To contribute towards thedevelopment<strong>of</strong> prosperous Pakistan by managingsmooth and economical Transmissionand Despatch System with pr<strong>of</strong>essionalexcellence and zeal.


National Transmission and DespatchCompany Ltd. aims to be the best electricityTransmission Company maintaining highlyefficient standards, uncompromising onTransmission System reliability and safety andcommitted to become the best serviceprovider to the power producers, distributioncompanies and bulk power consumersconnected to its Network.


<strong>NTDC</strong> was granted Transmission License No.TL/01//2002on 31st December 2002 by NEPRA to engage in theexclusive transmission business for a term <strong>of</strong> thirty (30)years, pursuant to Section 17 <strong>of</strong> the Regulation <strong>of</strong>Generation, Transmission and Distribution <strong>of</strong> ElectricPower Act, 1997. Under the regime set out in the License,the Company is entrusted to act as:-• System Operator (SO)• Transmission Network Operator (TNO)• Central Power Purchasing Agency (CPPA)• Contract Registrar and Power ExchangeAdministrator (CRPEA)


<strong>NTDC</strong> was incorporated on 6th November, 1998and commenced commercial operation on March I, 1999.It was organized to take over all the properties, rightsand assets, obligations and liabilities <strong>of</strong> 220 kV and500kV Grid Stations and Transmission Lines/Networkowned by WAPDA. Presently, <strong>NTDC</strong> operates andmaintains the following Network System:• 27 Nos. 220 kV Grid Stations, 7,359 km <strong>of</strong> 220 kV lines• 12 Nos. 500 kV Grid Stations, 5,077 km <strong>of</strong> 500 kV lines39 Nos. 12,436 Km


Addition <strong>of</strong> Transmission lines &transformation capacity <strong>of</strong> <strong>NTDC</strong> system foreconomical, reliable & efficient operation <strong>of</strong>evacuation <strong>of</strong> power from power plants &delivery to the Distribution Companies(DISCOs) and bulk power consumers at theirload centres.


The Grid System Operation (GSO) is a functional tier <strong>of</strong> TNO,maintaining 39 Grid Stations <strong>of</strong> 500 kV and 220 kV level and12,436 Km long transmission lines linking various powerstations ti to load centers throughh following four 4 (GSO)regions:• Lahore ,• Islamabad,• Multan and• HyderabadThe GSO system is used for transportation <strong>of</strong> electricity fromgeneration units to DISCOs and Bulk Power Consumers (BPCs).This system spreading all over the country is beingmaintained properly and efficiently. The GSO regions areavailing technical services from Technical Services Group(TSG) and System Protection (SP) based in Lahore.


ROUSCH MU ULTAN SAHIWAL500kVGATTI<strong>NTDC</strong> 500kV & 220kV SYSTEM (NORTHERN)500kVLAHORE500kVGAKHAR500kVREWAT500kVGHAZI BROTHA1450 MW500kVTARBELA3478 MW500kVPESHAWAR3X600MVA3X450MVA3X450MVA2X450MVASAMU NDRIROA AD3X450MVA220kVNISHATABAD3X600MVA220kVRAVI220kV NKLP220kVBUND ROAD220kVK.S.K220kVSIALKOT220kV 220kVGAKHAR MANGLA1000 MW220kVISPR220kVBURHAN220kVMARDAN3X160MVA 3X160MVA 3X160MVASAHIWAL220kVJWR FBD4X63.5 MVA1X100 MVA3X160MVA4X160MVA4X160MVA3X160MVA300 MW3X160MVA220kVCHASHMA220kVDAUD KHEL2X160MVA3X160MVASAHIW WAL2X160MVA220kVSARFRAZNAGAR2X160MVA220kVBANNU3X160MVA2X160MVA1X315 MVA3X160MVA3X160MVA2X160MVA2X160MVA


•Strict follow up <strong>of</strong> maintenance schedule as per system operatingprocedures.•Use <strong>of</strong> updated protection & SCADA System with suitable back-up.• Measures to control the reactive power deficit with theinstallation <strong>of</strong> Flexible AC Transmission System (FACTS) devicese.g. SVC etc.•Adherence <strong>of</strong> N-1 contingency criteria while allowing shut downsespecially on 500 kV Auto Transformers and Transmission Lines.•Increase in frequency <strong>of</strong> cleaning/ washing <strong>of</strong> grid stationsequipment and disc insulators <strong>of</strong> transmission lines in thepolluted areas.•Providing <strong>of</strong> additional cooling arrangements to increase theloading capacity <strong>of</strong> power transformers.


•Regular replacement <strong>of</strong> defective/broken disc insulators,towers and repairing <strong>of</strong> broken strands <strong>of</strong> conductor.•Increase in patrolling <strong>of</strong> transmission lines in the troubledareas to pin points the defects for timely rectification.•Maximum shutdown arrangements in low load flow seasonfor preventive maintenance <strong>of</strong> the system.•Provision <strong>of</strong> sufficient stock <strong>of</strong> material/spares forreplacement.•Detail Checking <strong>of</strong> protection system settings for properoperation.• Frequent approach to administrative set-up in the troubledFrequent approach to administrative set up in the troubledareas for developing liaison against miscreants.


The Code <strong>of</strong> Corporate Governance as stipulated by SECP, and so far as itapplies to <strong>NTDC</strong>, is being complied with.• <strong>NTDC</strong>, normally conduct Meetings <strong>of</strong> BOD as per Company Ordinance.• Significant issues placed for decision by the BOD include:•Annual PSDP, and Operational budgets;•Annual Financial Statement <strong>of</strong> <strong>NTDC</strong> and Management letters issued bythe commercial auditors;•All cases relating to acceptance <strong>of</strong> Tender for execution <strong>of</strong> Works,Purchase <strong>of</strong> store material beyond the financial powers <strong>of</strong> CEO <strong>NTDC</strong>.•Write <strong>of</strong>f <strong>of</strong> amounts due to failure in recoveries on account <strong>of</strong> tradedebts,•Write-<strong>of</strong>f <strong>of</strong> losses beyond the competency <strong>of</strong> the CEO;•Status and implications <strong>of</strong> any law suit or proceedings <strong>of</strong> materialnature, filed by oragainst the company;• The CFO and the Company Secretary attend BOD meetings• <strong>NTDC</strong> has established audit committee as required in the code <strong>of</strong>• <strong>NTDC</strong> has established audit committee as required in the code <strong>of</strong>corporate governance.


• STRENGTH<strong>NTDC</strong> is a major player in the National Power System and solelicensee <strong>of</strong> transmission <strong>of</strong> electricity from power producers toDistribution Companies.• WEAKNESSESExisting infrastructure t and facilities are inadequateto cater to therequirement <strong>of</strong> evacuation <strong>of</strong> power from future hydel and coalresources in the country.• OPPORTUNITIESCompany is open to take long term finances from local as well as frominternational financial institutions to upgrade its system.• THREATSThe fluctuation in demand (MW) due to seasonal changes and powershortages may reduce its recovery <strong>of</strong> revenue requirements.


Objectives / Targets Based on SWOT Analysis• Corporate ObjectiveEconomical, reliable & efficient operation <strong>of</strong> system on pr<strong>of</strong>itable basis.• Financial ObjectiveAll corporate and financial requirements are fully complied with rules &regulations• Technical Operations ObjectiveTo strengthen its transmission system for providing reliable electricpower from generation plants to distribution companies/Bulk PowerConsumers.• Commercial Operation ObjectiveTo ensure Commercial viability <strong>of</strong> the company by facilitating thepresent & future demand <strong>of</strong> electricity, its growth and tariff forecast.• Manpower <strong>Plan</strong>ning ObjectiveTo keep the best human resource and provide training to cope with thefuture demand and challenges given the future Hydro Electric projects inthe North and Thermal and Coal projects in the South <strong>of</strong> the country.• Procurement <strong>Plan</strong>ning Objective<strong>NTDC</strong> follows quality procurement procedures and maintain adequateinventory levels both for existing and running projects at the lowestpossible cost.


• Operational & Maintenance Cost <strong>of</strong> the system• Debt Servicing for <strong>NTDC</strong> System expansion• Return on Equity & plough back to enhance the<strong>NTDC</strong> System


The results projected by <strong>NTDC</strong> have the followingcharacteristics:•The targetst to be achieved are based on realisticassumptions for future projections.•The inflationary impact has been taken into accountwhile preparing these projections.•Future growth <strong>of</strong> 5 % in peak demand is also included inFuture growth <strong>of</strong> 5 % in peak demand is also included inaction plan <strong>of</strong> the company.


NEPRA has started disallowing T&T losses beyond 2.5% from Jan-2010.We have included this matter in the tariff petition as a separatecomponent in Line with the last tariff determination


(Mln.Rs.)


Mln.Rs.)


(Mln.Rs.)


(Mln.Rs.)