12.07.2015 Views

English - Project Uday

English - Project Uday

English - Project Uday

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

consultations with ULBs and communities. These would help in identifyingstress/critical areas, and prioritization of same based on the urgency of requiredintervention.d. Identification of DEWATS opportunities in stress areas.o Identification of appropriate DEWATS options for stress areas with respect totechnical, social and financial feasibility.o Formulation of project profiles for stress areas (presentation of DEWATSconcept for a particular stress area)o Prioritization of projects in consultation with local authoritiese. Strategy for implementation of DEWATSo Suggestions on institutional mechanism for ownership, financing, management,implementation, O&M and monitoring of identified DEWATS projects.o Strategy for capacity building requirements for implementation of DEWATSprojects.f. Tech economical conclusion for implementation of DEWATS vis-a-vis centralizedsystemg. A way forward strategy for sustainability of DEWATS with a special reference toarea specific issues2. Implementation of DEWATS options/solutionsf. Preparation of Detailed <strong>Project</strong> Report (DPR) for provision of DEWATSoptions in identified stress areaso This should include conducting feasibility studies, preparation of DEWATSconcept, detailed designs, cost estimation, time plan etc.o Support in preparation of tender document and evaluation of submitted tenders.g. Construction Supervisiono Expert and regular supervision during construction phase to achieve desiredlevel of construction quality.h. Post construction commissioning and monitoringo This should include commissioning of the DEWATS unit, checking offunctioning of DEWATS modules and training on O&M of DEWATS toconcerned ULB staffo Monitoring the performance of the installed system as per the predefined norms.3. Knowledge Transfer, Training and Capacity Buildingi. Customized training catering to needs of state government and urban localbody personnelo Training on <strong>Project</strong> Managemento Training on DEWATS Planning and Designo Training on construction and supervisiono Training on DEWATS commissioning and O&MIt is expected that the training on project management should be generic in nature anddesigned for key decision makers within the state/cities/town, who are responsible forproviding sanitation services at state/city/town level. The training design etc should betailored to the requirement of personnel involved with design, construction and monitoring ofDEWATS components.2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!