DEC. /09 - VETTER Krantechnik
DEC. /09 - VETTER Krantechnik
DEC. /09 - VETTER Krantechnik
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>VETTER</strong> produces about 5,000 cranes<br />
of different sizes for a variety of requirements<br />
every year. During the<br />
last few years, it became evident that the<br />
production at the original company headquarters<br />
in Siegen-Eiserfeld was hitting a<br />
wall in terms of the up-to-date demands<br />
concerning efficiency, quality and environmental<br />
protection. Since an expansion and<br />
optimization of the production in Siegen<br />
was impossible due to a lack of space, the<br />
company purchased a commercial property<br />
in July 2007, located directly on the A 45<br />
motorway in the nearby town of Haiger.<br />
Modern fi nishing<br />
While individual crane components continue to<br />
be manufactured in Siegen, the painting of the<br />
individual parts as well as the final assembly to<br />
the finished crane systems take place in Haiger.<br />
The biggest advantage at the new location, in<br />
addition to the generous space and the pleasant<br />
appearance, is the use of state-of-theart<br />
technology. It contributes to optimal work<br />
conditions, a uniformly high-grade product<br />
quality and an effective and efficient workflow.<br />
Robotic welding system for slewing jib cranes<br />
The welding of the individual components to<br />
full-blown slewing jib cranes now takes place<br />
in Haiger by means of an ultra-modern robotic<br />
welding system. The welding processes are<br />
accelerated and a consistently high quality level<br />
is ensured. A flue gas exhaust ventilation provides<br />
clean air at all welding work stations.<br />
New paint-spray line with drying facility<br />
In order to align quality, productivity and environmental<br />
protection, <strong>VETTER</strong> has installed a<br />
high-tech painting plant at the new location in<br />
cooperation with Heimer. The parts to be painted,<br />
with a maximum length of 10 m, a maximum<br />
width of 2.5 m and a maximum weight<br />
of 3 t, are carted into the painting booth via a<br />
power-and-free conveyor. The paint is applied<br />
manually with airless spray guns there. Following<br />
the paint application, the parts are automatically<br />
transported to the dryer. In order to<br />
ensure a sustained protection of the environment,<br />
in addition to optimized painting performance,<br />
the new facility is equipped with hightech<br />
filter systems, an automatically controlled<br />
air regulation, and a heat recovery system.<br />
The demands on crane technology are continuously<br />
on the rise: With <strong>VETTER</strong>, customers<br />
are optimally prepared for future tasks.<br />
Invitation<br />
QUALITY CLAIM<br />
Would you like to take a look behind<br />
the scenes of our new crane factory?<br />
You are welcome to visit our production<br />
facilities. Feel free to make an appointment<br />
by calling at +49 271 3502-250.<br />
01|<strong>09</strong> LIFT it 13