12.07.2015 Views

km-500mah km-500mwh km-500mrh modular crescent cuber

km-500mah km-500mwh km-500mrh modular crescent cuber

km-500mah km-500mwh km-500mrh modular crescent cuber

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2nd Cycle and after with pump drainIMPORTANTFreeze cycle time is limited to 60 minutes evenif Float Switch does not open.1. Float Switch opens and signals to completefreeze cycle.Drain timer starts counting.2. Drain timer stops counting.Pump drain is completed3. Thermistor reads 48° F.Defrost Timer startscounting.&IMPORTANTWater Valveopening is limited to 6minutes.5. After the first 5 minutes in freeze cycle.Ready to complete freeze cycle when FloatSwitch circuit opens.4. Defrost Timer stops counting.Defrost cycle is completed and freeze cyclestarts.IMPORTANTBoard never accepts freeze completion signalwithin the first 5 minutes in freeze cycle.IMPORTANT1. Board never accepts defrost completionsignal within the first 2 minutes in defrostcycle.2. Defrost cycle time is limited to 20 minuteseven if Defrost Timer does not stop counting.19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!