29.11.2012 Views

DEC. /09 - VETTER Krantechnik

DEC. /09 - VETTER Krantechnik

DEC. /09 - VETTER Krantechnik

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Investing in the future<br />

12 LIFT it 01|<strong>09</strong><br />

The best quality, the highest productivity, the most modern protection of the<br />

environment: In order to face the challenges of the future, <strong>VETTER</strong> has made an in-<br />

vestment in the construction of a crane factory with a total manufacturing area<br />

of 6,500 m² at the new Haiger / Kalteiche production site. Technological highlights are<br />

the ultra-modern robotic welding system and a painting line in a class of its own.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!