12.07.2015 Views

S08_E21_isle_of_eigg.ppt Island Electricity Generation: Isle of Eigg,

S08_E21_isle_of_eigg.ppt Island Electricity Generation: Isle of Eigg,

S08_E21_isle_of_eigg.ppt Island Electricity Generation: Isle of Eigg,

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Handouts <strong>of</strong> presentation: <strong>Island</strong> <strong>Electricity</strong> <strong>Generation</strong>: <strong>Isle</strong> <strong>of</strong> <strong>Eigg</strong>, Jaise Kuriakose, CAT, UK<strong>Island</strong> <strong>Electricity</strong> <strong>Generation</strong><strong>Isle</strong> <strong>of</strong> <strong>Eigg</strong>Jaise KuriakoseCentre for Alternative TechnologyEnergy 21 – ‘Community Energy Transition’ SeminarAugust 16-18, 2008, CAT, Wales, UK<strong>Isle</strong> <strong>of</strong> <strong>Eigg</strong>• 8 km x 6 km 10 miles west coast <strong>of</strong> scotland• Population 87• 45 residential properties and 5 commercialproperties• The <strong>Isle</strong> <strong>of</strong> <strong>Eigg</strong> Heritage Trust was formed in1997-<strong>Island</strong> residents, highland council and scottish wildlife trusthttp://www.inforse.org/europe/seminar08_Energy21.htm<strong>Island</strong> Electrification Project• <strong>Island</strong> was relying on age old diesel generators• <strong>Eigg</strong> Electric was formed as a subsidiary companyunder the trust.• New <strong>Island</strong> Electrification project operational onFebruary 2008Finance• The total cost <strong>of</strong> the scheme was £1.6 million.• European Regional Development Fund, Big Lottery,Highlands & <strong>Island</strong>s Enterprise, HIE Lochaber,Highlands and <strong>Island</strong>s Community Energy Company,Scottish Community Household RenewablesInitiative, Energy Saving Trust, Highland Council,<strong>Isle</strong> <strong>of</strong> <strong>Eigg</strong> Heritage Trust & The Residents <strong>of</strong> the<strong>Isle</strong> <strong>of</strong> <strong>Eigg</strong>.• Voluntary effort by the islanders with the help <strong>of</strong>Scottish Hydro and various contractors.<strong>Island</strong> Electrification SystemWind turbines• integration <strong>of</strong> multiple renewable energy sources-Wind, hydro and solar• Each <strong>of</strong> these sources has been sensitively sitedto cause minimum visual and physical impactupon the island• 11km <strong>of</strong> buried high voltage cable• Limited the demand with the approval <strong>of</strong> theresidents; domestic and small business supplieshave been capped at 5kW, and larger businesssupplies at 10kW.4 Nos. <strong>of</strong> 6 kWProven wind turbines• <strong>Electricity</strong> charges are collected via pre-paymentcard operated meters.Energy 21 – ‘Community Energy Transition’ – INFORSE-Europe Seminarwith support from EC, DG Environment Civil Society Support & CATAugust 16-18, 2008, CAT, Wales, UKhttp://www.inforse.org/europe/seminar08_Energy21.htm 1


Handouts <strong>of</strong> presentation: <strong>Island</strong> <strong>Electricity</strong> <strong>Generation</strong>: <strong>Isle</strong> <strong>of</strong> <strong>Eigg</strong>, Jaise Kuriakose, CAT, UKHydro ElectricThe major renewable energy source is a 100kWHydro Electric Generator.This is supported by two smaller Hydro ElectricGenerators <strong>of</strong> 10kW and 9kW.Independent hydro schemesSolar Photovoltaic• 10 kW PV<strong>Electricity</strong> DistributionControl RoomTwelve Sunny <strong>Island</strong> 5kW inverters are usedconnected in four three phase clusters to give atotal output rating <strong>of</strong> 60kW.A MultiCluster Box communicating invertersand provides contactors for the connection tothe island grid and the back-up generator.Energy 21 – ‘Community Energy Transition’ – INFORSE-Europe Seminarwith support from EC, DG Environment Civil Society Support & CATAugust 16-18, 2008, CAT, Wales, UKhttp://www.inforse.org/europe/seminar08_Energy21.htm 2


Handouts <strong>of</strong> presentation: <strong>Island</strong> <strong>Electricity</strong> <strong>Generation</strong>: <strong>Isle</strong> <strong>of</strong> <strong>Eigg</strong>, Jaise Kuriakose, CAT, UKControl RoomBatteriesEach cluster is connected to a 48V 2242 Ah (C10)battery bank consisting <strong>of</strong> 24 batteriesMetering SystemCentre for Alternative Technologywww.cat.org.uktel (+44)1654 705968Jaise KuriakoseEnergy 21 – ‘Community Energy Transition’ – INFORSE-Europe Seminarwith support from EC, DG Environment Civil Society Support & CATAugust 16-18, 2008, CAT, Wales, UKhttp://www.inforse.org/europe/seminar08_Energy21.htm 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!