Current Status<br />
� 1 st stream stabilized and operating at design capacity.<br />
�Achieved all parameters better than design.<br />
� 2 nd stream ready for operation. Trial runs in progress.<br />
� Captive Co-generation Power Plant operations stabilized.<br />
� Trial runs undertaken for increasing capacity through debottlenecking.<br />
� Alumina quality as per best International norms achieved.<br />
� Zero effluent discharge system implemented.<br />
� All statutory environmental requirements met.<br />
� ISO-9001,14001, OSHAS-18001 certificates obtained.