Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 1: Key to the decision process for the repair of potholesKey Defect Repair action Go to1Surfacing is asphalt 2Surfacing is thin bituminous seal 42Pothole is deeper than asphalt wearingcourseBottom of pothole is within asphalt wearingcourseShallow asphalt (HMA or cold mix)33Pothole caused by cracking due to fatigue ofasphaltPothole caused by localised surface wateringress with no associated crocodile crackingDeep repair after sub-soil drainageinstallationMedium-depth asphalt repair45678Pothole has exposed an unstabilised base 5Pothole has exposed a stabilised base 10Pothole is not associated with cracks 6Pothole is associated with cracks 8Pothole affects seal and top of baseonly (< 50 mm)Shallow surface repairPothole extends > 50 mm into base 7Pothole affects only the baseMedium-depth repairPothole extends below the base 8Pothole does not affect entire pavementstructure (only base and sub-base)Medium-depth or deep repairPothole affects entire pavement structure 99Pothole is the result of saturated subgrade orsupportPothole is the result of poor material – noevidence of excessive subsoil waterDeep repair after sub-soil drainageinstallationDeep repair10Top of base has carbonated and is weak 11Top of base has not carbonated excessivelyand is still strongShallow surface repair11Pothole is associated with crocodile crackingPothole is not associated with crocodilecrackingDeep repairMedium-depth repair25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!