CETOP RE 2000-01 - CETOP European Fluid Power
CETOP RE 2000-01 - CETOP European Fluid Power
CETOP RE 2000-01 - CETOP European Fluid Power
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
components (involving planning and preparation).CommissioningPreparing a system for ‘active duty’, setting up of the component parts tomeet a performance specification.ModificationProcedures to be followed when alterations are made to a system forexample, the need to update technical documentation and theperformance specification to ensure that any modifications are incompliance with the manufacturers specification and all requirements tohealth and safety.Recommendations Reports relating to system improvements specific to afor improvement particular aspect of its performance, maintenance safety and operationalmanagement.Health (condition) Procedures set up to determine system and componentmonitoring performance that meets the operation of the specification with referenceto: -• <strong>Fluid</strong> condition to meet target cleanliness levels.• Noise and vibration.• Temperature.• General leakage.• Documentation & report.PerformancemonitoringProcedures set up to determine that system and componentperformance meets the required operation specification with reference to:-• Pumps – Q/P testing.• Actuator speeds.• Operational pressures.• Documentation & report.Interpretation ofresultsRoutinemaintenancePro-active/predictivemaintenanceReferring to health and performance monitoring, translatingresults into an action plan with clear ‘outcome objectives’ as part of thepro-active maintenance programme.Maintenance activities that are time based – daily, weekly,monthly etc and follow a ‘set checklist’ approach.Maintenance activities carried out as part of a plan forcontinued improvement and/or relating to specific conditionmonitoring.-13-