01.12.2012 Views

EGlINTON - City of Wanneroo

EGlINTON - City of Wanneroo

EGlINTON - City of Wanneroo

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Objective Strategy Post Structure Plan Actions<br />

C6 Promote the provision Early provision <strong>of</strong> community facilities Develop strategies for early provision and funding <strong>of</strong><br />

<strong>of</strong> community facilities and services that meet the needs <strong>of</strong> community facilities and services<br />

and services that meet<br />

the needs <strong>of</strong> the<br />

community<br />

the community<br />

Develop community services<br />

structured around Eglinton District<br />

Centres, Coastal Villages,<br />

Neighbourhood Centres/Nodes, “bus<br />

stop” nodes<br />

Develop partnerships with service providers<br />

Subdivision design to accommodate necessary<br />

services and amenities<br />

Water<br />

Objective Strategy Post Structure Plan Actions<br />

WCM1 Promote more<br />

efficient use <strong>of</strong><br />

water<br />

WCM2 Develop integrated<br />

water<br />

management<br />

strategies to<br />

increase water<br />

efficiency<br />

Water Management at the<br />

District Scale<br />

61/25198/98570<br />

Investigate and develop<br />

feasible water efficiency<br />

initiatives:<br />

Energy and Greenhouse Gases<br />

Allow for water sensitive<br />

urban design to replenish<br />

superficial aquifer<br />

Investigate and develop<br />

alternative water sources<br />

for irrigation and<br />

nondrinking water uses<br />

Development <strong>of</strong> district<br />

wide management strategy<br />

Objective Strategy Post Structure Plan Actions<br />

E&G1 Reduce private<br />

transport<br />

emissions<br />

Develop integrated primary<br />

and secondary transport<br />

network<br />

Eglinton Local Structure Plan<br />

Sustainability Strategy<br />

Seek partnership with Water Corporation on Waterwise Homes<br />

program<br />

All front yard landscaping installed by the Developer shall be<br />

Waterwise<br />

Ensure Design Guidelines cover fixtures and fittings, garden<br />

design and irrigation systems<br />

BMPs to be developed for subdivision design<br />

UWMP to be prepared to support subdivision application<br />

Progress concept design and dialogue with Water Corporation<br />

and Dept <strong>of</strong> Water<br />

Convene a steering group <strong>of</strong> key stakeholders (including DoW,<br />

WaterCorp, <strong>City</strong> <strong>of</strong> <strong>Wanneroo</strong>)<br />

Prepare a District Water Management Strategy<br />

Prepare a groundwater allocation plan<br />

Concept design for a non-potable water supply (subject to<br />

feasibility assessment, approvals and issue <strong>of</strong> a non-potable<br />

water licence).<br />

Design Special Transport System stops, inclusive <strong>of</strong> pedestrian<br />

routes, shelter areas, provision for CCTV/IT systems. Integrate<br />

stops within high intensity surrounding land activity<br />

Conformation and detailed development <strong>of</strong> safe walking and<br />

cycling routes integrated with the movement network<br />

Detailed multimodal design <strong>of</strong> key precincts including all activity<br />

centres to mitigate traffic speeds, support active streetscapes and<br />

provide regular, safe street crossing points<br />

A detailed car parking supply and management plan for the<br />

Marina Village (Precinct 1) and Eglinton district centre<br />

Pulse timetabling <strong>of</strong> public transport to integrate the STS with the<br />

metro rail<br />

Investigate car sharing Investigate car sharing in conjunction with <strong>City</strong> <strong>of</strong> <strong>Wanneroo</strong> and<br />

private sector partners

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!