12.07.2015 Views

Practice of Pile Foundation Treatment Based on ZSOIL.PC

Practice of Pile Foundation Treatment Based on ZSOIL.PC

Practice of Pile Foundation Treatment Based on ZSOIL.PC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<str<strong>on</strong>g>Practice</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Pile</str<strong>on</strong>g> <str<strong>on</strong>g>Foundati<strong>on</strong></str<strong>on</strong>g> treatmentChallenge• According to the c<strong>on</strong>structi<strong>on</strong> records, 200+ piles are shorter than designlength (30m)• Irregularly distributed “hard layer” may be the reas<strong>on</strong>7.07.57.06.86.86.96.97.27777.17.1776.7 6.7 6.9 6.8 6.36.96.86.86.76.86.87 7 76.26.26.96.9 6.6 6.8 6.17 777 7.47.1 7 7 7 7 7.2 7.27.36.46.4 6.5 6.8 6.66.36.77.27.27.27.57.17.27.17.36.66.87.57.67.5 7.5 7 7.2 7.27.6 7.77.1 7.27.47.27.267.6 7.8 7.7 7 7.1 7.2 7.16.96.87.77.77.5 7.5 7.3 7.5 7.4 7.36.3 6.3 6.36.46.97.57.6 7.3 7.3 7.4 7.3667.57.47.3 7.5 7.4 7.5 7.36.86.76.76.46.56 6.679 piles are 7~8m shorterthan design length49 piles are 6~7m shorterthan design length

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!