12.07.2015 Views

Sprinkler Pump Test Card

Sprinkler Pump Test Card

Sprinkler Pump Test Card

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Sprinkler</strong> <strong>Pump</strong> <strong>Test</strong> <strong>Card</strong>Electric pump test procedure1. (a) Check electrical supply is healthy and indicated on panel.(b) Simulate the pressure reduction of the trunk main by closing the valve on thehydraulic connection to the starting switch and opening, very slowly, the valve onthe drain thereto. This will start the pump. Record the cut-in pressure.(c) Return valves to normal positions.2. Record the current being drawn in amps.3. (a) Record delivery pressure.(b) Open main test valve to obtain sufficient flow to prevent overheating.(c) Check packing gland of pump is sufficiently cooled by water drip.(d) Run for 10 minutes to check pump bearings not overheated.(e) Close main test valve and shut off pump.(f) Ensure that the pump is available for automatic start.ACE European Group Ltd.ACE Building100 Leadenhall StreetLondon EC3A 3BP+44 (0) 20 7173 7000 tel+44 (0) 20 7173 7800 faxRDiesel pump test procedure4. Check the engine oil level and top up with correct oil if necessary.5. (a) Check battery charger is working at correct rate.(b) Check by means of hydrometer that specific gravity is satisfactory.If low, replace battery.(c) Check battery electrolyte level and top up if necessary.6. If the cooling system is of closed circuit type check the water level in the primary systemand top up if necessary.7. (a) Simulate pressure reduction as in 1.(b) above.(b) Return the valves used in 7.(a) above to normal positions.(c) Shut off pump and restart manually.If diesel has closed circuit cooling, open maintest valve to obtain sufficient flow to prevent pump overheating. Run for 30 minutes.8. Check cooling water is circulating and gland sufficiently cooled by water drip.9. Record running speed in r.p.m.10. Record delivery pressure.11. Record engine oil pressure.12. Record engine water temperature.13. Record running hours.14. Shut off pump after 30 minutes.15. Reset automatic start if necessary.Refill fuel tank.To be done towardsthe end of the30 minute runGeneral16. Check level in suction tank.17. Check that pump running alarms operated.18. Check that all valves are secured open or closed as they should be.19. If Alarm Receiving Station, Brigade or Gatehouse alarm connection, check that signalwas received.Please keep completed test cards for future review.


<strong>Sprinkler</strong> <strong>Pump</strong><strong>Test</strong> <strong>Card</strong>ElectricDiesel pump test details1 2 3 4 5 6 7 8Date Cut-in Current Delivery Engine Batteries Coolant Cut-in Coolantpressure amps pressure oil OK water pressure circulatinglevel level levelNameAddressIf water supply or pump is restrictedor shut off, or if alterations toinstallation or pump are to be made,immediate notice must be given toACE European Group Ltd.(see addresses and contact numberson the back of this card).The <strong>Pump</strong>s must be tested weeklyby running the diesel pump for 30minutes and electric pump for 10minutes. Brief details of theprocedure are noted on the frontpage of this document.A representative of the Company willgladly call to explain the procedurein more detail. Before carrying outthe test advise the Alarm ReceivingStation, Fire Brigade, Gatehouse,Works Staff and other necessaryparties.Please complete the followingcolumns on a weekly basis.


General9 10 11 12 13 14 15 16 17 18 19 20Engine Delivery Engine Engine Running 30 minute Fuel Suction <strong>Pump</strong> <strong>Pump</strong> All valves Alarm <strong>Test</strong>ed byspeed pressure oil water hours test tank tank running failure open/ signal (initial)rpm pressure temp. complete full full alarms alarms closed verified


ACE European Group UK and Ireland officesRAberdeen7 Queen’s GardensAberdeen AB15 4YDBelfastArthur House41 Arthur StreetBelfast BT1 4GBBirminghamInnovation CourtInnovation Square121 Edmund StreetBirmingham B3 2HJDublin5 George’s DockIFSCDublin 1Glasgow200 BroomielawGlasgow G1 4RULeeds9 Bond StreetLeeds LS1 2JZLondonACE Building100 Leadenhall StreetLondon EC3A 3BPMaidstoneKent HouseRomney PlaceMaidstoneKent ME15 6LTManchesterThe Zenith Building26 Spring GardensManchester M2 1ABNewcastleSuites 38 & 40Cuthbert HouseCity RoadAll SaintsNewcastle Upon TyneNE1 2ETReadingSuite 6100 Longwater AvenueGreen ParkReadingBerkshire RG2 6GPWatford34 Clarendon RoadWatford WD17 1JJwww.acegroup.com/ukwww.acegroup.ieACE European Group Limited isauthorised and regulated by theFinancial Services Authority in theUnited Kingdom and is regulatedby the Central Bank of Irelandfor conduct of business rules.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!