12.07.2015 Views

River South Esk Special Area of Conservation (SAC) - The Food and ...

River South Esk Special Area of Conservation (SAC) - The Food and ...

River South Esk Special Area of Conservation (SAC) - The Food and ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Key information normally required1. A Construction Method Statement (CMS) whichshould include:− pollution prevention safeguards, including drainagearrangements <strong>and</strong> the possible use <strong>and</strong> capacity <strong>of</strong>siltation traps, settlement tanks, <strong>and</strong> bunds;− storage <strong>and</strong> disposal <strong>of</strong> materials, including the siting <strong>of</strong>stock piles, use <strong>of</strong> buffer strips <strong>and</strong> disposal methods;− construction site facilities, including extent <strong>and</strong> location<strong>of</strong> construction site huts, vehicle equipment, <strong>and</strong>materials compound;− timing, duration <strong>and</strong> phasing <strong>of</strong> construction, particularlyin relation to salmon migration/spawning an avoidance<strong>of</strong> periods <strong>of</strong> seasonally highest rainfall to sensitiveelements <strong>of</strong> construction.Please see Annex A for detailed information on the CMS.2. Details <strong>of</strong> surface water discharges, for exampleSustainable Urban Drainage Systems.3. Sewage treatment arrangements− Water quality needs to be maintained below 0.03mg/lSRP anywhere in the river. <strong>The</strong> threshold for thisis already close to being breached downstream <strong>of</strong>Brechin, therefore any development upstream in thecatchment can have an adverse effect downstreamwhich may lead to the SRP threshold being exceeded.− If it is not proposed to link the development to themains sewage system, it needs to be demonstratedthat the discharge will not result in the 0.03mg/l SRPthreshold being breached.Further detailsMore information on the <strong>River</strong> <strong>South</strong> <strong>Esk</strong> <strong>SAC</strong> includingits conservation objectives can be found on the SNHwebsite via SiteLink: http://gateway.snh.gov.uk/portal/page?_pageid=53,910305,53_910314&_dad=portal&_schema=PORTAL&PA_CODE=8364&NEW_WINDOW=falseSNH, SEPA <strong>and</strong> Angus Council are working closely toprotect the interests <strong>of</strong> the <strong>River</strong> <strong>South</strong> <strong>Esk</strong> <strong>SAC</strong>, <strong>and</strong>are happy to assist you where required in submitting yourapplication, including pre-application discussion.ContactsAngus Councilwww.angus.gov.ukDevelopment management, County Buildings, MarketStreet, Forfar, Angus DD8 3LGplanning@angus.gov.ukScottish Environment Protection Agencywww.sepa.org.ukSEPA planning service (planning application input)planning.perth@sepa.org.ukSEPA local regulatory team (regarding authorisations)DL-dundee<strong>and</strong>angus@sepa.org.ukScottish Natural Heritagewww.snh.gov.ukWest Lodge, Airlie, by Kirriemuir, Angus DD8 5NPTel: 01575 530333Tayside_Grampian@snh.gov.uk− It should be demonstrated that sediment enteringthe river that could affect freshwater pearl musselpopulations can be avoided.4. Locations <strong>of</strong> any outfalls, details <strong>of</strong> timing <strong>and</strong>the method <strong>of</strong> installation should be provided with theapplication including the relevant Construction MethodStatement (see 1 above).5. For any work within the river channel, it may benecessary to undertake a freshwater pearl musselsurvey. SNH can provide advice on whether a freshwater pearl mussel survey is required <strong>and</strong> has preparedguidance on survey requirements for freshwater pearlmussels:http://www.snh.gov.uk/docs/A372955.pdf6. Further information may need to be provided onother habitats <strong>and</strong> species in the immediate vicinity insupport <strong>of</strong> your application (e.g. water voles, bats <strong>and</strong>otters). <strong>The</strong> planning authority or SNH can advise onfurther surveys required.<strong>The</strong>re may also be a requirement for additional informationdepending on the nature <strong>of</strong> the development.8 <strong>River</strong> <strong>South</strong> <strong>Esk</strong> <strong>Special</strong> <strong>Area</strong> <strong>of</strong> <strong>Conservation</strong> (<strong>SAC</strong>) Advice to planning applicants

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!