab joints, application of surface screed (including falls if specified).Everlast Waterproofing Ltd O&M rev 1LJMU


- Formation of abutment upst<strong>and</strong>s, kerbs, box gutters, sumps, grooves, chases <strong>and</strong>expansion joints.- Fixing of battens, fillets <strong>and</strong> anchoring plugs/ strips as required.610IMoisture <strong>co</strong>ntent <strong>and</strong> stability of substrate: Must not impair roof integrity.Preparation: The new deck should be of a suitable type/profile to support the newwaterproofing. Approval of the specified deck should be first obtained from BauderLimited at specification stage to <strong>co</strong>nfirm suitability. The approved waterproofing<strong>co</strong>ntractor to Inspect the installed deck <strong>and</strong> report any issues that may have adetrimental effect upon waterproofing system to the both the Clients representative <strong>and</strong>Bauder Limited. If there is any doubt as to the exact requirement Bauder Limited shouldbe <strong>co</strong>ntacted for further advice. Prime the deck <strong>and</strong> all upst<strong>and</strong> abutments, edge detailsetc. with fast drying bitumen primer, as clause 320A <strong>and</strong> allow to dry, thoroughly. Pleasenote that primer should not be sprayed or poured onto the roof surface. It is best lightlyapplied either by rag wiping or with a roller after the taping strip has been taped intoplace, <strong>and</strong> ensuring adequate care is taken to avoid any excess primer dripping into <strong>and</strong>through the panel joints.Pre-screeded Cement Particle Board only: 200mm wide strips of Bauder R333 tapingstrip, loose-laid centrally over board joints. These can be retained temporarily held inposition with strips of self-adhesive membrane or gaffer tape, prior to the vapour barrierbeing laid.SUITABILITY OF SUBSTRATES (OSB BOARD)Substrates generally: Secure, clean, dry, smooth, free from frost, <strong>co</strong>ntaminants, voids<strong>and</strong> protrusions. The new OSB 3 board should be BBA certified, <strong>co</strong>nforming to BS5268Part 2:2002 & CPD/CE <strong>co</strong>mpliant, fixed directly to the metal using re<strong>co</strong>mmendedfasteners.Falls: Where provided, the falls/cross-falls should be a minimum of 1:60. No deflectionsor back-falls present if the deck is designed to achieve a 0° level finished surface.Preliminary work: Complete including:- Formation of upst<strong>and</strong>s, kerbs, box gutters, sumps, grooves, chases <strong>and</strong> expansionjoints.- Fixing of battens, fillets <strong>and</strong> anchoring plugs/ strips.Moisture <strong>co</strong>ntent <strong>and</strong> stability of substrate: Must not impair roof integrity.Preparation: All such items to be rectified as necessary to eliminate the possibility ofpuncturing the new waterproofing system.640 FIXING TIMBER TRIMS Fasteners: fastener type/length appropriate <strong>and</strong> suitable to particular deck substrate. Fixing centres (maximum): 500 mm.670B LAYING VAPOUR CONTROL LAYER Attachment: Cold applied <strong>and</strong> fully bonded to the deck. With metal decks the sheetsshould run in the direction of the crowns/troughs, with laps formed on the crowns of thedeck to ensure that they are fully supported in ac<strong>co</strong>rdance with manufacturersrequirements. Side <strong>and</strong> end laps: minimum 100 mm, laid red over blue with all laps torch sealed toprovide a 5-10 mm bitumen bead extrusion. Installation methods as re<strong>co</strong>mmended bymanufacturer. Penetrations: Fully seal using bonding methods re<strong>co</strong>mmended by manufacturer. Edges of insulation at roof edges, abutments, upst<strong>and</strong>s, kerbs, penetrations <strong>and</strong>the like: Edges of insulation at roof edges, abutments, upst<strong>and</strong>s, kerbs, penetrations<strong>and</strong> the like: Enclose, with vapour <strong>co</strong>ntrol layer, dressed up level with the surface ofinsulation. Care should be taken to ensure adhesion when the temperature is below + 5º C. Please note: Should BauderTherm DS1 DUO Vapour barrier be specified <strong>and</strong> left exposed forlonger than two weeks as a temporary waterproof layer, the burn off release foil <strong>and</strong> surface ofthe torch-activated adhesion stripes will be effected by the exposure to ultra violet. This minorissue can be resolved by using more heat to activate the bitumen stripes, but the process will beslightly slower than when using newly laid material.Everlast Waterproofing Ltd O&M rev 1LJMU


680C LAYING WARM ROOF INSULATION Setting out:- Long edges: Fully supported. (Where metal decking is specified, the long edges mustbe fully support <strong>and</strong> run at right angles to metal deck troughs).- End edges: Fully supported.- Joints: close butted together.- End joints: Stagger. Bedding: Fully bed into torch activated bonding stripes of vapour <strong>co</strong>ntrol layer surface. Additional board layer (if applicable): Where a se<strong>co</strong>nd board layer is required tomake up the total insulation thickness required, this should be off-set <strong>and</strong> staggered fromthe previous layer <strong>and</strong> bonded to the first layer of boards using Bauder insulationadhesive, applied in five equal strips across the board surface. Protection to exposed edges of insulation: A hard timber edge or similar protectionshould be in<strong>co</strong>rporated at all exposed edges. See clauses 330 & 640. Completion: Boards must be in good <strong>co</strong>ndition, well fitting <strong>and</strong> stable.WATERPROOF COVERINGS/ ACCESSORIES720D ADHESIVE BONDING OF WATERPROOF MEMBRANE Attachment: To be bonded directly to the surface of the Insulation. The adhesive for thisapplication must be Bauder Fleece backed membrane adhesive. The adhesive is to be appliedto the upper surface of the insulation in a full <strong>and</strong> <strong>co</strong>ntinuous <strong>co</strong>vering The adhesive <strong>co</strong>veragerate is approximately 2-3 kg/m². It is essential that the surface of the insulation is clean, dry <strong>and</strong>free from dust etc., before applying the adhesive. Care should be taken to ensure that theadhesive does not <strong>co</strong>me into <strong>co</strong>ntact with the areas of the membrane that will require welding.The membrane should be unrolled directly onto the adhesive within approximately 5-10 minutesof it being applied <strong>and</strong> then pressure rolled over its full surface area between 10 - 20 minutes afterapplication. All side <strong>and</strong> end laps to be hot air welded. Detailed instructions for the installation ofthe membrane can be found in the Bauder Installation Guide. Installation of the BauderThermofol System shall be carried out in ac<strong>co</strong>rdance with the details given in the BauderInstallation Guide. Note: A range of approved hot air welding machines <strong>and</strong> accessories specifically designed forthis operation are listed in the Bauder Installation Guide. Installation: Installation of the Bauder Thermofol system shall only be carried out byBauder trained <strong>and</strong> approved installers in strict ac<strong>co</strong>rdance with the details given in theBauder Installation Guide.720G ADHESIVE BONDING OF WATERPROOF MEMBRANE Attachment: To be bonded directly to the surface of the deck. The adhesive for this applicationmust be Bauder Fleece backed membrane adhesive. The adhesive is to be applied to theupper surface of the deck in a full <strong>and</strong> <strong>co</strong>ntinuous <strong>co</strong>vering. The adhesive <strong>co</strong>verage rate isapproximately 2-3 kg/m². It is essential that the surface of the deck is clean, dry <strong>and</strong> free fromdust etc., before applying the adhesive. Care should be taken to ensure that the adhesive doesnot <strong>co</strong>me into <strong>co</strong>ntact with the areas of the membrane that will require welding. The membraneshould be unrolled directly onto the adhesive within approximately 5-10 minutes of it being applied<strong>and</strong> then pressure rolled over its full surface area between 10 - 20 minutes after application. Allside <strong>and</strong> end laps to be hot air welded. Detailed instructions for the installation of the membranecan be found in the Bauder Installation Guide. Installation of the Bauder Thermofol System shallbe carried out in ac<strong>co</strong>rdance with the details given in the Bauder Installation Guide. Note: A range of approved hot air welding machines <strong>and</strong> accessories specificallydesigned for this operation are listed in the Bauder Installation Guide. Installation: Installation of the Bauder Thermofol system shall only be carried out byBauder trained <strong>and</strong> approved installers in strict ac<strong>co</strong>rdance with the details given in theBauder Installation Guide.730A WELDED JOINTING Laying: Loose lay, do not wrinkle or stretch.- Side <strong>and</strong> end joints: manufacturer’s/ supplier’s re<strong>co</strong>mmendation- Laps (minimum): manufacturer’s/ supplier’s re<strong>co</strong>mmendation- Preparation: Clean <strong>and</strong> dry surfaces for full width of joint.- Sealing: Weld together. Condition at <strong>co</strong>mpletion: Fully sealed, smooth, weatherproof <strong>and</strong> free draining.Everlast Waterproofing Ltd O&M rev 1LJMU


Accessories: None760 PERIMETER OF MEMBRANE General: Secure membrane at roof edge <strong>co</strong>nditions, changes of plane, curb flashings,upst<strong>and</strong>s to roof lights, etc. with mechanical fasteners.764A PRE-FORMED PRE-COATED METAL FLASHINGS Thermofol Pre-Coated Metal sheet is available from Bauder for the formation of fabricatedmetal flashings, trims <strong>and</strong> terminations. A list of fabrication <strong>co</strong>mpanies who already holdthis material for bespoke flashing fabrication is available from Bauder Ltd. All detaildesigns if not in ac<strong>co</strong>rdance with the design shown within our detail drawing attachedmust be submitted to Bauder for approval prior to fabrication. All Thermofol Coated Metal flashings must be mechanically attached using re<strong>co</strong>mmendedfastenings installed at 200mm centres. The flashing must be sealed using ThermofolTape 20 to the structure as shown in the attached detail drawing to ensure minimum airpassage through or below the flashing. The chosen fastener supplier can give guidanceas to the type of fastener required (fasteners must have <strong>co</strong>unter sunk head style).765A PERIMETER DETAILS FOR THERMOPLASTIC MEMBRANES Upst<strong>and</strong>s, edge trims, drips, kerbs, etc: Secure Bauder Thermofol preformed pre<strong>co</strong>atedmetal sections to roof structure with mechanical fasteners. Roof membrane: Dress over perimeter profile. Overlap beyond fasteners as permanufacturers re<strong>co</strong>mmendations Sealing: Weld together.766A WATERPROOFING MEMBRANE (TWO DIMENSIONAL DETAILS) Upst<strong>and</strong>s, edge details, flashings etc: Detail work requiring membrane is to be carriedout with Bauder Thermofol membrane restrained beneath or welded directly toThermofol Coated Metal as shown in the attached detail drawings. Thermofol Pre-Formed Corners must used for the formation of internal or external <strong>co</strong>rner details. Special <strong>co</strong>nsideration must be given to the preparation required prior to hot air welding ofthe all laps within the Bauder Thermofol System. A list of suitable Hot Air Welding machines <strong>and</strong> accessories specifically designed for thisoperation is <strong>co</strong>ntained in the Bauder application <strong>manual</strong>/data sheets.767A WATERPROOFING MEMBRANE (THREE DIMENSIONAL DETAILS) Pipes, Roof Penetrations etc.: Detail work requiring the membrane to be used inirregular angles is to be carried out with Bauder Thermofol D non-reinforced orThermofol Pre-Formed Accessory detailing items. Special <strong>co</strong>nsideration must be given tothe preparation required prior to the hot air welding of all detailing joints within theBauder Thermofol System. Special <strong>co</strong>nsideration must be given to the preparation required prior to hot air welding ofthe all laps within the Bauder Thermofol System. A list of suitable Hot Air Welding machines <strong>and</strong> accessories specifically designed for thisoperation is <strong>co</strong>ntained in the Bauder application <strong>manual</strong>/data sheets.768A COVER STRAPS TO THERMOFOL METAL Provision should be made to allow a 4mm gap between abutting sections in theThermofol metal edge trim, for expansion/<strong>co</strong>ntraction. Supply <strong>and</strong> install Thermofolreinforced <strong>co</strong>ver straps, 200mm in width fixed over the joints in the Thermofol metal edgetrim to provide a smooth neat finish. The membrane should be welded to the surface ofthe Thermofol metal leaving the centre section of the <strong>co</strong>ver strap un-welded. The <strong>co</strong>verstrap should be cut to remove visible 90º <strong>co</strong>rners.769 DETAILS GENERALLYThe minimum re<strong>co</strong>mmended height for <strong>co</strong>nstructing waterproofing details is 150mm fromthe top of the waterproofing. Special attention should be paid to all structures such asEverlast Waterproofing Ltd O&M rev 1LJMU


ooflights, <strong>co</strong>unter-flashings, window <strong>and</strong> door cills etc. These may have to be raised toenable a 150mm waterproofing detail to be formed. We cannot take responsibility forwater ingress over waterproofing details the do not meet the minimum required height.770 PERIMETER DETAILS FOR THERMOPLASTIC Upst<strong>and</strong>s, edge trims, drips, kerbs, etc: Form flashings from waterproof membranematerial. Roof membrane: Terminate in horizontal plane immediately adjacent to change indirection <strong>and</strong> secure with mechanical fasteners. Flashings: Dress over perimeter profile. Overlap horizontal roof membrane beyondperimeter securement, strictly in ac<strong>co</strong>rdance with the manufacturer’s re<strong>co</strong>mmendations. Sealing: Weld together.780A ROOF PENETRATIONS THROUGH THERMOPLASTIC MEMBRANES Roof membrane: Cut around penetrations <strong>and</strong> secure to deck. Flanged sleeve:- Type: Form from Thermofol D 15 un-reinforced membrane, <strong>co</strong>mplete with baseflange.- Installation: Dress over <strong>and</strong> around penetration.- Roof membrane overlap to flange (minimum): 50 mm beyond fasteners.- Sealing: Weld flange to roof membrane.- Protection to top edge of sleeve: Flashing or weathering cravat.ACCESSORIES901A MASTIC SEALANT Provision should be made to allow for the use of Bauder Sealant in <strong>co</strong>njunction withBauder Sealant Primer at all abutments with the Thermofol system, <strong>and</strong> any otherinstances where a mastic seal is required. It is imperative that the primer is used to prepare the surfaces effectively to enable a longlasting key with the sealant.903A THERMOFOL STANDARD OUTLET Bauder Thermofol St<strong>and</strong>ard Outlet of the <strong>co</strong>rrect size is to be installed through thesystem <strong>and</strong> deck after creation of a suitable size diameter opening. The outlet should besecured using suitable fasteners. All vapour barrier edges should be sealed to the deck using Tape 03. Connection to therainwater waste pipe should be made by others, details for this <strong>co</strong>nnection can be foundin the product data pages. The outlet is designed to be <strong>co</strong>nnected into the st<strong>and</strong>ardspigot end <strong>co</strong>nnector on the rainwater waste pipe. The outlet spigot is universal length to<strong>co</strong>pe with differing insulation thickness’s <strong>and</strong> will require cutting down to the <strong>co</strong>rrectlength. The Thermofol waterproofing membrane should be welded on to the outlets preattachedmembrane. Install the clip-fix leaf grille.904A THERMOFOL STANDARD PARAPET OUTLET Bauder Thermofol St<strong>and</strong>ard 80 mm Parapet Outlet to be installed through the system<strong>and</strong> deck after creation of a suitable size diameter opening. The outlet should be securedusing suitable fasteners. The Thermofol waterproofing membrane should be welded on to the outlet body. Asuitable leaf grille should be provided upon <strong>co</strong>mpletion.COMPLETION910A INSPECTIONS Interim <strong>and</strong> final roof inspections - These are a requirement where workmanship isincluded within the Bauder Guarantee <strong>and</strong> must to be carried out in strict ac<strong>co</strong>rdancewith the manufacturer’s requirements. It is the responsibility of the approved <strong>co</strong>ntractor toadvise the appointed Bauder Site Technician when the roof is ready for ‘FinalInspection’.Everlast Waterproofing Ltd O&M rev 1LJMU


A Final Inspection of the waterproofing should be carried out prior to any l<strong>and</strong>scapingbeing installed i.e. where green roofs, paved or ballasted finishes are specified to ensurethat any damage or defects are rectified.Any waterproofing <strong>co</strong>vered by l<strong>and</strong>scaping that has not been inspected <strong>and</strong> approved byBauder Ltd will not be eligible for guarantee.Where a ‘Product only’ guarantee is offered, there may still be r<strong>and</strong>om inspectionscarried by Bauder Ltd for the purposes of monitoring general workmanship st<strong>and</strong>ards,but these do not form part of any warranty ‘sign off’ process.Please also refer to preliminaries / general <strong>co</strong>nditions.940 COMPLETION Roof areas: Clean.- Outlets: Clear. Work necessary to provide a weather-tight finish: Complete. Storage of materials on finished surface: Not permitted. Completed membrane: Do not damage. Protect from traffic <strong>and</strong> adjacent or high levelworking.950D GUARANTEE A 15 year product <strong>and</strong> workmanship guarantee is to be provided upon <strong>co</strong>mpletionfollowing a Final Inspection by Bauder. Details regarding the full terms <strong>and</strong> <strong>co</strong>nditions areavailable separately from Bauder Ltd upon request. This system must installed by aBauder Approved Contractor to be eligible for guarantee.Everlast Waterproofing Ltd O&M rev 1LJMU