Headquarters U.S. Air ForceI n t e g r i t y - S e r v i c e - E x c e l l e n c e<strong>AFCEE</strong> <strong>Technology</strong> <strong>Transfer</strong><strong>Program</strong> <strong>Update</strong>Mr. David CarrilloHQ USAF/A7CVR6 December 2006


<strong>AFCEE</strong> Technical DirectorateTechnical DirectorateMarty Faile (Acting)BuiltInfrastructure(TDB)Gene MesickNaturalInfrastructure(TDN)Marty FaileRestoration(TDE)Jim GonzalesRange(TDR)Jon HaliscakPBM/PBCTDE TeamsRPO<strong>Technology</strong>ChemistryI n t e g r i t y - S e r v i c e - E x c e l l e n c e2


Environmental <strong>Technology</strong> <strong>Program</strong>• Use technology demonstration & deployment versus R&DLeave R&D to industry, other agencies<strong>AFCEE</strong> dem/val’s COTS or GOTS technologiesunder field conditions – to achieve site closure“<strong>Technology</strong>” refers to new equipment or new processes thatstreamline cleanup operationsMove from high-cost active system technologies to low-cost passivesystem technologiesNo vested interests other than save $ and close sites…creating an adaptive, innovative, and implementable pathforward for Air Force restoration into the futureI n t e g r i t y - S e r v i c e - E x c e l l e n c e3


<strong>AFCEE</strong> Environmental<strong>Technology</strong> <strong>Transfer</strong> Process“Resources”Technical Expertise,Databases,Partnerships, Tools,ProcessesContinuous Feedback<strong>AFCEE</strong>Identify, investigate, and deploy solutionsfor clients’ environmental restoration needsIdentified NeedsMAJOMs, <strong>AFCEE</strong> and <strong>AFCEE</strong>/TDE clients,site visits, databases, surveys, processes, etc.“Clients”MAJCOMs, USAF/ILEV,SAF, Installations, Others<strong>Technology</strong> Insertion ProcessEducationTrainingHost Site for<strong>Technology</strong> DemoExternal FundingExisting SolutionsIdentified throughResourcesSERDP/ESTCP, EPA, NDCEE, DOE, Other<strong>Technology</strong> /Methodology Dem/ValUSAF FundingInvestigate/ValidateNew SolutionHQ USAF/ILEV, MAJCOMs, Installations, OtherExisting <strong>AFCEE</strong> ContractsContractingPartnershipsOther<strong>Technology</strong> <strong>Transfer</strong>I n t e g r i t y - S e r v i c e - E x c e l l e n c e4


<strong>AFCEE</strong> <strong>Technology</strong> <strong>Transfer</strong> –Return on Investment<strong>Technology</strong> (# sites) Savings ROI• Bioremediation / Bioventing (176) $54.0M 5:1• Natural Attenuation (45) $525M 45:1• Internal Combustion Engine (6) $3.5M 2:1• Bioslurper (33) $15.5M 6:1• Risk-Based Site Closure (22) $10.1M 5:1• Diffusion Samplers (18) $2.4M 8:1• Remedial Process Optimization (AF-wide) $120M 12:1• Phytotechnologies (8) $7M 6:1Total Savings - $738MAVG ROI - 11:1Site Closures - 165I n t e g r i t y - S e r v i c e - E x c e l l e n c e5


Enhanced In Situ Bioremediation– Biowalls• Enhanced In Situ Bioremediation (EISB) – Biowalls Significant taxpayer savings when compared toexisting technologies Requires minimal maintenance; can treat TCEplumes at fraction of cost of pump-and-treat Construction costs typically 1/3 of constructioncosts of permeable zero-valent walls Uses simple organic materials, often free (e.g.,tree mulch, agriculture waste products)Nine biowalls installed to date- Altus, Offutt, Dover, Ellsworth, FE Warren,NAS Ft Worth JRB, WhitemanLongest biowall installed to date isAltus AFB at 5,200+ linear ft- $30M avoidance <strong>AFCEE</strong> “how-to manual” due out December 2006I n t e g r i t y - S e r v i c e - E x c e l l e n c e6


<strong>Program</strong> StatusOptimization PotentialFY 2005LTM <strong>Program</strong>s$24,769,23732%MMRP Investigation:239 Sites3%Investigation:1,570 Sites23%23%RIP:752 Sites11%No FurtherAction Response Planned:Action4,293 SitesPlanned:63%4,293 Sites63%All Other SystemsPump & Treat119 SystemsRemediation Systems$51,783,11868%IRP = 6,615 SitesMMRP = 239 SitesERA Cleanup Total = 6,854 Sites74% PROGRAM COMPLETEI n t e g r i t y - S e r v i c e - E x c e l l e n c e


Remedial Action-Operations & LongTerm Monitoring Consolidation• Long Term Monitoring• $24.8M in FY05• Remedial System O&M• $51.8M in FY05• Pump-and-Treat Systems• $25.6M alone• Longest expected operatinglifetime (i.e., 27 yrs)• Regional RA-O/LTMConsolidation• Region 4• Greatest MAJCOM participation• FY07 Performance Based Contract• Regions 1, 2, 3 & 5 in FY08EPA XEPA IXEPA VIIIEPA VIEPA VEPA VIIEPA IEPA IIEPA IIIEPA IVI n t e g r i t y - S e r v i c e - E x c e l l e n c e8


P2 <strong>Technology</strong> Support for theWeapon Systems $5M weapon system pollution prevention (P2)program- Environmentally Advantaged Radar AbsorbingMaterial- Two materials currently undergoing full scale testson F-16 demonstrate 70% & 30% reduction inapplication time; quicker return to the field- Low Temperature Cure Powder Coating- Joint Air Force/Navy project to gain the advantageof low-VOC powder coatings for non-flight criticalcomposite aircraft parts; will reduce over 10,000 lbsof VOCs, plus over $300K in labor/materials- Environmentally Advantaged (LBOD) AircraftDeicing Fluids (ADF)- Demonstrations on KC-135 aircraft prove theeffectiveness of the non-toxic, biodegradable, noncorrosive,cost-effective, drop-in substitute for thepropylene glycol (PG) based deicing fluids <strong>AFCEE</strong>’s partnership with the weapon systemenvironmental community improves theprocess to transition P2 technologies to thewar fighterI n t e g r i t y - S e r v i c e - E x c e l l e n c e9