12.07.2015 Views

Comments Resolution Matrix IS-GPS-200 - Los Angeles Air Force ...

Comments Resolution Matrix IS-GPS-200 - Los Angeles Air Force ...

Comments Resolution Matrix IS-GPS-200 - Los Angeles Air Force ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Comments</strong> <strong>Resolution</strong> <strong>Matrix</strong><strong>IS</strong>-<strong>GPS</strong>-<strong>200</strong>No.Reviewer Name/Orgn/OfficeSymbol/Phone4 M.A. Jeffris/MITRE/EN/781-271-7202PageNo.Para #<strong>IS</strong>-<strong>GPS</strong>-<strong>200</strong>3.3.1.6IMPORTANCE(C/S/A)CCOMMENT/SUGGESTED CHANGE/RATIONALEComment: Power defined in 3.3.1.6 need to be recalculatedto take into account changes to bandwidth in 3.3.1.1.Suggested Change: Make changes as indicated:Table 3-Va. Received Minimum RF Signal Strength forBlock IIR, IIR-M, and IIF Satellites over the BandwidthSpecified in 3.3.1.1SV Blocks ChannelSignalP(Y) CA or L2CII/IIA/IIRL1 -161.5 dBW -158.5 dBWL2 -164.5 dBW -164.5 dBWIIR-M/IIFL1 -161.5 dBW -158.5 dBWL2 -161.5 dBW -160.0 dBWPO RESOLUTION / REVIEWERSCONCURRENCEProject Officer <strong>Resolution</strong>: Accept.Concurrence:Table 3-Vb. Received Minimum RF Signal Strength for<strong>GPS</strong> III and Subsequent Satellites over the BandwidthSpecified in 3.3.1.1SV Blocks SV BlocksSV BlocksP(Y) CA or L2CIII and L1 -161.4 dBW -158.5 dBWSubsequent L2 -161.4 dBW -160.0 dBWRationale: References bandwidth to 3.3.1.1. New values areconsistent with the wider bandwidth; no change in receivedpower over the previous bandwidth.20 Mar 08


<strong>Comments</strong> <strong>Resolution</strong> <strong>Matrix</strong><strong>IS</strong>-<strong>GPS</strong>-<strong>200</strong>No.Reviewer Name/Orgn/OfficeSymbol/PhonePageNo.Para #IMPORTANCE(C/S/A)COMMENT/SUGGESTED CHANGE/RATIONALEPO RESOLUTION / REVIEWERSCONCURRENCE5 Steven T.Hutsell/2SOPS/719-567-2491119 20.3.3.5.2.3Comment: Rewording neededSuggested Change: Reword the following from“During extended operations (short-term and long-term) thealmanac time parameter may not provide the specified timeaccuracy or URE component.”to“During extended operations (short-term and long-term) thealmanac time parameter may not provide the specified timeaccuracy or URE component. Additionally, occasional CSactions to manage clock offsets may also inhibit the ability toprovide specified almanac time parameter accuracies.”Project Officer <strong>Resolution</strong>: Reject.While the information is useful, it does notbelong in this document. Should becaptured as a probability of occurrence ifincluded at all.Concurrence:Rationale: Clarification of reality. As one example, after weperform a necessary, periodic timing adjustment on a satellite,it can and will take literally hours [empirically, on averageabout 24 hours], before we will have uploaded the entireconstellation with new almanac time parameters reflecting thetiming adjustment. Additionally, user sets that downloadalmanacs based on the time of applicability (tOA), can andwill experience the elapsing of additional hours [empirically,as much as 24 hours], before such user equipment willrecognize the update.20 Mar 08


No.Reviewer Name/Orgn/OfficeSymbol/Phone6 ThomasDavis/SE&I/EN/310-416-8440PageNo.Para #IMPORTANCE(C/S/A)<strong>Comments</strong> <strong>Resolution</strong> <strong>Matrix</strong><strong>IS</strong>-<strong>GPS</strong>-<strong>200</strong>COMMENT/SUGGESTED CHANGE/RATIONALE1 1.2 A Comment: Remove references to previous ICCSuggested Change: Change wording as follows:“ARINC Engineering Services, LLC has been designated.”to“Science Applications International Corporation (SAIC) hasbeen designated…”Rationale: The SE&I is the new ICC for this document.PO RESOLUTION / REVIEWERSCONCURRENCEProject Officer <strong>Resolution</strong>: AcceptSE&I Update: Per EN guidance, uselanguage for the ICC that is noncompanyspecific: “The ICCdesignated by the government…”Concurrence:7 ThomasDavis/SE&I/EN/310-416-84408 Dr. MikeMunoz/SE&I/310-416-8365N/A N/A A Comment: Remove reference to <strong>GPS</strong> Joint Program Office16 3.3.1.6 SSuggested Change: Change wording as follows:“Navstar <strong>GPS</strong> Joint Program Office” & ”JPO”to“Navstar <strong>GPS</strong> Wing (<strong>GPS</strong>W)” & “<strong>GPS</strong>W”Rationale: .The term JPO is no longer used.Comment: The minimum power assumptions are inconsistentwith <strong>IS</strong>-<strong>GPS</strong>-800.Suggested Change: Include a common table of link lossesfor L1, L2 and L5 signals.Rationale: Need for consistency across interface documents.Project Officer <strong>Resolution</strong>: AcceptConcurrence:Project Officer <strong>Resolution</strong>: DeferConcurrence:20 Mar 08


<strong>Comments</strong> <strong>Resolution</strong> <strong>Matrix</strong><strong>IS</strong>-<strong>GPS</strong>-<strong>200</strong>No.Reviewer Name/Orgn/OfficeSymbol/Phone9 MichaelCarrol/SE&I/310-416-8357PageNo.Para #160 Table30-1IMPORTANCE(C/S/A)ACOMMENT/SUGGESTED CHANGE/RATIONALEComment: Table has a typoSuggested Change: Change wording as follows:“Amplitude of the sine harmonic correction term to theargument of latitude”.PO RESOLUTION / REVIEWERSCONCURRENCEProject Officer <strong>Resolution</strong>:Concurrence:to“Amplitude of the cosine harmonic correction term to theargument of latitude”.Rationale: Incorrect term used..20 Mar 08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!