12.07.2015 Views

Download Operating Instructions / Spare Parts List - HE-VA

Download Operating Instructions / Spare Parts List - HE-VA

Download Operating Instructions / Spare Parts List - HE-VA

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UK Front-Pakker 1.5 m / 1.65 m / 2.6 m / 3.0 m / 4.0 m / 6.0 m 01/03-2012Un- and couplingThe Front-Pakker is equipped with 2 supporting legs whichmust be lowered when the machine is uncoupled. The ringtype determines which hole is to be used.Before uncoupling, a possible mounted Spring-Board mustbe lifted and the hydraulic system is to be de-pressurized.Furthermore, the Front-Harrow must be lifted so that theweight of the Front-Packer does not rest on the tine of theharrow but on the supporting legs.TransportFor transport, the wing sections are to be lifted. The bolts at the cylinders are to be adjusted so thatthe wing sections are vertical (fig. 1A). Hereafter, the mechanical locking bar (fig. 1B) is to bemounted for reasons of failure in the hydraulic system. Moreover, the built-in transport lock mustbe locked, to prevent the packer from swaying around during transport (fig 1C).7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!