Searle Gulch Remediation 2006-8‣ Cost $2.3 Million (2006-7)‣ 200,000 cy of Acid Waste Rock Removed‣ 4,200 cy of Clean Topsoil UsedBEFORE‣ 2,100 cy of Biosolids Used‣ 2,500 cy of Topsoil Recovered for Future‣ 620 Tons of ag Lime Used‣ 127 Gabions Installed at Iron Prince‣ Approx. 20 Acres SeededAFTER34