Max-Schmeling Hall in Berlin - 22nd IAKS Congress, 26 – 28 Oct ...
Max-Schmeling Hall in Berlin - 22nd IAKS Congress, 26 – 28 Oct ...
Max-Schmeling Hall in Berlin - 22nd IAKS Congress, 26 – 28 Oct ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong><br />
Venue design from an operator’s perspective<br />
22 nd International <strong>IAKS</strong> <strong>Congress</strong> & FSB<br />
2011 | 10 | 27 Cologne, Germany<br />
Gegenbauer Location Management & Services GmbH
Your Speaker.<br />
Oliver Duderstädt<br />
» Residence: Berl<strong>in</strong><br />
» Aged 41<br />
» Political Economist<br />
» 1998 <strong>–</strong> 2004 Event Manager<br />
<strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e<br />
» s<strong>in</strong>ce 2004<br />
Consultant and<br />
Project Developer<br />
2
Agenda<br />
1. Gegenbauer Group<br />
2. <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong><br />
3. Miss<strong>in</strong>g Multifunctionality<br />
4. Utilization Concepts<br />
5. F<strong>in</strong>ale<br />
3
Comb<strong>in</strong><strong>in</strong>g emotions with ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g value.<br />
Gegenbauer Location Management & Services GmbH<br />
�<br />
Venue Management Facility Management<br />
=<br />
Location Management & Services (location-management.de)<br />
Operations Consult<strong>in</strong>g<br />
4
Event- and Facility Management = Location Management.<br />
Our approach.<br />
Event Management<br />
� Acquisitions<br />
� Schedul<strong>in</strong>g and Roomallocation<br />
� Event-Plann<strong>in</strong>g & -<br />
Operat<strong>in</strong>g<br />
� Arena- & Event-Market<strong>in</strong>g<br />
� Cater<strong>in</strong>g<br />
� Ticket<strong>in</strong>g<br />
Operations<br />
Technical<br />
Facility Management<br />
Outdoor<br />
Facility Management<br />
Facility-Management-Services<br />
focussed on all k<strong>in</strong>ds of Events<br />
Commercial Facility<br />
Management<br />
Location Management & Services<br />
Consult<strong>in</strong>g<br />
Individually taylored<br />
Concepts<br />
� Project- and<br />
Organisation Consult<strong>in</strong>g<br />
� Technical and<br />
constructional<br />
Consult<strong>in</strong>g<br />
� Supportservices and<br />
Implementations<br />
5
References.<br />
Venues<br />
<strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e<br />
Berl<strong>in</strong>, s<strong>in</strong>ce 1997<br />
IKBB <strong>–</strong> former german<br />
parliament 2004-2006<br />
Velodrom<br />
Berl<strong>in</strong>, s<strong>in</strong>ce 1997<br />
IKBB <strong>–</strong> former german<br />
parliament 2004-2006<br />
Rittal Arena Wetzlar<br />
s<strong>in</strong>ce 2005<br />
Beethovenhalle Bonn,<br />
2005-2006<br />
Rhe<strong>in</strong>-Sieg-<strong>Hall</strong>e<br />
Siegburg, s<strong>in</strong>ce 2006<br />
Olympiagelände/<br />
Olympiastadion Berl<strong>in</strong>, s<strong>in</strong>ce<br />
1997 subservices<br />
6
References (extract).<br />
Kongress- und Konzerthalle,<br />
Bonn<br />
Info-Box,<br />
Megaposter GmbH<br />
Kongresszentrum im Lehrter<br />
Stadtquartier, Berl<strong>in</strong> *<br />
Kongresszentrum im Europaviertel<br />
Frankfurt a.M.<br />
Konferenzzentrum,<br />
Stadt Böbl<strong>in</strong>gen<br />
Multifunktionsarena,<br />
IHK Coburg<br />
Mehrzweckhalle,<br />
Rhe<strong>in</strong>-Kreis Neuss<br />
Sport- und Kongresshalle,<br />
Schwer<strong>in</strong><br />
* Vivico Real Estate GmbH s<strong>in</strong>ce 1. Juli 2011 is namend CA Immo Deutschland GmbH<br />
Kongresszentrum und<br />
Kulturhaus<br />
Multifunktionsarena,<br />
Stadt Ludwigsburg<br />
Multifunktionshalle,<br />
Stadt Wetzlar<br />
multifunktionales Zentralgebäude/<br />
Audimax, Lüneburg<br />
Consult<strong>in</strong>g<br />
Kulturhaus,<br />
Stadt Ludwigsfelde<br />
Arena<br />
Gummersabch,<br />
VfL Handball<br />
Gummersbach<br />
GmbH<br />
7
Facility Management<br />
Division<br />
Industrial & Public FM Health Care<br />
Property Services<br />
Location Management<br />
Facility Services<br />
Division<br />
Clean<strong>in</strong>g Services<br />
Security Services<br />
One source for<br />
add<strong>in</strong>g value<br />
Bus<strong>in</strong>ess units<br />
» Sectorspecific<br />
» Dist<strong>in</strong>ct<br />
» Integrated<br />
85
Bremen<br />
Schwer<strong>in</strong><br />
Hamburg<br />
Greifswald<br />
Neubrandenburg<br />
Birkenwerder<br />
Hannover<br />
Berl<strong>in</strong><br />
Frankfurt/O.<br />
Potsdam<br />
Cottbus<br />
Kassel<br />
Wolfsburg<br />
Salzgitter<br />
Magdeburg<br />
Dessau<br />
Düsseldorf<br />
<strong>Hall</strong>e<br />
Leipzig<br />
Cologne<br />
Siegburg<br />
Bonn<br />
Erfurt<br />
Dresden<br />
Chemnitz<br />
Wetzlar<br />
Frankfurt/M.<br />
Wiesbaden<br />
Würzburg<br />
Mannheim<br />
Saarbrücken<br />
Freiburg<br />
Karlsruhe<br />
Stuttgart<br />
Vill<strong>in</strong>gen-<br />
Schwenn<strong>in</strong>gen<br />
Nuremberg<br />
Munich<br />
Traunste<strong>in</strong><br />
Over 85 years <strong>in</strong> the service sector<br />
Facts & figures<br />
» Founded 1925 <strong>in</strong> Berl<strong>in</strong><br />
» Services portfolio Integrated FM<br />
» Key sectors Industry & research<br />
F<strong>in</strong>ancial services<br />
Residential sector<br />
Health care services<br />
Public sector<br />
Venue & Event sector<br />
Adm<strong>in</strong>istrative offices<br />
» Offices <strong>in</strong> all <strong>in</strong>dustrial areas of<br />
Germany and <strong>in</strong> Poland<br />
» Pan-European<br />
presence<br />
» Employees (2010) 14,562<br />
» turnover (2010) € 387.9 million<br />
9
Agenda<br />
1. Gegenbauer Group<br />
2. <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong><br />
3. Miss<strong>in</strong>g Multifunctionality<br />
4. Utilization Concepts<br />
5. F<strong>in</strong>ale<br />
10
The awarded <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong>.<br />
-Multifunctional Sports Facility for International Events-<br />
Get a „golden“ first impression.<br />
11
The <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong>.<br />
History<br />
» Architects: Jörg Joppien, Annette Maud-Joppien,<br />
Albert Dietz<br />
» Completion: June 1997<br />
» Construction Costs: 205 Mio. DM (104,8 Mio. €)<br />
» Public Owner: City of Berl<strong>in</strong><br />
» Private Manager: s<strong>in</strong>ce 1997 / 2008<br />
Velomax Berl<strong>in</strong> <strong>Hall</strong>enbetriebs GmbH<br />
(100% Subsidiary Company of the Gegenbauer Location Management &<br />
Services GmbH)<br />
Member & Partner<br />
12
24,5%<br />
Sports<br />
2,0%<br />
Eventmix 2010<br />
<strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e<br />
6,1%<br />
67,3%<br />
Conventions, <strong>Congress</strong><br />
Concerts Musical, Show, Ballett<br />
Die <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong>.<br />
The green bridge connect<strong>in</strong>g former East- and former West-Berl<strong>in</strong>.<br />
» Susta<strong>in</strong>ability: Green Globe Certifcate as the first<br />
multipurpose arena <strong>in</strong> Berl<strong>in</strong><br />
» Occupancy Arena 2010: 151 days<br />
» Occupancy Gyms A,B,C:<br />
340 days p.y., opened daily 7-22h<br />
» Sports Events aver. 65 <strong>–</strong> 75 %<br />
» www.max-schmel<strong>in</strong>g-halle.de<br />
» Primary User<br />
- Füchse Berl<strong>in</strong> (1. National German Handball League)<br />
- SCC Berl<strong>in</strong> Recycl<strong>in</strong>g Volleys<br />
(1. National German Volleyball League)<br />
- 1997-2009 Alba Berl<strong>in</strong> Basketball Team<br />
(1. National German Basketball League)<br />
13
ANKERMIETER<br />
14
References.<br />
Events (extract)<br />
Sports Events<br />
» World- and European Championships (u.a. Basketball, Volleyball,<br />
<strong>Hall</strong>enhandball, Boxen, Tanzen)<br />
Enterta<strong>in</strong>ment<br />
» Robbie Williams, Bruce Spr<strong>in</strong>gsteen, Herbert Grönemeyer, Madonna, Elton<br />
John, Tokio Hotel, Take That, Rammste<strong>in</strong>, Kylie M<strong>in</strong>ogue, David Garrett, PINK,<br />
Bryan Adams, Joe Cocker, The Killers<br />
» Lord of the Dance, Apassionata, Disney on Ice, „The Dome“, „Wetten dass..?“<br />
» german comedians like Mario Barth, Atze Schröder, Ralf Schmitz, Urban Priol<br />
Special Events<br />
» Gala-Abende und product presentation by Audi, Mercedes-Benz, Panasonic,<br />
Wella, Hapag Lloyd, Berl<strong>in</strong>er Volksbank<br />
» Night of the Jumps<br />
Conventions, <strong>Congress</strong>es, Fairs<br />
» Berl<strong>in</strong> Pow Wow, Enjoy BERLIN, OSTPRO, Domestic Animal Fair<br />
» Party Conventions Bündnis 90 / Die Grünen, Die L<strong>in</strong>ken, CDU<br />
15
The <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong>.<br />
Build<strong>in</strong>g Structure - Layout<br />
16
The <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong>.<br />
Build<strong>in</strong>g Structure - Layout<br />
Facts Arena<br />
Total capacity: 11,900<br />
Seats <strong>in</strong> grandstand: 7,491 (extended)<br />
Flexible seat<strong>in</strong>g: up to 1,500 persons<br />
Arena floor space: 2,000 sqm<br />
Electricity: over 1,800 kW<br />
Load-bear<strong>in</strong>g capacity: 120 t<br />
Height: 18 m<br />
Truck access possible<br />
Basic stage up to 360 m²<br />
12 production offices<br />
16 cloakrooms<br />
7 VIP cloakrooms<br />
17
The <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong>.<br />
Build<strong>in</strong>g Structure - Layout<br />
Auxiliary rooms<br />
VIP-Lounge: 460 m²<br />
Restaurant: up to 120 persons<br />
Press conference room: 150 m²<br />
Conference room: 60 m²<br />
Colonnade hall: 2,420 m²<br />
Sports halls A+B: 2,430 m²<br />
Sports hall C: 1,215 m²<br />
Ballroom (dance studio): 400 m²<br />
Ballet studio: 210 m²<br />
Crew cater<strong>in</strong>g room: 360 m²<br />
18
The <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong>.<br />
Build<strong>in</strong>g Structure - Layout<br />
On two different levels, you will f<strong>in</strong>d the VIP-Lounge, press<br />
conference room, restaurant and offices.<br />
19
Capacity<br />
Offices<br />
20
The <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong>.<br />
History<br />
21
The <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong>.<br />
History<br />
The Plot<br />
» Projected as a box<strong>in</strong>g, gymnastics- and ballgame<br />
sports arena <strong>in</strong> the context of the application of the<br />
city of Berl<strong>in</strong> for the Olympic Games 2000<br />
22
Magic Moments <strong>in</strong> Australia.<br />
101. Session of the IOC<br />
1993 | 09| 23<br />
The Olympic Games 2000<br />
SYDNEY<br />
What would become to the <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong>?<br />
23
The <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong>.<br />
Re-Th<strong>in</strong>k<strong>in</strong>g, Re-Plann<strong>in</strong>g, Re-Construct<strong>in</strong>g<br />
Despite the failure of the application, the construction of the<br />
<strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e, already start<strong>in</strong>g <strong>in</strong> June 1993, had<br />
been completed due to the lack of appropriate Sports<br />
Venues <strong>in</strong> unified Berl<strong>in</strong> and the political <strong>in</strong>tention for<br />
clos<strong>in</strong>g former West-Berl<strong>in</strong> multipurpose arena<br />
”Deutschlandhalle”. This led to:<br />
» re-orientation<br />
» new def<strong>in</strong>ition as a multipurpose arena<br />
» cost sav<strong>in</strong>gs<br />
» partly no or different completion<br />
» new utilisation concepts had to be developed<br />
» th<strong>in</strong>k<strong>in</strong>g about new concepts to operate the venue<br />
24
Agenda<br />
1. Gegenbauer Group<br />
2. <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong><br />
3. Miss<strong>in</strong>g Multifunctionality<br />
4. Utilization Concepts<br />
5. F<strong>in</strong>ale<br />
25
Die <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong>.<br />
Pofitability through Multifunctionality<br />
Built as a sports facility but managed and profitably<br />
operated as a multipurpose arena.<br />
» Profitability<br />
- Public Private Partnership between the City of<br />
Berl<strong>in</strong> and privatly owned company Velomax/<br />
Gegenbauer<br />
- operat<strong>in</strong>g lease commitment<br />
�Multifunctionality<br />
At that time:<br />
Does the arena meet technical and structural<br />
requirements to achieve profitability <strong>in</strong><br />
multifuntionality?<br />
<strong>26</strong>
10 h<strong>in</strong>ts for miss<strong>in</strong>g multifunctionality.<br />
Problems to face - th<strong>in</strong>gs to re-th<strong>in</strong>k, re-plan and to re-build<br />
1. arena built light-flooded, translucent, no bl<strong>in</strong>ds to black out<br />
2. not sufficient high-voltage current for many k<strong>in</strong>ds of<br />
productions, partly at the wrong place<br />
3. miss<strong>in</strong>g pre- or secondary rigg for production truss<strong>in</strong>g over<br />
ma<strong>in</strong> stage<br />
4. not enough toilets resp. at the wrong position (backstagearea)<br />
5. miss<strong>in</strong>g cable-conduit to TV camera positions <strong>in</strong> arena<br />
6. miss<strong>in</strong>g crew-cater<strong>in</strong>g room for productions<br />
7. too little or no communication medium<br />
8. VIP-Lounge & restaurant unf<strong>in</strong>ished<br />
9. miss<strong>in</strong>g cater<strong>in</strong>g booths<br />
10.miss<strong>in</strong>g cha<strong>in</strong> hoist & truss<strong>in</strong>g to black out and downsize<br />
arena<br />
27
Die <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong>.<br />
Th<strong>in</strong>gs to be done.<br />
» expansions dur<strong>in</strong>g daily operations<br />
» based on a designated public budget<br />
�examples given for realised expansions<br />
<strong>28</strong>
10 h<strong>in</strong>ts for miss<strong>in</strong>g multifunctionality.<br />
Problems to face - th<strong>in</strong>gs to re-plan and to re-build<br />
» arena built light-flooded, translucent, no bl<strong>in</strong>ds<br />
to black out<br />
» not sufficient high-voltage current for many<br />
k<strong>in</strong>ds of productions, partly at the wrong place<br />
» miss<strong>in</strong>g pre- or secondary rigg for production<br />
truss<strong>in</strong>g over ma<strong>in</strong> stage<br />
» not enough toilets resp. at the wrong position<br />
(backstage-area)<br />
» miss<strong>in</strong>g cable-conduit to TV camera positions<br />
<strong>in</strong> arena<br />
» miss<strong>in</strong>g crew-cater<strong>in</strong>g room for productions<br />
» too little or no communication medium<br />
» VIP-Lounge & restaurant unf<strong>in</strong>ished<br />
» miss<strong>in</strong>g cater<strong>in</strong>g booths<br />
» miss<strong>in</strong>g cha<strong>in</strong> hoist & truss<strong>in</strong>g to black out and<br />
downsize arena<br />
29
10 h<strong>in</strong>ts for miss<strong>in</strong>g multifunctionality.<br />
Problems to face - th<strong>in</strong>gs to re-plan and to re-build<br />
» arena built light-flooded, translucent, no bl<strong>in</strong>ds<br />
to black out<br />
» not sufficient high-voltage current for many<br />
k<strong>in</strong>ds of productions, partly at the wrong place<br />
» miss<strong>in</strong>g pre- or secondary rigg for production<br />
truss<strong>in</strong>g over ma<strong>in</strong> stage<br />
» not enough toilets resp. at the wrong position<br />
(backstage-area)<br />
» miss<strong>in</strong>g cable-conduit to TV camera positions<br />
<strong>in</strong> arena<br />
» miss<strong>in</strong>g crew-cater<strong>in</strong>g room for productions<br />
» too little or no communication medium<br />
» VIP-Lounge & restaurant unf<strong>in</strong>ished<br />
» miss<strong>in</strong>g cater<strong>in</strong>g booths<br />
» miss<strong>in</strong>g cha<strong>in</strong> hoist & truss<strong>in</strong>g to black out and<br />
downsize arena<br />
30
10 h<strong>in</strong>ts for miss<strong>in</strong>g multifunctionality.<br />
Problems to face - th<strong>in</strong>gs to re-plan and to re-build<br />
» arena built light-flooded, translucent, no bl<strong>in</strong>ds<br />
to black out<br />
» not sufficient high-voltage current for many<br />
k<strong>in</strong>ds of productions, partly at the wrong place<br />
» miss<strong>in</strong>g pre- or secondary rigg for production<br />
truss<strong>in</strong>g over ma<strong>in</strong> stage<br />
» not enough toilets resp. at the wrong position<br />
(backstage-area)<br />
» miss<strong>in</strong>g cable-conduit to TV camera positions<br />
<strong>in</strong> arena<br />
» miss<strong>in</strong>g crew-cater<strong>in</strong>g room for productions<br />
» too little or no communication medium<br />
» VIP-Lounge & restaurant unf<strong>in</strong>ished<br />
» miss<strong>in</strong>g cater<strong>in</strong>g booths<br />
» miss<strong>in</strong>g cha<strong>in</strong> hoist & truss<strong>in</strong>g to black out and<br />
downsize arena<br />
31
10 h<strong>in</strong>ts for miss<strong>in</strong>g multifunctionality.<br />
Problems to face - th<strong>in</strong>gs to re-plan and to re-build<br />
» arena built light-flooded, translucent, no bl<strong>in</strong>ds<br />
to black out<br />
» not sufficient high-voltage current for many<br />
k<strong>in</strong>ds of productions, partly at the wrong place<br />
» miss<strong>in</strong>g pre- or secondary rigg for production<br />
truss<strong>in</strong>g over ma<strong>in</strong> stage<br />
» not enough toilets resp. at the wrong position<br />
(backstage-area)<br />
» miss<strong>in</strong>g cable-conduit to TV camera positions<br />
<strong>in</strong> arena<br />
» miss<strong>in</strong>g crew-cater<strong>in</strong>g room for productions<br />
» too little or no communication medium<br />
» VIP-Lounge & restaurant unf<strong>in</strong>ished<br />
» miss<strong>in</strong>g cater<strong>in</strong>g booths<br />
» miss<strong>in</strong>g cha<strong>in</strong> hoist & truss<strong>in</strong>g to black out and<br />
downsize arena<br />
32
10 h<strong>in</strong>ts for miss<strong>in</strong>g multifunctionality.<br />
Problems to face - th<strong>in</strong>gs to re-plan and to re-build<br />
» arena built light-flooded, translucent, no bl<strong>in</strong>ds<br />
to black out<br />
» not sufficient high-voltage current for many<br />
k<strong>in</strong>ds of productions, partly at the wrong place<br />
» miss<strong>in</strong>g pre- or secondary rigg for production<br />
truss<strong>in</strong>g over ma<strong>in</strong> stage<br />
» not enough toilets resp. at the wrong position<br />
(backstage-area)<br />
» miss<strong>in</strong>g cable-conduit to TV camera positions<br />
<strong>in</strong> arena<br />
» miss<strong>in</strong>g crew-cater<strong>in</strong>g room for productions<br />
» too little or no communication medium<br />
» VIP-Lounge & restaurant unf<strong>in</strong>ished<br />
» miss<strong>in</strong>g cater<strong>in</strong>g booths<br />
» miss<strong>in</strong>g cha<strong>in</strong> hoist & truss<strong>in</strong>g to black out and<br />
downsize arena<br />
33
10 h<strong>in</strong>ts for miss<strong>in</strong>g multifunctionality.<br />
Problems to face - th<strong>in</strong>gs to re-plan and to re-build<br />
» arena built light-flooded, translucent, no bl<strong>in</strong>ds<br />
to black out<br />
» not sufficient high-voltage current for many<br />
k<strong>in</strong>ds of productions, partly at the wrong place<br />
» miss<strong>in</strong>g pre- or secondary rigg for production<br />
truss<strong>in</strong>g over ma<strong>in</strong> stage<br />
» not enough toilets resp. at the wrong position<br />
(backstage-area)<br />
» miss<strong>in</strong>g cable-conduit to TV camera positions<br />
<strong>in</strong> arena<br />
» miss<strong>in</strong>g crew-cater<strong>in</strong>g room for productions<br />
» too little or no communication medium<br />
» VIP-Lounge & restaurant unf<strong>in</strong>ished<br />
» miss<strong>in</strong>g cater<strong>in</strong>g booths<br />
» miss<strong>in</strong>g cha<strong>in</strong> hoist & truss<strong>in</strong>g to black out and<br />
downsize arena<br />
34
10 h<strong>in</strong>ts for miss<strong>in</strong>g multifunctionality.<br />
Problems to face - th<strong>in</strong>gs to re-plan and to re-build<br />
» arena built light-flooded, translucent, no bl<strong>in</strong>ds<br />
to black out<br />
» not sufficient high-voltage current for many<br />
k<strong>in</strong>ds of productions, partly at the wrong place<br />
» miss<strong>in</strong>g pre- or secondary rigg for production<br />
truss<strong>in</strong>g over ma<strong>in</strong> stage<br />
» not enough toilets resp. at the wrong position<br />
(backstage-area)<br />
» miss<strong>in</strong>g cable-conduit to TV camera positions<br />
<strong>in</strong> arena<br />
» miss<strong>in</strong>g crew-cater<strong>in</strong>g room for productions<br />
» too little or no communication medium<br />
» VIP-Lounge & restaurant unf<strong>in</strong>ished<br />
» miss<strong>in</strong>g cater<strong>in</strong>g booths<br />
» miss<strong>in</strong>g cha<strong>in</strong> hoist & truss<strong>in</strong>g to black out and<br />
downsize arena<br />
35
10 h<strong>in</strong>ts for miss<strong>in</strong>g multifunctionality.<br />
Problems to face - th<strong>in</strong>gs to re-plan and to re-build<br />
» arena built light-flooded, translucent, no bl<strong>in</strong>ds<br />
to black out<br />
» not sufficient high-voltage current for many<br />
k<strong>in</strong>ds of productions, partly at the wrong place<br />
» miss<strong>in</strong>g pre- or secondary rigg for production<br />
truss<strong>in</strong>g over ma<strong>in</strong> stage<br />
» not enough toilets resp. at the wrong position<br />
(backstage-area)<br />
» miss<strong>in</strong>g cable-conduit to TV camera positions<br />
<strong>in</strong> arena<br />
» miss<strong>in</strong>g crew-cater<strong>in</strong>g room for productions<br />
» too little or no communication medium<br />
» VIP-Lounge & restaurant unf<strong>in</strong>ished<br />
» miss<strong>in</strong>g cater<strong>in</strong>g booths<br />
» miss<strong>in</strong>g cha<strong>in</strong> hoist & truss<strong>in</strong>g to black out and<br />
downsize arena<br />
36
10 h<strong>in</strong>ts for miss<strong>in</strong>g multifunctionality.<br />
Problems to face - th<strong>in</strong>gs to re-plan and to re-build<br />
» arena built light-flooded, translucent, no bl<strong>in</strong>ds<br />
to black out<br />
» not sufficient high-voltage current for many<br />
k<strong>in</strong>ds of productions, partly at the wrong place<br />
» miss<strong>in</strong>g pre- or secondary rigg for production<br />
truss<strong>in</strong>g over ma<strong>in</strong> stage<br />
» not enough toilets resp. at the wrong position<br />
(backstage-area)<br />
» miss<strong>in</strong>g cable-conduit to TV camera positions<br />
<strong>in</strong> arena<br />
» miss<strong>in</strong>g crew-cater<strong>in</strong>g room for productions<br />
» too little or no communication medium<br />
» VIP-Lounge & restaurant unf<strong>in</strong>ished<br />
» miss<strong>in</strong>g cater<strong>in</strong>g booths<br />
» miss<strong>in</strong>g cha<strong>in</strong> hoist & truss<strong>in</strong>g to black out and<br />
downsize arena<br />
37
10 h<strong>in</strong>ts for miss<strong>in</strong>g multifunctionality.<br />
Problems to face - th<strong>in</strong>gs to re-plan and to re-build<br />
» arena built light-flooded, translucent, no bl<strong>in</strong>ds<br />
to black out<br />
» not sufficient high-voltage current for many<br />
k<strong>in</strong>ds of productions, partly at the wrong place<br />
» miss<strong>in</strong>g pre- or secondary rigg for production<br />
truss<strong>in</strong>g over ma<strong>in</strong> stage<br />
» not enough toilets resp. at the wrong position<br />
(backstage-area)<br />
» miss<strong>in</strong>g cable-conduit to TV camera positions<br />
<strong>in</strong> arena<br />
» miss<strong>in</strong>g crew-cater<strong>in</strong>g room for productions<br />
» too little or no communication medium<br />
» VIP-Lounge & restaurant unf<strong>in</strong>ished<br />
» miss<strong>in</strong>g cater<strong>in</strong>g booths<br />
» miss<strong>in</strong>g cha<strong>in</strong> hoist & truss<strong>in</strong>g to black out and<br />
downsize arena<br />
38
Conclusion.<br />
Important experience for the operator of <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e (= us)<br />
» Result:<br />
The <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e became a multifunctional,<br />
nationally and <strong>in</strong>ternationally successfull to promote<br />
sports arena.<br />
» Someth<strong>in</strong>g to learn?<br />
- Expansions <strong>in</strong> technique and <strong>in</strong> the build<strong>in</strong>g dur<strong>in</strong>g<br />
daily operations are expensive, and at the expense<br />
of profitability and efficiency.<br />
whereas<br />
- Based on substantial utilization concepts, <strong>in</strong>itial<br />
construction costs might be higher but will<br />
f<strong>in</strong>ancially pay off <strong>in</strong> the life-cycle consideration of<br />
the build<strong>in</strong>g.<br />
39
Agenda<br />
1. Gegenbauer Group<br />
2. <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong><br />
3. Miss<strong>in</strong>g Multifunctionality<br />
4. Utilization Concepts<br />
5. F<strong>in</strong>ale<br />
40
Our propositions.<br />
Keep concepts as wide as possible for success.<br />
1. Work<strong>in</strong>g together with<br />
consultants that are experienced<br />
<strong>in</strong> operations.<br />
- Experienced <strong>in</strong> Event-/ and<br />
Venue Management<br />
- Experienced <strong>in</strong> Facility<br />
Management<br />
2. Provide a utilization concept<br />
prior to plann<strong>in</strong>g and<br />
construct<strong>in</strong>g<br />
3. Requirements Plan<strong>in</strong>g (DIN<br />
18205)<br />
41
Utilization Concept & Requirements Plann<strong>in</strong>g.<br />
Utilization Concept as a result of sub analysis<br />
» potential clients and target groups<br />
» potential options for use and <strong>in</strong>tensities of use<br />
(events profile of the facility)<br />
» recommendations for capacities and focus for events<br />
» requirements and necessities regard<strong>in</strong>g size, use,<br />
ammount of floor space and rooms as well as the<br />
build<strong>in</strong>g structure<br />
» requirements and necessities for equipment and usespecific<br />
technical features<br />
» possible synergies (neighbourhood)<br />
42
Utilization Concept<br />
Demand-oriented concepts.<br />
Utilization Concept as a basis for…<br />
Construction<br />
Concepts for plann<strong>in</strong>g and<br />
construct<strong>in</strong>g<br />
Management<br />
Feasabilityconcepts, Concepts for<br />
the organisational structure<br />
Facility Fanagement<br />
Facility Management Concepts<br />
43
Demand-oriented concepts.<br />
Further (sub)-concepts based on the results of the Utilization Concept.<br />
Utilization Concept<br />
Construction<br />
Management<br />
FM<br />
room layout, function charts, <strong>in</strong>frastructure, equipment,<br />
furniture, event technique, fire protetion, security<br />
concepts, employment protection, seat<strong>in</strong>g plans,<br />
ermergency organisation, documentation<br />
analysis and design<strong>in</strong>g the oraganisational- and<br />
management structures and processes, ticket<strong>in</strong>g,<br />
operat<strong>in</strong>g schemes, human ressource concepts,<br />
market<strong>in</strong>g & sales, cater<strong>in</strong>g<br />
FM plann<strong>in</strong>g <strong>in</strong> advance <strong>–</strong> materials, surfaces, everyday<br />
solutions to susta<strong>in</strong>ably reduce operat<strong>in</strong>g costs<br />
Process oriented, long-term FM concepts focussed on<br />
the life-cycle of the real estate (sports facility)<br />
44
Agenda<br />
1. Gegenbauer Group<br />
2. <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e Berl<strong>in</strong><br />
3. Miss<strong>in</strong>g Multifunctionality<br />
4. Utilization Concepts<br />
5. F<strong>in</strong>ale<br />
45
Thesis<br />
» Venue operators are a nightmare for <strong>in</strong>itiators of<br />
new arena projects.<br />
46
Someth<strong>in</strong>g’s wrong?<br />
Solution<br />
» Darkended glas to<br />
avoid light to sh<strong>in</strong>e<br />
from production<br />
offices <strong>in</strong>to the dark<br />
arena <strong>in</strong>terior and<br />
to keep spectators<br />
from look<strong>in</strong>g <strong>in</strong>to<br />
the backstage-area<br />
47
Protect your build<strong>in</strong>g. Avoid additional costs.<br />
Solution<br />
» Many users, many<br />
service provider <strong>–</strong><br />
lots of potential<br />
damages and costs<br />
48
Reduc<strong>in</strong>g costs<br />
Solution<br />
» While plann<strong>in</strong>g<br />
ways, space and<br />
surfaces go back to<br />
the future an th<strong>in</strong>k<br />
about costs for<br />
everyday clean<strong>in</strong>g<br />
over years!<br />
» Do cleans<strong>in</strong>g<br />
mach<strong>in</strong>es fit?<br />
(lenght and width)<br />
» Can they drive the<br />
radius around the<br />
corner?<br />
49
Logistic<br />
Storage Capacity<br />
» Multifunctionality<br />
requires high<br />
storage capacities.<br />
» Th<strong>in</strong>k about it:<br />
- Basketball Court<br />
- Handball Court<br />
- Volleyball Court<br />
- Danc<strong>in</strong>g Court<br />
- Stage elements<br />
- Chairs, Tables<br />
- Stairs<br />
- Tool Kits<br />
- …<br />
50
Somehow too complicated, yet dangerous<br />
Load<strong>in</strong>g ramp and door<br />
» not high enough<br />
» not wide enough<br />
» difficult angle for<br />
trucks<br />
Load<strong>in</strong>g with up to<br />
3 forklifter =<br />
additional costs<br />
51
Thesis<br />
» Venue operators are the „natural enemy“ of<br />
<strong>in</strong>itiators for new arena projects.<br />
» Plann<strong>in</strong>g an arena from outside to <strong>in</strong>side:<br />
- don‘t be surprised when the handball court will<br />
not fit <strong>in</strong>to the basketball court<br />
- don‘t be surprised, baskeball team meet<strong>in</strong>gs<br />
suddenly are held <strong>in</strong> your office or the VIP-<br />
Lounge due to lack of alternative room capacity<br />
� Also th<strong>in</strong>k from <strong>in</strong>side to outside.<br />
» In the long run you will love us.<br />
» You don‘t have to love us but you are <strong>in</strong>vited to<br />
listen.<br />
52
Gett<strong>in</strong>g th<strong>in</strong>gs <strong>in</strong>to a more successfull direction.<br />
Work<strong>in</strong>g together with operation experienced consultants<br />
» <strong>Max</strong>-<strong>Schmel<strong>in</strong>g</strong>-<strong>Hall</strong>e was not misplanned. It just<br />
had a different approach and background (Olympia<br />
2000). Today it is a successfull multifunctional<br />
sports arena - successfull <strong>in</strong> both: professional<br />
market<strong>in</strong>g and open to the public <strong>in</strong> sports<br />
» Even the experienced „operations“ consultant<br />
can not predict the future. But meet<strong>in</strong>g the state of<br />
the art requirements (laws, regulations, norms,<br />
rules, standards, ...) is crucial and will be the least,<br />
owner, <strong>in</strong>vestors, architects and planners should ask<br />
for from a professional and experienced venue<br />
management consultant.<br />
53
Thank you very much for your attention.<br />
Oliver Duderstädt<br />
Gegenbauer Location<br />
Management & Services GmbH<br />
Consult<strong>in</strong>g &<br />
Project Development<br />
Paul-Robeson-Straße 39<br />
10437 Berl<strong>in</strong><br />
54<br />
oliver.duderstaedt@gegenbauer.de<br />
www.location-management.de