12.07.2015 Views

Mr. Hayward Alto - The SABIT and Cohran Exchange Program

Mr. Hayward Alto - The SABIT and Cohran Exchange Program

Mr. Hayward Alto - The SABIT and Cohran Exchange Program

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• Sabit <strong>Program</strong>– <strong>Exchange</strong> <strong>Program</strong>s– 2012 <strong>Program</strong>s– Requirements• Cochran <strong>Program</strong>– History– Goals– <strong>Program</strong>• ContactAgendaU.S. Embassy Chisinau


W → eν <strong>and</strong> Z → ee, <strong>and</strong> an aligned tracking system. In 10 pb −1 , only 10 5 W<strong>and</strong> 15000 Z decays are available, not sufficient for the calibration of the 75000crystals.<strong>The</strong> trigger system in the 2007 pilot run should present a nominal L1trigger, apart from the eta coverage <strong>and</strong> the reduced 12.5 kHz rate. ConcerningHLT, the absence of the Pixel system will probably limit its application forphysical studies. Moreover, since the priority is detector commissioning <strong>and</strong>underst<strong>and</strong>ing, the HLT table will be focused on calibration, allowing minimumbias events, high p T single electrons, muons <strong>and</strong> gammas, <strong>and</strong> jets with highE T . No official decision has been taken, but these “easy” objects should allow atimely commissioning of the various subdetectors, at the expenses of a physicsprogram which would be in any case difficult to fulfil. In principle, alreadyin 10 pb −1 more t¯t are produced than in any previous experiment, but theabsence of a Pixel system <strong>and</strong> thus of a reliable b-tagging does not allow anymeasurements 3) .4 ConclusionsDuring the first LHC Pilot run, scheduled in 2007, the CMS Collaboration willundergo the commissioning of the various CMS subdetectors,in order to reachdesign performance. <strong>The</strong> pilot run will probably not be sufficient for a properTracker alignment <strong>and</strong> ECAL calibration, which will be reached only duringthe 2008 physics run, with the final detector configuration including Pixels<strong>and</strong> ECAL endcap. Physics will probably have to wait for 2008, when the fullperformance of the CMS detector should be available.References1. <strong>The</strong> CMS Collaboration, “<strong>The</strong> Compact Muon Solenoid TDR”,CERN/LHCC 94-38 (1994).2. <strong>The</strong> CMS Collaboration, “Data Acquisition <strong>and</strong> High Level Trigger TDR”,CERN/LHCC 2002-26.3. <strong>The</strong> CMS Collaboration, “<strong>The</strong> CMS Physics TDR”, to be published.


<strong>Exchange</strong> Groups for 2013<strong>Program</strong>Progam DatesApplicationDeadline:Energy Efficiency in Construction January 12 – February 9, 2013 CompletedDairy Processing & Packaging January 19 – February 9, 2013 CompletedMunicipal Water Infrastructure March 16 – April 13, 2013 CompletedIPR: Technology CommercializationMarch 16 – April 6, 2013CompletedCold Chain Storage & Transport, <strong>Program</strong> Dates April 27 – May 11, 2013 CompletedTourism: Destination Development & Marketing June 8 – 29, 2013 CompletedHotel Management June 8 – 29, 2013 CompletedAssociations: SME Development August 24 - September 14, 2013 24/05/2013Fruit & Vegetable Processing & Packaging August 31- September 28, 2013 31/05/2013U.S. Embassy Chisinau


Requirements for C<strong>and</strong>idacy•For middle <strong>and</strong> senior level in positions that allow them tomake changes in enterprises, <strong>and</strong> have the motivation for thisafter-acquired their experience in the program.• Generally, professionals should have connected education<strong>and</strong> five years of experience in the field.U.S. Embassy Chisinau


Requirements for Application•Answers to questions should be complete, but the goalsshould be sufficiently clear.• Questionnaire filled out in Russian <strong>and</strong> English• In addition, a summary, a copy of the first / main page ofyour passport, a copy of the diploma <strong>and</strong> a letter ofrecommendationU.S. Embassy Chisinau


Do you have an interest in the businessprogram in the U.S.?contact:Irina Podsushnaya(7 495) 728 51 36Irina.Podsushnaya @ trade.govAnd visit our online pagewww.sabitprogram.orgwww.trade.gov/sabitwww.facebook.com/<strong>SABIT</strong><strong>Program</strong>U.S. Embassy Chisinau


U.S. Embassy Chisinau


‣short-term training, two to three weeks‣meet with professionals‣participate in field observations <strong>and</strong> industry visits‣attend courses <strong>and</strong> seminarsU.S. Embassy Chisinau


Cochran Fellowship <strong>Program</strong>Selection Procedures:• <strong>The</strong> U.S. Embassy announces programs (June-August).• Applications are required to be completed inEnglish (preferably typed) <strong>and</strong> submitted to theUS Embassy (August).• A final pool of applicants will be selected <strong>and</strong>interviewed during a country visit by a programmanager (September).U.S. Embassy Chisinau


Cochran Fellowship <strong>Program</strong>Selection Procedures:‣Final approval of c<strong>and</strong>idates is made by a USDA committeeon the basis of a c<strong>and</strong>idate's qualifications,recommendations, interview, <strong>and</strong> country specific trainingneeds (October-November).‣USDA notifies U.S. Embassy of recipients. U.S. Embassynotifies recipients (October-November).U.S. Embassy Chisinau


Cochran Fellowship <strong>Program</strong>Valentina RobertsonEconomic SpecialistUS Embassy ChisinauRobertsonVV@state.govTelephone: (22) 40 84 11U.S. Embassy Chisinau


Cochran Fellowship <strong>Program</strong>For more information, contact:Cochran Fellowship <strong>Program</strong>USDA/FAS/ICD/Food Industries Division14th <strong>and</strong> Independence Avenue, SWWashington, DC 20250-1086Internet:www.fas.usda.gov/icd/cochran/cochran.aspTelephone: (202) 690-1734Fax: (202) 690-0349E-mail: CochranFellowship@fas.usda.govU.S. Embassy Chisinau


How to contact us:chisinaucommerce@state.govU.S. Embassy Chisinau

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!